Letter Sequence Other |
---|
|
|
MONTHYEARML0829101572008-10-15015 October 2008 Acceptance Review Email Project stage: Acceptance Review ML0829403772008-10-20020 October 2008 Acceptance Review Email of Requested Licensing Action Proposed Alternative Request, W3-ISI-006 Project stage: Acceptance Review ML0902708312009-02-0505 February 2009 Request for Additional Information, Request for Alternative W3-ISI-006 to Extend the Second 10-Year Inservice Inspection Interval and License Amendment Request NPF-38-280 to Support Request for Alternative W3-ISI-006 (MD9671, MD9669) Project stage: RAI W3F1-2009-0006, RAI Response to Request for Alternative W3-ISI-006 to Extend the Second 10 Year Amse Code ISI and License Amendment Request NPF-38-280 to Support Request for Alternative W3-ISI-0062009-03-19019 March 2009 RAI Response to Request for Alternative W3-ISI-006 to Extend the Second 10 Year Amse Code ISI and License Amendment Request NPF-38-280 to Support Request for Alternative W3-ISI-006 Project stage: Request ML0912103752009-06-12012 June 2009 Relief, Request for Alternative W3-ISI-006, from Requirements of ASME Code Section XI, for Second 10-Year Inservice Inspection Interval Project stage: Other ML0932102532009-11-17017 November 2009 Acceptance Review E-mail Relief Request ANO2-ISI-004 to Extend Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations Project stage: Acceptance Review ML1010302082010-04-13013 April 2010 E-mail Arkansas Nuclear One, Unit 2 - Request for Additional Information, Relief Request ANO2-ISI-004 to Extend Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations Project stage: RAI 2CAN041004, Response to Request for Additional Information on Request for Alternative ANO2-ISI-0042010-04-29029 April 2010 Response to Request for Additional Information on Request for Alternative ANO2-ISI-004 Project stage: Response to RAI ML1024506542010-09-21021 September 2010 Relief Request ANO2-ISI-004 to Extend Third Inservice Inspection Interval from 10 to 20 Years for Reactor Vessel Weld Examinations Project stage: Other W3F1-2011-0087, Commitment Change for Reactor Vessel Internals Degradation Management Program2011-12-19019 December 2011 Commitment Change for Reactor Vessel Internals Degradation Management Program Project stage: Other 2CAN041303, Additional Reactor Vessel Closure Head Weld Request for Alternative ANO2-ISI-004 Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations2013-04-24024 April 2013 Additional Reactor Vessel Closure Head Weld Request for Alternative ANO2-ISI-004 Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations Project stage: Request 2009-06-12
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML21299A0032021-10-28028 October 2021 And Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML20022A2582020-01-28028 January 2020 Re-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control ML20002A0202020-01-13013 January 2020 Approval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19247B1972019-09-0909 September 2019 Approval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination ML19232A0252019-08-27027 August 2019 Authorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement Activities W3F1-2019-0052, CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2)2019-07-18018 July 2019 CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2) CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 W3F1-2018-0065, Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-0322018-11-30030 November 2018 Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-032 ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML17341A1202017-12-11011 December 2017 Relief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049) ML17328A8822017-11-29029 November 2017 Requests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47) CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML17069A1872017-03-22022 March 2017 Request for Alternative to 10 CFR 50.55a(c) ASME Code Section III Code Case 1361-1, Relief Request W3-ISI-024 ML16235A2282016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML16182A2702016-07-0606 July 2016 Relief Request PRR-WF3-2016-1, Alternative to the Inservice Testing Program ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division ML14070A0082014-03-26026 March 2014 Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations, Third 10-Year Inservice Inspection Interval ML13192A2222013-08-0202 August 2013 Request for Alternative W3-ISI-021, ASME Code Case N-770-1 Baseline Examination Request for the Third 10-Year Inservice Inspection Interval ML13128A1292013-05-31031 May 2013 Request for Alternative W3-ISI-020, ASME Code Case N-770-1 Baseline Examination Request for the Third 10-Year Inservice Inspection Interval ML13085A1592013-03-26026 March 2013 Verbal Authorization on 12/18/2012, Request for Alternative W3-ISI-021, ASME Code Case N-770-1 Baseline Examination Request for the Third 10-Year Inservice Inspection Interval ML13085A1252013-03-26026 March 2013 Verbal Authorization on 12/18/2012, Revised Request for Alternative W3-ISI-020, ASME Code Case N-770-1 Baseline Examination Request for the Third 10-Year Inservice Inspection Interval ML12293A3622012-11-0808 November 2012 Relief Request VRR-WF3-2012-1 Associated with Category a Leak Test of Component Cooling Water Check Valve ACC-108B for the Third 10-Year Inservice Inspection Interval W3F1-2012-0085, Request for Alternative W3-ISI-020, ASME Code Case N-770-1 Baseline Examination Request2012-10-16016 October 2012 Request for Alternative W3-ISI-020, ASME Code Case N-770-1 Baseline Examination Request ML12234A6352012-08-21021 August 2012 Verbal Authorization of Relief Request VRR-WF3-2012-1 ML1133301372012-01-0404 January 2012 Request for Alternative W3-CISI-002 to ASME Code, Section XI, IWE-5221 for Post-repair Testing of Steel Containment Vessel Opening, Third 10-Year Inservice Inspection Interval ML1125701682011-10-14014 October 2011 Request for Alternative W3-ISI-019 from Inservice Inspection Requirements of Reactor Vessel Head In-Core Instrument Nozzles, Third 10-Year Inservice Inspection Interval ML1125702732011-10-14014 October 2011 Request for Alternative W3-ISI-018 from Inservice Inspection Requirements of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles, Third 10-Year Inservice Inspection Interval ML1035703922011-01-13013 January 2011 Relief Request No. W3-ISI-017, Alternative to ASME IWA-5211 Regarding Chemical Volume Control System Pipe Visual Inspection, for Third 10-Year Inservice Inspection Interval ML1029903712010-11-23023 November 2010 Correction to May 18, 2010 Safety Evaluation for Relief Request No. W3-CISI-001 Regarding Post Repair Testing of the Steel Containment Vessel Opening ML1015905742010-06-30030 June 2010 Relief Request Nos. WF3-ISI-007 to WF3-ISI-014 from ASME Code, Section XI Volumetric Examination Requirements - Second 10-Year Interval ML1008500892010-05-18018 May 2010 Relief Request W3-CISI-001, Request for Alternative to ASME IWE-5521, Post Repair Testing of the Steel Containment Vessel Opening ML1008203552010-03-23023 March 2010 Request for Additional Information Round 2, Relief Request Nos. WF3-ISI-007 to WF3-ISI-014 from ASME Code, Section XI Volumetric Examination Requirements - Second 10-Year Interval W3F1-2010-0018, Request for Alternative to ASME IWA-5211 Regarding Chemical Volume Control System Pipe Visual Inspection2010-02-22022 February 2010 Request for Alternative to ASME IWA-5211 Regarding Chemical Volume Control System Pipe Visual Inspection W3F1-2010-0002, Request for NRC Alternative to ASME IWE-5521 Regarding Post Repair Testing of Waterford 3's Steel Containment Vessel-Opening2010-02-0909 February 2010 Request for NRC Alternative to ASME IWE-5521 Regarding Post Repair Testing of Waterford 3's Steel Containment Vessel-Opening 2CAN011005, Supplement to Request for Alternative Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-7162010-01-28028 January 2010 Supplement to Request for Alternative Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML0931604422009-11-0404 November 2009 Email Verbal Authorization of Request for Alternative W3-ISI-015 - Third 10-year Inservice Inspection Interval ML0930808142009-11-0404 November 2009 Email Verbal Authorization of Request for Alternative - W3-ISI-016 ML0912103752009-06-12012 June 2009 Relief, Request for Alternative W3-ISI-006, from Requirements of ASME Code Section XI, for Second 10-Year Inservice Inspection Interval ML0903708982009-03-0606 March 2009 Unit 3 - Request for Alternative CEP-ISI-012, Use Alternative Requirements in ASME Code Case N-753 CNRO-2009-00001, Relief Requests for Third 120 Month Inservice Inspection Interval2009-01-23023 January 2009 Relief Requests for Third 120 Month Inservice Inspection Interval CNRO-2008-00035, Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 8052008-11-20020 November 2008 Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 805 ML0809801202008-04-28028 April 2008 Request for Alternative W3-ISI-005, Request to Use ASME Code Case N-716 ML0809502732008-04-21021 April 2008 Revised Request for Alternative W3-R&R-006 to ASME Code Requirements for Weld Overlay Repairs for Second 10-Year Inservice Inspection ML0802504912008-02-15015 February 2008 Request for Alternative W3-ISI-003 to ASME Code Requirements to Allow Extension to Second 10-Year Inservice Inspection Interval Beyond That Currently Allowed by ASME Subsection IWA-2340(d) ML0725600262007-09-24024 September 2007 Withdrawal of W3-ISI-002, Request for Alternative CNRO-2007-00027, Request for Alternative W3-ISI-004 Proposed Alternative to Second Interval ISI Examinations2007-08-0707 August 2007 Request for Alternative W3-ISI-004 Proposed Alternative to Second Interval ISI Examinations ML0701200812007-02-0202 February 2007 River Bend Station, & Waterford Steam Electric Station, Unit 3 - Request for Alternative CEP-PT-001, Visual Exam of Vent & Drain Leakage Tests (TAC MD1399, MD1400, MD1401, MD1402, & MD1403) 2021-10-28
[Table view] Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000382/20230032023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 2024-09-06
[Table view] Category:Safety Evaluation
MONTHYEARML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22194A9012022-07-20020 July 2022 Issuance of Amendment No. 268 Adoption of Technical Specification Task Forcetraveler TSTF-569, Revise Response Time Testing Definition, Revision 2 ML22153A4452022-07-0808 July 2022 Issuance of Amendment No. 267 for Reactor Coolant System Pressure/Temperature Limits and Low Temperature Overpressure Setpoints Applicable for 55 Effective Full Power Years ML22145A0152022-05-27027 May 2022 Issuance of Amendment No. 266 to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22075A1022022-04-29029 April 2022 Issuance of Amendment No. 264 to Relocate Chemical Detection System Technical Specifications to Technical Requirements Manual ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22061A2172022-03-15015 March 2022 Revision of the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21166A1832021-09-15015 September 2021 Issuance of Amendment No. 261 Regarding Removal and Relocation of Boration System Technical Specifications ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System ML21082A3022021-05-19019 May 2021 Issuance of Amendment No. 259 to Revise Emergency Action Levels to a Scheme Based on NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML20280A3292020-10-20020 October 2020 Issuance of Amendment No. 258 Regarding Technical Specification 3/4.8.1 Surveillance Requirements ML20205L5742020-08-25025 August 2020 Issuance of Amendment No. 257 Control Room Air Condition System Technical Specifications ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML20022A2582020-01-28028 January 2020 Re-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control ML20002A0202020-01-13013 January 2020 Approval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control System ML19275D4382019-10-24024 October 2019 Redacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML19282D8922019-10-15015 October 2019 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19247B1972019-09-0909 September 2019 Approval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination ML19232A0252019-08-27027 August 2019 Authorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement Activities ML19164A0012019-06-28028 June 2019 Issuance of Amendment No. 254 Regarding Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink, ML19157A3162019-06-12012 June 2019 Authorization of Proposed Alternative to ASME Code Case N-770-2 ML19022A3372019-02-13013 February 2019 Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload ML18282A0302018-10-18018 October 2018 Proposed Alternative to ASME Code, Section XI, Regarding Charging Pipe Visual Inspection ML18180A2982018-07-23023 July 2018 Issuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18026B0532018-04-26026 April 2018 Issuance of Amendment No. 251 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control,(Cac No. MF9537; EPID L-2017-LLA-0205) ML17341A1202017-12-11011 December 2017 Relief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049) ML17328A8822017-11-29029 November 2017 Requests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47) ML17192A0072017-07-27027 July 2017 Issuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3 ML17069A1872017-03-22022 March 2017 Request for Alternative to 10 CFR 50.55a(c) ASME Code Section III Code Case 1361-1, Relief Request W3-ISI-024 ML17045A1482017-03-0303 March 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16235A2282016-12-0909 December 2016 Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML16278A0172016-10-19019 October 2016 Entergy Fleet Relief Request RR-EN-ISI-15-1, Alternative to Maintain Inservice Inspection Related to Activities to the 2001 Edition/2003 Addendum of ASME Section XI Code ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16159A4192016-07-26026 July 2016 Issuance of Amendment No. 249 Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control ML16182A2702016-07-0606 July 2016 Relief Request PRR-WF3-2016-1, Alternative to the Inservice Testing Program ML16126A0332016-06-27027 June 2016 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16077A2702016-05-10010 May 2016 Issuance of Amendment No. 247 Regarding Cyber Security Plan Milestone 8 Full Implementation Schedule ML15289A1432015-11-13013 November 2015 Redacted - Issuance of Amendment No. 246 Changes to Technical Specification 3.1.3.4 Regarding Control Element Assembly Drop Times 2024-08-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 June 12, 2009 Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 SUB~IECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - REQUEST FOR ALTERNATIVE W3-ISI-006 FOR THE SECOND 10-YEAR INSERVICE INSPECTION INTERVAL (TAC NO. MD9671)
Dear Sir or Madam:
By letter dated September 18, 2008, as supplemented by letter dated March 19, 2009, Entergy Operations, Inc. (Entergy, the licensee), requested U.S. Nuclear Regulatory Commission (NRC) approval for request for alternative W3-ISI-006. The request for alternative, to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Paragraph IWB-2412, Inspection Program B, requested approval, to extend the second and third 10-year inservice inspection (lSI) interval examinations of the reactor pressure vessel (RPV) welds (Category B-A) as well as the nozzle-to-vessel welds and inner radius sections (Category B-D) until 2015 and 2035, respectively, plus or minus one refueling cycle at the Waterford Steam Electric Station, Unit 3 (Waterford 3).
The proposed alternative was requested pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(a)(3)(i). Based on the NRC staff's review, authorization of the proposed alternative is justified on the basis that it would provide an acceptable level of quality and safety to perform Waterford 3's second 10-year lSI interval examination in 2015, plus or minus one refueling cycle. The licensee will have to resubmit the requested alternative for Waterford 3's third 1O-year lSI interval after the results of the facility's 2015 inspection have been evaluated.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
-2 The NRC staff's safety evaluation is enclosed.
Sincerely, Michael 1. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
Safety Evaluation cc w/encl.: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ALTERNATIVE W3-ISI-006 FOR THE SECOND 10-YEAR INSERVICE INSPECTION INTERVAL FOR REACTOR PRESSURE VESSEL WELD EXAMINATION WATERFORD STEAM ELECTRIC STATION, UNIT 3 ENTERGY OPERATIONS, INC.
DOCKET NO. 50-382
1.0 INTRODUCTION
By letter dated September 18, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082660040), as supplemented by letter dated March 19, 2009 (ADAMS Accession No, ML090820487), Entergy Operations, Inc. (Entergy, the licensee) requested U.S. Nuclear Regulatory Commission (NRC) approval for request for alternative W3-ISI-006 which proposes an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, paragraph IWB-2412, Inspection Program B, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a(a)(3)(i). The licensee requested approval for the use of the alternative, W3-ISI-006, to extend the second and third 1O-year inservice inspection (lSI) interval for examinations of the reactor pressure vessel (RPV) welds (Category B-A) as well as the nozzle-to-vessel welds and inner radius sections (Category B-D) until 2015 and 2035, respectively, plus or minus one refueling cycle at the Waterford Steam Electric Station, Unit 3 (Waterford 3).
2.0 REGULATORY EVALUATION
In accordance with 10 CFR 50.55a(g)(4), the licensee is required to perform lSI of ASME Code Class 1, 2, and 3 components and system pressure tests during the first 10-year interval and subsequent 10-year intervals that comply with the requirements in the latest edition and addenda of Section XI of the ASME Code, incorporated by reference in 10 CFR 50.55a(b),
subject to the limitations and modifications listed therein.
Paragraph 50.55a(a)(3) of 10 CFR states, in part, that the Director of the Office of Nuclear Reactor Regulation may authorize an alternative to the requirements of 10 CFR 50.55a(g). For an alternative to be authorized, as per 10 CFR 50.55a(a)(3)(i), the licensee must demonstrate Enclosure
-2 that the proposed alternative would provide an acceptable level of quality and safety; per 10 CFR 50.55a(a)(3)(ii), the licensee must show that following the ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.1 Background The lSI of Category B-A and B-D components consists of visual and ultrasonic examinations intended to discover whether flaws have initiated, whether pre-existing flaws have extended, and existence of (pre-existing) flaws that may have been missed in prior examinations. These examinations are required to be performed at regular intervals, as defined in Section XI of the ASME Code.
2.2 Summary ofWCAP-16168-NP On January 26, 2006, the Pressurized Water Reactor Owners Group (PWROG) submitted topical report WCAP-16168-NP, Revision 1, "Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval" (WCAP-16168), to the NRC in support of making a risk-informed assessment of extensions to the lSI intervals for Category B-A and B-D components. In the report, the PWROG took data associated with three different pressurized-water reactor (PWR) plants (referred to as the pilot plants), one designed by each of the main contractors for nuclear power plants in the U.S., and performed the necessary studies on each of the pilot plants required to justify the proposed extension for the lSI interval for Category B-A and B-D components from 10 to 20 years.
The analyses in the WCAP-16168 used probabilistic fracture mechanics (PFM) tools and inputs from the work described in the NRC's pressurized thermal shock (PTS) risk re-evaluation. The PWROG analyses incorporated the effects of fatigue crack growth and lSI. Design-basis transient data was used as input to the fatigue crack-growth evaluation. The effects of lSI were modeled consistently with the previously approved PFM codes. These effects were put into evaluations performed with the Fracture Analysis of Vessels-Oak Ridge (FAVOR) code. All other inputs were identical to those used in the PTS risk re-evaluation.
From the results of the studies, the PWROG concluded that the ASME Code,Section XI, 1O-year inspection interval for Category B-A and B-D components in PWR reactor vessels can be extended to 20 years. Their conclusion from the results for the pilot plants was considered to be applicable to PWR plants designed by the three vendors (Westinghouse, Combustion Engineering, and Babcock and Wilcox) as long as the critical, plant-specific parameters (defined in Appendix A of the WCAP-16168) are bounded by the pilot plants.
2.3 Summary of NRC Safety Evaluation Report ofWCAP-16168-NP The staff's conclusion in its safety evaluation report (SER) ofWCAP-16168-NP, Revision 2, dated May 8,2008 (ADAMS Accession No. ML081060045), indicates that the methodology presented in the WCAP-16168, along with the guidance provided by Regulatory Guide 1.174, Revision 1, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," dated November 2002 (ADAMS Accession No. ML023240437), is acceptable for referencing in requests to implement alternatives to the
-3 ASME Code inspection requirements for PWR plants in accordance with the limitations and conditions in the SER. In addition to showing that the subject plant is bounded by the pilot plants' information from Appendix A in the WCAP, the key points of the SER are summarized below.
- 1. The dates identified in the request for alternative should be within plus or minus one refueling cycle of the dates identified in the implementation plan, PWROG letter OG-06-356, "Plan for Plant Specific Implementation of Extended Inservice Inspection Interval per WCAP-16168-NP, Revision 1, 'Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval,'" dated October 31, 2006 (ADAMS Accession No. ML082210245). Any deviations from the implementation plan should be discussed in detail in the request for alternative lSI interval. The maximum interval for proposed lSI is 20 years.
- 2. The requirements for reporting the results of ISIs found in the voluntary PTS rule apply in all cases. Licensees that do not implement the voluntary PTS rule must amend their licenses to require that the information and analyses requested in the voluntary PTS rule be submitted for NRC staff review and approval. The amendment to the license shall be submitted at the same time as the request for alternative lSI interval. However, as explained in Section 4.0 of this SE, this requirement has been relaxed.
- 3. The request for alternative lSI interval can use any NRC-approved method to calculate
- b. T 30 and RTMAX-X to subsequently calculate the total through-wall-crack-frequency (TWCF95-TOTAL) for the RPV. However, if the request uses the NUREG-1874, "Recommended Screening Limits for Pressurized Thermal Shock (PTS)," 2007 (ADAMS Accession No. ML070860156) methodology to calculate b. T 30, then the request should include the analysis described in paragraph (6) of subsection (f) to the voluntary PTS rule. The analysis should be done for all of the materials in the beltline area with at least three surveillance data points.
- 4. If the subject plant has RPV forgings that are susceptible to underclad cracking or if the RPV includes forgings with RTMAX-FO values exceeding 240 degrees Fahrenheit CF),
then the WCAP-16168 analyses are not applicable. The licensee must submit a plant-specific evaluation for any extension to the 10-year inspection interval for ASME Code,Section XI, Category B-A and B-D RPV welds.
3.0 TECHNICAL EVALUATION
3.1 Description of Proposed Alternative The licensee proposes to defer the ASME Code-required Category B-A and B-D second 10-year lSI interval weld examination at Waterford 3 until 2015 (18-year interval from the last inspection) and continuing with the third 10-year lSI interval examination in 2035. This schedule is consistent with the information in PWROG letter OG-06-356.
-4 3.2 Components for Which Relief is Requested The affected component is the Waterford 3 RPV; specifically, the following ASME Code,Section XI examination categories and item numbers cover examinations of the RPV. These examination categories and item numbers are from Table IW8-2500 and IW8-2500-1 of the ASME Code,Section XI.
Examination Category Item Number Description 8-A 81.11 Circumferential Shell Welds 8-A 81.12 Longitudinal Shell Welds 8-A 81.21 Circumferential Head Welds 8-A 81.22 Meridional Shell Welds 8-A 81.30 Shell-to-Flange Weld 8-A 81.40 Head-to-Flange Weld 8-A 81.50 Repair Welds 8-A 81.51 8eltline Region Repair Welds 8-D 83.90 Nozzle-to-Vessel Welds 8-D 83.100 Nozzle Inner Radius Areas 3.3 8asis for Proposed Alternative The basis for the alternative is found in the NRC-approved version of topical report WCAP-16168 (WCAP-16168-NP-A). Plant-specific parameters for the subject plant are summarized in Enclosure 1 to the licensee's submittal dated September 18, 2008. The format of the information is patterned after that found in Appendix A of the WCAP-16168.
All of the critical parameters listed in Tables 1, 2, and 3 of Enclosure 1 to the licensee's submittal are bounded by the WCAP-16168-NP-A pilot plant evaluations.
3.4 Duration of Proposed Alternatives The duration of the proposed alternative is until 2015 for the second 1O-year lSI and until 2035 for the third 10-year lSI.
4.0 NRC STAFF EVALUATION The staff has reviewed Enclosure 1 to the licensee's request for alternative application, dated September 18, 2008, as supplemented by letter dated March 19, 2009. The "Frequency and Severity of Design Transients" of Waterford 3 were found to be bounded by the WCAP-16168-NP-A. Also, the Waterford 3 RPV was single-layer clad and so was bounded by the WCAP-16168-N P-A.
Table 2 to Enclosure 1 of the licensee's submittal dated September 18, 2008, includes additional information pertaining to previous RPV inspections and the schedule for future ones.
- 5 The proposed second 10-year lSI interval examination and the proposed third 1O-year lSI interval examination, for Waterford 3, would be in 2015 and 2035, respectively. These proposed dates for the second and third 10-year lSI interval examinations for Waterford 3 are consistent with the PWROG letter OG-06-356. According to the past inspection's data contained in Table 2 of the licensee's submittal, zero reportable indications have been found to date and any recordable indications have been acceptable per ASME Code,Section XI IWB-3500. Therefore, the information in Table 2 of the licensee's submittal meets the regulatory guidance and is, therefore, acceptable.
At the time of issuance of the WCAP-16168-NP SER, it was the NRC's intent to establish a process by which licensees could receive approval to implement 20-year lSI intervals for the subject component examinations through the end of their facility's current operating license.
This objective led to the provision established in the WCAP-16168-NP SER that licensees submit a license condition which would require the licensee to evaluate future volumetric lSI data in accordance with the criteria in the draft and/or final alternative PTS Rule, 10 CFR 50.61 a. However, since that time, further guidance has resulted in a modification of this position.
Based on the modified position, the NRC staff will grant lSI interval extensions for the subject components on an interval-by-interval basis (i.e., a facility's current lSI interval only will be extended for up to 20 years). Licensees will have to submit subsequent alternatives, for NRC staff review and approval, to extend from 10 years to 20 years each following lSI interval, as needed. As a result, the NRC staff cannot grant Entergy's request to also extend the third lSI interval until 2035. Based on this, the requirement for a license condition (in WCAP-16168-NP) to address the evaluation of future lSI data is no longer necessary. The license condition requested by Entergy for Waterford 3 by letter dated September 17, 2008, was withdrawn by letter dated June 3, 2009 (ADAMS Accession No. ML091560028). However, subsequent alternative requests which seek to extend additional lSI intervals from 10 to 20 years for the subject component examinations should include the evaluation of a facility's most recent lSI data in accordance with the criteria in the final alternative PTS Rule, 10 CFR 50.61 a, in order to obtain NRC staff approval. In addition, for purposes of technical and regulatory consistency, the WCAP-16168-NP SER will be revised to reflect these changes in NRC position regarding the implementation of lSI interval extensions based on WCAP-16168-NP.
The licensee used the NUREG-1874 methodology to calculate LH 30 , RT MAX-X, and TWCF95-TOTAL values for the RPV. Table 3 to Enclosure 1 of the licensee's submittal dated September 18, 2008, summarizes the results of these calculations. Since the licensee did not include an analysis of surveillance data points as described in paragraph (6) of subsection (f) to the voluntary PTS rule, which is required if the licensee implements the NUREG-1874 methodology to calculate 6T3o , RT MAX-X, and TWCF95-TOTAL value for the RPV, the staff requested the licensee to provide analysis consistent with the requirements (paragraph (6) of subsection (f) to the voluntary PTS rule) for Waterford 3 RPV surveillance data points. In its letter dated March 19, 2009, the licensee stated that presently, Waterford 3 has only 2 points of surveillance data.
Therefore, the surveillance checks of paragraphs (f)(6)(ii), (f)(6)(iii), and (f)(6)(iv) can not be performed and as stated in paragraph (f)(6)(i)(B) to the voluntary PTS rule, the embrittlement model of NUREG-1874 may be used without performing the consistency check.
-6 The staff independently verified the licensee's calculations of I:::. T 30 and RTMAX-X using the methodology described in NUREG-1874. The staff calculated the RTMAX-X values for the limiting axial weld, limiting plate, and circumferential weld which were all within 5 OF of the values listed in Table 3 of the licensee's application and well below the PTS screening criteria thresholds as given in Table 1 of the voluntary PTS rule. The calculation of TWCF95-TOTAl value for the Waterford 3 RPV is not the critical parameter in the analysis of this request for alternative, because none of the conditions of paragraph (e)(4)(i) through (e)(4)(iv) apply to Waterford 3.
However, the staff also calculated values for TWCF 95 -xx for each of the limiting beltline materials mentioned above and found them to be off by orders of magnitude compared to the licensee's calculated values. The TWCF95-TOTAl value for the Waterford 3 RPV was then calculated by the staff and found to be an order of magnitude smaller than the licensee calculated value, and orders of magnitude below the 1 x 10-6 per reactor year threshold stated in paragraph (e)(4).
In summary, the licensee has demonstrated through the request for alternative submittal that the RPV for Waterford 3 is bounded by the WCAP-16168-NP-A analyses and that all regulatory requirements pertaining to the voluntary PTS rule have been satisfied. The staff concluded that the licensee's submittal demonstrates that there is no significant additional risk associated with extending the lSI interval for Category B-A and B-D pressure retaining welds from 10 years to 20 years for the second 10-year lSI interval at Waterford 3 and is, therefore, acceptable.
5.0 REGULATORY COMMITMENTS In Enclosure 2 to its letter dated September 18, 2008, the licensee made the following commitments:
Commitment Scheduled Completion Date Entergy will extend the second 1O-year inservice inspection interval from 2015 refueling 10 years to 20 years for the Examination Category B-A and B-D reactor outage plus or minus vessel welds and perform the Waterford 3 inspection in the 2015 one refueling cycle refuelinq outaqe plus or minus one refuelinq cycle (One Time Action).
Entergy will perform the second 1O-year inservice inspection of the Fall 2009 refueling Examination Category B-J welds associated with the reactor vessel outage. (RF16) durinq the refuelinq outage Waterford 3 (One Time Action).
6.0 CONCLUSION
The staff has completed its review of the request for alternative W3-ISI-006, and concludes that increasing the second 10-year lSI interval for Category B-A and B-D pressure retaining weld examinations from 10 years to 20 years shows no appreciable increase in risk and thus, granting of the modified proposed alternative is justified on the basis that it would provide an acceptable level of quality and safety. Therefore, the staff authorizes the modified proposed alternative pursuant to 10 CFR 50.55a(a)(3)(i) for the second 1O-year lSI interval at Waterford 3.
The alternative authorizes the licensee to perform the subject Waterford 3 second 10-year lSI interval examinations in 2015, plus or minus one refueling cycle.
-7 All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: A. Shaikh Date: June 12, 2009