MONTHYEARML24227A5692024-08-31031 August 2024 NextEra - Pre-Application 10 CFR 50.69 8/28/2024 Meeting Slides ML24240A1502024-07-15015 July 2024 End-of-Cycle Public Outreach Meeting Presentation ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment ML22181B0842022-06-30030 June 2022 2021 Point Beach Nuclear Plant End-of-Cycle Meeting Handout ML21336A7972021-12-0909 December 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC - December 9, 2021 (Slides) ML21335A0232021-12-0808 December 2021 Slides - Point Beach Nuclear Plant, Unit Nos. 1 and 2 December 8, 2021 Public Meeting Slides for the Draft Plant-Specific Supplement 23, Second Renewal Dseis Public Meeting ML21285A1212021-08-0505 August 2021 SLRA Public Meeting Discussion Questions August 5 2021 ML21162A2632021-06-11011 June 2021 2020 Point Beach Nuclear Plant End-of-Cycle Meeting Presentation ML21134A0232021-05-18018 May 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC (NextEra) ML21042B9452021-02-17017 February 2021 Scoping and Process Meeting - February 17, 2021 ML20240A2702020-08-27027 August 2020 2019 EOC Slide Presentation ML18213A3912018-07-12012 July 2018 Public Meeting ML18179A4032018-06-29029 June 2018 Public Meeting Discussion Points ML18108A0152018-05-0101 May 2018 NextEra Approach to Resolution of Tornado Missile Protection May 1, 2018 ML18121A3392018-05-0101 May 2018 Slides for Point Beach 2017 EOC Open House ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16291A1772016-10-18018 October 2016 License Amendment Request Pre-Submittal Discussion October 18, 2016 ML16154A6772016-05-25025 May 2016 Annual Assessment Meeting/Open House (Hand Out) ML15112A0672015-04-20020 April 2015 Annual Assessment Meeting Open House - Handout EOC 2014 Mtg ML15091A5172015-04-0606 April 2015 4/6/2015, Meeting Slide for Public Teleconference on Point Beach MCR Abandonment Analysis for Loss of Control Scenarios ML14112A4252014-04-0808 April 2014 Annual Assessment Meeting, 2013 Reactor Oversight Process - Slides ML13162A7902013-06-11011 June 2013 Meeting Slides ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML1114603332011-05-25025 May 2011 EOC Licensee Presentation Slides ML1107703492011-03-22022 March 2011 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request ML1108206992011-03-22022 March 2011 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request ML1011304452010-04-22022 April 2010 FPL Energy Point Beach Handout from End-Of-Cycle Public Meeting ML0921107842009-07-29029 July 2009 Meeting Slides, Public Meeting with NRC Region III on Point Beach ML0912007212009-04-29029 April 2009 NRC Presentation Handouts for Point Beach 2008 End-of-Cycle Public Meeting ML0912007042009-04-29029 April 2009 Presentation at 2008 End-of-Cycle Public Meeting ML0912007342009-04-29029 April 2009 NRC Slides for Point Beach 2008 End-of-Cycle Public Meeting ML0828905272008-10-14014 October 2008 Meeting with NRC on AST ML0822503302008-10-0606 October 2008 Teleconference Summary Regarding Point Beach Nuclear Plant Supplement to the Auxiliary Feedeater Amendment ML0826819412008-09-24024 September 2008 Meeting Slides, FPL Energy Point Beach Public Meeting with NRC Region III ML0825401402008-09-16016 September 2008 Meeting Slides Point Beach Nuclear Plant Meeting with NRC on Epu. ML0819905262008-07-16016 July 2008 EOC Annual Assessment Meeting Slides ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0632601422006-11-21021 November 2006 11/21/2006 Informational Meeting Regarding Prairie Island License Renewal Application ML0604406422006-02-10010 February 2006 Summary of Public Meeting to Discuss Point Beach Self-Assessments, Summary Letter & Licensee Slides ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0413803782004-05-0707 May 2004 NMC New Fuel Supplier Development Initiative ML0412602942004-04-21021 April 2004 Public Meeting Slides, Point Beach 2003 End-of-Cycle Assessment ML0511502282004-04-19019 April 2004 Public Meeting Slides Point Beach EOC Performance Assessment ML0336406072004-01-0505 January 2004 Summary of Meeting with Nuclear Management Company, LLC Potential Repairs That May Overlap Remnant j-groove Welds on the Upper Reactor Vessel Head Penetrations ML0316902142003-06-16016 June 2003 Enclosure 1- NMC Handout Regulatory Conference Concerning Auxiliary Feedwater Orifice Issue for 06/06/2003 Point Beach Regulatory Conference ML0316903022003-06-16016 June 2003 Enclosure 3b - NMC Handout Regu;Atory Conference Concerning Auxiliary Feedwater Orifice Issue for 06/06/2003 Point Beach Regulatory Conference NRC 2003-0056, Submittal of the Auxiliary Feedwater Orifice Issue Regulatory Conference Slide Presentation2003-06-10010 June 2003 Submittal of the Auxiliary Feedwater Orifice Issue Regulatory Conference Slide Presentation ML1122206032003-06-0606 June 2003 Meeting Presentation, Point Beach, Regulatory Conference, EA-03-057 ML0312202182003-04-25025 April 2003 Public Meeting, Point Beach Re EOC, Licensee'S Slides ML0309300732003-04-25025 April 2003 Public Meeting, Point Beach Re EOC, Slides 2024-08-31
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24227A5692024-08-31031 August 2024 NextEra - Pre-Application 10 CFR 50.69 8/28/2024 Meeting Slides ML24240A1502024-07-15015 July 2024 End-of-Cycle Public Outreach Meeting Presentation ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment ML22181B0842022-06-30030 June 2022 2021 Point Beach Nuclear Plant End-of-Cycle Meeting Handout ML21336A7972021-12-0909 December 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC - December 9, 2021 (Slides) ML21335A0232021-12-0808 December 2021 Slides - Point Beach Nuclear Plant, Unit Nos. 1 and 2 December 8, 2021 Public Meeting Slides for the Draft Plant-Specific Supplement 23, Second Renewal Dseis Public Meeting ML21253A0152021-09-16016 September 2021 Pre-Submittal Meeting: LAR to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times -RITSTF Initiative 4b ML21162A2632021-06-11011 June 2021 2020 Point Beach Nuclear Plant End-of-Cycle Meeting Presentation ML21134A0232021-05-18018 May 2021 GL 2004-02 Resolution Update - NextEra Energy Point Beach, LLC (NextEra) ML21042B9452021-02-17017 February 2021 Scoping and Process Meeting - February 17, 2021 ML20240A2702020-08-27027 August 2020 2019 EOC Slide Presentation ML18121A3392018-05-0101 May 2018 Slides for Point Beach 2017 EOC Open House ML18108A0152018-05-0101 May 2018 NextEra Approach to Resolution of Tornado Missile Protection May 1, 2018 ML17310B2322017-11-0707 November 2017 Presentation Slides - NextEra Energy/Fpl - GSI-191 Issue Resolution, Pre-submittal Meeting, September 20, 2017 ML17205A0192017-07-17017 July 2017 Presentation for Point Beach 2016 EOC Open House ML17023A0652017-01-24024 January 2017 Pre-Submittal Call Regarding License Amendment Requests for Prairie Island Nuclear Generating Plant, Units 1 and 2 and Monticello Nuclear Generating Plant Emergency Action Level Scheme Changes ML16291A1772016-10-18018 October 2016 License Amendment Request Pre-Submittal Discussion October 18, 2016 ML15203A5072015-07-28028 July 2015 July 28, 2015, Turbine Driven Auxiliary Feedwater Cross-tie License Amendment Request ML15203A4982015-07-22022 July 2015 July 2015, Containment Dome Truss Seismic Analysis Methodology License Amendment Request ML15112A0672015-04-20020 April 2015 Annual Assessment Meeting Open House - Handout EOC 2014 Mtg ML15091A5172015-04-0606 April 2015 4/6/2015, Meeting Slide for Public Teleconference on Point Beach MCR Abandonment Analysis for Loss of Control Scenarios ML14112A4252014-04-0808 April 2014 Annual Assessment Meeting, 2013 Reactor Oversight Process - Slides ML13200A3962013-07-19019 July 2013 EA-13-125, Point Beach, Conference Slides ML13162A7902013-06-11011 June 2013 Meeting Slides ML1114603332011-05-25025 May 2011 EOC Licensee Presentation Slides ML1115400612011-05-25025 May 2011 Licensee Slides from 5/25/11 Public Meeting ML1108206992011-03-22022 March 2011 3/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment Request ML1107703492011-03-22022 March 2011 3/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment Request ML1013802102010-05-18018 May 2010 5/18/2010 Point Beach Public Meeting Slides ML1011304452010-04-22022 April 2010 FPL Energy Point Beach Handout from End-Of-Cycle Public Meeting ML1011304972010-04-22022 April 2010 NRC Slides for Point Beach End-of-Cycle Public Meeting ML0921107842009-07-29029 July 2009 Meeting Slides, Public Meeting with NRC Region III on Point Beach ML0912007342009-04-29029 April 2009 NRC Slides for Point Beach 2008 End-of-Cycle Public Meeting ML0912007042009-04-29029 April 2009 Presentation at 2008 End-of-Cycle Public Meeting ML0912007212009-04-29029 April 2009 NRC Presentation Handouts for Point Beach 2008 End-of-Cycle Public Meeting ML0828905272008-10-14014 October 2008 Meeting with NRC on AST ML0826819412008-09-24024 September 2008 Meeting Slides, FPL Energy Point Beach Public Meeting with NRC Region III ML0825401402008-09-16016 September 2008 Meeting Slides Point Beach Nuclear Plant Meeting with NRC on Epu. ML0819905262008-07-16016 July 2008 EOC Annual Assessment Meeting Slides ML0709403182007-03-28028 March 2007 EOC Summary Meeting Slides - 2007, Reactor Oversight Program - Cy 2006 ML0705106742007-02-21021 February 2007 NMC Slides for Public Meeting, Conduct of Operations Action Plan Update. ML0632601422006-11-21021 November 2006 11/21/2006 Informational Meeting Regarding Prairie Island License Renewal Application ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0609307552006-04-0303 April 2006 Public Meeting Summary - Point Beach Safety Culture Meeting (Includes NMC Slides) ML0524903212005-08-25025 August 2005 Slides for Point Beach CAL Public Meeting Summary - August 25, 2005 ML0508304892005-03-14014 March 2005 Confirmatory Action Letter Public Meeting Slides ML0509200092005-03-0303 March 2005 3/3/05 - Preliminary Results of Environmental Review Point Beach Nuclear Plant, Units 1 and 2, Nuclear Regulatory Commission, March 3, 2005 ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0425404652004-08-18018 August 2004 Nuclear Management Co Confirmatory Action Letter Public Meeting Presentation Regarding Point Beach Nuclear Plant ML0508303502004-05-11011 May 2004 E-Mail B. Kemp, NMC, to H. Chernoff, NRR, May 11 Rev 2. Ppt W/Att Slides Conference Call, May 11, 2004 2024-08-31
[Table view] |
Text
Selective Implementation of AST for the Point Beach Nuclear Plant Fuel Handling Accident February 6, 2003 NMc Committed to NuclearExcellenc>e 1
Introduction
Purpose:
- Discuss Selective Implementation of AST for the Fuel Handling Accident Analysis at PBNP NMC PBNP Representatives
- Sara Scott (Radiological Analysis Engineer)
- Jack Gadzala (Licensing Manager)
LisaaSchbfield (Licensing Engineer)
'~ ~~~~~
',,4,pif ,!!, , L- ' " ! ' "; !. . . .. * ,, .,,*
NMC Committed to NuclearExcellnc>e
"~~~~~~~~~~~~~~~~~~
,", "" "-7 'T'- ".** !*,"*
2
Background
"* February 28, 2002, LAR 224 submitted to NRC
" Requested implementation of AST for a limited number of the design basis accidents
" Requested changes to various TS
"* Discussions with NRC staff following submittal resulted in staff requesting additional information
"* Approach
- LAR 224 was retracted (1/24/2003)
- Analyses to be resubmitted in two parts i.;*...Fuel, Handling Accident II *,*,:Remaining :Analyses (LOCA, MSLB, SGTR, LR, ORE)
. . ,.I* , . , : . . ..* , L, I ;;I . " " "' ; S..
,ii.
':,' , ,3 ' " " ' ' :,:i '" , "i '
Topics of Discussion
"* Current Licensing Analysis
"*Proposed Fuel Handling Accident
" Proposed FHA Dose Results
"*Atmospheric Dispersion Factor Basis
"*Control, Room Envelope and HVAC
"*Proposed Technical Specification Changes
"*Commitments Conclusion t
FHA Current Licensing Basis
"* Thermal Power Level 1548.9 MWt (102%)
"* Accident Occurs 161 hours0.00186 days <br />0.0447 hours <br />2.662037e-4 weeks <br />6.12605e-5 months <br /> post-shutdown
"* All rods in one assembly damaged
"* NG gap inventories based on RG 1.25
"* Radial peaking factor of 1.77 applied
- Overall pool DF of 100 for iodine (none for NG)
" Activity isreleased in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
.*'ICRFP30:iodine DCF used for thyroid doses 5
FHA Current Licensing Basis Doses Whole Body Thyroid Exclusion Area 0.23 rem 75 rem Boundary Low Population Lowl 0.14 rem 4.5 rem Zone Control Room Dose not specified, but FHA is not limiting
,,,F. ,.. 75 rem 300 rem L1..1imits 6
Proposed FHA Analysis
"- RG 1.183 Appendix B guidance followed
"*Parameters for Source Term
- Core Power Level of 1683 MWt
- Radial Peaking Factor of 1.8
+ All Rods in One Assembly Damaged
- Decay time of 65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br />
- RG 1.183 Gap Fractions and Chemical Forms
. Water Depth (minimum) 23 feet
-Effective Pool DF for Iodine is 200
, 7-
"Effect 0iPool DF for NG is 1 ni, L 7
Proposed FHA Analysis
"* Release Point
"* Unit 2 Purge Stack (bounding)
"* No Credit for Purge Stack Filtration
- 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Release Duration
"* CR HVAC
- Emergency Mode Actuated at 10 min Post-Accident
- 500 cfm Unfiltered Inleakage
- 95% Elemental and Organic Iodine Filter Efficiency 99%,Particulate Iodine Filter Efficiency
.. NoCredittfor the Administration of KI
' ... t"}, i'I , I, 8
Proposed FHA Dose Results TRE 1.183 Accept.
TEDE Criteria Exclusion Area < 2.0 rem 6.3 rem Boundary LowPopulation < 0.5 rem 6.3 rem Zone Control Room < 3 rem 5 rem I_____________________________
'i ý -
i 9
Offsite 7/Q Basis
- EAB/LPZ values consistent with CLB LOCA
- Submitted to the NRC as part of TSCR 192 (SW Pump Operability Requirements)
- Analysis approved as amendments 174/178 (July, 9,1997)
, RG. 1..145 used to calculate EAB and LPZ X/Q's
- 1/1/1991 to 12/31/1993 Primary Tower Met Data ialues based on True North
,, ',, ~~ ,, : ', ,-2... b 10
Control Room x /Q Basis
%/Q
, Values were developed using ARCON96
- 1/1/1997 - 12/31/1999 Primary Met Data Used
. Most of December 1999 data unavailable from Primary Tower
+ Unavailability due to implementation of digital recorders (replaced strip charts)
+ Overalldata recovery > 90%
- Stability class determined from temp difference
'. :, .* 45. m intru ofl. "Tand 0.."" t'm
=" ,,
11
Control Room {IQ Basis
.M Possible Release Paths for FHA
"*Unit 2 Purge Stack
"*Spent Fuel Pool Deck
"*Drumming Area Vent Stack
"*All release points treated as Ground Release
"* Plume centerline transported directly over CR intake mAll releases influenced by Building Wake
,- .,*,,*+++,*+:,,+ onta nM, e n t Building for U2 Purge Stack / DAVS S......"
. '. "'r :"'
'!i ;, ,..'
+!t::r+*"* * '+ i' ' ,, '* +:+:**-*'", 1 ,, .. ..- , "
12
Control Room { /Q Basis m ARCON96 default wind direction range of 90O
- Values based on True North m ARCON96 default parameter changes based on DG-1111
, Surfaceroughness length set equal to 0.2 m
- Sector, averaging constant set equal to 4.3 m Unit 2 Purge Stack represents most bounding
- ,, , yI .. '"' '1,," ,
' 13
Control Room Envelope and HVAC
- Designed and Licensed under PBNP GDC 11
- Includes provisions for continuous occupancy under any credible post-accident condition
- No dose value associated with PBNP GDC 11
- Envelope contained in control building
- Control Room Proper Computer Room
_.Q.
.: ReactortEng ineering Room CR. Ventilation Duct Work 14
Control Room Envelope and HVAC m CR HVAC System provides heating, ventilation, air conditioning, and radiological habitability m CR HVAC has 4 modes of operation
- mode 2: 100% recirculation
- mode 3: 25% filtered return air / 75% recirc
- mode 4: 25% filtered outside air /75% recirc; positive pressure > 1/8 in w.g.
- Actuated on high rad signal
"."HVA*C " ducwork design/construction considered comm r'c"i:a S-Slip and Drive joints I 15
Control Room Envelope and HVAC
- Hardcasting of the majority of the seams of the ventilation ductwork
- Installation of new balancing dampers
- Installed position indication for washroom exhaust fan isolation
- New fusible links installed in the equipment room
"-,_,, roof penetrations i.Reilaced CR to Turbine Bldg differential pressure CR**
..nd c t..or......
16
Control Room Envelope and HVAC
[] Benefits of modifications made to CR/HVAC
+ Increase system reliability
- Improve program implementation
- Gain system operating margin
+ Increase integrity of CR HVAC system 10,
Proposed Technical Specification Change
[] Deletion of TS 3.9.3, "Containment Penetrations" (Refueling Operations)
- a. Equipment hatch closed and held in place with all bolts
- b. One door in each air lock capable of being closed c.. Containment Purge/Exhaust penetration closed by a manual or automatic isolation valve...or capable
,........ ,,.o,,e. g closed by an OPERABLE isolation
- r "*;.... .. '.,.+,
,;,,,,-6.:
',,,..'s *'"" " : s tem';i,," ..
":" ' i'*
,,',,", *,, ' ,"7n ,,
18
Proposed Technical Specification Change
- Technical Support for Deletion
- Revised analysis does not credit
"* Closure of the equipment or personnel hatches
"* Isolation of the purge stack
- Ventilation system filtration of the release Although the SFP release is not limiting, this area does not-have closure requirements during refueling- operations
,t ; D*;"+rum- ming, Area Vent Stack does not have automati isolation 19
Commitments
- A supplement to the proposed submittal which addresses the remaining accidents of concern
j 4
"" V
Conclusion
"*PBNP requesting Selective Implementation of AST for the Fuel Handling Accident
"*No exceptions to RG 1.183 are taken
"*Calculated doses do not challenge the limits specified in 10 CFR 50.67
, Revised: analysis supports deletion of TS 3.9.3
- PBNP commits to submitting a supplement to the proposed-LAR to address remaining analyses