Letter Sequence ' |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement
|
MONTHYEARML0729006392007-10-29029 October 2007 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for Beaver Valley Power Station Units 1 and 2 Project stage: Other ML0729006502007-10-29029 October 2007 United States Nuclear Regulatory Commission Firstenergy Nuclear Operating Company Beaver Valley Power Station Unit Nos. 1 and 2 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process Project stage: Request ML0735202822007-11-27027 November 2007 Slides, Beaver Valley Power Station License Renewal Process and Environmental Scoping Meeting. Project stage: Meeting ML0734008432007-11-27027 November 2007 Transcript of the Beaver Valley Power Station License Renewal Public Meeting - Evening Session, November 27, 2007, Pages 1-49 Project stage: Meeting ML0733900322007-11-27027 November 2007 Transcript of Proceedings for Beaver Valley Power Station Public Meeting (Afternoon Session), November 27, 2007, Pages 1-39 Project stage: Request ML0735305392008-01-0909 January 2008 Summary of Public Environmental Scoping Meetings Related to the Renewal of the Beaver Valley Power Station, License Renewal Application (TAC Nos. MD6595 and MD6596) Project stage: Meeting ML0802203432008-01-14014 January 2008 Letter from George Dudash III, Comment Regarding the Beaver Valley Power Station Unit 1 and 2 License Renewal Project stage: Other ML0802307282008-01-28028 January 2008 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Beaver Valley Power Station, Units 1 and 2, License Renewal (TAC Nos. MD6595 and MD6596) Project stage: RAI ML0802404112008-01-30030 January 2008 Beaver, Units 1 and 2, Environmental Impact Statement Scoping Process Summary Report Project stage: Other ML0805606272008-02-27027 February 2008 Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report Project stage: Approval ML0805605882008-03-13013 March 2008 RAI Refurbishment Impacts for Beaver Valley Units 1 & 2 License Renewal (TAC Nos. MD6595 and MD6596) Project stage: RAI ML0802902572008-03-17017 March 2008 Summary of Site Audit Related to the Review of the LRA for Beaver Valley, Units 1 and 2 Project stage: Approval ML0807301162008-03-21021 March 2008 Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional In Project stage: Request ML0807403922008-03-26026 March 2008 Summary of Telephone Conference Between NRC and Firstenergy Nuclear Operating Company, Concerning Clarification of Severe Accident Mitigation Alternatives Request for Additional Information Pertaining to Beaver Valley Units 1 & 2 Project stage: RAI ML0807401232008-04-0707 April 2008 Summary of Telephone Conference Call Held on March 05, 2008, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Request for Additional Information Pertaining to the Refurbishment Activit Project stage: RAI L-08-125, Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, for License Renewal2008-04-25025 April 2008 Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, for License Renewal Project stage: Response to RAI L-08-148, Reply to Follow-Up Questions Pertaining to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for License Renewal2008-05-0202 May 2008 Reply to Follow-Up Questions Pertaining to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for License Renewal Project stage: Request ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval L-08-179, Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts for License Renewal2008-05-30030 May 2008 Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts for License Renewal Project stage: Response to RAI L-08-200, Supplemental License Renewal Environmental Information Requested by Nuclear Regulatory Commission2008-06-0202 June 2008 Supplemental License Renewal Environmental Information Requested by Nuclear Regulatory Commission Project stage: Supplement ML0812304992008-06-0303 June 2008 Teleconf Held 4/30/08 Between NRC and Firstenergy Concerning the RAI Pertaining to the Refurbishment Activities at Beaver, Units 1 and 2, LRA Project stage: Request L-08-210, Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, License Renewal2008-06-26026 June 2008 Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, License Renewal Project stage: Response to RAI ML0825403992008-09-17017 September 2008 Notice of Availability of the Draft Plant-Specific Supplement 36 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants the Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MD6595 and MD6596) Project stage: Draft Other ML0826001472008-09-30030 September 2008 NUREG-1437 Supp 36, Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment) Project stage: Draft Other ML0831005872008-10-21021 October 2008 Comment (1) of Vincent Biancucci, on Behalf of Self, Beaver Valley Power Station, Renewal and Extension of Licensing for Units 1 and 2 Project stage: Request ML0832505192008-10-30030 October 2008 Official Transcript of Proceedings for the Beaver Valley Draft Environmental Impact Statement Public Meeting Afternoon Session, Thursday, October 30, 2008, Pages 1-45 Project stage: Request ML0832505202008-10-30030 October 2008 Transcript of Beaver Valley Power Station, Units 1 & 2, Public Meeting Evening Session: Evening Session, 10/30/2008, Pages 1-33 Project stage: Request ML0831507282008-10-30030 October 2008 Letter from PA Historical and Museum Commission Bureau for Historic Preservation Regarding the Beaver Valley Power Station License Renewal Project stage: Other ML0832902542008-11-10010 November 2008 Comment (2) of Diane M. Kemp on Behalf of Borough of Midland Re License Renewal of Beaver Valley, Units 1 and 2 Project stage: Other ML0832400512008-11-17017 November 2008 Preliminary Results of Environmental Review Project stage: Request ML0835204932008-11-19019 November 2008 Us Dept. of Interior, Office of the Secretary Comment on Draft Generic Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 & 2, NUREG-1437, Supplement 36 L-08-365, FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement2008-11-24024 November 2008 FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement ML0833301862008-11-24024 November 2008 NUREG-1437 Supplement 36, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment). ML0835700412008-12-10010 December 2008 Comment (4) of William Arguto on Behalf of the U. S. Environmental Protection Agency, Region III on Draft Generic Supplemental Environmental Impact Statement (Dgseis) for the Beaver Valley Power, Units 1 and 2 (Report Number NUREG-1437, Sup Project stage: Request ML0835700422008-12-12012 December 2008 Comment (3) of Diane Johnson on Behalf of United Way of Southern Columbiana County in Support of the Firstenergy Nuclear Operating Company Beaver Valley Power Station Project stage: Request ML0836600292009-01-0909 January 2009 10/30/08 Summary of Public Meeting on the Draft Supplemental Environmental Impact Statement Regarding the Beaver Valley Power Station, License Renewal Review ML0912600242009-05-12012 May 2009 Final Supplement 36 to NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (BVPS) Project stage: Acceptance Review ML0912504132009-05-12012 May 2009 Final Supplement 36 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS) Regarding Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MD6595 and MD6596) Project stage: Other ML0912503632009-05-14014 May 2009 Notice of Availability of the Final Plant-Specific Supplement 36 to the GEIS for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station Project stage: Other ML0912600112009-05-31031 May 2009 NUREG-1437 Supplement 36 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station Units 1 and 2 Final Report Project stage: Acceptance Review ML0926105222009-09-28028 September 2009 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC MD6593, MD6594, MD6595, MD6596) Project stage: Approval 2008-03-17
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] |
Text
Beaver Valley Power Station P.O. Box 4 I--% Shippingport,PA 15077 FirstEnergyNuclear OperatingCompany Peter P. Sena II 724-682-5234 Site Vice President Fax: 724-643-8069 November 24, 2008 L-08-365 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 NUREG-1437 Supplement 36, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regardinq Beaver Valley Power Station, Units 1 & 2 (Draft For Comment)" (TAC Nos. MD6595 and MD6596) (ML082600147)
The attachment provides FirstEnergy Nuclear Operating Company (FENOC) comments on NUREG-1437 Supplement 36, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units I & 2 (Draft.
For Comment)" (TAC Nos. MD6595 and MD6596) (ML082600147).
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
I declare under penalty of perjury that the foregoing is true and correct. Executed on November,&j., 2008.
Sincerely, Peter P. Sena III
Beaver Valley Power Station, Unit Nos. 1 and 2 L-08-365 Page 2
Reference:
NUREG-1437 Supplement 36, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft For Comment)" (TAC Nos. MD6595 and MD6596) (ML082600147).
Attachment:
FirstEnergy Nuclear Operating Company (FENOC) Comments on NUREG-1437 Supplement 36, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft For Comment)" (TAC Nos. MD6595 and MD6596) (ML082600147) cc: Mr. K. L. Howard, NRC DLR Project Manager Mr. S. J. Collins, NRC Region I Administrator cc: w/o Attachment Mr. B. E. Holian, NRC DLR Director Mr. D. L. Werkheiser, NRC Senior Resident Inspector Ms. N. S. Morgan, NRC DORL Project Manager Mr. D. J. Allard, PA BRP/DEP Director Mr. L. E. Ryan, PA BRP/DEP
ATTACHMENT Beaver Valley Power Station (BVPS), Unit Nos. I and 2 Letter L-08-365 FirstEnergy Nuclear Operatinq Company (FENOC)
Comments on NUREG-1437 Supplement 36, "Generic Environmental lmoact Statement for License Renewal of Nuclear Plants:
- Regarding Beaver Valley Power Station, Units I & 2 (Draft For Comment)"
(TAC Nos. MD6595 and MD6596) (ML082600147)
Page 1 of 4 EDITORIAL Page Line Comment xiii 30 Change tense to 'The NRC staff held two public meetings...'
1-2 25 'appendixes' should be 'appendices' 1-6 43 Change tense to '...the NRC staff held two public meetings...'
Insert the following clause after 'existing OL,' "or be operating pursuant to the 1-7 24 timely renewal provisions of 10 CFR 2.109(b) pending completion of the NRC's review of a license renewal application, the possession...."
1-7 36 A space is need between '(AEA)' and 'of' 2-1 9 'river' should be 'River' 2-2 28 Change 'tunnel' to 'culvert' 2-2 33 Un-hyphenate 'Duquesne-Light-owned' The sentence beginning on Line 42 and continuing onto the next page appears to be incomplete. Seems that text has been left off the page.
Section 2.1.4 is where we first encounter the description of any hypothetical steam 2-10 5 ,generator replacement's "interaction with the environment." Potential resulting interactions should be made more conditional in nature e.g., "would" vs. "will" usage.
2-10 10 'federal' should be 'Federal' 2-13 39 Update the Barnwell June 2008 discussion.
2-13 40 Remove the comma between 'June' and '2008' 2-14 36 'An' should be 'A' 2-17 1 Lines 1 through 7 contain extraneous bullets.
2-18 3 Insert comma after 'FENOC aging management review' 2-18 26 Change 'conclude' to 'concluded' 2-23 2 Insert comma after the 'U.S.'
Change system to be possessive, '...in the nuclear steam supply system's primary 2-24 and secondary...'
2-26 Table 2-2, include a footnote with the meaning of the acronym NDR.
Attachment L-08-365 Page 2 of 4 EDITORIAL (Continued)
Page Line' Comment Table 2-2, change formatting of the 'Source Name' and 'Source Type' columns to 2-26 clarify labels.
2-29 Table 2-3, include a footnote for the meaning of the acronym NLR.
2-30 25 Hydrazine should be lowercase Rearrange sentence to read, 'The facility must provide reports to PADEP that 2-30 35 describe the quantities of unrestricted radioactive material released in effluent discharges.'
2-38 12 Change 'semienclosed' to 'semi-enclosed' 2-38 20 Change 'mostly consists' to 'consists mostly' 2-39 15 Change 'mostly consists' to 'consists mostly' 2-41 12 Move '(FENOC 2007a)' to be before the period 2-42 12 In Table 2-5, change 'Molluscs' to 'Mollusks' Section 2.2.6.3 should include discussion on the plants contained in Table 2-6 2-45 6 similarly to the discussion of birds, mammals and reptiles.
2-46 29 Add a space between 'FWS' and 'confirmed' Section 2.2.8.2 does not contain the definition of "MGD" used in section text and 2-52 4 table 2-9.
The sentence beginning on line 23 lacks a reference to verify the noise level of 55 2-57 23 decibels.
2-65 36 Remove the sentence that is related to 'PPL Susquehanna' 2-67 40 Sentence beginning on line 40 does not end in a period on line 42.
2-70 31 Remove the word 'is' after 'above,'
Use of "would" vs. "will:" Given that the Unit 2 steam generator replacement is not a foregone conclusion, use of the term "will" throughout sends a message different 3-3 1 from that conveyed by "would." Change Section 3.1 to be consistent with the language used in Section 3.2.2, page 3-9, Line 4, to ensure a consistent message throughout this chapter, and an accurate portrayal of the conditional nature of the project.
4-4 28 Put acronym in parentheses (NPDES), not the complete term 4-12 32 Insert 'with' after 'consulted' 4-14 1 ,Mixed indentation in the formatting on this page 4-14 5 Add blank line after line 5 4-26 24 Insert an additional space after line 24 4-33 36 Change 'formally' to 'formerly' GEBetz Powerline 3627 is no longer used. Remove the specific product name 4-39 44 and leaving only the generic name of "quaternary amine-based nonoxidizing molluscicide" 4-44 5 Change 're-licensing' to 'license renewal' 6-6 12 Change 'This development do' to 'This development does' 8-36 7 Change 'European Pressurized Reactor' to 'Evolutionary Power Reactor' Include the estimated MWe output of the European Pressurized Reactor and the 8-36 7 US- Advanced Pressurized Water Reactor.
8-40 36 Add space between line 36 & 37
Attachment L-08-365 Page 3 of 4 EDITORIAL (Continued)
Page Line Comment 8-41 7 Add space between line 7 & 8 8-41 24 Add space between line 24 & 25 8-41 38 Add space between line 38 & 39 8-45 32 Spell-out acre and hectare versus using "a" and "ha" respectively.
ERRATA Page Line Comment Remove the word "dedicated" regarding waste minimization team. Waste 2-16 39 minimization is a function of the FENOC Environmental Peer Group /
Environmental Team, but waste minimization is not its sole or primary function.
Table 2-2, change the following 'Evaporation' values:
- Main Intake Structure 2006: from "NDR" to 10,233,513,828
- Midland Municipal Authority 2004: from 2,684,000 to 2,364,000 "Midland Municipal Authority 2005: from 2,795,000 to 2,454,500 "Midland Municipal Authority 2006: from "NDR" to 2,437,547 Table 2-2, change the following 'Offsite Disposal' value:
" Midland Municipal Authority 2006: from "NDR" to 830,300 2-26 The apparent discrepancy is due to the fact that between 2004 and 2006, the PA DEP changed reporting formats. Beginning in 2006, DEP reports no longer separated evaporation from each source name/type, and reported only as one facility. The above data to be input into the table per this comment was submitted to the PA DEP and copies were submitted to NRC as "Supplemental Information" from the environmental audit.
2-30 4 Change '(005)' to '(006)'
Re-word sentence to read, 'According to the "Annual Radiological Environmental 2-31 38 Operating Report," tritium and radionuclides were not detected in samples taken from the Ohio River of water released during normal plant operations.'
It is more accurate to state that there are five (5) standby emergency power diesel generators... (2 @ Unit 1, 2 @ Unit 2, and the ERF EDG) OR say ... four (4) 2-34 25 standby emergency power supply diesel generators, and one (1) emergency response facility generator (because there is only one Emergency Response Facility diesel generator).
The sentence beginning on line 7 states, "According to the Pennsylvania Natural Heritage Program, five aquatic species listed by the Commonwealth of 2-42 7 Pennsylvania as threatened or endangered may occur in the vicinity of BVPS (PNHP 2008)." Table 2-5 list more than five (5) threatened or endangered species in the vicinity of BVPS.
Section 2.2.6 does not include the bald eagle in discussion of wildlife (pg 2-43, 2-43 1 line 34) or threatened species (pg 2-45, line 6 and Table 2-6).
Attachment L-08-365 Page 4 of 4 ERRATA (Continued)
Page Line Comment 2-44 30 FENOC does not conduct the transmission line flyovers. The work on transmission lines should be attributed to FirstEnergy rather than FENOC 2-53 19 It should be stated that the NRC's data gathering yielded the same results.
2-70 11 Change 'Two Archaeological Sites...' to 'Three Archaeological Sites...'
Delete sentence stating FENOC is currently collecting additional information in regards to Shippingport Atomic Power Station. Nothing more is needed for 4-25 21 license renewal and any work at Shippingport Atomic Power Station is now captured in BVPS procedures and practices and is beyond the scope of license renewal.
4-25 30 Change 'Two Archaeological Sites...' to 'Three Archaeological Sites...'
Include a statement that the identified radionuclide levels do not exceed regulatory 4-32 13 limits. Line 40 states as such, but would beneficial to state with text in line 13.
4-38 2 Bruce Mansfield is a FirstEnergy plant, not a FENOC plant 4-38 6 W.H. Sammis is a FirstEnergy plant, not a FENOC plant Change 'From 1970 until present...' to 'From 1970 until 1995...' Line 35 an 37 4-38 33 state that FENOC discontinued icthyoplankton and impingement surveys in 1995.
Add 'asiatic clams and' between 'nonnative' and 'zebra mussels' (as invasive 4-40 25 species of impact).
Section 8.2.5.11: Recently enacted state laws in both Pennsylvania and Ohio establish energy conservation targets for both states. These laws do not require 8-48 36 or envision net reductions in overall energy use in the future. Rather, they require that certain amounts of energy savings occur from what would otherwise have been used, i.e., overall energy usage will still be such that BVPS Unit I will still be necessary to meet customer loads.
Section 8.2.6: Recently enacted state laws in both Pennsylvania and Ohio establish energy conservation targets for both states. These laws do not require or envision net reductions in overall energy use in the future. Rather, they require that certain amounts of energy savings occur from what would otherwise have been used, i.e., overall energy usage will still be such that BVPS Unit I will still be necessary to meet customer loads.