Point Beach Nuclear Plant Annual Assessment Summary 2016 Reactor Oversight Process Nuclear Regulatory Commission - Region III

What We/NRC Regulate What It Includes Reactors Materials Safety Security Waste Environment What We Dont Regulate Assurance of Plant Safety Elements Continuous Training Long-Term Maintenance Military Radon Regulation Compliance Defense In-X-Rays Depth 1

How We Regulate Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution Performance Indicators Significance Threshold Performance Indicators 17 Performance Indicators PIs for each cornerstone Green White Yellow Red Licensee submits data to NRC Increasing Safety Significance quarterly Inspection program verifies accuracy Inspection Findings Data available on NRC website Green White Yellow Red Increasing Safety Significance 2

Action Matrix Columns Industry-Wide Performance 90 86 80 As of 02/27/2017 Multiple/Repetitive 70 Licensee Regulatory Degraded Unacceptable Degraded Response Response Performance Performance 60 Cornerstone 50 40 30 20 10 Increasing: 10 0 3 0

  • Safety Significance 0 0
  • Inspection
  • Management Involvement
  • Regulatory Action Industry-Wide Inspection Findings Industry-Wide Performance Indicators Finding data current as of 2/22/2017 693 7000 6713 700 600 Calendar Year 6000 Calendar Year 500 2016 data 2016 data 5000 400 300 4000 200 3000 100 2 4 0

0 2000 0

1000 7

0 0 0 Green White Yellow Red 3

NRC Annual Assessment Summary NRC Inspection Activities Point Beach Nuclear Plant, Units 1 and 2 Point Beach 2016 5153 total hours expended by NRC on Reactor NextERA, the Licensee, operated the plant Oversight Process activities safely and in a manner that preserved the 2230 inspector hours of direct inspection activity public health and safety and protected the 542 inspector hours reviewing and observing plant environment. operating status Point Beach Nuclear Plant was in the 1445 inspector hours of preparation for and Licensee Response Column of the NRCs documentation of inspection activities ROP Action Matrix for all quarters of 2016. 937 hours0.0108 days <br />0.26 hours <br />0.00155 weeks <br />3.565285e-4 months <br /> for other Reactor Oversight Process NRC plans baseline inspections at Point elements (e.g., assessments and communications)

Beach for 2017 NRC Inspection Activities Point Beach Nuclear Plant Point Beach Nuclear Plant for 2016 PIs and Findings January 1 through December 31, 2016 2 resident inspectors on site - residents produced four quarterly inspection reports and walked through the All Green Performance Indicators plant daily 7 Green inspection findings which included:

20 other inspectors participated in various inspections Lockout of a main transformer and plant transient 2 major team inspections due to incorrect hanging of danger tags Triennial Fire Protection Inspection Failure to maintain emergency diesel generator Biennial Problem Identification and Resolution fuel oil transfer pump safety-related electrical power cables in an environment for which they Inspection were designed.

4

Actions in Response to the NRC Social Media Japan Nuclear Accident Channels

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of

Contact:

OPA.resource@nrc.gov or 301-415-8200

  • (301) 816-5100 (call collect)

Report a safety concern

  • (800) 695-7403
  • Allegation@nrc.gov General information or questions
  • www.nrc.gov Point Beach NRC Resident Inspectors
  • 920-755-2309 5