ML083150728
Letter Sequence Other | |
---|---|
TAC:MD6595, (Approved, Closed) | |
Initiation Questions Answers Results Other: ML072900639, ML080220343, ML080240411, ML083150728, ML083290254, ML091250363, ML091250413 | |
MONTHYEARML0729006392007-10-29029 October 2007
[Table View]Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for Beaver Valley Power Station Units 1 and 2 Project stage: Other ML0729006502007-10-29029 October 2007 United States Nuclear Regulatory Commission Firstenergy Nuclear Operating Company Beaver Valley Power Station Unit Nos. 1 and 2 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process Project stage: Request ML0735202822007-11-27027 November 2007 Slides, Beaver Valley Power Station License Renewal Process and Environmental Scoping Meeting. Project stage: Meeting ML0734008432007-11-27027 November 2007 Transcript of the Beaver Valley Power Station License Renewal Public Meeting - Evening Session, November 27, 2007, Pages 1-49 Project stage: Meeting ML0733900322007-11-27027 November 2007 Transcript of Proceedings for Beaver Valley Power Station Public Meeting (Afternoon Session), November 27, 2007, Pages 1-39 Project stage: Request ML0735305392008-01-0909 January 2008 Summary of Public Environmental Scoping Meetings Related to the Renewal of the Beaver Valley Power Station, License Renewal Application (TAC Nos. MD6595 and MD6596) Project stage: Meeting ML0802203432008-01-14014 January 2008 Letter from George Dudash III, Comment Regarding the Beaver Valley Power Station Unit 1 and 2 License Renewal Project stage: Other ML0802307282008-01-28028 January 2008 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Beaver Valley Power Station, Units 1 and 2, License Renewal (TAC Nos. MD6595 and MD6596) Project stage: RAI ML0802404112008-01-30030 January 2008 Beaver, Units 1 and 2, Environmental Impact Statement Scoping Process Summary Report Project stage: Other ML0805606272008-02-27027 February 2008 Advisory Committee on Reactor Safeguards Review of the Vermont Yankee Nuclear Power Station License Renewal Application - Safety Evaluation Report Project stage: Approval ML0805605882008-03-13013 March 2008 RAI Refurbishment Impacts for Beaver Valley Units 1 & 2 License Renewal (TAC Nos. MD6595 and MD6596) Project stage: RAI ML0802902572008-03-17017 March 2008 Summary of Site Audit Related to the Review of the LRA for Beaver Valley, Units 1 and 2 Project stage: Approval ML0807301162008-03-21021 March 2008 Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional In Project stage: Request ML0807403922008-03-26026 March 2008 Summary of Telephone Conference Between NRC and Firstenergy Nuclear Operating Company, Concerning Clarification of Severe Accident Mitigation Alternatives Request for Additional Information Pertaining to Beaver Valley Units 1 & 2 Project stage: RAI ML0807401232008-04-0707 April 2008 Summary of Telephone Conference Call Held on March 05, 2008, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Request for Additional Information Pertaining to the Refurbishment Activit Project stage: RAI L-08-125, Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, for License Renewal2008-04-25025 April 2008 Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, for License Renewal Project stage: Response to RAI L-08-148, Reply to Follow-Up Questions Pertaining to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for License Renewal2008-05-0202 May 2008 Reply to Follow-Up Questions Pertaining to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for License Renewal Project stage: Request ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval L-08-179, Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts for License Renewal2008-05-30030 May 2008 Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts for License Renewal Project stage: Response to RAI L-08-200, Supplemental License Renewal Environmental Information Requested by Nuclear Regulatory Commission2008-06-0202 June 2008 Supplemental License Renewal Environmental Information Requested by Nuclear Regulatory Commission Project stage: Supplement ML0812304992008-06-0303 June 2008 Teleconf Held 4/30/08 Between NRC and Firstenergy Concerning the RAI Pertaining to the Refurbishment Activities at Beaver, Units 1 and 2, LRA Project stage: Request L-08-210, Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, License Renewal2008-06-26026 June 2008 Supplement to Reply to Request for Additional Information Regarding Postulated Refurbishment Impacts, License Renewal Project stage: Response to RAI ML0825403992008-09-17017 September 2008 Notice of Availability of the Draft Plant-Specific Supplement 36 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants the Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MD6595 and MD6596) Project stage: Draft Other ML0826001472008-09-30030 September 2008 NUREG-1437 Supp 36, Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment) Project stage: Draft Other ML0831005872008-10-21021 October 2008 Comment (1) of Vincent Biancucci, on Behalf of Self, Beaver Valley Power Station, Renewal and Extension of Licensing for Units 1 and 2 Project stage: Request ML0832505192008-10-30030 October 2008 Official Transcript of Proceedings for the Beaver Valley Draft Environmental Impact Statement Public Meeting Afternoon Session, Thursday, October 30, 2008, Pages 1-45 Project stage: Request ML0832505202008-10-30030 October 2008 Transcript of Beaver Valley Power Station, Units 1 & 2, Public Meeting Evening Session: Evening Session, 10/30/2008, Pages 1-33 Project stage: Request ML0831507282008-10-30030 October 2008 Letter from PA Historical and Museum Commission Bureau for Historic Preservation Regarding the Beaver Valley Power Station License Renewal Project stage: Other ML0832902542008-11-10010 November 2008 Comment (2) of Diane M. Kemp on Behalf of Borough of Midland Re License Renewal of Beaver Valley, Units 1 and 2 Project stage: Other ML0832400512008-11-17017 November 2008 Preliminary Results of Environmental Review Project stage: Request ML0835204932008-11-19019 November 2008 Us Dept. of Interior, Office of the Secretary Comment on Draft Generic Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 & 2, NUREG-1437, Supplement 36 L-08-365, FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement2008-11-24024 November 2008 FENOC Comments to NUREG-1437 Supplement 36, Bearer Valley Power Station Draft Environmental Impact Statement ML0833301862008-11-24024 November 2008 NUREG-1437 Supplement 36, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Beaver Valley Power Station, Units 1 & 2 (Draft for Comment). ML0835700412008-12-10010 December 2008 Comment (4) of William Arguto on Behalf of the U. S. Environmental Protection Agency, Region III on Draft Generic Supplemental Environmental Impact Statement (Dgseis) for the Beaver Valley Power, Units 1 and 2 (Report Number NUREG-1437, Sup Project stage: Request ML0835700422008-12-12012 December 2008 Comment (3) of Diane Johnson on Behalf of United Way of Southern Columbiana County in Support of the Firstenergy Nuclear Operating Company Beaver Valley Power Station Project stage: Request ML0836600292009-01-0909 January 2009 10/30/08 Summary of Public Meeting on the Draft Supplemental Environmental Impact Statement Regarding the Beaver Valley Power Station, License Renewal Review ML0912600242009-05-12012 May 2009 Final Supplement 36 to NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (BVPS) Project stage: Acceptance Review ML0912504132009-05-12012 May 2009 Final Supplement 36 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS) Regarding Beaver Valley Power Station, Units 1 and 2 (TAC Nos. MD6595 and MD6596) Project stage: Other ML0912503632009-05-14014 May 2009 Notice of Availability of the Final Plant-Specific Supplement 36 to the GEIS for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station Project stage: Other ML0912600112009-05-31031 May 2009 NUREG-1437 Supplement 36 Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Beaver Valley Power Station Units 1 and 2 Final Report Project stage: Acceptance Review ML0926105222009-09-28028 September 2009 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC MD6593, MD6594, MD6595, MD6596) Project stage: Approval 2008-03-17 |
ML083150728 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 10/30/2008 |
From: | Mclearen D State of PA, Bureau for Historic Preservation |
To: | Rani Franovich NRC/NRR/ADRO |
References | |
ER 1985-0426-007-J | |
Download: ML083150728 (2) | |
Similar Documents at Beaver Valley | |
---|---|
Category:Letter
MONTHYEARIR 05000334/20240112024-10-17017 October 2024
[Table view]License Renewal Phase IV Inspection Report 05000334/2024011 L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000334/20240022024-08-0505 August 2024 Integrated Inspection Report 05000334/2024002 and 05000412/2024002 ML24208A0462024-07-26026 July 2024 NRC Office of Investigations Case No. 1-2023-005 L-24-182, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-23023 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-24-161, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-07-19019 July 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 05000334/LER-2024-004, Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control2024-07-17017 July 2024 Reactor Trip Due to Bypass Feedwater Regulating Valve Failure to Control L-24-014, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models2024-07-16016 July 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling Svstem Evaluation Models ML24193A2912024-07-16016 July 2024 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule IR 05000334/20245012024-07-0808 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000334/2024501 and 05000412/2024501 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping2024-07-0202 July 2024 Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping L-24-164, BV-2, Post Accident Monitor Report2024-06-27027 June 2024 BV-2, Post Accident Monitor Report IR 05000334/20244012024-06-26026 June 2024 Material Control and Accounting Program Inspection Report 05000334/2024401 and 05000412/2024401 (Cover Letter Only) L-24-094, Reactor Vessel Surveillance Capsule Withdrawal Schedule2024-06-24024 June 2024 Reactor Vessel Surveillance Capsule Withdrawal Schedule L-24-152, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-06-17017 June 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations 05000334/LER-2024-002, Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation2024-06-11011 June 2024 Automatic Reactor Trip Due to Low Reactor Coolant Flow Caused by Transformer Overexcitation Protection Relay Actuation 05000334/LER-2024-001, Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification2024-06-0606 June 2024 Offsite AC Power Source Inoperable Due to Breaker Failure Resulting in Condition Prohibited by Technical Specification ML24135A2282024-05-29029 May 2024 Review of the Spring 2023 Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F Star Reports ML24135A1702024-05-29029 May 2024 – Steam Generator Tube Inspection - Review of the Spring 2023 Tube Inspection Reports L-24-021, Cycle 30 Core Operating Limits Report2024-05-23023 May 2024 Cycle 30 Core Operating Limits Report L-24-121, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-05-23023 May 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24141A1052024-05-20020 May 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000334/20240102024-05-15015 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000334/2024010 and 05000412/2024010 L-24-107, CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair2024-05-13013 May 2024 CFR 50.55a Request 1-TYP-5-RRP-l, for Alternative Method of Nondestructive Examination for River Water Outlet Piping Weld Repair IR 05000334/20240012024-05-0808 May 2024 Integrated Inspection Report 05000334/2024001 and 05000412/2024001 L-23-269, Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2024-05-0707 May 2024 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions L-24-054, Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological)2024-04-29029 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report 2023 Annual Radiological Environmental Operating Report and 2023 Annual Environmental Operating Report (Non-Radiological) L-24-089, Emergency Preparedness Plan2024-04-23023 April 2024 Emergency Preparedness Plan L-24-088, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 20242024-04-22022 April 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for March 2024 ML24101A2752024-04-10010 April 2024 Response to Request for Additional Information Regarding Spring 2023 180-Day Steam Generator Tube Inspection Report L-24-082, Withdrawal of Exemption Request2024-04-0303 April 2024 Withdrawal of Exemption Request L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-064, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152024-03-13013 March 2024 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24044A0662024-03-0404 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0083 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000334/20230062024-02-28028 February 2024 Annual Assessment Letter for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2023006 and 05000412/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee 05000412/LER-2023-003-01, Missile Barrier Door Left Open Resulting in a Loss of Safety Function2024-02-20020 February 2024 Missile Barrier Door Left Open Resulting in a Loss of Safety Function IR 05000334/20230042024-02-12012 February 2024 Integrated Inspection Report 05000334/2023004 and 05000412/2023004 ML24025A0922024-01-25025 January 2024 Requalification Program Inspection 2024-09-17 |
Text
Commonwealth of Pennsylvania Pennsylvania Historical and Museum Commission Bureau for Historic Preservation Commonwealth Keystone Building, 2nd Floor 400 North Street Harrisburg, PA 17120-0093 www.phmcn.state.pa.us October 30, 2008 Rani Franovich TO EXPEDITE REVIEW USE US Nuclear Regulatory Commission BHP REFERENCE NUMBER Washington, D.C. 20555-0001 Re: File No. ER 1985-0426-007-J NRC License Renewal Application:
Beaver Valley Power Station, Units 1
& 2 Project, Shippingport, Beaver County
Dear Ms. Franovich:
The Bureau for Historic Preservation (the State Historic Preservation Office) has reviewed the above named project in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended in 1980 'and 1992; and the regulations (36 CFR Part 800) of the Advisory Council on Historic Preservation.
These requirements include consideration of the project's potential effect upon both historic and archaeological resources.
There may be historic buildings, structures, and/or archaeological resources located in the project area. In our opinion the activities described in your proposal should have no effect on these resources. Should you become aware, from any source, that unidentified historic buildings, structures, and or archaeological resources are located at the project site, or that the project activities will have an effect on these properties, the Bureau for Historic Preservation should immediately be contacted.
If you need further information regarding archaeological survey please contact Kira Presler at (717) 705-0700. If you need further information concerning historic structures please consult Susan Zacher at (717) 783-9920.
Sincerely, Douglas C. McLearen, Chief Division of Archaeology &