|
---|
Category:Letter
MONTHYEARML23342A0942024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commission'S Analysis of ADP CR3, Llc'S Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan ML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a IR 05000302/20210012021-08-12012 August 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021001 and 05000302/2021002 ML21182A1032021-07-0606 July 2021 Request for Additional Information (RAI) Related to the ISFSI-Only Emergency Plan ML21159A0422021-06-28028 June 2021 VY and CR Indirect License Transfer Package ML21060B4142021-04-12012 April 2021 U.S. Nuclear Regulatory Commission Analysis of Duke Energy Florida, Llc'S Initial Decommissioning Funding Plan for the Crystal River Independent Spent Fuel Storage Installation ML21028A5912021-03-0202 March 2021 Letter to Reid Forwarding Exemption from 10 CFR Part 20, Appendix G, Section Iii.E ML21055A7832021-02-25025 February 2021 Letter to Reid, Change in NRC Staff Project Management for Crystal River Unit 3 Nuclear Generating Plant ML21012A3142021-01-13013 January 2021 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20200012020-11-19019 November 2020 NRC Inspection Report No. 05000302/2020001, Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, Crystal River, Florida ML20269A2922020-10-0707 October 2020 NRC Form 311 QA Program Approval Revision 10 Related to Crystal River 3 ML20101G5822020-04-10010 April 2020 CR-3 License Transfer SE Corrected Cover Letter ML20069A0232020-04-0101 April 2020 Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC, to ADP CR3, LLC, and Draft Conforming Administrative License Amendment ML20050D0142020-02-19019 February 2020 NRC Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2020001, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML20050F7702020-02-14014 February 2020 30-Day Notice of Payment from the City of Tallahassee Trust Fund Non-Qualified Nuclear Decommissioning Trust Fund for Crystal River Unit 3 ML20015A5672020-01-15015 January 2020 Independent Spent Fuel Storage Installation Security Inspection Plan ML20009D0432020-01-10010 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Corrected Safety Evaluation for Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19339G5092020-01-0202 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex IR 05000302/20190022019-11-20020 November 2019 NRC Inspection Report No. 05000302/2019002 and Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2019002, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19261A0702019-09-19019 September 2019 VEGP U3 Proficiency Watches Prior to Fuel Load ML19177A0802019-06-26026 June 2019 Nuclear Generating Plant (CR-3) - Notification of Revised Post-Shutdown Decommissioning Activities Report (Revised PSDAR) ML19170A1942019-06-14014 June 2019 Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment ML19129A1402019-05-15015 May 2019 Letter to Hobbs, Correction to Amendment No. 257 Approving Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Revision 1 2024-01-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23354A0642023-12-22022 December 2023 Enclosure - Crystal River License Termination Plan Request for Additional Information ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23103A1922023-04-19019 April 2023 Request for Supplemental Information Enclosure ML21182A1032021-07-0606 July 2021 Request for Additional Information (RAI) Related to the ISFSI-Only Emergency Plan ML16032A1772016-02-0404 February 2016 J. Hickman, NRC, Letter to T. Hobbs, Crystal River 3, Request for Additional Information for Emergency Plan Change ML15026A4162015-02-0202 February 2015 Request for Additional Information Regarding the 10 CFR 50.54(p) Changes to the Security Plans ML14274A1392015-01-0808 January 2015 Request for Additional Information, License Amendment Request to Revise Technical Specifications and License Conditions to Create Permanently Defueled Technical Specifications ML14133A5032014-05-14014 May 2014 Correction, Request for Additional Information on the Post Shutdown Decommissioning Activities Report ML14104A0392014-04-28028 April 2014 Request for Additional Information on the Post Shutdown Decommissioning Activities Report ML13175A2152013-06-28028 June 2013 Request for Additional Information Regarding Request to Rescind Fukushima-Related Orders ML13018A3072013-02-0101 February 2013 Request for Additional Information for Extended Power Uprate License Amendment Request ML12355A6592012-12-21021 December 2012 Nuclear Generating Plant - RAI 9.3 of the Near-Term Task Force Fukushima Dai-ichi.. ML12333A0892012-12-19019 December 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12310A2912012-11-15015 November 2012 Request for Additional Information for Changes to Security Plan ML12240A0152012-08-28028 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12219A1912012-08-16016 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12213A3032012-08-0303 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request (Srxb) ML12202A0602012-08-0202 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12125A1622012-08-0101 August 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request ML11308A6592011-11-17017 November 2011 Generating Plant - Request for Additional Information Regarding 60-Day Response to Bulletin 2011-01, Mitigating Strategies ML11301A1142011-11-0808 November 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1128602942011-10-12012 October 2011 IR 05000302-11-005; 11/14-18/2011; Crystal River Unit 3, Notification of Inspection and Request for Information ML11175A1512011-06-30030 June 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML11137A1742011-06-22022 June 2011 Nuclear Generating Plant; H. B. Robinson Steam Electric Plant, 2; and Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information Regarding 2011 Decommissioning Funds ML1115403412011-06-0202 June 2011 Nuclear Generating Plant - Notification of Inspection and Request for Information 05000302/2011501 ML11122A0002011-05-26026 May 2011 Request for Additional Information for the Review of the Crystal River, Unit 3, License Renewal Application ML1112501592011-05-0505 May 2011 Notice of Inspection and Request for Information 05000302/2011003 ML1108202262011-03-31031 March 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1031402722010-11-16016 November 2010 Request for Additional Information for the Review of the Crystal Review Unit 3 Nuclear Generating Plant, License Renewal Application ML1029503292010-11-0808 November 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ML1030202942010-10-28028 October 2010 Nuclear Generating Plant - Notification of Inspection and Request for Information IR 05000302-10-005 ML1027100652010-10-19019 October 2010 09/27/10 Summary of Telephone Conference Call Held Between NRC and Florida Power Corp., Concerning Draft Request for Information Related to Crystal River, Unit 3, License Renewal Application ML1026002432010-10-14014 October 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1022800102010-08-11011 August 2010 Nuclear Generating Plant - Draft RAIs Regarding Crystal River Unit 3 Part 26 Exemption Request ML1017404972010-07-0808 July 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1015303972010-07-0808 July 2010 RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1014105122010-06-0202 June 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application 2023-04-19
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 20, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (1\1 A 1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 SUB"IECT: CRYSTAL RIVER UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION, REGARDING THE 2007 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 15 (TAC. NO. MD8918)
Dear Mr. Young:
By letter dated May 30,2008, Florida Power Corporation (the licensee) submitted information summarizing the results of the fall 2007 steam generator tube inspections performed at Crystal River, Unit 3 during refueling outage 15. The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee prOVided and determined that additional information is required in order to complete the evaluation. The NRC staff's request for additional information is enclosed.
Please respond to the enclosed questions within 30 days of the date of this letter. Please contact me at 301-415-1447, if you have any questions on this issue.
Sincerely, rl4-r7~L ~. ~~ ~
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of l\Iuclear Reactor Regulation Docket No. 50-302
Enclosure:
As stated cc w/enclosure: See next page
October 20, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
AnN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 SUB.JECT: CRYSTAL RIVER UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION, REGARDING THE 2007 STEAM GENERATOR TUBE INSERVICE INSPECTIONS DURING REFUELING OUTAGE 15 (TAC. NO. MD8918)
Dear Mr. Young:
By letter dated May 30, 2008, Florida Power Corporation (the licensee) submitted information summarizing the results of the fall 2007 steam generator tube inspections performed at Crystal River, Unit 3 during refueling outage 15. The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided and determined that additional information is required in order to complete the evaluation. The NRC staff's request for additional information is enclosed.
Please respond to the enclosed questions within 30 days of the date of this letter. Please contact me at 301-415-1447, if you have any questions on this issue.
Sincerely, IRA!
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
As stated cc w/enclosure: See next page Distribution:
PUBLIC LPL2-2 R/F Ridsl\lrrDorlLpl2-2 RidsN rrPM FSaba RidsOgcRp RidsNrrLACSola (Hard Copy)
RidsAcrsAcnw_MailCTR RidsRgn2MailCenter RidsNrrDorlDpr RidsNrrDciCsgb ADAMS ACCESSION: ML082630157 NRR-088 OFFICE LPL2-2/PM LPL2-2/LA SSGB/BC* LPL2-2/BC I\lAME FSaba CSoia AHiser TBoyce DATE 10/20/08 10/20/08 09/02/08 10/20/08
- by Memorandum OFFICIAL RECORD
Florida Power Corporation Crystal River Nuclear Plant, Unit 3 cc:
Mr. James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Daniel R. Westcott Supervisor, Licensing & Regulatory Programs Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428-6708 Additional Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION REGARDING CRYSTAL RIVER UNIT 3 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORTS DOCKET NO. 50-302, LICENSE NO. DPR-72
- 1. On page 7 and 8, you indicated that your normal operating differential pressure (NODP) is 1500 pounds per square inch (psi). However, you also indicated that 3 times your NODP is only 4300 psi. Please clarify. If you did not achieve your full 3 times NODP, please discuss the implications given that the flaws appeared to have been opening up (based on a comparison of the pre and post in situ eddy current inspection results).
- 2. Please confirm that all detected crack-like indications were plugged (except for those that were determined to be acceptable for service, based on an NRC-approved alternate tube repair criteria).
- 3. Please discuss whether any degradation of your tube supports was detected. If so, discuss the extent and the basis for dispositioning t~lis degradation.
- 4. Please discuss the results of your visual and eddy current inspection of the plugs.
- 5. Other than postulated leakage from tube-end cracking flaws, please discuss whether there are any other sources that contributed to your estimates of accident-induced primary-to-secondary leakage.
- 6. Please discuss whether any indications were detected at dented locations. If so, please discuss the nature and size of the indication and the size of the dent. If any indications were found in dents whose voltage was near the threshold value for performing rotating probe examinations, please provide the basis for why no sample expansion was necessary.
- 7. Please discuss whether any indications were detected in the sleeves (including the parent tube at the joints) or in the lower tubesheet crevice. If any indications were detected, please discuss the nature of the indications.
- 8. Page 9 of 20 indicated that 293 re-roll repairs were performed in steam generator A and 703 re-roll repairs in steam generator B. These values do not appear to match the numbers on page 15 (263 tubes re-rolled in steam generator A and 566 tubes re-rolled in steam generator B). In addition, these numbers do not appear to match the number of indications re-rolled as identified in Appendix 4 (although these numbers do appear to match the number or re-rolled cited on page 5). Please clarify.
- 9. Please discuss the source and nature of the "general volumetric degradation" identified on page 5. Please discuss whether any volumetric indications other than wear and first span intergranular attack in steam generator B were left in service. If so, discuss the basis for leaving these flaws in service.
- 10. Please discuss whether the foreign object inside tube 73-99 in steam generator A was removed.
Enclosure