Category:Inspection Report Correspondence
MONTHYEARWO 22-0056, Operating Corporation’S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082022-12-19019 December 2022 Operating Corporation’S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 IR 05000482/20224022022-06-29029 June 2022 Security Baseline Inspection Report 05000482/2022402 - Public WO 20-0058, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082020-12-23023 December 2020 Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 IR 05000482/20182012018-10-15015 October 2018 NRC Inspection Report 05000482/2018201 IR 05000482/20164082016-08-31031 August 2016 NRC Security Inspection Report 05000482/2016408 (Cover Letter Only) IR 05000482/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Wolf Creek Generating Station (NRC Physical Security Inspection Report Number 05000482/2015402) IR 05000482/20130062013-08-0101 August 2013 Errata for Wolf Creek Generating Station, Notification of NRC Component Design Bases Inspection (05000482-13-006) and Initial Request For Information ML13213A4052013-08-0101 August 2013 Errata for Wolf Creek Generating Station, Notification of NRC Component Design Bases Inspection (05000482-13-006) and Initial Request for Information IR 05000482/20105012011-01-10010 January 2011 IR 05000482-10-501, on 12/31/10, Wolf Creek Generating Station - NRC Annual Emergency Preparedness IR 05000482/20104042010-06-11011 June 2010 NRC Material Control and Accounting Program Inspection Report 05000482-10-404 IR 05000482/20094012010-03-26026 March 2010 IR 05000482-09-401, on 12/31/2009, Wolf Creek Generating Station - NRC Physical Security Annual ML0913403092009-05-14014 May 2009 Operating Corporation -Notification of Inspection 05-000482-09-004 and Request for Information IR 05000482/20074022008-01-22022 January 2008 NRC Security Inspection Report 05000482/2007402 IR 05000482/20070062007-10-15015 October 2007 IR 05000482-07-006, on 06/11/2007 - 07/20/2007, Wolf Creek Generating Station, Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection IR 05000482/20074012007-09-0404 September 2007 IR 05000482-07-401; on 6/25/2007- 8/3/2007; Wolf Creek Generating Station; Security Baseline Inspection, Security Training - Letter Only IR 05000482/20060032006-08-21021 August 2006 IR 05000482-06-003; on 04/08/2006 - 07/7/2006 for Wolf Creek; Identification and Resolution of Problems, and Event Follow-up IR 05000482/20010062002-04-15015 April 2002 IR 05000482/2001-006; on 12/29/2001 - 03/23/2002; Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station. Integrated Resident/Regional Report. Fire Protection. One Noncited Violation Identified IR 05000482/20020062002-04-0505 April 2002 IR 05000482/2002-006; on 02/11 - 03/08/2002; Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station. Special Inspection Report. Event Followup IR 05000482/20010072002-03-18018 March 2002 Corrected IR 05000482/2001-007, Wolf Creek Nuclear Station, Inspection on 10/15- 11/02/2001 Re Safety System Design & Performance Capability, Heat Sink Performance, & Evaluation of Changes, Tests, or Experiments. Revised Pages 2, 4 & 5 Encl IR 05000482/20010042002-01-15015 January 2002 IR 05000482/2001-004; on 9/30/2001 - 12/29/2001; Wolf Creek Nuclear Operating Corporation, Wolf Creek Generating Station. Routine Integrated Report. No Findings of Significance Were Identified 2022-06-29
[Table view] Category:Letter
MONTHYEARML24352A0322024-12-17017 December 2024 Notification of Post Approval Site Inspection for License Renewal and Request for Information IR 05000482/20240142024-12-17017 December 2024 Comprehensive Engineering Team Inspection Report 05000482/2024014 05000482/LER-2024-002-01, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-12-11011 December 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve IR 05000482/20244022024-12-0505 December 2024 Security Baseline Inspection Report 05000482/2024402 ML24337A0132024-12-0202 December 2024 Cycle 27 Core Operating Limits Report, Revision 1 IR 05000482/20240032024-11-0101 November 2024 Integrated Inspection Report 05000482/2024003 ML24306A2192024-11-0101 November 2024 Results of the Steam Generator Tube Inservice Inspection During the 26th Refueling Outage to Reflect TSTF-577 Reporting Requirements IR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications 2024-09-06
[Table view] |
Text
ust 31, 2016
SUBJECT:
WOLF CREEK GENERATING STATION, NRC SECURITY INSPECTION REPORT 05000482/2016408
Dear Mr. Heflin:
On July 27, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Wolf Creek Generating Station. The NRC inspectors discussed the results of this inspection with Mr. S. Smith, Plant Manager, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
The NRC inspectors documented three findings of very low security significance (Green) in this report. These findings involved violations of NRC requirements. In addition, the inspectors documented one violation that was determined to be Severity Level IV under the traditional enforcement process. Further, inspectors documented a licensee-identified violation which was determined to be of very low safety significance in this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violations or significance of the non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Wolf Creek Generating Station.
Cross-cutting aspects were assigned to three of the findings in the areas of problem identification and resolution, evaluation (P.2) and self-assessment (P6) (assigned to two of the findings). If you disagree with the cross-cutting aspect assignments in this report, you should provide a response within 30 days of the date of this inspection report, with a basis for your disagreement to the Regional Administrator, Region IV, and the NRC resident inspector at the Wolf Creek Generating Station. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA James R. Larsen for/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-482 License No. NPF-42 Nonpublic Enclosure:
NRC Inspection Report 05000482/2016408 w/Attachment: Supplemental Information cc: Electronic Distribution