Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24004A209 | 12 December 2023 | Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code | |
ML23352A238 | 8 December 2023 | 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow | |
ML23207A076 | 14 July 2023 | EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 | |
ML23212A950 | 24 May 2023 | Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material | |
ML23066A221 | 7 March 2023 | Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose | |
ML23038A019 | 6 February 2023 | Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays | |
ML22259A173 | 26 August 2022 | EN 55960 - Curtiss Wright Part 21 Report Re Potential Defect in Configuration of the Quick Disconnect Connector Cable Assemblies Supplied to McGuire and Catawba Nuclear Power Stations | |
ML22201A101 | 18 July 2022 | Framatome, Inc. - 10 CFR Part 21 Notification of Existence of a Defect and Failure to Comply | Commercial Grade Dedication |
RA-22-0127, Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay | 8 April 2022 | Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay | |
ML22087A009 | 9 March 2022 | Ultra Energy, Report Under 10CFR21 of Noncompliance for N7030 Transmitter | |
ML21322A051 | 27 October 2021 | Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) | |
ML21295A247 | 18 October 2021 | Engine Systems, Inc., Part 21 Reportable Notification on a Pressure Regulator Valve | Dedication package |
ML21260A007 | 9 September 2021 | Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay | |
ML20366A047 | 18 November 2020 | Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 | |
ML20108F530 | 20 March 2020 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720 | |
ML20073G457 | 9 March 2020 | Carrier Corporation - Final Report Notification of Defect Pursuant to 10 CFR Part 21 for 17FA999-1200-107 Oil Pump | Loctite |
ML20024D823 | 10 January 2020 | Carrier Corp., Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 | Loctite |
ML20016A220 | 10 January 2020 | Carrier - Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 | Loctite |
ML19346H873 | 12 December 2019 | Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 | |
ML19347A426 | 10 December 2019 | General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) | Post Accident Monitoring |
0CAN101902, CFR Part 21 Notification, Ite/Gould Relay | 30 October 2019 | CFR Part 21 Notification, Ite/Gould Relay | |
ML19317D093 | 25 October 2019 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing | |
ML19199A034 | 5 July 2019 | Lake Engineering Co., Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 | |
ML19168A010 | 31 May 2019 | Curtis-Wright Nuclear Division- Notification Report for Potential Part 21 Update | |
ML19158A130 | 31 May 2019 | Curtiss-Wright Nuclear Division - Notification Report for Potential Part 21 Update | |
ML19078A087 | 8 March 2019 | Curtiss-Wright - Interim Notification Report for Potential Part 21 Update | |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML19071A112 | 1 March 2019 | Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 | |
ML19053A500 | 1 February 2019 | Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block | |
ML19024A164 | 7 January 2019 | Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts Kits | Commercial Grade Dedication Commercial Grade |
ML19002A204 | 21 December 2018 | to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts | |
ML18354A742 | 4 December 2018 | Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts | |
ML18353A428 | 30 November 2018 | Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps | |
ML18289A457 | 8 October 2018 | Curtiss-Wright Nuclear Division - Interim Notification Report for Potential Part 21 with Exelon Powerlabs Failure Analysis | |
ML18295A199 | 24 September 2018 | Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 | |
ML18225A118 | 27 July 2018 | Ametek Solidstate Controls - Notification of Potential Defect-10CFR Part 21 | |
ML18102A529 | 3 April 2018 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. | Safe Shutdown |
ML18087A003 | 21 March 2018 | Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) | |
ML18081A119 | 15 March 2018 | Rosemount Nuclear Instruments, Inc., Submittal of Notification Under 10 CFR Part 21 for Certain Model 1154 and Model 1154 Serles H Pressure Transmitters and 01154-0153-0002 Amplifier Circuit Card Assemblies | |
ML18079A014 | 6 March 2018 | Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve | |
ML18075A355 | 6 March 2018 | 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve | |
ML17313A471 | 3 November 2017 | Part 21 - Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Interim Report | |
ML17286A024 | 11 October 2017 | Part 21 on Siemens 5-3AF-GER-350-1200-78 & 5-3AF-GEU-350-1200-78 Circuit Breakers | |
ML17212A628 | 24 July 2017 | Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 | |
ML17206A039 | 13 July 2017 | Part 21 - Hex Cap Screws Produced with Pre-existing Cracks | |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17142A323 | 11 May 2017 | Interim Report Concerning Supply of Stainless Steel Tubing | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML17019A351 | 10 January 2017 | Submittal of 10CFR21 Reporting of Defects and Non-Compliance Rev. 0, Emo Fuel Injector |