Point Beach Nuclear Plant Annual Assessment Meeting Reactor Oversight Program - 2003 Nuclear Regulatory Commission - Region III Lisle, Illinois April 21, 2004
22 Agenda
Introduction
Review of Reactor Oversight Process
National Summary of Plant Performance
Discussion of Point Beach Performance Results
NMC Response and Remarks
NRC Closing Remarks
Break
NRC available to address public questions
33 NRC Representatives
James Caldwell Regional Administrator
Steve Reynolds Acting Director, Division Reactor Projects
Harold Chernoff Project Manager, NRR
R. Michael Morris Acting Senior Resident Inspector
Mike Kunowski Senior Project Engineer
Patrick Louden Branch Chief
44 Region III Organization James Caldwell Regional Administrator Geoffrey Grant Deputy Regional Administrator Steven Reynolds Director Division of Reactor Projects Patrick Hiland Deputy Director Cynthia Pederson Director Division of Reactor Safety Roy Caniano Deputy Director Patrick Louden Branch Chief Regional Specialists Paul Krohn Mike Morris Point Beach Resident Inspectors Mike Kunowski Project Engineer
55 NRC Performance Goals
Maintain safety and protect the environment
Enhance public confidence
Improve effectiveness, efficiency, and realism of processes and decision-making
Reduce unnecessary regulatory burden
66 Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
77 Examples of Baseline Inspections
Equipment Alignment
~92 hrs/yr
Triennial Fire Protection
~200 hrs every 3 yrs
Operator Response
~125 hrs/yr
~80 hrs/yr
Rad Release Controls
~100 hrs every 2 yrs
Worker Radiation Protection ~100 hrs/yr
Corrective Action Program
~200 hrs every 2 yrs
Corrective Action Case Reviews ~60 hrs/yr
88 Significance Threshold Performance Indicators Green:
Only Baseline Inspection White:
May increase NRC oversight Yellow:
Requires more NRC oversight Red:
Requires more NRC oversight Inspection Findings Green:
Very Low safety issue White:
Low to moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue
99 Action Matrix Concept Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
10 10 Purpose of Todays Meeting
A public forum for discussion of Point Beachs (NMCs) performance
NRC will address the Point Beach performance issues identified in the annual assessment letter
Point Beach will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
11 11 National Summary of Plant Performance Status at End of 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2
Multiple/Repetitive Degraded Cornerstone 3
Unacceptable 0
Total 102*
- Davis-Besse is in IMC 0350 process
12 12 National Summary
Performance Indicator Results (at end of 2003)
Green 1825
White 15
Yellow 0
Red 0
Total Inspection Findings (2003)
Green 748
White 9
Yellow 2
Red 1
13 13 Point Beach Assessment Results January 1 - December 31, 2003
Both Units were in the Multiple/Repetitive Degraded Cornerstone Column of the Action Matrix for 2003 because of the Red inspection finding from 2002 for the Auxiliary Feedwater System and the Yellow/Red inspection finding from 2003 for the Auxiliary Feedwater System
95003 supplemental inspection identified 10 Green Non-Cited Violations, 1 Severity Level IV Non-Cited Violation, 1 Severity Level III Cited Violation, and 1 Unresolved Item
14 14 Safety Significant Findings or PIs
First Auxiliary Feedwater (AFW) Red Finding
- Identified in November 2001 by Point Beach
- Design problem, applies to both Units
- NRC special inspection December 2001 - February 2002
- Regulatory Conference on April 29, 2002
- Final Significance Determination on July 12, 2002
- Relation to Second AFW Red finding reviewed during NRC special inspection October 2002 - March 2003
- Corrective actions reviewed during 95003 supplemental inspection July - December 2003
15 15 Safety Significant Findings or PIs
Second AFW Red Finding
- Identified in October 2002
- Design problem; Yellow for Unit 1, Red for Unit 2
- NRC special inspection October 2002 - March 2003
- Regulatory Conference on June 6, 2003
- Final Significance Determination on December 11, 2003
- Corrective actions reviewed during 95003 supplemental inspection July - December 2003
16 16 Point Beach Inspection Activities January 1 - December 31, 2003
For the Baseline Inspections, approximately 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> of inspection were used
- Regional Inspector Inspections
Radiation Protection, Security, Emergency Preparedness
Operator Licensing
Engineering - Modifications/50.59
For the 95003 Supplemental Inspection, approximately 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> of inspection were used
17 17 Point Beach Inspection Activities January 1 - December 31, 2004
Unit 1 Refuel Outage (April 2004)
Expanded Safety System Design and Performance Capability Inspection (July 2004)
Expanded Problem Identification and Resolution Inspection (September 2004)
Quarterly inspections of Confirmatory Action Letter progress
18 18 Point Beach Annual Assessment Summary January 1 - December 31, 2003
NMC operated Point Beach Units 1 & 2 in a manner that preserved public health and safety
All cornerstone objectives were met with a Red finding for both Units and a Yellow finding for Unit 1 and a Red finding for Unit 2 (AFW)
NRC plans expanded baseline inspections and Confirmatory Action Letter follow-up inspections at Point Beach for the remainder of the assessment period
19 19 Confirmatory Action Letter (CAL)
Administrative Letter Issued That Confirms a Licensees Agreement to Take Certain Actions
- Flexible Tool for Resolving Licensee Issues in a Timely and Efficient Manner
- Commitment, not a Requirement
20 20 Point Beach CAL
To be issued in April
Confirms NMCs Commitments in March 22 Letter to take actions on a specified schedule to address:
- Human Performance
- Engineering Design Control
- Engineering/Operations Interface
- Corrective Action Program
21 21 NRC Followup
Periodic inspections
Public meetings
Closure Letter - demonstrated improved performance
22 22 Point Beach Response and Remarks Douglas Cooper Senior Vice-President Nuclear Management Company, LLC
23 23 Contacting the NRC
Report an emergency
(301) 816-5100 (call collect)
Report a safety concern:
(800) 695-7403
Allegation@nrc.gov
General information or questions
www.nrc.gov
Select What We Do for Public Affairs
24 24 Contacting the NRC
Region III Public Affairs Officer
- Jan Strasma or Viktoria Mitlyng
(630) 829-9663 or 829-9662
opa3@nrc.gov
Point Beach Resident Inspector Office
- Mike Morris, Acting Senior Resident Inspector
- Paul Krohn, Senior Resident Inspector
(920) 755-2309
25 25 Reference Sources
Reactor Oversight Process
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
Public Electronic Reading Room
http://www.nrc.gov/reading-rm.html
Public Document Room
1-800-397-4209 (Toll Free)