2020 Point Beach Nuclear Plant End-of-Cycle Meeting Presentation
ML21162A263
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/11/2021
From:
NRC/RGN-III
To:
Shared Package
ML21050A376 List:
References
Download: ML21162A263 (16)


Text

NRC 2020 Annual Assessments Point Beach Nuclear Plant For Audio, please dial: 800-369-1681 Passcode: 6785354 To contact the operator or ask a question at the end of the presentation, dial *1

Host Néstor J. Féliz Adorno Branch Chief Division of Reactor Projects Branch 4

Purpose

  • Discuss Point Beach Nuclear Plants performance in 2020
  • Discuss the COVID-19 response as it relates to the oversight of Point Beach Nuclear Plant

About the NRC The NRC licenses and regulates the Nations civilian use of radioactive material to achieve the following goals:

  • Safety - Ensure adequate protection of public health and safety and the environment
  • Security - Ensure adequate protection of the secure use and management of radioactive materials

Reactor Oversight Process (ROP)

Safety/Security Significance ROP Action Matrix Multiple/Repetitive Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance Cornerstone Increasing:

  • Safety Significance
  • Inspection
  • Management Involvement
  • Regulatory Action

Point Beach Resident Inspectors Tom Hartman Vance Petrella Senior Resident Inspector Resident Inspector

2020 Annual Assessment Point Beach

  • The plant operated safely
  • Licensee Response Column

- All performance indicators were Green

- 2 Green inspection findings

2020 NRC Inspections Point Beach

  • 2536 hours0.0294 days <br />0.704 hours <br />0.00419 weeks <br />9.64948e-4 months <br /> of direct inspection
  • 2 NRC resident inspectors on site
  • 10 regional inspections
  • 2 major team inspections

- Biennial Problem Identification and Resolution Inspection

- Design Basis Assurance Inspection (Program)

NRC Response to COVID-19

  • Maintained mission critical functions

- Monitored plant activities

- Maintained emergency response capabilities

- Risk-informed "eyes on" inspections through residents and regional inspections

  • Expanded use of telework
  • Coordinated actions with industry on best practices
  • For more information visit:

https://www.nrc.gov/about-nrc/covid-19/reactors/

NRC Plans for 2021 NRC plans baseline inspections at Point Beach Nuclear Plant for the remainder of 2021.

NRC Social Media Channels

Meeting Feedback

1. On Any Device or Computer:

- Go to the Public Meeting Schedule at (www.nrc.gov/pmns/mtg?do=recent30days)

- Locate this meeting using the sorting buttons and click on the Meeting Feedback Form link.

Note: Meetings are sorted by date and time. Use Last to get to todays date.

- or -

2. Scan QR Code with smart device

Public Affairs Viktoria Mitlyng Prema Chandrathil

Questions In order to ask a question please dial *1 Viktoria Mitlyng Prema Chandrathil Public Senior Public Affairs Officer Public Affairs Officer 630-829-9662 630-829-9663 Affairs Viktoria.Mitlyng@nrc.gov Prema.Chandrathil@nrc.gov NRC Response to COVID-19: https://www.nrc.gov/about-nrc/covid-19/reactors/