MONTHYEARML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23066A2212023-03-0707 March 2023 Velan, Inc. - Revised Part 21 Notification Re Butterfly Valves Found to Have a Number of Fasteners Loose ML22259A1732022-08-26026 August 2022 EN 55960 - Curtiss Wright Part 21 Report Re Potential Defect in Configuration of the Quick Disconnect Connector Cable Assemblies Supplied to McGuire and Catawba Nuclear Power Stations ML22201A1012022-07-18018 July 2022 Framatome, Inc. - 10 CFR Part 21 Notification of Existence of a Defect and Failure to Comply RA-22-0127, Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay2022-04-0808 April 2022 Interim Part 21 Report of a Deviation or Failure to Comply for Cutler-Hammer Relay ML20073G4572020-03-0909 March 2020 Carrier Corporation - Final Report Notification of Defect Pursuant to 10 CFR Part 21 for 17FA999-1200-107 Oil Pump ML20024D8232020-01-10010 January 2020 Carrier Corp., Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 ML20016A2202020-01-10010 January 2020 Carrier - Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) MNS-16-078, Written Notification Joslyn Clark Overload Heater Element Part No. 24552016-10-19019 October 2016 Written Notification Joslyn Clark Overload Heater Element Part No. 2455 ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2722016-09-19019 September 2016 Part 21 Notification - Joslyn Clark Overload Heater Element Part Number 2455 ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16127A5952016-05-0404 May 2016 Rotork Controls Inc. Part 21 Notification Concerning V12 (Pt No. N69-921) and K5 (N69-838 & N69-926) Safety Related Micro Switches ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML14085A0122014-03-21021 March 2014 Notification of Part 21 - Sbm Selector Switches Contact Assembly Unplanned Manufacturing Change ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13102A3032013-04-10010 April 2013 Part 21 Involving a Potential Weld Defect ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12318A0412012-11-0808 November 2012 Part 21 Report - Commercial Grade Dedication Not Properly Applied to Butterfly Valves ML12219A2312012-08-0303 August 2012 Us NRC 10CFR Part 21 Notification from Flowserve on Seal Cap for Kerotest 3/4, 1, 1-1/2, and 2 Y-Type Globe Valves ML11287A1392011-10-13013 October 2011 Stations - Amended 10CFR21 Notification - Identification of Defect Mackson, Inc. - Defective Tube Steel - NRC Event Number 46375 ML11186A8912011-07-0101 July 2011 Notification of Potential Part 21 Seal Failure and Leakage Associated with Model B5497-301 Valves ML11116A0962011-04-18018 April 2011 Submittal of 10 CFR 21 Notification - Identification of Defect Problem Investigation Process No.: M-11-01725 ML1108907632011-03-29029 March 2011 Notification of Potential Part 21 Re Paint Chips Discovered in Woodward Governors ML1106701702011-03-0404 March 2011 Notification of Potential Part 21 - Error in Value Body Drawing ML1105506152011-02-22022 February 2011 Duke Energy - Notification of Potential Part 21 Re Identification of Defect ML1102800152011-01-24024 January 2011 Notification of Potential Part 21 - Bus Disconnect Stab Assembly - 600V Essential Motor Control Centers ML1030601022010-10-29029 October 2010 Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves ML1025304462010-09-0808 September 2010 Rotork Inc. Part 21 Notification Sintered Gear ML1009200932010-03-25025 March 2010 10 CFR21 Notification of a Potential Weld Defect ML0925902502009-09-0909 September 2009 Notification of Potential Part 21 Re Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0097, Rev. 0. Woodward 2301A & DRU with Unapproved Supplier IC, P/N: 9903-303, 9903-337, 9903-444 and 9903-470 ML0925800812009-09-0909 September 2009 Notification of Potential Part 21 Involving Woodward Governors Using Unapproved Supplier Integrated Circuits ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0904104852009-02-0606 February 2009 Notification of Potential Part 21 Report (Draft) Re Defective ASME SA-193, Grade 6 Cap Screw Material ML0903502172009-01-27027 January 2009 Notification of Potential Part 21 Report from Fisher Controls International - Water Quality Deficiency ML0903502112009-01-16016 January 2009 Part 21 Report Re Identification of Defect Found in Basic Component. Initially Reported to NRC on 12/18/2008 ML0835404692008-12-18018 December 2008 Duke Energy Carolinas, Llc., Deficiency Report on Defective Digital Optical Isolators ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information 2023-07-14
[Table view] |
Text
Commercial HV AC North American Parts Carrier Parkway, TR5 Syracuse, NY 13221 U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 January 10, 2020
Subject:
Interim Report/Notification of Defect Pursuant to 10 CFR Part 21 Reference (A): Duke Energy Carolinas, LLC (Duke Energy)
McGuire Nuclear Station (MNS), Units I and 2 Request for Determination of 10 CFR 21 Reportability Nuclear Condition Report (NCR) 2300622 Reference (B): Carrier I 7F A999- l 200- l 07 Oil Pump Duke Catalog Identification Number: 157183 Duke Energy UTC Numbers: 30110654, 30078287
}
The following infonnation is provided pursuant to the requirements of l O CFR Part 21 to report a defect that could lead to a substantial safety haz.ard (SSH).
Dpke Energy, Notice Duke Energy via Mr. James M. Smith issued a letter to Carrier Corporation's Customer Service Organization on November 21, 2019 reporting that on November 4, 2019, a Carrier 17FA999-1200-l 07 Oil Pump (Duke Energy UTC Number 30110654) failed rendering one train of the Control Room Area Chilled Water System inoperable.
A failure investigation by Duke Energy representatives' determined that the oil pump, which had been in service for less than two* months, had a broken shaft and failed due to improperly assembled oil pump motor assembly.
The failed oil pump and a replacement (spare) oil pump in the warehouse (Duke Energy UTC Number 30078287) both had loose fasteners and unstaked alignment pins.
Prior Corrective ActioM Prior to Duke Energy's November 21, 2019 notice, Carrier issued a corrective action to our supplier on April 28, 2017 to address failures with a different non-safety related oil pump (Carrier Model l 7F AS12-968) at a non-nuclear facility. The corrective action applied to all 17FA oil pump assemblies supplied to Carrier after April 28, 2017, including both safety and non-safety related oil pumps. The corrective action consisted of cleaning of threaded holes and application of red Loctite, ensuring specified torque requirements are met using a calibrated digital torque wrench, and verifying the staking operation. Both
Commercial HV AC North American Parts Carrier Parkway, TR5 Syracuse, N'/ 13221
. oil pump issues described by Duke Energy in the November 21, 2019 notice concerned oil pumps built prior to the April 28, 2017 corrective action. We are not aware of reports of any other defects in pumps in the same series in either nuclear or non-nuclear applications built since the corrective action.
10 CFR §21.21 Interim Report Details (i) Name and address of the individual or individuals informing the Commission.
David F. Kwasigroch Carrier Corporation Carrier Parkway TR5 Syracuse, New Yark 13221 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
Duke Energy- McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078 Supplied Component- Carrier 17F A999-l 200- l 07 Oil Pumps (Duke Energy UTC Numbers 30110654,30078287)
(iii) [dentification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
Carrier Corporation Carrier Parkway, TR5 Syracuse, NY, 13221 (iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply As Guide Pin peening operations were not perfonned correctly and Cover Bolts were not torqued down enough, the two Guide Pins and two Cover Bolts vibrated loose on the Oil Pump Assembly, resulting in failure of the pumps.
(v) The date on which the information of such defect or failure to comply was obtained.
Carrier Customer Service was informed in writing by buke Energy on November 21, 2019.
(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulatiohs in this part 2
Commercial HV AC North American Parts Carrier Parkway, TR.5 Syracuse, NY" 13221 Two Carrier 17FA999-l200-I07 Oil Pumps (Duke Energy UTC Numbers 30110654, 30078287) were supplied to the McGuire Nuclear Station. Carrier is in the process of investigating its records to determine if any additional affected oil pumps were supplied to other nuclear facilities.
(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
Carrier will-issue a letter to Duke Energy offering to replace the two failed oil pumps at Carrier's expense. Further, Carrier is in the process of investigating its records to detennine if any additional affected oil pumps were supplied to other nuclear facilities and, if so, will promptly provide notice and corrective action guidance.
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
Carrier is in the process of investigating its records to determine if any additional affected oil pumps were supplied to other nuclear facilities and, if so, will promptly provide notice and corrective action guidance.
(ix) In the case of any early site permit, the entities to whom an early site permit was transferred.
NIA Carrier will provide a final report to the U.S. Nuclear Regulatory Commission no later than March 11, 2020. If you have questions regarding this matter, please contact the undersigned.
fi)11v David Kwasigroch Associate Di~tor ngineering Carrier Safety Review Committee Direct Telephone: (315)-432-3461 Email: dave.kwasigroch@carrier.com cc: Jim Komemann (RC) Director Walter J. Hunston III (RC) Legal ,
Document Control Desk, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 (01-14-20) 3