1 Point Beach Nuclear Plant Annual Assessment Summary 2021 Reactor Oversight Process Nuclear Regulatory Commission - Region III Meetings Purpose Public forum for discussion of Point Beach Nuclear Plants performance in 2021 NRC will address the performance issues identified in the annual assessment 1
2
2 Region III Organization JACK GIESSNER Regional Administrator MOHAMMED SHUAIBI Deputy Regional Administrator JULIO LARA Director, Division of Reactor Projects JAMIE HEISERER Deputy Director LAURA KOZAK Branch Chief (Acting)
Resident Inspectors THOMAS HARTMAN VANCE PETRELLA SABRINA ATACK Director, Division of Reactor Safety (Acting)
DAVID CURTIS Deputy Director Regional Inspectors Office Assistant THERESA RAY Security Safety Environment What We Do 3
4
3 Materials Reactors Waste What We Regulate Radon Military X-Rays What We Dont Regulate 5
6
4 Defense In-Depth Regulation Compliance Continuous Training Assurance of Plant Safety Long-Term Maintenance Regulatory Principles Independence Openness Efficiency Clarity Reliability 7
8
5 How We Regulate Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution 9
10
6 Performance Indicators 17 Performance Indicators PIs for each cornerstone Licensee submits data to NRC quarterly Inspection program verifies accuracy Data available on NRC website Significance Threshold Increasing Safety Significance Green White Yellow Red Performance Indicators Inspection Findings Green White Yellow Red Increasing Safety Significance 11 12
7 Action Matrix Columns Increasing:
Safety Significance Inspection Management Involvement Regulatory Action Licensee
Response
Regulatory
Response
Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance Industry-Wide Performance 0
10 20 30 40 50 60 70 80 90 100 1
2 3
4 5
6 91 2
0 0
0 As of 02/23/2022 0
13 14
8 Industry-Wide Inspection Findings Finding data current as of 02/23/2022 0
50 100 150 200 250 300 350 400 450 1
2 3
4 5
289 0
1 0
0 Calendar Year 2021 data Industry-Wide Performance Indicators 0
1000 2000 3000 4000 5000 6000 7000 1
2 3
4 6314 5
0 0
Calendar Year 2021 data 15 16
9 NRC Annual Assessment Summary NextEra, the Licensee, operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
Point Beach Nuclear Plant was in the Licensee Response Column of the NRCs ROP Action Matrix for all quarters of 2021.
NRC plans baseline inspections at Point Beach for 2022.
Point Beach Nuclear Plant, Units 1 and 2 NRC Inspection Activities 2450 hours0.0284 days <br />0.681 hours <br />0.00405 weeks <br />9.32225e-4 months <br /> of direct inspections 2 resident inspectors on site - residents make four quarterly inspections per year and walk through the plant every day 9 regional inspections 3 major team inspections Contingency Response - Force-on-Force Testing Evaluations of Changes, Tests and Experiments Emergency Preparedness Exercise Evaluation Unit Two Refueling Outage
- seepresentationnotes Point Beach Nuclear Plant for 2021 17 18
10 Point Beach Nuclear Plant PIs and Findings All Green Performance Indicators 5 Green / Severity Level IV inspection findings January 1 through December 31, 2021 NRC Response to COVID-19 Monitoring plant activities through inspections and oversight.
Maintaining emergency response capabilities within Regional IRCs and HQ.
Risk-informing "eyes on" inspections through residents and regional inspections.
Mission Critical Functions 19 20
11 NRC Response to COVID-19 Expanded use of telework where appropriate Maintaining emergency response capabilities within Regional IRCs and HQ.
Risk-informing "eyes on" inspections through residents and regional inspections.
Additional Actions Subsequent License Renewal Review Process and Inputs into NRC Licensing Decision 22 Environmental Review (10 CFR 51)
NRC Renewal Decision (10 CFR 54.29)
Subsequent License Renewal Application (SLRA) Accepted Safety Review (10 CFR 54)
ACRS Recommendation (10 CFR54.25)
Hearings*
10 CFR 2 21 22
12 NRC Social Media Channels Facebook:
https://www.facebook.com/nrcgov/
Flickr:
http://www.flickr.com/photos/nrcgov/
Twitter:
https://twitter.com/#!/nrcgov YouTube:
http://www.youtube.com/user/NRCgov RSS:
http://www.nrc.gov/public-involve/listserver.html#rss Blog:
http://public-blog.nrc-gateway.gov/
23 Contacting the NRC Report an emergency
- (301) 816-5100 (call collect)
Report a safety concern
- (800) 695-7403
- Allegation@nrc.gov General information or questions
- www.nrc.gov Contact Point Beach Resident Inspectors
- 630-829-9992 23 24