MONTHYEARML0729006392007-10-29029 October 2007 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for Beaver Valley Power Station Units 1 and 2 Project stage: Other ML0729006502007-10-29029 October 2007 United States Nuclear Regulatory Commission Firstenergy Nuclear Operating Company Beaver Valley Power Station Unit Nos. 1 and 2 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process Project stage: Request ML0735202822007-11-27027 November 2007 Slides, Beaver Valley Power Station License Renewal Process and Environmental Scoping Meeting. Project stage: Meeting ML0734008432007-11-27027 November 2007 Transcript of the Beaver Valley Power Station License Renewal Public Meeting - Evening Session, November 27, 2007, Pages 1-49 Project stage: Meeting ML0733900322007-11-27027 November 2007 Transcript of Proceedings for Beaver Valley Power Station Public Meeting (Afternoon Session), November 27, 2007, Pages 1-39 Project stage: Request ML0735305392008-01-0909 January 2008 Summary of Public Environmental Scoping Meetings Related to the Renewal of the Beaver Valley Power Station, License Renewal Application (TAC Nos. MD6595 and MD6596) Project stage: Meeting ML0802203432008-01-14014 January 2008 Letter from George Dudash III, Comment Regarding the Beaver Valley Power Station Unit 1 and 2 License Renewal Project stage: Other ML0802307282008-01-28028 January 2008 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Beaver Valley Power Station, Units 1 and 2, License Renewal (TAC Nos. MD6595 and MD6596) Project stage: RAI ML0802404112008-01-30030 January 2008 Beaver, Units 1 and 2, Environmental Impact Statement Scoping Process Summary Report Project stage: Other ML0805606272008-02-27027 February 2008 Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report Project stage: Approval ML0805605882008-03-13013 March 2008 RAI Refurbishment Impacts for Beaver Valley Units 1 & 2 License Renewal (TAC Nos. MD6595 and MD6596) Project stage: RAI ML0802902572008-03-17017 March 2008 Summary of Site Audit Related to the Review of the LRA for Beaver Valley, Units 1 and 2 Project stage: Approval ML0807301162008-03-21021 March 2008 Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional In Project stage: Request ML0807403922008-03-26026 March 2008 Summary of Telephone Conference Between NRC and Firstenergy Nuclear Operating Company, Concerning Clarification of Severe Accident Mitigation Alternatives Request for Additional Information Pertaining to Beaver Valley Units 1 & 2 Project stage: RAI ML0807401232008-04-0707 April 2008 Summary of Telephone Conference Call Held on March 05, 2008, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Request for Additional Information Pertaining to the Refurbishment Activit Project stage: RAI L-08-125, Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, for License Renewal2008-04-25025 April 2008 Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, for License Renewal Project stage: Response to RAI L-08-148, Reply to Follow-Up Questions Pertaining to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for License Renewal2008-05-0202 May 2008 Reply to Follow-Up Questions Pertaining to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for License Renewal Project stage: Request ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval L-08-179, Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts for License Renewal2008-05-30030 May 2008 Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts for License Renewal Project stage: Response to RAI L-08-200, Supplemental License Renewal Environmental Information Requested by Nuclear Regulatory Commission2008-06-0202 June 2008 Supplemental License Renewal Environmental Information Requested by Nuclear Regulatory Commission Project stage: Supplement ML0812304992008-06-0303 June 2008 Teleconf Held 4/30/08 Between NRC and Firstenergy Concerning the RAI Pertaining to the Refurbishment Activities at Beaver, Units 1 and 2, LRA Project stage: Request L-08-210, Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, License Renewal2008-06-26026 June 2008 Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, License Renewal Project stage: Response to RAI ML0825403992008-09-17017 September 2008 Notice of Availability of the Draft Plant-Specific Supplement 36 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants the Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MD6595 and MD6596) Project stage: Draft Other ML0826001472008-09-30030 September 2008 NUREG-1437 Supp 36, Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment) Project stage: Draft Other ML0831005872008-10-21021 October 2008 Comment (1) of Vincent Biancucci, on Behalf of Self, Beaver Valley Power Station, Renewal and Extension of Licensing for Units 1 and 2 Project stage: Request ML0832505192008-10-30030 October 2008 Official Transcript of Proceedings for the Beaver Valley Draft Environmental Impact Statement Public Meeting Afternoon Session, Thursday, October 30, 2008, Pages 1-45 Project stage: Request ML0832505202008-10-30030 October 2008 Transcript of Beaver Valley Power Station, Units 1 & 2, Public Meeting Evening Session: Evening Session, 10/30/2008, Pages 1-33 Project stage: Request ML0831507282008-10-30030 October 2008 Letter from PA Historical and Museum Commission Bureau for Historic Preservation Regarding the Beaver Valley Power Station License Renewal Project stage: Other ML0832902542008-11-10010 November 2008 Comment (2) of Diane M. Kemp on Behalf of Borough of Midland Re License Renewal of Beaver Valley, Units 1 and 2 Project stage: Other ML0832400512008-11-17017 November 2008 Preliminary Results of Environmental Review Project stage: Request ML0835204932008-11-19019 November 2008 Us Dept. of Interior, Office of the Secretary Comment on Draft Generic Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 & 2, NUREG-1437, Supplement 36 L-08-365, FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement2008-11-24024 November 2008 FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement ML0833301862008-11-24024 November 2008 NUREG-1437 Supplement 36, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment). ML0835700412008-12-10010 December 2008 Comment (4) of William Arguto on Behalf of the U. S. Environmental Protection Agency, Region III on Draft Generic Supplemental Environmental Impact Statement (Dgseis) for the Beaver Valley Power, Units 1 and 2 (Report Number NUREG-1437, Sup Project stage: Request ML0835700422008-12-12012 December 2008 Comment (3) of Diane Johnson on Behalf of United Way of Southern Columbiana County in Support of the Firstenergy Nuclear Operating Company Beaver Valley Power Station Project stage: Request ML0836600292009-01-0909 January 2009 10/30/08 Summary of Public Meeting on the Draft Supplemental Environmental Impact Statement Regarding the Beaver Valley Power Station, License Renewal Review ML0912600242009-05-12012 May 2009 Final Supplement 36 to NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (BVPS) Project stage: Acceptance Review ML0912504132009-05-12012 May 2009 Final Supplement 36 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS) Regarding Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MD6595 and MD6596) Project stage: Other ML0912503632009-05-14014 May 2009 Notice of Availability of the Final Plant-Specific Supplement 36 to the GEIS for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station Project stage: Other ML0912600112009-05-31031 May 2009 NUREG-1437 Supplement 36 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station Units 1 and 2 Final Report Project stage: Acceptance Review ML0926105222009-09-28028 September 2009 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC MD6593, MD6594, MD6595, MD6596) Project stage: Approval 2008-03-17
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML24134A1562024-09-19019 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - FRN ML24102A2572024-04-25025 April 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - March 2024 ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23124A0772023-05-17017 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (FRN) ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML21033B0782021-02-0808 February 2021 Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specifications to Defer Steam Generator Inspections to Fall 2022 Refueling Outage ML21033B0772021-02-0808 February 2021 Letter, Individual Notice of Consideration of Issuance of Amendment, Revise Technical Specifications to Defer Steam Generator Inspections to Fall 2022 Refueling Outage ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20119B0842020-05-19019 May 2020 FRN - Beaver Valley Power Station, Units 1 and 2 - Request for Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (EPID L-2020-LLE-0033 (COVID-19)) ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML19337A0312019-12-11011 December 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 12/17/2019 ML19303A0672019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Federal Register Notice, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19151A4742019-06-24024 June 2019 Letter to FENOC - Individual FRN Regarding Application for Order Consenting to Transfer of Licenses and Conforming Amendments. Notice of Consideration of Approval of Transfers and Conforming Amendments and Opportunity for Comments and a Hea ML19151A4932019-06-24024 June 2019 Individual FRN Regarding Application for Transfer of Licenses and Conforming Amendments. Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments, and Opportunity for Comments and a Hearing ML19067A0232019-06-0404 June 2019 FENOC - Notice of Issuance of Exemption FRN (EPID-L-2018-LLE-0016) ML19067A0222019-06-0404 June 2019 FENOC - Exemption (EPID-L-2018-LLE-0016) ML19133A0492019-05-16016 May 2019 FENOC Fleet FRN Notice Withdrawal of the Application ML19133A0722019-05-16016 May 2019 FENOC Fleet - Beaver Valley 1 & Davis Besse 1 Withdrawal of an Amendment Request Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement (CAC Nos. MF9714 & MF9715, EPID L-2017-LL ML19052A0412019-04-0404 April 2019 OEDO-18-00160 - Notice of Issuance of Final Director'S Decision in FRN NRC-2018-0193, First Energy Operating Company (FENOC) Firstenergy Nuclear Generation, LLC, Beaver Valley Power Station, Units 1 and 22018-09-0404 September 2018 First Energy Operating Company (FENOC) Firstenergy Nuclear Generation, LLC, Beaver Valley Power Station, Units 1 and 2 ML18130A7602018-09-0404 September 2018 First Energy Operating Company (FENOC) Firstenergy Nuclear Generation, LLC, Beaver Valley Power Station, Units 1 and 2 ML18130A8852018-08-29029 August 2018 FENOC Fleet - Beaver Valley; Davis-Besse; Perry - Environment Assessment and Finding of No Significant Impact Related to Exemption Request for a Physical Barrier Requirement (CAC Nos. MG0010, MG0011, MG0012, and MG0013; EPID L-2018-LLE-0019 NRC-2018-0174, OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition2018-08-27027 August 2018 OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition ML18220B3142018-08-27027 August 2018 OEDO-18-00160 - Acknowledgement Letter 2.206 Petition for Citizen Complaint and Request for Enforcement Action Regarding Firstenergy Nuclear Facility Operations in Ohio and Pennsylvania ML18220B3172018-08-27027 August 2018 OEDO-18-00160, Individual Fr Notice for Publication, 10 CFR 2206 Request-Action, FENOC Fleet 2.206 Petition ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C ML17313A5542018-03-0101 March 2018 FRN Exemption from the Requirements of 10 CFR 50.46 and Appendix K to 10 CFR Part 50 to Allow the Use of Optimized Zirlo Clad Fuel Rods (CAC Nos. MF9582 and MF9583; EPID L-2017-LLE-0011) ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and NRC-2017-0157, FRN Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for Hearing (CAC Nos. MF9887 and MF9888)2017-07-0606 July 2017 FRN Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for Hearing (CAC Nos. MF9887 and MF9888) ML17184A0602017-07-0606 July 2017 FRN Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for Hearing ML17184A0592017-07-0606 July 2017 Transmittal Letter Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for Hearing ML17079A4322017-04-14014 April 2017 Federal Register Notice with Order Approving Direct Transfer of License and Approving Conforming Amendment NRC-2016-0277, Federal Register Notice with Order Approving Direct Transfer of License and Approving Conforming Amendment2017-04-14014 April 2017 Federal Register Notice with Order Approving Direct Transfer of License and Approving Conforming Amendment ML16277A5172017-01-13013 January 2017 FRN: Beaver Valley Power Station, Unit 2; Consideration of Approval of Transfer of License and Conforming Amendment (Docket No. 50-412; NRC-2016-0277) ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 ML15204A2792015-07-27027 July 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 4, 2015 ML15148A3762015-06-0101 June 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015 ML15120A2272015-05-0101 May 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015 NRC-2015-0104, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register2015-04-20020 April 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register ML15106A9162015-04-20020 April 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1122302752011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 NRC-2011-0187, Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/20112011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 NRC-2010-0086, Fr Notice--Beaver Valley Power Station, Unit No. 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing, and Order Imposing Procedures for Access to Sensitive Unclassif2010-03-0505 March 2010 Fr Notice--Beaver Valley Power Station, Unit No. 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing, and Order Imposing Procedures for Access to Sensitive Unclassified N ML1001303452010-03-0505 March 2010 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing, and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information ML1001303662010-03-0505 March 2010 Fr Notice--Beaver Valley Power Station, Unit No. 2 - Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing, and Order Imposing Procedures for Access to Sensitive Unclassified N 2024-09-19
[Table view] Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee 05000412/LER-2023-003-01, Missile Barrier Door Left Open Resulting in a Loss of Safety Function2024-02-20020 February 2024 Missile Barrier Door Left Open Resulting in a Loss of Safety Function IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17
[Table view] |
Text
September 17, 2008 Vice President Peter P. Sena III FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB-1 Shippingport, PA 15077
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT PLANT-SPECIFIC SUPPLEMENT 36 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (TAC NOS. MD6595 AND MD6596)
Dear Mr. Sena:
The U.S. Nuclear Regulatory Commission (NRC) staff has completed the draft plant-specific Supplement 36 to NUREG-1437, ?Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants,@ regarding the renewal of operating license/ses DPR-66 and NPF-73 for an additional 20 years of operation for the Beaver Valley Power Station, Units 1 and 2.
Enclosed is a copy of the draft supplement and the associated Federal Register Notice of Availability. This notice advises the public that the draft supplement is publicly available at the NRC Public Document Room (PDR) or from the NRC=s Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://adamswebsearch.nrc.gov/dologin.htm. The Accession Number for the draft Supplement 36 to the GEIS is ML082600147 and it is available for viewing on the Internet at:
http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html#underreview.
In addition, two libraries have agreed to make the draft Supplement 36 to the GEIS available for public inspection: Beaver Area Memorial Library,100 College Ave, Beaver, PA 15009-2704 (telephone 724-775-1132), and Beaver County Library System, 1 Campus Drive, Monaca, PA 15061 (telephone 724-728-3737).
As discussed in Section 9.3 of the draft supplement, the preliminary recommendation of the staff is that the Commission determine that the adverse environmental impacts of license renewal for the Beaver Valley Power Station, Units 1 and 2, are not so great that preserving the option of license renewal for energy planning decision makers would be unreasonable. This recommendation is based on: (1) the analysis and findings in the GEIS; (2) the Environmental Report submitted by FirstEnergy Nuclear Operating Company; (3) consultation with Federal, State, and local agencies; (4) the staff=s own independent review; and (5) the staff=s consideration of public comments received during the scoping process.
P. Sena A separate Notice of Availability of the draft supplemental environmental impact statement will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact the NRC Project Manager, Mr. Kent Howard, at 301-415-2989 or by e-mail at Kent.Howard@nrc.gov.
Sincerely,
/RA/
Rani L. Franovich, Branch Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-334 and 50-412
Enclosure:
As stated cc w/encl: See next page
- 1. Letter w/Svc List, FRN: ML082540399
- 2. ?Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 36@: ML082600147
- 3. Pkg: ML082540377 OFFICE DLR:LA DLR:PM DLR:PM OGC DLR:BC NAME IKing ESayoc KHoward LSubin R. Franovich DATE 9/14/08 09/15/08 09/16/08 09/17/08 09/17/08
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION, BEAVER VALLEY POWER STATION, UNITS 1 AND 2 NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENT 36 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS, AND PUBLIC MEETING FOR THE LICENSE RENEWAL OF THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-334 and 50-412 Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC, Commission) has published a draft plant-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS), NUREG-1437, regarding the renewal of operating licenses DPR-66 and NPF-73 for an additional 20 years of operation for the Beaver Valley Power Station, Units 1 and 2, which is located in Shippingport, PA, about 25 miles northwest of Pittsburgh, PA. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources.
The draft Supplement 36 to the GEIS is publicly available at the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC=s Agencywide Documents Access and Management System (ADAMS).
The ADAMS Public Electronic Reading Room is accessible at http://adamswebsearch.nrc.gov/dologin.htm. The Accession Number for the draft Supplement 36 to the GEIS is ML082600147. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC=s PDR reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov. In addition, two libraries have agreed to make the draft
Supplement 36 to the GEIS available for public inspection: Beaver Area Memorial Library,100 College Ave, Beaver, PA 15009-2704 (telephone 724-775-1132), and Beaver County Library System, 1 Campus Drive, Monaca, PA 15061 (telephone 724-728-3737).
Any interested party may submit comments on the draft supplement to the GEIS for consideration by the NRC staff. To be considered, comments on the draft supplement to the GEIS and the proposed action must be received by December 17, 2008; the NRC staff is able to ensure consideration only for comments received on or before this date. Comments received after the due date will be considered only if it is practical to do so. Written comments on the draft Supplement 36 to the GEIS should be sent to: Chief, Rulemaking, Directives and Editing Branch, Division of Administrative Services, Office of Administration, Mailstop T-6D59, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001.
Comments may be hand-delivered to the NRC at 11545 Rockville Pike, Room T-6D59, Rockville, Maryland, between 7:30 a.m. and 4:15 p.m. on Federal workdays. Electronic comments may be submitted to the NRC by e-mail at BeaverValleyEIS@nrc.gov. All comments received by the Commission, including those made by Federal, State, local agencies, Native American Tribes, or other interested persons, will be made available electronically at the Commission=s PDR in Rockville, Maryland, and through ADAMS.
The NRC staff will hold a public meeting to present an overview of the draft plant-specific supplement to the GEIS and to accept public comments on the document. The public meeting will be held on October 30, 2008, at the Embassy Suites Pittsburgh-International Airport, 550 Cherrington Parkway, Pittsburgh, Pennsylvania 15108. There will be two sessions to accommodate interested parties. The first session will convene at 1:30 p.m. and will continue until 4:30 p.m., as necessary. The second session will convene at 7:00 p.m. with a repeat of the overview portions of the meeting and will continue until 10:00 p.m., as necessary. Both meetings
will be transcribed and will include: (1) a presentation of the contents of the draft plant-specific supplement to the GEIS, and (2) the opportunity for interested government agencies, organizations, and individuals to provide comments on the draft report. Additionally, the NRC staff will host informal discussions one hour prior to the start of each session at the same location. No comments on the draft Supplement 36 to the GEIS will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meeting or in writing. Persons may pre-register to attend or present oral comments at the meeting by contacting Mr. Sayoc, the NRC Project Manager at 1-800-368-5642, extension 1924, or by e-mail at BeaverValleyEIS@nrc.gov, no later than October 27, 2008. Members of the public may also register to provide oral comments within 15 minutes of the start of each session. Individual, oral comments may be limited by the time available, depending on the number of persons who register. If special equipment or accommodations are needed to attend or present information at the public meeting, the need should be brought to Mr. Sayocs attention no later than October 16, 2008, to provide the NRC staff adequate notice to determine whether the request can be accommodated.
FOR FURTHER INFORMATION, CONTACT: Mr. Sayoc, Projects Branch 2, Division of License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Mail Stop O-11F1, Washington, D.C., 20555-0001. Mr. Sayoc may be contacted at the aforementioned telephone number or e-mail address.
Dated at Rockville, Maryland, this 19th day of September 2008 FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Rani L. Franovich, Branch Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation
Letter to P. Sena III from R. Franovich dated September 17, 2008 DISTRIBUTION:
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT PLANT-SPECIFIC SUPPLEMENT 36 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (TAC NOS. MD6595 AND MD6596)
E-MAIL B. Holian (RidsNrrDlr)
S. Lee (RidsNrrDlr)
R. Franovich (RidsNrrDlrRpb2)
B. Pham (RidsNrrDlrRerb)
R. Schaaf K. Howard E. Sayoc N. Morgan D. Werkheiser L. Subin N. Sheehan R. Barkley M. McLaughlin E. Brenner D. Screnci E. Dacus N. McNamara D. McIntyre RidsOGCMailRoom DLR/RPB2 DLR/RERB
Beaver Valley Power Station, Units 1 and 2 cc:
Joseph J. Hagan President and Chief Nuclear Officer Ohio EPA-DERR FirstEnergy Nuclear Operating Company ATTN: Zack A. Clayton Mail Stop A-GO-19 P.O. Box 1049 76 South Main Street Columbus, OH 43266-0149 Akron, OH 44308 Peter P. Sena III James H. Lash Site Vice President Senior Vice President of Operations FirstEnergy Nuclear Operating Company and Chief Operating Officer Beaver Valley Power Station FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB-1 Mail Stop A-GO-14 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308 Director, Fleet Regulatory Affairs Danny L. Pace FirstEnergy Nuclear Operating Company Senior Vice President, Fleet Engineering Mail Stop A-GO-2 FirstEnergy Nuclear Operating Company 76 South Main Street Mail Stop A-GO-14 Akron, OH 44308 76 South Main Street Akron, OH 44308 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Jeannie M. Rinckel Beaver Valley Power Station Vice President, Fleet Oversight Mail Stop A-BV-A FirstEnergy Nuclear Operating Company P.O. Box 4, Route 168 Mail Stop A-GO-14 Shippingport, PA 15077 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation David W. Jenkins, Attorney Mail Stop A-GO-15 FirstEnergy Corporation 76 South Main Street Mail Stop A-GO-15 Akron, OH 44308 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support Manager, Fleet Licensing FirstEnergy Nuclear Operating Company FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Mail Stop A-GO-2 76 South Main Street 76 South Main Street Akron, OH 44308 Akron, OH 44308
Beaver Valley Power Station, Units 1 and 2 cc:
Commissioner James R. Lewis U.S. Nuclear Regulatory Commission West Virginia Division of Labor P.O. Box 298 749-B, Building No. 6 Shippingport, PA 15077 Capitol Complex Charleston, WV 25305 Tony Gonyea Onondaga Nation Director, Utilities Department RR#1, Route 11A Public Utilities Commission Box 319B 180 East Broad Street Via Nedrow, NY 13120 Columbus, OH 43266-0573 Cliff Custer Jennifer Kagel FirstEnergy Nuclear Operating Company Pennsylvania Field Office Beaver Valley Power Station 315 south Allen St. Suite 322 P.O. Box 4, Route 168 State college, PA 16801-4850 Shippingport, PA 15077 Director, Pennsylvania Emergency Mike Banko Management Agency FirstEnergy Nuclear Operating Company 2605 Interstate Drive Beaver Valley Power Station Harrisburg, PA 17110-9364 P.O. Box 4, Route 168 Shippingport, PA 15077 Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Julie Firestone Sierra Club FirstEnergy Nuclear Operating Company 433 Orlando Avenue Beaver Valley Power Station State College, PA 16803 P.O. Box 4, Route 168 Shippingport, PA 15077 Director Bureau of Radiation Protection Sherry White Pennsylvania Department of Cultural Preservation Officer Environmental Protection Stockbridge-Munsee Band of the Mohican Rachel Carson State Office Building Nation, Wisconsin P.O. Box 8469 Route 1, P.O. Box 70 Harrisburg, PA 17105-8469 Bowler, WI 54416 Mayor of the Borough of Shippingport Greg Bunker P.O. Box 3 Director Environmental/NEPA Shippingport, PA 15077 Stockbridge-Munsee Band of the Mohican Nation, Wisconsin Regional Administrator, Region I Route 1, P.O. Box 70 U.S. Nuclear Regulatory Commission Bowler, WI 54416 475 Allendale Road King of Prussia, PA 19406 Resident Inspector