ML083520493
Letter Sequence ' | |
---|---|
TAC:MD6595, (Approved, Closed) | |
Initiation Questions Answers Results Other: ML072900639, ML080220343, ML080240411, ML083150728, ML083290254, ML091250363, ML091250413 | |
MONTHYEARML0729006392007-10-29029 October 2007
[Table View]Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for Beaver Valley Power Station Units 1 and 2 Project stage: Other ML0729006502007-10-29029 October 2007 United States Nuclear Regulatory Commission Firstenergy Nuclear Operating Company Beaver Valley Power Station Unit Nos. 1 and 2 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process Project stage: Request ML0735202822007-11-27027 November 2007 Slides, Beaver Valley Power Station License Renewal Process and Environmental Scoping Meeting. Project stage: Meeting ML0734008432007-11-27027 November 2007 Transcript of the Beaver Valley Power Station License Renewal Public Meeting - Evening Session, November 27, 2007, Pages 1-49 Project stage: Meeting ML0733900322007-11-27027 November 2007 Transcript of Proceedings for Beaver Valley Power Station Public Meeting (Afternoon Session), November 27, 2007, Pages 1-39 Project stage: Request ML0735305392008-01-0909 January 2008 Summary of Public Environmental Scoping Meetings Related to the Renewal of the Beaver Valley Power Station, License Renewal Application (TAC Nos. MD6595 and MD6596) Project stage: Meeting ML0802203432008-01-14014 January 2008 Letter from George Dudash III, Comment Regarding the Beaver Valley Power Station Unit 1 and 2 License Renewal Project stage: Other ML0802307282008-01-28028 January 2008 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Beaver Valley Power Station, Units 1 and 2, License Renewal (TAC Nos. MD6595 and MD6596) Project stage: RAI ML0802404112008-01-30030 January 2008 Beaver, Units 1 and 2, Environmental Impact Statement Scoping Process Summary Report Project stage: Other ML0805606272008-02-27027 February 2008 Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report Project stage: Approval ML0805605882008-03-13013 March 2008 RAI Refurbishment Impacts for Beaver Valley Units 1 & 2 License Renewal (TAC Nos. MD6595 and MD6596) Project stage: RAI ML0802902572008-03-17017 March 2008 Summary of Site Audit Related to the Review of the LRA for Beaver Valley, Units 1 and 2 Project stage: Approval ML0807301162008-03-21021 March 2008 Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional In Project stage: Request ML0807403922008-03-26026 March 2008 Summary of Telephone Conference Between NRC and Firstenergy Nuclear Operating Company, Concerning Clarification of Severe Accident Mitigation Alternatives Request for Additional Information Pertaining to Beaver Valley Units 1 & 2 Project stage: RAI ML0807401232008-04-0707 April 2008 Summary of Telephone Conference Call Held on March 05, 2008, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Request for Additional Information Pertaining to the Refurbishment Activit Project stage: RAI L-08-125, Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, for License Renewal2008-04-25025 April 2008 Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, for License Renewal Project stage: Response to RAI L-08-148, Reply to Follow-Up Questions Pertaining to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for License Renewal2008-05-0202 May 2008 Reply to Follow-Up Questions Pertaining to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for License Renewal Project stage: Request ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval L-08-179, Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts for License Renewal2008-05-30030 May 2008 Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts for License Renewal Project stage: Response to RAI L-08-200, Supplemental License Renewal Environmental Information Requested by Nuclear Regulatory Commission2008-06-0202 June 2008 Supplemental License Renewal Environmental Information Requested by Nuclear Regulatory Commission Project stage: Supplement ML0812304992008-06-0303 June 2008 Teleconf Held 4/30/08 Between NRC and Firstenergy Concerning the RAI Pertaining to the Refurbishment Activities at Beaver, Units 1 and 2, LRA Project stage: Request L-08-210, Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, License Renewal2008-06-26026 June 2008 Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, License Renewal Project stage: Response to RAI ML0825403992008-09-17017 September 2008 Notice of Availability of the Draft Plant-Specific Supplement 36 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants the Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MD6595 and MD6596) Project stage: Draft Other ML0826001472008-09-30030 September 2008 NUREG-1437 Supp 36, Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment) Project stage: Draft Other ML0831005872008-10-21021 October 2008 Comment (1) of Vincent Biancucci, on Behalf of Self, Beaver Valley Power Station, Renewal and Extension of Licensing for Units 1 and 2 Project stage: Request ML0832505192008-10-30030 October 2008 Official Transcript of Proceedings for the Beaver Valley Draft Environmental Impact Statement Public Meeting Afternoon Session, Thursday, October 30, 2008, Pages 1-45 Project stage: Request ML0832505202008-10-30030 October 2008 Transcript of Beaver Valley Power Station, Units 1 & 2, Public Meeting Evening Session: Evening Session, 10/30/2008, Pages 1-33 Project stage: Request ML0831507282008-10-30030 October 2008 Letter from PA Historical and Museum Commission Bureau for Historic Preservation Regarding the Beaver Valley Power Station License Renewal Project stage: Other ML0832902542008-11-10010 November 2008 Comment (2) of Diane M. Kemp on Behalf of Borough of Midland Re License Renewal of Beaver Valley, Units 1 and 2 Project stage: Other ML0832400512008-11-17017 November 2008 Preliminary Results of Environmental Review Project stage: Request ML0835204932008-11-19019 November 2008 Us Dept. of Interior, Office of the Secretary Comment on Draft Generic Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 & 2, NUREG-1437, Supplement 36 L-08-365, FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement2008-11-24024 November 2008 FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement ML0833301862008-11-24024 November 2008 NUREG-1437 Supplement 36, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment). ML0835700412008-12-10010 December 2008 Comment (4) of William Arguto on Behalf of the U. S. Environmental Protection Agency, Region III on Draft Generic Supplemental Environmental Impact Statement (Dgseis) for the Beaver Valley Power, Units 1 and 2 (Report Number NUREG-1437, Sup Project stage: Request ML0835700422008-12-12012 December 2008 Comment (3) of Diane Johnson on Behalf of United Way of Southern Columbiana County in Support of the Firstenergy Nuclear Operating Company Beaver Valley Power Station Project stage: Request ML0836600292009-01-0909 January 2009 10/30/08 Summary of Public Meeting on the Draft Supplemental Environmental Impact Statement Regarding the Beaver Valley Power Station, License Renewal Review ML0912600242009-05-12012 May 2009 Final Supplement 36 to NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (BVPS) Project stage: Acceptance Review ML0912504132009-05-12012 May 2009 Final Supplement 36 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS) Regarding Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MD6595 and MD6596) Project stage: Other ML0912503632009-05-14014 May 2009 Notice of Availability of the Final Plant-Specific Supplement 36 to the GEIS for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station Project stage: Other ML0912600112009-05-31031 May 2009 NUREG-1437 Supplement 36 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station Units 1 and 2 Final Report Project stage: Acceptance Review ML0926105222009-09-28028 September 2009 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC MD6593, MD6594, MD6595, MD6596) Project stage: Approval 2008-03-17 |
ML083520493 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 11/19/2008 |
From: | Chezik M US Dept of Interior, Office of the Secretary |
To: | Rulemaking, Directives, and Editing Branch |
References | |
ER 08/1013, NUREG-1437 | |
Download: ML083520493 (1) | |
Similar Documents at Beaver Valley | |
---|---|
Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024
[Table view]Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25 |
Text
United States Department of the Interior OFFICE OF THE SECRETARY Office of Environmental Policy and Compliance TAKE PRIDE Custom House, Room 244 INAMERICA 200 Chestnut Street IN REPLY REFER TO: Philadelphia, Pennsylvania 19106-2904 November 19, 2008 ER 08/1013 Chief, Rulemaking, Directives and Editing Brach U.S. Nuclear Regulatory Commission Mailstop T6-D59 Washington, D.C. 20555-001
Dear Sir/Madam:
The U. S. Department of the Interior (Department) has no comment on the Draft Generic Environmental Impact Statement for the License Renewal of Nuclear Plants, NUREG-1437, Supplement 36; for the Beaver Valley Power Station, Units 1 and 2, located in Beaver County, Pennsylvania.
Thank you for the opportunity for comment.
Sincerely, Michael T., Chezik Regional Environmental Officer