Point Beach Nuclear Plant Annual Assessment Meeting Reactor Oversight Program - 2007 Nuclear Regulatory Commission - Region III Lisle, IL July 16, 2008
2 Purpose of Todays Meeting
- A public forum to discuss Point Beach performance in 2007
- NRC will address the performance issues identified in the annual assessment letter
- Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance
3 Agenda
- Introduction
- Review of Reactor Oversight Process
- National Summary of Plant Performance
- Discussion of Plant Performance Results
- Licensee Response and Remarks
- NRC Closing Remarks
- Break
- NRC available to address public questions
4 Region III Organization James Caldwell Regional Administrator Mark Satorius Deputy Regional Administrator Cynthia Pederson Director Division of Reactor Projects Gary Shear Deputy Director Steven West Director Division of Reactor Safety Anne Boland Deputy Director Michael Kunowski Branch Chief Regional Specialists KPS Resident Inspectors Robert Krsek Robert Ruiz Project Engineer John Jandovitz
5 Our Mission
- To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
6 Some Nuclear Facts More than 100 nuclear power plants supply about 20 percent of the electricity in the U.S.
Nuclear materials are used in medicine for diagnosis and cancer treatment.
Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
7 The NRC Regulates
- Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
- Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
- Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
- Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks
8 What We Dont Do
- Regulate nuclear weapons, military reactors, or space vehicle reactors
- Own or operate nuclear power plants
- Regulate some radioactive materials, such as X-rays and naturally occurring radon
9 How We Regulate
- Establish rules and regulations
- Issue licenses
- Provide oversight through inspection, enforcement, and evaluation of operational experience
- Conduct research to provide support for regulatory decisions
- Respond to events and emergencies
10 Assurance of Plant Safety
- Require defense-in-depth
- Require long-term maintenance of equipment
- Require continual training of operators
- Verify compliance with regulations
11 What We Do - Nuclear Waste
- The NRC regulates:
- Storage of spent reactor fuel in fuel pools or dry storage casks, and
- A national spent fuel storage site--Yucca Mountain.
12 What We Do - Nuclear Security
- NRC Requires:
- Well-armed and well-trained security forces,
- Surveillance and perimeter
- patrols,
- State-of-the-art site access equipment and controls,
- Physical barriers and detection zones, and
- Intrusion detection systems and alarm stations.
13 NRC Performance Goals
- Safety: Ensure adequate protection of public health and safety and the environment.
- Security: Ensure adequate protection in the secure use and management of radioactive materials.
14 Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
15 Examples of Baseline Inspections
- Equipment Alignment
~80 hrs/yr
- Triennial Fire Protection
~250 hrs every 3 yrs
- Operator Response
~125 hrs/yr
~80 hrs/yr
- Rad Release Controls
~110 hrs every 2 yrs
- Worker Radiation Protection ~95 hrs/yr
- Corrective Action Program ~250 hrs every 2 yrs
- Corrective Action Case Reviews ~60 hrs/yr
16 Significance Threshold Performance Indicators Green:
Only Baseline Inspection White:
May increase NRC oversight Yellow:
Requires more NRC oversight Red:
Requires more NRC oversight Inspection Findings Green:
Very low safety issue White:
Low to moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue
17 Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance
18 National Summary of Plant Performance Status at End of 2007 Licensee Response 87 Regulatory Response 8
Degraded Cornerstone 8
Multiple/Repetitive Degraded Cornerstone 1
Unacceptable 0
Total 104
19 National Summary
- Performance Indicator Results (for 2007)
- Green 1942
- White 8
- Yellow 1
- Red 0
- Total Inspection Findings (for 2007)
- Green 759
- White 9
- Yellow 2
- Red 0
20 Point Beach Assessment Results (January 1 - December 31, 2007)
- Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight.
21 Inspection Activities (January 1 - December 31, 2007)
- The inspections were performed by the Resident Inspectors and Regional Inspectors, including specialists in engineering, security, emergency preparedness, and radiation protection
- There were 29 Green or SL-IV Inspection Findings identified during 2007 and one SL-III violation issued relating to the reactor vessel head drop analysis.
- There was a Refueling Outage on Unit 1 during the 2nd Quarter of 2007.
22 Point Beach Inspection Activities (January 1 - December 31, 2007)
- Major team inspections included the Tri-Annual Fire Protection Inspection; Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications Inspection; and the June Special Inspection related to the Unit 1 Turbine-Driven Auxiliary Feedwater Pump.
23 Annual Assessment Summary (January 1 - December 31, 2007)
- NRC plans baseline inspections at PBNP for the remainder of the assessment period.
24 Annual Assessment Summary (January 1 - December 31, 2007)
- Substantive cross-cutting issuesone in problem identification and resolution and one in human performance
- NRC plans baseline inspections at Point Beach for 2008
25 Licensee Response and Remarks Mr. Larry Meyer Site Vice-President Point Beach Nuclear Plant
26 Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- At www.nrc.gov, you can:
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
27 Contacting the NRC
- Report an emergency
- (301) 816-5100 (call collect)
- Report a safety concern
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs
28 NRC Representatives Cynthia Pederson, Director, Division of Reactor Projects
- (630) 829-9600 Gary Shear, Deputy Division Director, DRP
- (630) 829-9601 Jack Cushing, Project Manager, NRR
- (301) 415-1424 Rob Krsek, Senior Resident Inspector - Point Beach
- (920) 755-2309 Rob Ruiz, Resident Inspector - Point Beach
- (920) 755-2309 John Jandovitz, Senior Project Engineer
- (630) 829-9763 Michael Kunowski, Branch Chief
- (630) 829-9618
29 NRC Representatives Patrick Louden, Chief, Decommissioning Branch (ISFSI)
- (630) 829-9627 Viktoria Mitlyng, Public Affairs Officer
- (630) 829-9662 Prema Chandrathil, Public Affairs Officer
- (630) 829-9663 Steve Burton, Senior Resident Inspector - Kewaunee
- (920) 388-3156 Patrick Higgins, Resident Inspector - Kewaunee
- (920) 388-3156 NRC Region III Office Switchboard
- (630) 829-9500 (800) 522-3025
30 Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tml Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html Public Document Room 800-397-4209 (Toll Free)