ML21162A263

From kanterella
Jump to navigation Jump to search
2020 Point Beach Nuclear Plant End-of-Cycle Meeting Presentation
ML21162A263
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/11/2021
From:
NRC/RGN-III
To:
Shared Package
ML21050A376 List:
References
Download: ML21162A263 (16)


Text

NRC 2020 Annual Assessments Point Beach Nuclear Plant For Audio, please dial: 800-369-1681 Passcode: 6785354 To contact the operator or ask a question at the end of the presentation, dial *1

Host Néstor J. Féliz Adorno Branch Chief Division of Reactor Projects Branch 4

Purpose Discuss Point Beach Nuclear Plants performance in 2020 Discuss the COVID-19 response as it relates to the oversight of Point Beach Nuclear Plant

About the NRC The NRC licenses and regulates the Nations civilian use of radioactive material to achieve the following goals:

  • Safety - Ensure adequate protection of public health and safety and the environment
  • Security - Ensure adequate protection of the secure use and management of radioactive materials

Reactor Oversight Process (ROP)

Safety/Security Significance

ROP Action Matrix Licensee

Response

Regulatory

Response

Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance Increasing:

Safety Significance Inspection Management Involvement Regulatory Action

Point Beach Resident Inspectors Tom Hartman Senior Resident Inspector Vance Petrella Resident Inspector

2020 Annual Assessment Point Beach The plant operated safely Licensee Response Column All performance indicators were Green 2 Green inspection findings

2020 NRC Inspections Point Beach 2536 hours0.0294 days <br />0.704 hours <br />0.00419 weeks <br />9.64948e-4 months <br /> of direct inspection 2 NRC resident inspectors on site 10 regional inspections 2 major team inspections Biennial Problem Identification and Resolution Inspection Design Basis Assurance Inspection (Program)

NRC Response to COVID-19 Maintained mission critical functions Monitored plant activities Maintained emergency response capabilities Risk-informed "eyes on" inspections through residents and regional inspections Expanded use of telework Coordinated actions with industry on best practices For more information visit:

https://www.nrc.gov/about-nrc/covid-19/reactors/

NRC Plans for 2021 NRC plans baseline inspections at Point Beach Nuclear Plant for the remainder of 2021.

NRC Social Media Channels Facebook:

https://www.facebook.com/nrcgov/

Twitter:

https://twitter.com/nrcgov YouTube:

http://www.youtube.com/user/NRCgov Flickr:

http://www.flickr.com/people/nrcgov/

LinkedIn https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/

Meeting Feedback

1. On Any Device or Computer:

- Go to the Public Meeting Schedule at (www.nrc.gov/pmns/mtg?do=recent30days)

- Locate this meeting using the sorting buttons and click on the Meeting Feedback Form link.

Note: Meetings are sorted by date and time. Use Last to get to todays date.

- or -

2. Scan QR Code with smart device

Public Affairs Prema Chandrathil Viktoria Mitlyng

Questions In order to ask a question please dial *1 Public Affairs Prema Chandrathil Public Affairs Officer 630-829-9663 Prema.Chandrathil@nrc.gov Viktoria Mitlyng Senior Public Affairs Officer 630-829-9662 Viktoria.Mitlyng@nrc.gov NRC Response to COVID-19: https://www.nrc.gov/about-nrc/covid-19/reactors/