Letter Sequence Other |
---|
|
|
MONTHYEARML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 Project stage: Other ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter Project stage: Other ML23346A2392024-01-17017 January 2024 Seismic Hazard Report by the Office of Nuclear Reactor Regulation Project stage: Other 2023-05-18
[Table View] |
|
---|
Category:Letter
MONTHYEARML24022A2262024-01-22022 January 2024 (PBAPS) Unit 3 - Submittal of the Inservice Inspection (ISI) Owner'S Activity Report (OAR) for the 24th Refueling Outage for Unit 3 ML23346A2412024-01-17017 January 2024 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information (EPID L-2019-PMP-0061) - Letter IR 05000277/20234022024-01-11011 January 2024 Security Baseline Inspection Report 05000277/2023402 and 05000278/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200029/2023401 ML23354A1922024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23355A0622023-12-18018 December 2023 Independent Spent Fuel Storage Installation (Isfsi), Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) IR 05000277/20230032023-10-30030 October 2023 Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion ML23286A0012023-10-13013 October 2023 Reply to a Notice of Violation (NOV) - NOV 05000277, 05000278/2023010-01 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23271A1342023-10-11011 October 2023 Dtf Analysis Letter IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23265A1502023-09-22022 September 2023 License Amendment Request Revise a License Condition and Certain Technical Specifications to Remove Restrictions in Support of Decommissioning Activities ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L IR 05000277/20230102023-09-15015 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000277/2023010 and 05000278/2023010 and Notice of Violation ML23251A2022023-09-11011 September 2023 Cover Letter W/Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement IR 05000277/20230052023-08-31031 August 2023 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2023005 and 05000278/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 IR 05000277/20230112023-08-15015 August 2023 Comprehensive Engineering Team Inspection Report 05000277/2023011 and 05000278/2023011 ML23226A1112023-08-14014 August 2023 10 CFR 50.46 Annual Report IR 05000277/20230022023-08-0808 August 2023 Integrated Inspection Report 05000277/2023002 and 05000278/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000277/20230402023-07-17017 July 2023 95001 Inspection Supplemental Report 05000277/2023040 and Follow-Up Assessment Letter ML23188A0532023-07-0707 July 2023 Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks ML23186A1272023-07-0606 July 2023 Response to Disputed Non-Cited Violation Documented in Peach Bottom Atomic Power Station, Units 2 and 3, Inspection Report 05000277/2022004 and 05000278/2022004 ML23178A0352023-06-27027 June 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ML23150A2052023-05-30030 May 2023 Independent Spent Fuel Storage Installation (Isfsi), Annual Radiological Environmental Operating Report 80 January 1, 2022 Through December 31, 2022 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) IR 05000277/20230012023-05-0808 May 2023 Integrated Inspection Report 05000277/2023001 and 05000278/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI 2024-01-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23132A1582023-05-18018 May 2023 Correction to Technical Specification 3.4.7 (Page 3.4-16) Issued in Amendment No. 337 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22096A2982022-04-0808 April 2022 Correction Letter to Modification to Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 in Conjunction with Commission Memorandum and Order CLI-22-04 ML22054A1782022-03-0202 March 2022 Correction to Amendment Nos. 341 and 344 Changes to Technical Specification 5.5.7, Ventilation Filter Testing Program ML22004A2582022-02-14014 February 2022 Issuance of Amendment Nos. 341 and 344 Change to Technical Specification 5.5.7, Ventilation Filter Testing Program ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21074A4112021-05-14014 May 2021 Issuance of Amendment Nos. 338 and 341, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4B ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML20024G4262020-03-0505 March 2020 Issuance of Subsequent Renewed Facility Operating License No. DPR-56 for Peach Bottom Atomic Power Station Unit 3 ML20024G4232020-03-0505 March 2020 Issuance of Subsequent Renewed Facility Operating License No. DPR-44 for Peach Bottom Atomic Power Station Unit 2 ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19289B9312019-12-17017 December 2019 Issuance of Amendment Nos. 329 and 332 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML19266A6222019-10-29029 October 2019 Issuance of Amendment Nos. 328 and 331 Revising Technical Specifications 3.81, AC Sources - Operating, for a One-Time Extension of Completion Time ML19182A0062019-08-28028 August 2019 Issuance of Amendment Nos. 327 and 330 Reduce High Pressure Service Water System Design Pressure and Temporarily Extend Completion Times ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML19078A0182019-05-24024 May 2019 Issuance of Amendment Nos. 235, 198, 14, 325, and 328 to Revise the Emergency Response Organization Staffing Requirements ML19039A2232019-02-26026 February 2019 Issuance of Amendment Nos. 324 and 327 Expanded Actions for Leading Edge Flow Meter Conditions ML19011A3252019-02-26026 February 2019 Issuance of Amendment Nos. 323 and 326 to Revise Technical Specifications to Allow Continued Operation with Two Safety Relief Valves/Safety Valves Out of Service ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18302A2572018-11-0101 November 2018 Correction to Amendment Nos. 321 and 324 to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems and Components (CAC Nos. MG0181 and MGO182; EPID L-2017-LLA-0281) ML18263A2322018-10-25025 October 2018 Issuance of Amendment Nos. 321 and 324 to Adopt 10 CFR 50.69 (CAC Nos. MG0181 and MG0181; EPID L-2017-LLA-0281) ML18249A2402018-09-28028 September 2018 Issuance of Amendment Nos. 320 and 323 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18173A0422018-06-23023 June 2018 Issuance of Amendment Nos. 318 & 321 to Revise Technical Specifications 3.8.1 and 3.8.3, One-Time Change Suspending EDG Surveillance Test Completion Requirements (Emergency Situation) ML17325B7082017-12-27027 December 2017 Issuance of Amendments Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542 (CAC Nos. MF9138 and MF9139; EPID L-2017-LLA-0174) ML17286A0132017-11-15015 November 2017 Issuance of Amendments Measurement Uncertainty Recapture Power Uprate (CAC Nos. MF9289 and MF9290; EPID L-2017-LLS-0001) ML17249A1512017-10-25025 October 2017 Issuance of Amendment Safety Relief Valve and Safety Valve Operability for Cycle 22 (CAC No. MF9705; EPID L-2017-LLA-0229) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML16292A1882016-11-16016 November 2016 Issuance of Amendments Diesel Generator Fuel Oil Transfer Surveillance Requirements ML16235A4052016-10-14014 October 2016 Issuance of Amendments Diesel Generator Lube Oil Inventory Requirements ML16165A0022016-08-10010 August 2016 Issuance of Amendments Surveillance Requirements for Recirculation Pump Discharge Valves ML16159A1482016-07-0505 July 2016 Issuance of Amendments Surveillance Requirements for High Pressure Coolant Injection System and Reactor Core Isolation Cooling System ML16084A9682016-05-0909 May 2016 Issuance of Amendments Inservice Leak and Hydrostatic Testing Operation ML16064A1502016-04-27027 April 2016 Issuance of Amendments Reduce Steam Dome Pressure Specified in Reactor Core Safety Limits ML16034A3722016-03-21021 March 2016 Issuance of Amendments Maximum Extended Load Line Limit Analysis Plus ML15343A1652016-02-0808 February 2016 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML15343A1772016-02-0808 February 2016 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML15350A1792016-02-0101 February 2016 Issuance of Amendments Secondary Containment Access Openings 2023-08-30
[Table view] |
Text
May 18, 2023 Mr. David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNIT 2 - CORRECTION TO TECHNICAL SPECIFICATION 3.4.7 (PAGE 3.4-16) ISSUED IN AMENDMENT NO. 337 (EPID L-2019-PMP-0061)
Dear Mr. Rhoades:
By letter1 dated April 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) staff issued Amendment No. 337 to Subsequent Renewed Facility Operating License No. DPR-44 for Peach Bottom Atomic Power Station (Peach Bottom), Unit 2, in response to the application from Exelon Generation Company, LLC (Exelon) via letter2 dated April 13, 2020, as supplemented by letter3 dated January 29, 2021. On May 10, 2023, your staff informed me of a discrepancy between what Exelon requested and the technical specifications (TS) that the NRC staff issued in the amendment.
The NRC staff has determined that the NRC inadvertently introduced a typographical error in the Completion Time for Condition A in Peach Bottom, Unit 2, TS 3.4.7, RHR [Residual Heat Removal] Cooling System - Hot Shutdown. Specifically, in its application, as supplemented, Exelon requested that the NRC approve a new completion time for Condition A that would state, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (emphasis added). The NRC staffs safety evaluation for Amendment No. 337 refers to and evaluates, in sections 2.2.1 and 3.1.1, the 24-hour value. However, the completion time for condition A in the TS that the NRC issued states, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter (emphasis added).
The NRC staff is issuing this letter to correct the error in accordance with the guidance in the NRC memorandum4 dated January 16, 1997, which is derived from the Staff Requirements 1
Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF)Traveler TSTF-566, dated April 1, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21033A530).
2 Application to Revise Technical Specifications to Adopt TSTF-566, letter from Exelon Generation Company, LLC to Nuclear Regulatory Commission dated April 13, 2020 (ML20104C104).
3 Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, letter from Exelon Generation Company, LLC to Nuclear Regulatory Commission dated January 29, 2021 (ML21029A306).
4 License Amendment Corrections of Technical Specifications, NRC Memorandum dated January 16, 1997 (ML103260096).
D. Rhoades Memorandum (SRM)5 for SECY-96-238.6 The NRC staff determined that this correction to the TS does not change any of the NRC staffs conclusions in its safety evaluation regarding the acceptability of the changes approved in Amendment No. 337, nor does the correction affect the no significant hazards consideration published in the Federal Register on May 19, 2020 (85 FR 29985). The use of the 24-hour language in the Safety Evaluation for the amendment, as well as in the application and the TSTF7 that the proposed changes in the application were based on, supports the conclusion that this was an inadvertent typographical mistake.
Accordingly, the enclosure to this letter has a copy of revised and corrected TS page 3.4-16 for Amendment No. 337.
If you have any questions, please contact me at 301-415-0489 or by email to Audrey.Klett@nrc.gov.
Sincerely,
/RA/
Audrey L. Klett, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-277
Enclosure:
Corrected TS page 3.4-16 cc: Listserv 5
SRM-SECY-96-238, Proposed Guidance for Correction of Technical Specification Typographical Errors, dated December 17, 1996 (ML003754054).
6 SECY-96-238, Guidance for Correction of Technical Specification Typographical Errors, dated November 19, 1996 (ML9611250030).
7 TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, dated January 19, 2018 (ML18019B187).
ENCLOSURE CORRECTED TECHNICAL SPECIFICATION PAGE 3.4-16
RHR Shutdown Cooling System Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
NOTES---------------------------
- 1. Both required RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
- 2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.
APPLICABILITY: MODE 3, with reactor steam dome pressure less than the RHR shutdown cooling isolation pressure.
ACTIONS
NOTE------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> RHR shutdown cooling method of decay heat subsystems inoperable. removal is available for each required AND inoperable RHR shutdown cooling Once per subsystem. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)
PBAPS UNIT 2 3.4-16 Amendment/P337
ML23132A158 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA OGC - NLO NAME AKlett KEntz BVaisey DATE 5/12/2023 5/11/2023 5/17/2023 OFFICE NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME HGonzalez (MMarshall for) AKlett DATE 05/18/2023 05/18/2023