ML16306A081
From kanterella
Jump to navigation
Jump to search
Similar Documents at Clinton | |
---|---|
Category:Drawing
MONTHYEARML22111A1982022-03-31031 March 2022
[Table view]2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML17354A2052017-12-20020 December 2017 Revision 19 to Updated Safety Analysis Report, Chapter 3, Figure 3.6-1 Through Figure 3.11-16, Part 5 of 5 (Redacted) ML16306A0812016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 ML16306A0792016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 70 of 111 to 3.6-1, Sheet 82 of 111 ML16305A3112016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 43 of 111 to 3.6-1, Sheet 49 of 111 ML16306A0772016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 56 of 111 to 3.6-1, Sheet 62 of 111 ML16306A0832016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 101 of 111 to 3.6-1, Sheet 111 of 111 ML16306A0802016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 83 of 111 to 3.6-1, Sheet 94 of 111 ML16306A0782016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 63 of 111 to 3.6-1, Sheet 69 of 111 RS-16-196, Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 1112016-10-31031 October 2016 Clinton - Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 95 of 111 to 3.6-1, Sheet 100 of 111 ML16305A3122016-10-31031 October 2016 Updated Safety Analysis Report (Usar), Revision 18, Chapter 3 - Design of Structures, Components, Equipment, and Systems, Figure 3.6-1, Sheet 50 of 111 to 3.6-1, Sheet 55 of 111 RS-13-157, Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-07-0303 July 2013 Response to Request for Additional Information - Overall Integrated Plan in Response to Commission Order Modifying License Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) RS-13-009, Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-302013-01-10010 January 2013 Clinton, Unit 1, Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 ML13016A3322013-01-10010 January 2013 Updated Safety Analysis Report, Revision 15, Chapter 4 - Table of Contents Through Figure 4.6-30 ML0709302592005-01-31031 January 2005 Cps/Usar, Chapter 15, Accident Analyses, Revision 11 ML0709303642005-01-31031 January 2005 Cps/Usar, Appendix F, Fire Protection Safe Shutdown Analysis, Revision 11 ML0709303622005-01-31031 January 2005 USAR, Figure 1 Through Figure 22 ML0709303612005-01-31031 January 2005 Cps/Usar, Fire Protection Evaluation Report, Revision 11 ML0709303602005-01-31031 January 2005 Cps/Usar, Appendix D, Requirements Resulting from TMI-2 Accident, Revision 11 ML0709202042005-01-31031 January 2005 Cps/Usar, Chapter 4, Reactor, Revision 11 ML0709202062005-01-31031 January 2005 Cps/Usar, Chapter 5, Reactor Coolant System and Connected System, Revision 11 ML0709302252005-01-31031 January 2005 Cps/Usar, Chapter 6, Engineered Safety Features, Revision 11 ML0709302282005-01-31031 January 2005 Cps/Usar, Chapter 7, Instrumentation and Control Systems, Revision 11 ML0709302292005-01-31031 January 2005 Cps/Usar, Chapter 8, Electric Power, Revision 11 ML0709302362005-01-31031 January 2005 Cps/Usar, Chapter 10, Steam and Power Conversion System, Revision 11 ML0709302452005-01-31031 January 2005 Cps/Usar, Chapter 12, Radiation Protection, Revision 11 ML0709302532005-01-31031 January 2005 Cps/Usar, Chapter 13, Conduct of Operations, Revision 11 ML0709302542005-01-31031 January 2005 Cps/Usar, Chapter 14, Initial Test Program, Revision 11 ML0709303592005-01-31031 January 2005 Cps/Usar, Appendix C, Computer Programs, Revision 11 ML0327306192003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33 ML0327306182003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5 ML0327306172003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-12 Through 2.4-19 ML0327306162003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11 ML0327306152003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1 ML0327306132003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Figures 2.1-20 Through Plate 1 ML0327306102003-09-25025 September 2003 Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-12 Through Figure B-2-2 ML0327216042003-09-25025 September 2003 Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-7 Through 2.3-15 2022-03-31 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24092A3452024-04-0101 April 2024
[Table view]Updated Safety Analysis Report (Usar), Revision 23 ML22216A2212022-05-19019 May 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 1 of 2_Redacted ML22111A2152022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML22111A2002022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 4 of 5 ML22111A1962022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22111A2162022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix a, Glossary ML22111A1922022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22111A2182022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix C, Computer Programs RS-22-048, 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls)2022-03-31031 March 2022 2 to Updated Safety Analysis Report, B 2.0 Safety Limits (Sls) ML22111A2142022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML22111A2082022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22111A2102022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 12, Radiation Protection ML22111A1912022-03-31031 March 2022 2 to Updated Safety Analysis Report, USAR Cover and List of Effective Pages (Loep) ML22111A1982022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures Part 2 of 5 ML22111A2022022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 4, Reactor ML22111A1942022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 1 of 2 ML22111A1952022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Figures, Part 2 of 2 ML22111A1932022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 2, Site Characteristics ML22111A2072022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems ML22111A1992022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 3 of 5 ML22111A2222022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML22111A2052022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 7, Instrument and Control Systems ML22111A2122022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML22111A2172022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML22111A1972022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 3, Figures, Part 1 of 5 ML22111A2032022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22111A2202022-03-31031 March 2022 2 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML22111A1902022-03-31031 March 2022 Submittal of Revision 22 to Updated Safety Analysis Report, Letter and Attachments A-F ML22111A2092022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22111A2062022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 8, Electric Power ML22111A2242022-03-31031 March 2022 2 to Updated Safety Analysis Report, Clinton Power Station Operational Requirements Manual (Orm) ML22111A2112022-03-31031 March 2022 2 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2502020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.3-1, Part 1 of 5 ML20105A2672020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 16, Technical Specifications ML20105A2712020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix C, Computer Programs ML20105A2732020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Fire Protection Evaluation Report ML20105A2642020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations ML20105A2612020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20105A2702020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML20105A2652020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 14, Initial Test Program ML20105A2682020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 17, Quality Assurance ML20105A2592020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 8, Electric Power RS-20-028, 1 to Updated Safety Analysis Report, CPS Tsb2020-03-31031 March 2020 1 to Updated Safety Analysis Report, CPS Tsb ML20105A2492020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML20105A2752020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix E, Figures Part 2 of 2 ML20105A2512020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 2 of 5 ML20105A2522020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 3 of 5 ML20105A2532020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 3, Figures 3.6-1, Part 4 of 5 ML20105A2692020-03-31031 March 2020 1 to Updated Safety Analysis Report, Appendix a, Glossary ML20105A2622020-03-31031 March 2020 1 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management 2024-04-01 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML16306A081&oldid=1384351"