E-mail Arkansas Nuclear One, Unit 2 - Request for Additional Information, Relief Request ANO2-ISI-004 to Extend Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations
ML101030208
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/13/2010
From: Kalyanam K
Plant Licensing Branch IV
To: Clark R
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
ANO2-ISI-004, TAC ME2508
Download: ML101030208 (2)


Text

From:

Kalyanam, Kaly Sent:

Tuesday, April 13, 2010 9:54 AM To:

CLARK, ROBERT W Cc:

BICE, DAVID B

Subject:

RAI on ANO-2 Request for Alternative ANO2_ISI-004 (TAC No. ME2508)

Dave/Bob, By letter dated October 19, 2009, Entergy Operations, Inc. (Entergy) submitted Request for Alternative ANO2-ISI-004, "Proposed Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations," for Arkansas Nuclear One, Unit 2.

The NRC Staff has reviewed the Request for Alternative and determined that it requires additional information to complete its review. A request for additional information appears below.

Please provide the response to this RAI within 45 days of receipt of this email. If it is likely that you can not meet this date, please let me know.

Thanks Kaly REQUEST FOR ADDITIONAL INFORMATION ON RELIEF REQUEST FOR ARKANSAS NUCLEAR ONE, UNIT 2 DOCKET NO. 50-368 ISI SCHEDULE: ANO2-ISI-004 TAC NO: ME2508

1. In Table 3, Details of TWCF Calculation - ANO Unit 2 at 48 Effective Full Power Years (EFPY), input values are given for Cu, Ni, and fluence for each beltline material. These values are not all consistent with Nuclear Regulatory Commission (NRC) records. The Cu and Ni values are consistent with Arkansas Nuclear One, Unit 2 (ANO-2) License Renewal Application (LRA), Agencywide Documents Access and Management System, (ADAMS), Accession No. ML032890506, but were not consistent with Safety Analysis Report (SAR), Amendment No. 19. Fluence values are not consistent with the LRA or

the SAR. Please identify a docketed and reviewed reference containing these values, or provide a technical basis for the change from previous values. If any input values are changed, please provide the appropriate revised calculations.

2. Table 2, Additional Information Pertaining to Reactor Vessel Inspection - ANO-2, states that ANO-2 is bounded by 13 heatups/cooldowns per year. Please cite the plant design basis for heatup/cooldowns per year.

E-mail Properties Mail Envelope Properties ()

Subject:

RAI on ANO-2 Request for Alternative ANO2_ISI-004 (TAC No. ME2508)

Sent Date: 4/13/2010 9:36:35 AM Received Date: 4/13/2010 9:54:00 AM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients:

RCLARK@entergy.com (CLARK, ROBERT W)

Tracking Status: None DBICE@entergy.com (BICE, DAVID B)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 12971 4/13/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: