MONTHYEARWO 22-0056, Operating Corporation’S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082022-12-19019 December 2022 Operating Corporation’S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 IR 05000482/20224022022-06-29029 June 2022 Security Baseline Inspection Report 05000482/2022402 - Public WO 20-0058, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082020-12-23023 December 2020 Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 IR 05000482/20182012018-10-15015 October 2018 NRC Inspection Report 05000482/2018201 IR 05000482/20164082016-08-31031 August 2016 NRC Security Inspection Report 05000482/2016408 (Cover Letter Only) IR 05000482/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Report Number 05000482/2015402) IR 05000482/20130062013-08-0101 August 2013 Errata for Wolf Creek Generating Station, Notification of NRC Component Design Bases Inspection (05000482-13-006) and Initial Request For Information ML13213A4052013-08-0101 August 2013 Errata for Wolf Creek Generating Station, Notification of NRC Component Design Bases Inspection (05000482-13-006) and Initial Request for Information IR 05000482/20105012011-01-10010 January 2011 IR 05000482-10-501, on 12/31/10, Wolf Creek Generating Station - NRC Annual Emergency Preparedness IR 05000482/20104042010-06-11011 June 2010 NRC Material Control and Accounting Program Inspection Report 05000482-10-404 IR 05000482/20094012010-03-26026 March 2010 IR 05000482-09-401, on 12/31/2009, Wolf Creek Generating Station - NRC Physical Security Annual ML0913403092009-05-14014 May 2009 Operating Corporation -Notification of Inspection 05-000482-09-004 and Request for Information IR 05000482/20074022008-01-22022 January 2008 NRC Security Inspection Report 05000482/2007402 IR 05000482/20070062007-10-15015 October 2007 IR 05000482-07-006, on 06/11/2007 - 07/20/2007, Wolf Creek Generating Station, Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection IR 05000482/20074012007-09-0404 September 2007 IR 05000482-07-401; on 6/25/2007- 8/3/2007; Wolf Creek Generating Station; Security Baseline Inspection, Security Training - Letter Only IR 05000482/20060032006-08-21021 August 2006 IR 05000482-06-003; on 04/08/2006 - 07/7/2006 for Wolf Creek; Identification and Resolution of Problems, and Event Follow-up IR 05000482/20010062002-04-15015 April 2002 IR 05000482/2001-006; on 12/29/2001 - 03/23/2002; Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station. Integrated Resident/Regional Report. Fire Protection. One Noncited Violation Identified IR 05000482/20020062002-04-0505 April 2002 IR 05000482/2002-006; on 02/11 - 03/08/2002; Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station. Special Inspection Report. Event Followup IR 05000482/20010072002-03-18018 March 2002 Corrected IR 05000482/2001-007, Wolf Creek Nuclear Station, Inspection on 10/15- 11/02/2001 Re Safety System Design & Performance Capability, Heat Sink Performance, & Evaluation of Changes, Tests, or Experiments. Revised Pages 2, 4 & 5 Encl IR 05000482/20010042002-01-15015 January 2002 IR 05000482/2001-004; on 9/30/2001 - 12/29/2001; Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station. Routine Integrated Report. No Findings of Significance Were Identified 2022-06-29
[Table view] Category:Letter
MONTHYEARML24352A0322024-12-17017 December 2024 Notification of Post Approval Site Inspection for License Renewal and Request for Information IR 05000482/20240142024-12-17017 December 2024 Comprehensive Engineering Team Inspection Report 05000482/2024014 05000482/LER-2024-002-01, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-12-11011 December 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve IR 05000482/20244022024-12-0505 December 2024 Security Baseline Inspection Report 05000482/2024402 ML24337A0132024-12-0202 December 2024 Cycle 27 Core Operating Limits Report, Revision 1 IR 05000482/20240032024-11-0101 November 2024 Integrated Inspection Report 05000482/2024003 ML24306A2192024-11-0101 November 2024 Results of the Steam Generator Tube Inservice Inspection During the 26th Refueling Outage to Reflect TSTF-577 Reporting Requirements IR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications 2024-09-06
[Table view] |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 May 14, 2009 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
WOLF CREEK NUCLEAR OPERATING CORPORATION - NOTIFICATION OF INSPECTION 05000482/2009004 AND REQUEST FOR INFORMATION
Dear Mr. Muench:
From July 20 to July 31, Reactor Inspectors from NRCs Region IV office will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at WCNOC, using NRC Inspection Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent Plant Modifications. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Larry Stevens of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector James Adams at 817-860-8294 or by email james.adams@nrc.gov
Wolf Creek Nuclear Operating Corporation In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 50-482 License: NPF-42
Enclosure:
Documents Requested Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612-1590 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597
Wolf Creek Nuclear Operating Corporation County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Chief, Radiation and Asbestos Control Section Bureau of Air and Radiation Kansas Department of Health and Environment 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Chief, Technological Hazards Branch FEMA, Region VII 9221 Ward Parkway Suite 300 Kansas City, MO 64114-3372
Wolf Creek Nuclear Operating Corporation Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov )
Deputy Regional Administrator (Chuck.Casto@nrc.gov )
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov )
DRS Director (Roy.Caniano@nrc.gov )
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Chris.Long@nrc.gov )
Site Secretary (Shirley.Allen@nrc.gov )
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
File located: R:REACTORS\WC 2009004 RFI-JPA ML091340309 SUNSI Rev Compl. ; Yes No ADAMS ; Yes No Reviewer Initials TRF Publicly Avail ; Yes No Sensitive Yes ;No Sens. Type Initials TRF EB1 EB1 C:EB 1 J. Adams C. Ryan T. Farnholtz
/RA/ /RA/ /RA/
5/11/09 5/12/09 5/14/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification Inspection Dates: July 20 - 31, 2009 Inspection Procedures: IP 71111.17 Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications Inspectors: James Adams, Reactor Inspector, Lead Inspector Christopher Ryan, Reactor Inspector Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (Certrec database preferred), in care of James Adams, by July 3, 2009, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspectors will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. Also, we request that you categorize the documents in your response with the numbered list below.
Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.
- 1. A list with descriptions, of all 50.59 screenings (or equivalent) performed since March 2006, which did not result in an evaluation. Note: Description of screenings should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.
- 2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in an application for license amendment to NRC from March 2006 to the present. Note:
Description of evaluations should be brief, but of sufficient detail so that inspectors can determine the significance of the issue.
- 3. WCNOC procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
- 4. A list with descriptions of all Corrective Action documents related to 50.59 activities, including screenings and evaluations from March 2006, to the present.
- 5. A list with descriptions of all permanent plant modifications dating from March 2006.
Include sufficient detail to enable the inspector to determine the significance of each modification. For this inspection, permanent plant modifications include permanent plant changes, design changes, setpoint changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.
- 6. WCNOC procedure for implementing and controlling permanent plant modifications.
Enclosure
- 7. A list with descriptions of all Corrective Action documents related to your permanent plant modification program and its implementation since March 2006. Include sufficient detail to enable the inspector to determine the significance of each modification.
- 8. A list with descriptions of all Corrective Action documents related to your 10 CFR 50.59 program and its implementation since March 2006. Include sufficient detail to enable the inspector to determine the significance of each screening/evaluation.
- 9. A listing of personnel qualified to prepare 50.59 screenings and evaluations, including qualification dates.
- 10. A listing of personnel qualified to review and approve 50.59 screenings and/or evaluations, including qualification dates.
Inspector Contact Information:
James Adams Christopher Ryan Reactor Inspector Reactor Inspector 817-860-8294 817-860-8181 james.adams@nrc.gov christopher.ryan@nrc.gov Mailing Address:
US NRC Region IV Attn: James Adams 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Enclosure