Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1
ML21062A198
Person / Time
Site: Grand Gulf, River Bend  Entergy icon.png
Issue date: 03/03/2021
From: Gaston R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO-2021/00010
Download: ML21062A198 (8)


Text

Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Nuclear Licensing 10 CFR 50.90 CNRO-2021/00010 March 3, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Supplement to License Amendment Request to Adopt TSTF-501 "Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control,"

Revision 1 Grand Gulf Nuclear Station, Unit 1 NRC Docket No. 50-416 Renewed Facility Operating License No. NPF-29 River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47

References:

1. Entergy Operations, Inc. (Entergy) letter to U. S. Nuclear Regulatory Commission (NRC), "Application to Revise Technical Specifications to Adopt TSTF-501 "Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control," Revision 1," (ADAMS Accession No. ML20057G004), dated February 26, 2020
2. NRC Electronic mail from S. Lingam (NRC) to J. Schrage (Entergy),

Subject:

"Entergy Fleet (GGNS and RBS) - TSTF-501 LAR SE, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control (EPID L-2020-LLA-0032)," dated February 8, 2021 In Reference 1, Entergy Operations, Inc. (Entergy) submitted a request for a proposed amendment to Renewed Facility Operating License (FOL), Appendix A, "Technical Specifications" (TS) for Grand Gulf Nuclear Station, Unit 1 (GGNS) and River Bend Station, Unit 1 (RBS). Specifically, Entergy requested to adopt Technical Specification Task Force (TSTF)

Traveler TSTF-501, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control" into the GGNS and RBS TS. The proposed change, in part, revises GGNS and RBS TS 3.8.3, "Diesel Fuel Oil, Lube Oil, and Starting Air" by removing the current stored diesel fuel oil and lube oil numerical volume requirements from the TS and placing them in the

CNRO-2021/00010 Page 2 of 2 TS Bases so that they may be modified under licensee control. The TS are also revised such that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator at GGNS and RBS.

In Reference 2, the NRC identified an administrative error in the proposed GGNS marked-up and clean TS pages that were provided in Attachments 1a and 2a to the Enclosure of Reference 1. Corrected versions of the proposed GGNS marked-up and clean TS pages are provided in Attachments 1 and 2 to this letter, respectively. The corrected TS pages are consistent with TSTF-501, Revision 1.

In accordance with 10 CFR 50.91, Entergy is providing notification of this LAR by transmitting a copy of this letter and enclosure to the designated State Officials.

The No Significant Hazards Consideration determination provided in the Reference 1 submittal is not altered by the corrected TS pages provided in this letter.

This letter contains no new regulatory commitments.

If there are any questions or if additional information is needed, please contact Ron Gaston, Director, Nuclear Licensing at (601) 368-5138.

I declare under penalty of perjury that the foregoing is true and correct. Executed on March 3, 2021.

Sincerely, Ron Gaston RWG/jls Attachments:

1. Proposed Technical Specification Pages (mark-up) - Grand Gulf Nuclear Station Unit 1
2. Proposed Technical Specification Pages (clean) - Grand Gulf Nuclear Station, Unit 1 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Grand Gulf Nuclear Station, Unit 1 NRC Senior Resident Inspector - River Bend Station, Unit 1 NRC Project Manager - Entergy Fleet State Health Officer, Mississippi Department of Health Louisiana of Department of Environmental Quality

Attachment 1 CNRO-2021/00010 Proposed Technical Specification Pages (mark-up) -

Grand Gulf Nuclear Station Unit 1 (2 Pages)

GGNS TS Pages 3.8-22 3.8-24

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each DG.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more DGs with A.1 Restore fuel oil level to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> fuel oil level less than a within limits.

7 day supply and greater than a 6 day supply.:

1. For DG 11 or 12,

< 68,744 gal and 59,173 gal; and

2. For DG 13,

< 44,616 gal and 38,280 gal.

B. One or more DGs with B.1 Restore lube oil inventory 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> lube oil inventory less to within limits.

than a 7 day supply and greater than a 6 day supply.:

1. For DG 11 or 12,

< 410 gal and 350 gal; and

2. For DG 13, < 202 gal and 173 gal.

(continued)

GRAND GULF 3.8-22 Amendment No. 147, 149

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains > a 7 day In accordance with supply of fuel.: the Surveillance Frequency Control

a. 68,744 gal of fuel for DGs 11 and 12; and Program
b. 44,616 gal of fuel for DG 13.

SR 3.8.3.2 Verify lube oil inventory is > a 7 day supply.: In accordance with the Surveillance

a. 410 gal for DGs 11 and 12; and Frequency Control Program
b. 202 gal for DG 13.

SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are In accordance with tested in accordance with, and maintained within the the Diesel Fuel Oil limits of, the Diesel Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify each required DG air start receiver pressure is: In accordance with the Surveillance

a. 160 psig for DGs 11 and 12; and Frequency Control Program
b. 175 psig for DG 13.

SR 3.8.3.5 Check for and remove accumulated water from each In accordance with fuel oil storage tank. the Surveillance Frequency Control Program (continued)

GRAND GULF 3.8-24 Amendment No. 147, 149, 219 Next page is 3.8-26

Attachment 2 CNRO-2021/00010 Proposed Technical Specification Pages (clean) -

Grand Gulf Nuclear Station, Unit 1 (2 Pages)

GGNS TS Pages 3.8-22 3.8-24

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil, Lube Oil, and Starting Air LCO 3.8.3 The stored diesel fuel oil, lube oil, and starting air subsystem shall be within limits for each required diesel generator (DG).

APPLICABILITY: When associated DG is required to be OPERABLE.

ACTIONS


NOTE-----------------------------------------------------------

Separate Condition entry is allowed for each DG.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more DGs with A.1 Restore fuel oil level to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> fuel oil level less than a within limits.

7 day supply and greater than a 6 day supply.

B. One or more DGs with B.1 Restore lube oil inventory 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> lube oil inventory less to within limits.

than a 7 day supply and greater than a 6 day supply.

(continued)

GRAND GULF 3.8-22 Amendment No. 147, 149

Diesel Fuel Oil, Lube Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.3.1 Verify each fuel oil storage tank contains > a 7 day In accordance with supply of fuel. the Surveillance Frequency Control Program SR 3.8.3.2 Verify lube oil inventory is > a 7 day supply. In accordance with the Surveillance Frequency Control Program SR 3.8.3.3 Verify fuel oil properties of new and stored fuel oil are In accordance with tested in accordance with, and maintained within the the Diesel Fuel Oil limits of, the Diesel Fuel Oil Testing Program. Testing Program SR 3.8.3.4 Verify each required DG air start receiver pressure is: In accordance with the Surveillance

a. 160 psig for DGs 11 and 12; and Frequency Control Program
b. 175 psig for DG 13.

SR 3.8.3.5 Check for and remove accumulated water from each In accordance with fuel oil storage tank. the Surveillance Frequency Control Program (continued)

GRAND GULF 3.8-24 Amendment No. 147, 149, 219 Next page is 3.8-26