ML052130309
ML052130309 | |
Person / Time | |
---|---|
Site: | Grand Gulf ![]() |
Issue date: | 08/01/2005 |
From: | Bottemiller C Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
GNSO-2005/00046 | |
Download: ML052130309 (4) | |
Similar Documents at Grand Gulf | |
---|---|
Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024
[Table view]Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31 Category:Technical Specification MONTHYEARML23208A2112023-07-27027 July 2023
[Table view]Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML22223A0512022-08-11011 August 2022 Report of Technical Specification Bases Changes CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21105A0522021-04-15015 April 2021 EAL Technical Bases Document Revision 1 ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes ML20134H9592020-05-12012 May 2020 Technical Specification Bases 3.10 ML20134H8802020-05-12012 May 2020 Technical Specification Bases 3.1 ML20134H8672020-05-12012 May 2020 Technical Specification Bases 2.0 ML20134H9562020-05-12012 May 2020 Technical Specification Bases 3.9 ML20134H9532020-05-12012 May 2020 Technical Specification Bases 3.8 ML20134H9502020-05-12012 May 2020 Technical Specification Bases 3.7 ML20134H8772020-05-12012 May 2020 Technical Specification Bases 3.0 ML20134H8872020-05-12012 May 2020 Technical Specification Bases 3.2 ML20134H9372020-05-12012 May 2020 Technical Specification Bases 3.6 ML20134H8892020-05-12012 May 2020 Technical Specification Bases 3.3 ML20134H9312020-05-12012 May 2020 Technical Specification Bases 3.4 ML20134H9352020-05-12012 May 2020 Technical Specification Bases 3.5 CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/20142015-03-27027 March 2015 Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density2015-03-27027 March 2015 Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints GNRO-2014/00050, Correction of Technical Specification Typographical Error2014-07-31031 July 2014 Correction of Technical Specification Typographical Error ML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update2012-12-21021 December 2012 Technical Requirements Manual and Technical Specification Bases Update ML12277A0812012-10-0202 October 2012 Proposed Techincal Specification Changes ML11308A1032011-10-28028 October 2011 License Renewal Application - Appendix D - Technical Specification Changes GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. GNRO-2010/00042, Technical Specification Bases & Technical Requirements Manual Update2010-05-27027 May 2010 Technical Specification Bases & Technical Requirements Manual Update GNRO-2010/00009, Technical Specification Bases Update to the NRC for Period Dated January 20, 20092010-01-20020 January 2010 Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 GNRO-2009/00062, License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits2009-10-27027 October 2009 License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions GNRO-2009/00028, Technical Specification Bases Update to the NRC for Period Dated April 22, 20092009-04-22022 April 2009 Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 GNRO-2009/00017, Technical Specification Bases Update to the NRC for Period Dated March 4, 20092009-03-0404 March 2009 Technical Specification Bases Update to the NRC for Period Dated March 4, 2009 GNRO-2009/00008, Technical Specification Bases Update to the NRC for Period Dated January 23, 20092009-01-23023 January 2009 Technical Specification Bases Update to the NRC for Period Dated January 23, 2009 GNRO-2008/00069, Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 20082008-10-22022 October 2008 Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 GNRO-2008/00013, License Amendment Request, Technical Specification Surveillance Requirements for Diesel Generator Slow Start Testing2008-09-11011 September 2008 License Amendment Request, Technical Specification Surveillance Requirements for Diesel Generator Slow Start Testing GNRO-2008/00049, Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-4482008-09-0202 September 2008 Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 2023-07-27 Category:Bases Change MONTHYEARML23208A2112023-07-27027 July 2023
[Table view]Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML22223A0512022-08-11011 August 2022 Report of Technical Specification Bases Changes ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21105A0522021-04-15015 April 2021 EAL Technical Bases Document Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes ML20134H8892020-05-12012 May 2020 Technical Specification Bases 3.3 ML20134H9312020-05-12012 May 2020 Technical Specification Bases 3.4 ML20134H8872020-05-12012 May 2020 Technical Specification Bases 3.2 ML20134H8772020-05-12012 May 2020 Technical Specification Bases 3.0 ML20134H8672020-05-12012 May 2020 Technical Specification Bases 2.0 ML20134H9352020-05-12012 May 2020 Technical Specification Bases 3.5 ML20134H9372020-05-12012 May 2020 Technical Specification Bases 3.6 ML20134H9502020-05-12012 May 2020 Technical Specification Bases 3.7 ML20134H9532020-05-12012 May 2020 Technical Specification Bases 3.8 ML20134H9562020-05-12012 May 2020 Technical Specification Bases 3.9 ML20134H9592020-05-12012 May 2020 Technical Specification Bases 3.10 ML20134H8802020-05-12012 May 2020 Technical Specification Bases 3.1 CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density2015-03-27027 March 2015 Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints ML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update2012-12-21021 December 2012 Technical Requirements Manual and Technical Specification Bases Update ML11308A1032011-10-28028 October 2011 License Renewal Application - Appendix D - Technical Specification Changes GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. GNRO-2010/00042, Technical Specification Bases & Technical Requirements Manual Update2010-05-27027 May 2010 Technical Specification Bases & Technical Requirements Manual Update GNRO-2010/00009, Technical Specification Bases Update to the NRC for Period Dated January 20, 20092010-01-20020 January 2010 Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 GNRO-2009/00028, Technical Specification Bases Update to the NRC for Period Dated April 22, 20092009-04-22022 April 2009 Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 GNRO-2009/00017, Technical Specification Bases Update to the NRC for Period Dated March 4, 20092009-03-0404 March 2009 Technical Specification Bases Update to the NRC for Period Dated March 4, 2009 GNRO-2009/00008, Technical Specification Bases Update to the NRC for Period Dated January 23, 20092009-01-23023 January 2009 Technical Specification Bases Update to the NRC for Period Dated January 23, 2009 GNRO-2008/00069, Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 20082008-10-22022 October 2008 Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 GNRO-2008/00049, Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-4482008-09-0202 September 2008 Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 GNRO-2008/00025, Technical Specification Bases Update to the NRC for Period Dated March 5, 20082008-03-0505 March 2008 Technical Specification Bases Update to the NRC for Period Dated March 5, 2008 GNRO-2007/00073, Technical Specification Bases Update to the NRC for Period Dated December 03, 20072007-12-0303 December 2007 Technical Specification Bases Update to the NRC for Period Dated December 03, 2007 GNRO-2007/00049, Technical Specification Bases Update to the NRC for Period Dated July 25, 20072007-07-25025 July 2007 Technical Specification Bases Update to the NRC for Period Dated July 25, 2007 GNRO-2007/00043, Technical Specification Bases Update to the NRC for Period Dated June 13, 20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for Period Dated June 13, 2007 GNRO-2007/00021, Technical Specification Bases, Technical Requirements Manual and Core Operating Limits Updates to the NRC for Period Dated April 7, 20072007-04-11011 April 2007 Technical Specification Bases, Technical Requirements Manual and Core Operating Limits Updates to the NRC for Period Dated April 7, 2007 GNRO-2007/00019, Technical Specification Bases Update to the NRC for Period Dated March 30, 20072007-03-30030 March 2007 Technical Specification Bases Update to the NRC for Period Dated March 30, 2007 GNRO-2006/00054, Technical Specification Bases Update to the NRC for Period Dated September 28, 20062006-09-28028 September 2006 Technical Specification Bases Update to the NRC for Period Dated September 28, 2006 GNRO-2006/00030, Technical Specification Bases Update to the NRC for Period Dated February 16, 20062006-05-15015 May 2006 Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 GNRO-2006/00008, Technical Specification Bases Update to the NRC for Period Dated February 16, 20062006-02-16016 February 2006 Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 GNRO-2006/00003, Technical Requirements Manual Update to the NRC for Period Dated January 17, 20062006-01-17017 January 2006 Technical Requirements Manual Update to the NRC for Period Dated January 17, 2006 2023-07-27 |
Text
GNRO-2005/00046 August 1,2005 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
Subject:
Technical Specification Bases Update to the NRC for Period Dated July 29, 2005 Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29
Dear Sir an( Idam:
Pursuant to Grand Gulf Nuclear Station (GGNS) Technical Specification 5.5.1 1, Entergy Operations, Inc. hereby submits an update of all changes made to GGNS Technical Specification Bases since the last submittal (GNRO-2005/00027 letter dated May 5, 2005 to the NRC from GGNS). This update is consistent with update frequency listed in 10CFR50.71(e).
Should you have any questions, please contact Michael Larson at (601) 437-6685.
Yours truly, CAB/MJL attachment: GGNS Technical Specification Bases Revised Pages cc: (See Next Page)
GNRO-2005/00046 PAGE 2 cc:
I ComPton I J. N. I I ... -
(w/o\ 1 Levanway D. E. (Wise Carter) (w/a)
Reynolds N. S. (w/a)
Smith L. J. (Wise Carter) (w/a)
NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U S . Nuclear Regulatory Commission ALL LETTERS ATTN: Dr. Bruce S. Mallett (w/2) 61 1 Ryan Plaza Drive, Suite 400 Arlinaton. TX 7601 1-4005 U.S. Nuclear Regulatory Commission ALL LETTERS - COURIER ATTN: Mr. , NRR/DLPM (w/2) DELIVERY (FEDEX, ETC.)
ADDRESS ONLY - ****
ATTN: ADDRESSEE ONLY ATTN: Courier Delivery Only Mail Stop OWFN/7D-I 11555 Rockville Pike Rockville, MD 20852-2378
ATTACHMENT to GNRO-2005/00046 Grand Gulf Technical Specification Bases Revised Pages dated August I, 2005 LDC# BASES PAGES AFFECTED TOPIC of CHANGE 05018 B 3.3-30a Technical Specification Bases changes to correct an error in the fiaure for vessel levels.
RPS I N S T R U M E N T A T I O N 900 T NOTE: S C A L E I N INCHES B 3.3.1.1 ABOVE VESSEL ZERO I
WATER LEVEL NOMENCLATURE 513.0 ~
=
z
+
a I S O L A T E CONTAINMENT, AUXILARY B U I L D I N G
& DRYWELL 400+3820
+
z W 3 z -150.3 (1) 3 I N I T I A T E RHR L P C S AND OI L
+
v, 350 366.3 START DIESEL: D I V I AND I1 CONTRIBUTE TO A.D.S. AND 300t f, CLOSE M S I V ' S W
z 1 0 W N 3 LL 1
W W 3
LL 2
+
250 0 a
- 216.3 ' +(8) TRIP RCIC TURBINE, 213.0 ~
200 + CLOSE HPCS I N J E C T I O N PATH, REACTOR SCRAM ( I N RUN)
-179.3 -RECIRCULATION I
RECIRCULATION-172.3- (9) TRIP M A I N TURBINE 150 -- AND REACTOR FEEDPUMPS 100 --
50 --
BASES FIGURE B 3.3.1.1-1REACTOR VESSEL WATER L E V E L G R A N D GULF B 3.3-30a LDC 05-018 DFN: f ig3151.dgn