ML091250363

From kanterella
Jump to navigation Jump to search

Notice of Availability of the Final Plant-Specific Supplement 36 to the GEIS for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station
ML091250363
Person / Time
Site: Beaver Valley
Issue date: 05/14/2009
From: David Wrona
License Renewal Projects Branch 2
To: Sena P
FirstEnergy Nuclear Operating Co
Sayoc, Manny, NRR/DLR/RPB2 415-1924
Shared Package
ML091250329 List:
References
TAC MD6595, TAC MD6596
Download: ML091250363 (6)


Text

May 14, 2009 Peter P. Sena III Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB-1 Shippingport, PA 15077

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL PLANT-SPECIFIC SUPPLEMENT 36 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (TAC NOS. MD6595 AND MD6596)

Dear Mr. Sena:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final plant-specific Supplement 36 to NUREG-1437, ?Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS),@ regarding the renewal of operating licenses DPR-66 and NPF-73 for an additional 20 years of operation for the Beaver Valley Power Station, Units 1 and

2. Enclosed is a copy of the final supplement and the associated Federal Register Notice of Availability. This notice advises the public that the final supplement is publicly available at the NRC Public Document Room (PDR) or from the NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://adamswebsearch.nrc.gov/dologin.htm. The Accession Number for the final Supplement 36 to the GEIS is ML091260011. In addition, the following libraries have agreed to make the final Supplemental Environmental Impact Statement (SEIS) available for public inspection:
  • Beaver Area Memorial Library,100 College Ave., Beaver, PA 15009-2704, telephone 724-775-1132
  • Beaver County Library System, 1 Campus Drive, Monaca, PA 15061, telephone 724-728-3737 As discussed in Section 9.3 of the final supplement, the staff recommends that the Commission determine that the adverse environmental impacts of license renewal for the Beaver Valley Power Station, Units 1 and 2 are not so great that preserving the option of license renewal for energy planning decision makers would be unreasonable. This recommendation is based on:

(1) the analysis and findings in the GEIS; (2) the Environmental Report submitted by FirstEnergy Nuclear Operating Company; (3) consultation with Federal, State, and local agencies; (4) the NRC staff=s own independent review; and (5) the NRC staff=s consideration of public comments during the scoping period and the draft SEIS comment period.

P. Sena A separate Notice of Availability of the final supplemental environmental impact statement will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact the NRC License Renewal Project Manager, Mr. Emmanuel Sayoc, at 301-415-1924 or by e-mail at Emmanuel.Sayoc@nrc.gov, or Mr. Kent Howard, at 301-415-2989 or by e-mail at Kent.Howard@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

As stated cc w/encl: See next page

P. Sena A separate Notice of Availability of the final supplemental environmental impact statement will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact the NRC License Renewal Project Manager, Mr. Emmanuel Sayoc, at 301-415-1924 or by e-mail at Emmanuel.Sayoc@nrc.gov, or Mr. Kent Howard, at 301-415-2989 or by e-mail at Kent.Howard@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosures:

As stated cc w/encl: See next page DISTRIBUTION:

See next page ADAMS Accession Numbers: Pkg: ML091250329, Ltr: ML091250363, FRN: ML091260010, FINAL SEIS: ML091260011 OFFICE LA:DLR PM:DLR:RPB2 PM:DLR:RPB2 OGC (NLO) BC:DLR:RPB2 NAME SFigueroa ESayoc KHoward LSubin DWrona DATE 05/14/09 05/7/09 05/07/09 05/05/09 05/14/09 OFFICIAL RECORD COPY

Letter to P. Sena from D. Wrona dated May 14, 2009 DISTRIBUTION:

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL PLANT-SPECIFIC SUPPLEMENT 36 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (TAC NOS. MD6595 AND MD6596)

E-MAIL RidsNrrDlrRpb2 RidsNrrDlrRerb R. Schaaf K. Howard E. Sayoc N. Morgan D. Werkheiser L. Subin N. Sheehan R. Barkley M. McLaughlin E. Brenner D. Screnci E. Dacus N. McNamara D. McIntyre RidsOGCMailRoom

Beaver Valley Power Station, Units 1 and 2 cc:

Joseph J. Hagan Director, Fleet Regulatory Affairs President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 Mail Stop A-GO-19 76 South Main Street 76 South Main Street Akron, OH 44308 Akron, OH 44308 Manager, Site Regulatory Compliance James H. Lash FirstEnergy Nuclear Operating Company Senior Vice President of Operations Beaver Valley Power Station and Chief Operating Officer Mail Stop A-BV-A FirstEnergy Nuclear Operating Company P.O. Box 4, Route 168 Mail Stop A-GO-14 Shippingport, PA 15077 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support Danny L. Pace FirstEnergy Nuclear Operating Company Senior Vice President, Fleet Engineering Mail Stop A-GO-14 FirstEnergy Nuclear Operating Company 76 South Main Street Mail Stop A-GO-14 Akron, OH 44308 76 South Main Street Akron, OH 44308 Commissioner James R. Lewis West Virginia Division of Labor Jeannie M. Rinckel 749-B, Building No. 6 Vice President, Fleet Oversight Capitol Complex FirstEnergy Nuclear Operating Company Charleston, WV 25305 Mail Stop A-GO-14 76 South Main Street Director, Utilities Department Akron, OH 44308 Public Utilities Commission 180 East Broad Street David W. Jenkins, Attorney Columbus, OH 43266-0573 FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149

Beaver Valley Power Station, Units 1 and 2 cc:

Jennifer Kagel Tony Gonyea Pennsylvania Field Office Onondaga Nation 315 South Allen St. Suite 322 RR#1, Route 11A State College, PA 16801-4850 Box 319B Via Nedrow, NY 13120 Director, Pennsylvania Emergency Management Agency Cliff Custer 2605 Interstate Dr. FirstEnergy Nuclear Operating Company Harrisburg, PA 17110-9364 Beaver Valley Power Station P.O. Box 4, Route 168 Dr. Judith Johnsrud Shippingport, PA 15077 Environmental Coalition on Nuclear Power Sierra Club Mike Banko 433 Orlando Avenue FirstEnergy Nuclear Operating Company State College, PA 16803 Beaver Valley Power Station P.O. Box 4, Route 168 Director Shippingport, PA 15077 Bureau of Radiation Protection Pennsylvania Department of Julie Firestone Environmental Protection FirstEnergy Nuclear Operating Company Rachel Carson State Office Building Beaver Valley Power Station P.O. Box 8469 P.O. Box 4, Route 168 Harrisburg, PA 17105-8469 Shippingport, PA 15077 Mayor of the Borough of Shippingport Sherry White P.O. Box 3 Cultural Preservation Officer Shippingport, PA 15077 Stockbridge-Munsee Band of the Mohican Nation, Wisconsin Regional Administrator, Region I Route 1, P.O. Box 70 U.S. Nuclear Regulatory Commission Bowler, WI 54416 475 Allendale Road King of Prussia, PA 19406 Greg Bunker Director Environmental/NEPA Resident Inspector Stockbridge-Munsee Band of the Mohican U.S. Nuclear Regulatory Commission Nation, Wisconsin P.O. Box 298 Route 1, P.O. Box 70 Shippingport, PA 15077 Bowler, WI 54416