Errata for Wolf Creek Generating Station, Notification of NRC Component Design Bases Inspection (05000482-13-006) and Initial Request for Information
ML13213A405
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/01/2013
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Matthew Sunseri
Wolf Creek
References
Download: ML13213A405 (8)


See also: IR 05000482/2013006

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

August 1, 2013

Matthew W. Sunseri, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: ERRATA FOR WOLF CREEK GENERATING STATION - NOTIFICATION OF

NRC COMPONENT DESIGN BASES INSPECTION (05000482/2013006) AND

INITIAL REQUEST FOR INFORMATION

Dear Mr. Sunseri:

Please replace the Wolf Creek Generating Station - Notification of NRC Component Design

Bases Inspection (05000482/2013006, ADAMS Accession Number - ML13036A374) and Initial

Request for Information, dated February 5, 2013, with the revised Notification of NRC

Component Design Bases Inspection (05000482/2013008) and Initial Request for Information

pages enclosed with this letter. The purpose of this change is to correct the inspection report

number and to correct the dates of the inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response, if you choose to provide one for cases where a response is not

required, will be made available electronically for public inspection in the NRC Public Document

Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not

include any personal privacy or proprietary, information so that it can be made available to the

Public without redaction.

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-482

License: NPF-42

Enclosure: Notification of NRC Component Design Bases Inspection (05000482/2013008) and

Initial Request for Information

ML13213A405

SUNSI Review Complete Non-Sensitive Publicly Available

Initials: TRF Sensitive Non-Publicly Available

SRI:EB-1 C:EB-1

RAKopriva TFarnholtz

/RA/ TRF for /RA/

8/1/2013 8/1/2013

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

February 5, 2013

Matthew W. Sunseri, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - NOTIFICATION OF NRC

COMPONENT DESIGN BASES INSPECTION (05000482/2013008) AND

INITIAL REQUEST FOR INFORMATION

Dear Mr. Sunseri:

On August 5, 2013, the NRC will begin a triennial baseline Component Design Bases Inspection

at the Wolf Creek Generating Station. A six-person team will perform this inspection using NRC

Inspection Procedure 71111.21, Component Design Bases Inspection.

The inspection focuses on components and operator actions that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an information

gathering visit and during the subsequent in-office preparation week. In addition, a number of

operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of

four NRC inspectors and two contractors, of which five will focus on engineering and one on

operations. The current inspection schedule is as follows:

Onsite Information Gathering Visit: July 15-18, 2013

Preparation Week(s): July 22-26, 2013

Onsite Week(s): August 5-9, 2013; and August 19-30, 2013

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. During the onsite weeks, several days of time will be needed on the plant-referenced

simulator in order to facilitate the development of operator action-based scenarios. Additional

information and documentation needed to support the inspection will be identified during the

inspection, including interviews with engineering managers, engineers, and probabilistic safety

assessment staff.

Matthew W. Sunseri -2-

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than July 10, 2013. Insofar as

possible, this information should be provided electronically to the lead inspector. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested is those items that the team will need access to

during the preparation week in order to finalize the samples to be inspected. The third group

lists information necessary to aid the inspection team in tracking issues identified as a result of

the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. Additional requests by inspectors will be made

throughout all three onsite weeks for specific documents needed to complete the review of that

component/selection. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the onsite portions of the inspection. In order to facilitate the inspection, we request that a

contact individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Mr. Ronald Kopriva. We understand that our licensing

engineer contact for this inspection is Mr. Hobby Reece, III. If there are any questions about the

inspection or the requested materials, please contact the lead inspector by telephone at

817-200-1104 or by e-mail at Ron.kopriva@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 05000482

License Nos.: NPF-42

Enclosure: Notification of NRC Component Design Bases Inspection (05000482/2013008) and

Initial Request for Information

Initial Request for Information

Component Design Bases Inspection

Wolf Creek Generating Station

Inspection Report: 05000482/2013008

Information Gathering Dates: July 15-18, 2013

Inspection Dates: August 5-9, 2013

August 19-30

Inspection Procedure: IP 71111.21, Component Design Bases Inspection

Lead Inspector: Ronald A. Kopriva, Senior Reactor Inspector

I. Information Requested Prior to Information Gathering Visit ( July 10, 2013)

The following information (Section I of this enclosure) should be sent to the Region IV office

in hard copy or electronic format (Certrec IMS preferred), to the attention of Mr. Ronald

Kopriva by July 10, 2013, to facilitate the reduction in the items to be selected for a final list

during the preparation week July 22, 2013. The inspection team will finalize the selected list

during the prep week using the additional documents requested in Section II of this

enclosure. The specific items selected from the lists shall be available and ready for review

on the day indicated in this request. *Please provide requested documentation

electronically in pdf files, Excel, or other searchable formats, if possible. The information

should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in "lists" should contain enough information to be easily understood by someone

who has knowledge of pressurized water reactor technology. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection.

1. An excel spreadsheet of equipment basic events (with definitions) including importance

measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your

internal events probabilistic risk assessment (PRA). Include basic events with RAW

value of 1.3 or greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA system notebooks, and the latest PRA summary document.

4. An excel spreadsheet of PRA human action basic events or risk ranking of operator

actions from your site specific PSA sorted by RAW and FV. Provide copies of your

human reliability worksheets for these items.

-1- Enclosure

5. If you have an external events or fire PSA model, provide the information requested in

items 1-4 for external events and fire.

6. Any pre-existing evaluation or list of components and associated calculations with low

design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel

generator close to design required output, heat exchangers close to rated design heat

removal, etc.).

7. List of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment.

8. A list of operating experience evaluations for the last 2 years.

9. A list of all time-critical operator actions in procedures.

10. A list of permanent and temporary modifications sorted by component identified in

Item 1.

11. List of current operator work arounds/burdens.

12. A list of the design calculations, which provide the design margin information for

components included in Item 1, (Calculations should be available during the information

gathering visit).

13. List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 5 years.

14. Current management and engineering organizational charts.

15. Wolf Creek Generating Station IPEEE, if available electronically.

16. Mechanical piping drawings for:

  • Engineered safety features

17. Electrical one-line drawings for:

  • Offsite power/switchyard supplies
  • Normal AC power systems
  • Emergency AC/DC power systems including
  • 120VAC power, and
  • 125VDC/24VDC safety class systems

18. List of any common-cause failures of components in the last 3 years.

19. An electronic copy of the Design Bases Documents.

-2-

20. An electronic copy of the System Health notebooks.

II. Information Requested to be Available on First Day of Preparation Week (July 22,

2013)

1. List of condition reports (corrective action documents) associated with each of the

selected components for the last 5 years.

2. The corrective maintenance history associated with each of the selected components for

the last 2 years.

3. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and also

provide copies of reference material (such as drawings, engineering requests, and

vendor letters).

4. Copies of operability evaluations associated with each of the selected components and

plans for restoring operability, if applicable.

5. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

6. Copies of any open temporary modifications associated with each of the selected

components, if applicable.

7. Trend data on the selected electrical/mechanical components performance for last 3

years (for example, pumps performance including in-service testing, other vibration

monitoring, oil sample results, etc., as applicable).

8. A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for the inspection.

9. A copy of engineering/operations related audits completed in the last 2 years.

10. List of motor operated valves (MOVs) in the program, design margin and risk ranking.

11. List of air operated valves (AOVs) in the valve program, design and risk ranking.

12. Structure, system and components in the Maintenance Rule (a)(1) category.

13. Site top 10 issues list.

14. Procedures used to accomplish operator actions associated with the basic events in

your PRA.

15. List of licensee contacts for the inspection team with pager or phone numbers.

-3-

III. Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the teams questions

or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the status/resolution

of the information requested (provide daily during the inspection to each team member).

3. Reference materials (available electronically and as needed during all onsite weeks):

  • General set of plant drawings
  • IPE/PRA report
  • Procurement documents for components selected
  • Plant procedures (normal, abnormal, emergency, surveillance, etc.)
  • Technical Specifications
  • Vendor manuals

Inspector Contact Information:

Ronald Kopriva

Reactor Inspector

(817) 200-1104

Ron.Kopriva@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Ronald Kopriva

1600 East Lamar Blvd.

Arlington, TX 76011-4511

-4-