Primary Containment B 3.6.1.1 BASES BACKGROUND This Specification ensures that the performance of the primary (continued) containment, in the event of a DBA, meets the assumptions used in the safety analyses of References 1 and 2. SR 3.6.1.1.1 leakage rate requirements are in conformance with 10 CFR 50, Appendix J (Ref. 3), as modified by approved exemptions.

APPLICABLE The safety design basis for the primary containment is that SAFETY ANALYSES it must withstand the pressures and temperatures of the limiting DBA without exceeding the design leakage rate.

The DBA that postulates the maximum release of radioactive material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERABLE such that release of fission products to the environment is controlled by the rate of primary containment leakage.

Analytical methods and assumptions involving the primary containment are presented in References 1 and 2. The safety analyses assume a nonmechanistic fission product release following a DBA, which forms the basis for determination of offsite doses. The fission product release is, in turn, based on an assumed leakage rate from the primary containment.

OPERABILITY of the primary containment ensures that the leakage rate assumed in the safety analyses is not exceeded.

The maximum allowable leakage rate for the primary containment (La) including MSIV Leakage is 0.682% by weight of the containment and drywell air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at the maximum peak containment pressure (Pa) of 12.1 psig (Ref. 4).

Primary containment satisfies Criterion 3 of the NRC Policy Statement.

LCO Primary containment OPERABILITY is maintained by limiting leakage to <

1.0 La, except prior to the first unit startup after performing a required 10 CFR 50, Appendix J leakage test. At this time, the combined Type B and Type C leakage must be < 0.6 La, and the overall Type A leakage must be < 0.75 La. Compliance with this LCO will ensure a primary containment configuration, including equipment hatches, that is structurally sound and that will limit leakage to those (continued)

GRAND GULF B 3.6-2 LBDCR 17071

Primary Containment Air Locks B 3.6.1.2 BASES BACKGROUND DBA. Not maintaining air lock integrity or leak tightness (continued) may result in a leakage rate in excess of that assumed in the unit safety analysis.

APPLICABLE The DBA that postulates the maximum release of radioactive SAFETY ANALYSES material within primary containment is a LOCA. In the analysis of this accident, it is assumed that primary containment is OPERABLE, such that release of fission products to the environment is controlled by the rate of primary containment leakage. The primary containment is designed with a maximum allowable leakage rate (La) of 0.682% by weight of the containment and drywell air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at the calculated maximum peak containment pressure (Pa) of 12.1 psig. This allowable leakage rate forms the basis for the acceptance criteria imposed on the SRs associated with the air locks.

Primary containment air lock OPERABILITY is also required to minimize the amount of fission product gases that may escape primary containment through the air lock and contaminate and pressurize the secondary containment.

Primary containment air locks satisfy Criterion 3 of the NRC Policy Statement.

LCO As part of the primary containment, the air lock's safety function is related to control of containment leakage rates following a DBA. Thus, the air lock's structural integrity and leak tightness are essential to the successful mitigation of such an event.

The primary containment air locks are required to be OPERABLE. For each air lock to be considered OPERABLE, the air lock interlock mechanism must be OPERABLE, the air lock must be in compliance with the Type B air lock leakage test, both air lock doors must be OPERABLE, and the test connection valves must be OPERABLE in accordance with LCO 3.6.1.3. These normally closed manual isolation valves are considered OPERABLE when closed or when intermittently opened under administrative controls. The interlock allows only one air lock door to be open at a time. This provision ensures that a gross breach of primary containment does not exist when primary containment is required to be OPERABLE.

(continued)

GRAND GULF B 3.6-6 LBDCR 16070

Primary Containment Air Locks B 3.6.1.2 BASES ACTIONS D.1 and D.2 (continued) does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.1.2.1 REQUIREMENTS Maintaining primary containment air locks OPERABLE requires compliance with the leakage rate test requirements of 10 CFR 50, Appendix J (Ref. 2), as modified by approved exemptions. This SR reflects the leakage rate testing requirements with regard to air lock leakage (Type B leakage tests). The leakage rate testing requirements include the airlock test connection valves (Type C leakage tests). The periodic testing requirements verify that the air lock leakage does not exceed the allowed fraction of the overall primary containment leakage rate.

The SR has been modified by two Notes. Note 1 states that an inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test. This is considered reasonable since either air lock door is capable of providing a fission product barrier in the event of a DBA. Note 2 has been added to this SR, requiring the results to be evaluated against the acceptance criteria of SR 3.6.1.1.1. This ensures that air lock leakage is properly accounted for in determining the overall primary containment leakage rate. Since the overall primary containment leakage rate is only applicable in MODES 1, 2, and 3 operation, the Note 2 requirement is imposed only during these MODES.

SR 3.6.1.2.2 The seal air flask pressure is verified to be at 90 psig to ensure that the seal system remains viable. It must be checked because it could bleed down during or (continued)

GRAND GULF B 3.6-11 LDC 18127

Primary Containment Air Locks B 3.6.1.2 BASES SURVEILLANCE SR 3.6.1.2.2 (continued)

REQUIREMENTS following access through the air lock, which occurs regularly. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.1.2.3 The air lock interlock mechanism is designed to prevent simultaneous opening of both doors in the air lock. Since both the inner and outer doors of an air lock are designed to withstand the maximum expected post accident primary containment pressure (Ref. 3), closure of either door will support primary containment OPERABILITY. Thus, the interlock feature supports primary containment OPERABILITY while the air lock is being used for personnel transit in and out of the containment. Periodic testing of this interlock demonstrates that the interlock will function as designed and that simultaneous inner and outer door opening will not inadvertently occur. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.6-12 LBDCR 18127

Primary Containment Air Locks B 3.6.1.2 BASES SURVEILLANCE SR 3.6.1.2.4 REQUIREMENTS (continued) A seal pneumatic system test to ensure that pressure does not decay at a rate equivalent to > 2 psig for a period of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> from an initial pressure of 90 psig is an effective leakage rate test to verify system performance.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 3.8.

2. 10 CFR 50, Appendix J.
3. UFSAR, Table 6.2-13.

GRAND GULF B 3.6-13 LBDCR 18127

PCIVs B 3.6.1.3 BASES LCO are listed with their associated stroke times in the applicable plant (continued) procedures. Purge valves with resilient seals, MSIVs, and hydrostatically tested valves must meet additional leakage rate requirements. Other PCIV leakage rates are addressed by LCO 3.6.1.1, "Primary Containment," as Type B or C testing.

Valves on the containment airlock bulkhead have a design function as a primary containment isolation when the airlock inner door is inoperable per LCO 3.6.1.2 or during performance of airlock barrel testing or pneumatic tubing testing or at any time the inner airlock door/bulkhead is breached.

However, these valves are Primary Containment Isolation Valves as required by LCO 3.6.1.3 at all times.

This LCO provides assurance that the PCIVs will perform their designed safety functions to minimize the loss of reactor coolant inventory, and establish the primary containment boundary during accidents.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, PCIVs are not required to be OPERABLE. Certain valves are required to be OPERABLE to prevent release of radioactive material during a postulated fuel handling accident involving the handling of recently irradiated fuel (i.e., fuel that has occupied part of a critical reactor core within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />). These valves are those whose associated isolation instrumentation is required to be OPERABLE according to LCO 3.3.6.1, "Function 2.g." (This does not include the valves that isolate the associated instrumentation.)

ACTIONS The ACTIONS are modified by a Note allowing penetration flow path(s) to be unisolated intermittently under administrative controls. These controls consist of stationing a dedicated (continued)

GRAND GULF B 3.6-16 LBDCR 18128

PCIVs B 3.6.1.3 BASES ACTIONS D.1, D.2, and D.3 (continued) verification that those isolation devices outside primary containment and potentially capable of being mispositioned are in the correct position. For the isolation devices inside primary containment, the time period specified as "prior to entering MODE 2 or 3, from MODE 4 if not performed within the previous 92 days" is based on engineering judgment and is considered reasonable in view of administrative controls that will ensure that isolation device misalignment is an unlikely possibility.

For the primary containment purge valve with resilient seal that is isolated in accordance with Required Action D.1, SR 3.6.1.3.5 must be performed at least once every 92 days. This provides assurance that degradation of the resilient seal is detected and confirms that the leakage rate of the primary containment purge valve does not increase during the time the penetration is isolated. Since more reliance is placed on a single valve while in this Condition, it is prudent to perform the SR more often. Therefore, a Frequency of once per 92 days was chosen and has been shown acceptable based on operating experience.

E.1 and E.2 If any Required Action and associated Completion Time cannot be met in MODE 1, 2, or 3, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

F.1 If any Required Action and associated Completion Time cannot be met, the plant must be placed in a condition in which the LCO does not apply. If applicable, movement of recently irradiated fuel assemblies in the primary and (continued)

GRAND GULF B 3.6-20 LBDCR 18128

PCIVs B 3.6.1.3 BASES ACTIONS F.1 (continued) secondary containment must be immediately suspended. Suspension of these activities shall not preclude completion of movement of a component to a safe condition. Also, if applicable, action must be immediately initiated to restore the valves to OPERABLE status. This allows RHR to remain in service while actions are being taken to restore the valve.

SURVEILLANCE SR 3.6.1.3.1 REQUIREMENTS This SR verifies that the 20 inch primary containment purge valves are closed as required or, if open, open for an allowable reason. If a purge valve is open in violation of this SR, the valve is considered inoperable. If the inoperable valve is not otherwise known to have excessive leakage when closed, it is not considered to have leakage outside of the limits.

The SR is also modified by a Note (Note 1) stating that primary containment purge valves are only required to be closed in MODES 1, 2, and 3. At times other than MODE 1, 2, or 3 when the purge valves are required to be capable of closing (e.g., during movement of recently irradiated fuel assemblies) pressurization concerns are not present and the purge valves are allowed to be open (automatic isolation capability would be required by SR 3.6.1.3.4 and SR 3.6.1.3.7).

The SR is modified by a Note (Note 2) stating that the SR is not required to be met when the purge valves are open for the stated reasons. The Note states that these valves may be opened for pressure control, ALARA, or air quality considerations for personnel entry, or for Surveillances, or special testing of the purge system that require the valves to be open (e.g., testing of the containment and drywell ventilation radiation monitors). These primary containment (continued)

GRAND GULF B 3.6-21 LBDCR 18128

PCIVs B 3.6.1.3 BASES SURVEILLANCE SR 3.6.1.3.1 (continued)

REQUIREMENTS purge valves are capable of closing in the environment following a LOCA.

Therefore, these valves are allowed to be open for limited periods of time.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.1.3.2 This SR verifies that each primary containment isolation manual valve and blind flange that is located outside primary containment, drywell, and steam tunnel, and not locked, sealed, or otherwise secured and is required to be closed during accident conditions, is closed. The SR helps to ensure that post accident leakage of radioactive fluids or gases outside of the primary containment boundary is within design limits. This SR does not require any testing or valve manipulation. Rather, it involves verification that those devices outside primary containment, drywell, and steam tunnel, and capable of being mispositioned, are in the correct position. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

Two Notes are added to this SR. The first Note applies to valves and blind flanges located in high radiation areas and allows them to be verified by use of administrative controls. Allowing verification by administrative controls is considered acceptable, since access to these areas is typically restricted during MODES 1, 2, and 3 for ALARA reasons. Therefore, the probability of misalignment of these devices, once they have been verified to be in the proper position, is low. A second Note is included to clarify that PCIVs open under administrative controls are not required to meet the SR during the time the PCIVs are open. This SR does not apply to valves that are locked, sealed, or otherwise secured in the closed position, since these were verified to be in the correct position upon locking, sealing, or securing.

(continued)

GRAND GULF B 3.6-22 LBDCR 18127

PCIVs B 3.6.1.3 BASES SURVEILLANCE SR 3.6.1.3.4 (continued)

REQUIREMENTS by the applicable regulatory documents (10CFR 50.67).

Closure times explicitly assumed in accident analyses are listed in UFSAR Table 6.2-44 Note d. The Frequency of this SR is in accordance with the INSERVICE TESTING PROGRAM.

(continued)

GRAND GULF B 3.6-23a LBDCR 15010

PCIVs B 3.6.1.3 BASES SURVEILLANCE SR 3.6.1.3.5 REQUIREMENTS (continued) For primary containment purge valves with resilient seals, additional leakage rate testing beyond the test requirements of 10 CFR 50, Appendix J (Ref. 3),

is required to ensure OPERABILITY. Operating experience has demonstrated that this type of seal has the potential to degrade in a shorter time period than do other seal types. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

Additionally, this SR must be performed for all purge valves within 92 days following any purge valve failing to meet it's acceptance criteria. This ensures that any common mode seal degradation is identified.

The Once within 92 day Frequency is accordance with the INSERVICE TESTING PROGRAM as is modified by a note that indicates that all valves do not have to be retested due to the failure of another valve, provided they have been tested within 92 days prior to any valve failing to meet it's acceptance criteria.

The SR is modified by a Note stating that the primary containment purge valves are only required to meet leakage rate testing requirements in MODES 1, 2, and 3. If a LOCA inside primary containment occurs in these MODES, purge valve leakage must be minimized to ensure offsite radiological release is within limits. At other times when the purge valves are required to be capable of closing (e.g., during handling of recently irradiated fuel),

pressurization concerns are not present and the purge valves are not required to meet any specific leakage criteria.

SR 3.6.1.3.6 Verifying that the full closure isolation time of each MSIV is within the specified limits is required to demonstrate OPERABILITY. The full closure isolation time test ensures that the MSIV will isolate in a time period that does not (continued)

GRAND GULF B 3.6-24 LBDCR 18127

PCIVs B 3.6.1.3 BASES SURVEILLANCE SR 3.6.1.3.6 (continued)

REQUIREMENTS exceed the times assumed in the DBA analyses. The 3 second time limit is measured from the start of valve motion to complete valve closure. The 5 second time limit is measured from initiation of the actuating signal to complete valve closure. The Frequency of this SR is in accordance with the INSERVICE TESTING PROGRAM.

SR 3.6.1.3.7 Automatic PCIVs close on a primary containment isolation signal to prevent leakage of radioactive material from primary containment following a DBA. This SR ensures that (continued)

GRAND GULF B 3.6-24a LBDCR 15010

PCIVs B 3.6.1.3 BASES SURVEILLANCE SR 3.6.1.3.7 (continued)

REQUIREMENTS each automatic PCIV will actuate to its isolation position on a primary containment isolation signal. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.1.7 overlaps this SR to provide complete testing of the safety function. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.1.3.8 The analyses in Reference 2 is based on leakage that is less than the specified leakage rate. Leakage through any single main steam line must be 100 scfh when tested at a pressure of 12.1 psig. Leakage through all four steam lines must be 250 scfh when tested at Pa (12.1 psig).

The MSIV leakage rate must be verified to be in accordance with the leakage test requirements of Reference 3, as modified by approved exemptions. A Note is added to this SR which states that these valves are only required to meet this leakage limit in MODES 1, 2 and 3. In the other conditions, the Reactor Coolant System is not pressurized and specific primary containment leakage limits are not required.

SR 3.6.1.3.9 Surveillance of hydrostatically tested lines provides assurance that the calculation assumptions of Reference 2 is met.

This SR is modified by a Note that states these valves are only required to meet the combined leakage rate in MODES 1, 2, and 3 since this is when the Reactor Coolant System is (continued)

GRAND GULF B 3.6-25 LBDCR 18127

PCIVs B 3.6.1.4 BASES ACTIONS B.1 and B.2 (continued) required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.1.4.1 REQUIREMENTS Verifying that primary containment to auxiliary building differential pressure is within limits ensures that operation remains within the limits assumed in the primary containment analysis. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 6.2.1.

2. UFSAR, Section 6.2.1.1.4.2.
3. UFSAR, Section 6.2.

GRAND GULF B 3.6-28 LBDCR 18127

Primary Containment Air Temperature B 3.6.1.5 BASES SURVEILLANCE SR 3.6.1.5.1 (continued)

REQUIREMENTS The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 6.2.

GRAND GULF B 3.6-31 LBDCR 18127

LLS Valves B 3.6.1.6 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.6 Low-Low Set (LLS) Valves BASES BACKGROUND The safety/relief valves (S/RVs) can actuate either in the relief mode, the safety mode, the Automatic Depressurization System mode, or the LLS mode. In the LLS mode (one of the power actuated modes of operation), a pneumatic operator and mechanical linkage overcome the spring force and open the valve. The main valve can be maintained open with valve inlet steam pressure as low as 0 psig. The pneumatic operator is arranged so that its malfunction will not prevent the valve disk from lifting if steam inlet pressure exceeds the safety mode pressure setpoints.

Six of the S/RVs are equipped to provide the LLS function. The LLS logic causes two LLS valves to be opened at a lower pressure than the relief or safety mode pressure setpoints and causes all the LLS valves to stay open longer, such that reopening of more than one S/RV is prevented on subsequent actuations. Therefore, the LLS function prevents excessive short duration S/RV cycles with valve actuation at the relief setpoint.

Each S/RV discharges steam through a discharge line and quencher to a location near the bottom of the suppression pool, which causes a load on the suppression pool wall. Actuation at lower reactor pressure results in a lower load.

APPLICABLE The LLS relief mode functions to ensure that the containment design SAFETY ANALYSES basis of one S/RV operating on "subsequent actuations" is met (Ref. 1).

In other words, multiple simultaneous openings of S/Rvs (following the initial opening) and the corresponding higher loads, are avoided. The safety analysis demonstrates that the LLS functions to avoid the induced thrust loads on the S/RV discharge line resulting from "subsequent actuations" of the S/RV during Design Basis Accidents (DBAs).

Furthermore, the LLS function justifies the primary containment analysis assumption that multiple simultaneous S/RV openings occur only on the initial actuation for DBAs. Even though six LLS S/RVs are specified, all six LLS S/RVs do not operate in any DBA analysis.

LLS valves satisfy Criterion 3 of the NRC Policy Statement.

LCO Six LLS valves are required to be OPERABLE to satisfy the assumptions of the safety analysis (Ref. 2). The requirements of this LCO are applicable to the mechanical and electrical/pneumatic capability of the LLS valves to function for controlling the opening and closing of the S/RVs.

(continued)

GRAND GULF B 3.6-32 LBDCR 14043

LLS Valves B 3.6.1.6 BASES APPLICABILITY In MODES 1, 2, and 3, an event could cause pressurization of the reactor and opening of S/RVs. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations in these MODES. Therefore, maintaining the LLS valves OPERABLE is not required in MODE 4 or 5.

ACTIONS A.1 With one LLS valve inoperable, the remaining OPERABLE LLS valves are adequate to perform the designed function. However, the overall reliability is reduced. The 14 day Completion Time takes into account the redundant capability afforded by the remaining LLS S/RVs and the low probability of an event in which the remaining LLS S/RV capability would be inadequate.

B.1 If the inoperable LLS valve cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 3) and because the time spent to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action B.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems (continued)

GRAND GULF B 3.6-33 LBDCR 14043

LLS Valves B 3.6.1.6 BASES ACTIONS C.1 and C.2 If two or more LLS valves are inoperable, there could be excessive short duration S/RV cycling during an overpressure event. The plant must be brought to a condition in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.1.6.1 REQUIREMENTS A manual actuation of each required LLS valve (those valves removed and replaced to satisfy SR 3.4.4.1) is performed to verify that the valve is functioning properly. This SR can be demonstrated by one of two methods. If performed by method 1), plant startup is allowed prior to performing this test because valve OPERABILITY and the setpoints for overpressure protection are verified, per the INSERVICE TESTING PROGRAM requirements, prior to valve installation. Therefore, this SR is modified by a Note that states the Surveillance is not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test. The 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> allowed for manual actuation after the required pressure is reached is sufficient to achieve stable conditions for testing and provides a reasonable time to complete the SR.

If performed by method 2), valve OPERABILITY has been demonstrated for all installed LLS valves based upon the successful operation of a test sample of S/RVs.

1. Manual actuation of the LLS valve, with verification of the response of the turbine control valves or bypass valves, by a change in the measured steam flow, or any other method suitable to verify steam flow (e.g., tailpipe temperature or pressure). Adequate reactor steam pressure must be available to perform this test to avoid damaging the valve. Also, adequate steam flow must be passing through the main turbine or turbine bypass valves to continue to control reactor pressure when the LLS valves divert steam flow upon opening.

Sufficient time is therefore allowed after the required pressure and flow are achieved to perform this test. Adequate pressure at which this test is to be performed is consistent with the pressure recommended by the valve manufacturer.

2. The sample population of S/RVs tested each refueling outage to satisfy SR 3.4.4.1 will be stroked in the relief mode during as-found testing to verify proper operation of the S/RV. Just prior to installation of the to be newly-installed S/RVs to satisfy SR 3.4.4.1 the valve will be stroked in the relief mode during certification testing to verify proper operation of the S/RV.

(continued)

GRAND GULF B 3.6-34 LBDCR 18085

LLS Valves B 3.6.1.6 BASES SURVEILLANCE SR 3.6.1.6.1 (continued)

REQUIREMENTS The successful performance of the test sample of S/RVs provides reasonable assurance that the remaining installed S/RVs will be perform in a similar fashion. After the S/RVs are replaced, the electrical and pneumatic connections shall be verified either through mechanical/electrical inspection or test prior to the resumption of electric power generation to ensure that no damage has occurred to the S/RV during transportation and installation. This verifies that each replaced S/RV will properly perform its intended function.

The STAGGERED TEST BASIS Frequency ensures that both solenoids for each LLS valve relief-mode actuator are alternatively tested. The Frequency of the required relief-mode actuator testing is based on the tests required by the INSERVICE TESTING PROGRAM. The testing Frequency required by the Inservice Testing Program is based on operating experience and valve performance. Therefore, the Frequency was concluded to be acceptable from a reliability standpoint.

SR 3.6.1.6.2 The LLS designed S/RVs are required to actuate automatically upon receipt of specific initiation signals. A system functional test is performed to verify that the mechanical portions (i.e., solenoids) of the automatic LLS function operate as designed when initiated either by an actual or simulated automatic initiation signal. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.5.4 overlaps this SR to provide complete testing of the safety function.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

This SR is modified by a Note that excludes valve actuation. This prevents a reactor pressure vessel pressure blowdown.

REFERENCES 1. GESSAR-II, Appendix 3B, Attachment A, Section 3BA.8.

2. FSAR, Section 5.2.2.2.3.3.
3. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.
4. Deleted
5. GNRI-96/00229, Amendment 130 to the Operating License.

GRAND GULF B 3.6-35 LBDCR 18127

RHR Containment Spray System B 3.6.1.7 B 3.6 CONTAINMENT SYSTEMS B 3.6.1.7 Residual Heat Removal (RHR) Containment Spray System BASES BACKGROUND The primary containment is designed with a suppression pool so that, in the event of a loss of coolant accident (LOCA), steam released from the primary system is channeled through the suppression pool water and condensed without producing significant pressurization of the primary containment. The primary containment is designed so that with the pool initially at the minimum water volume and the worst single failure of the primary containment heat removal systems, suppression pool energy absorption combined with subsequent operator controlled pool cooling will prevent the primary containment pressure from exceeding its design value. However, the primary containment must also withstand a postulated bypass leakage pathway that allows the passage of steam from the drywell directly into the primary containment airspace, bypassing the suppression pool. The primary containment also must withstand a low energy steam release into the primary containment airspace. The RHR Containment Spray System is designed to mitigate the effects of bypass leakage and low energy line breaks.

There are two redundant, 100% capacity RHR containment spray subsystems. Each subsystem consists of a suction line from the suppression pool, an RHR pump, a heat exchanger, and three spray spargers inside the primary containment (outside of the drywell) above the refueling floor. Dispersion of the spray water is accomplished by 350 nozzles in each subsystem.

The RHR containment spray mode will be automatically initiated, if required, following a LOCA.

APPLICABLE Reference 1 contains the results of analyses that predict SAFETY ANALYSES the primary containment pressure response for a LOCA with the maximum allowable bypass leakage area.

The equivalent flow path area for bypass leakage has been specified to be 0.8 ft2. The analysis demonstrates that with containment spray operation the primary containment pressure remains within design limits.

(continued)

GRAND GULF B 3.6-36 LBDCR 12035

RHR Containment Spray System B 3.6.1.7 BASES APPLICABLE The containment spray operation is also assumed in the SAFETY ANALYSES design basis LOCA dose analysis to scrub iodine from the (continued) containment atmosphere thereby mitigating the affects of the accident.

The RHR Containment Spray System satisfies Criterion 3 of the NRC Policy Statement.

LCO In the event of a Design Basis Accident (DBA), a minimum of one RHR containment spray subsystem is required to mitigate potential bypass leakage paths and maintain the primary containment peak pressure below design limits. To ensure that these requirements are met, two RHR containment spray subsystems must be OPERABLE. Therefore, in the event of an accident, at least one subsystem is OPERABLE assuming the worst case single active failure. An RHR containment spray subsystem is OPERABLE when the pump, the heat exchanger, and associated piping, valves, instrumentation, and controls are OPERABLE.

Management of gas voids is important to RHR Containment Spray System OPERABILITY.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause pressurization of primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations in these MODES. Therefore, maintaining RHR containment spray subsystems OPERABLE is not required in MODE 4 or 5.

ACTIONS A.1 With one RHR containment spray subsystem inoperable, the inoperable subsystem must be restored to OPERABLE status within 7 days. In this Condition, the remaining OPERABLE RHR containment spray subsystem is adequate to perform the primary containment cooling function.

However, the overall reliability is reduced because a single failure in the OPERABLE subsystem could result in reduced primary containment cooling capability. The 7 day Completion Time was chosen in light of the redundant RHR containment capabilities afforded by the OPERABLE subsystem and the low probability of a DBA occurring during this period.

(continued)

GRAND GULF B 3.6-37 LBDCR 16003

RHR Containment Spray System B 3.6.1.7 BASES ACTIONS B.1 (continued)

With two RHR containment spray subsystems inoperable, one subsystem must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. In this Condition, there is a substantial loss of the primary containment bypass leakage mitigation function. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time is based on this loss of function and is considered acceptable due to the low probability of a DBA and because alternative methods to remove heat from primary containment are available.

C.1 If the inoperable RHR containment spray subsystem cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 2) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state Required Action C.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Times is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

(continued)

GRAND GULF B 3.6-38 LBDCR 14043

RHR Containment Spray System B 3.6.1.7 BASES SURVEILLANCE SR 3.6.1.7.1 REQUIREMENTS Verifying the correct alignment for manual, power operated, and automatic valves in the RHR containment spray mode flow path provides assurance that the proper flow paths will exist for system operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, or securing. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

Two Notes have been added to this SR. The first Note allows RHR containment spray subsystems to be considered OPERABLE during alignment to and operation in the RHR shutdown cooling mode when below the RHR cut in permissive pressure in MODE 3, if capable of being manually realigned and not otherwise inoperable. At these low pressures and decay heat levels (the reactor is shut down in MODE 3), a reduced complement of subsystems should provide the required containment pressure mitigation function thereby allowing operation of an RHR shutdown cooling loop when necessary. The second Note exempts system vent flow paths opened under administrative control. The administrative control should be proceduralized and include stationing a dedicated individual at the system vent flow path who is in continuous communication with the operators in the control room. This individual will have a method to rapidly close the system vent path if directed.

SR 3.6.1.7.2 RHR Containment Spray System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the RHR suppression pool spray subsystems and may also prevent water hammer and pump cavitation. Selection of RHR Containment Spray System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration. Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions.

GRAND GULF B 3.6-39 LBDCR 18127

RHR Containment Spray System B 3.6.1.7 BASES SURVEILLANCE SR 3.6.1.7.2 (continued)

REQUIREMENTS The RHR Containment Spray System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR Containment Spray System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met.

Accumulated gas should be eliminated or brought within the acceptance criteria limits.

RHR Containment Spray System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative subset of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY.

The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. The Surveillance Frequency may vary by location susceptible to gas accumulation.

SR 3.6.1.7.3 Verifying each RHR pump develops a flow rate 7450 gpm while operating in the suppression pool cooling mode with flow through the associated heat exchanger ensures that pump performance has not degraded below the required flow rate during the cycle. It is tested in the pool cooling mode to demonstrate pump OPERABILITY without spraying down equipment in primary containment. Flow is a normal test of centrifugal pump performance required by the ASME Code,Section XI (Ref. 2). This test confirms one point on the pump design curve and is indicative of overall performance. Such inservice inspections confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. The Frequency of this SR is in accordance with the INSERVICE TESTING PROGRAM.

(continued)

GRAND GULF B 3.6-40 LBDCR 18127

RHR Containment Spray System B 3.6.1.7 BASES SURVEILLANCE SR 3.6.1.7.4 REQUIREMENTS This SR verifies that each RHR containment spray subsystem automatic valve actuates to its correct position upon receipt of an actual or simulated automatic actuation signal. Actual spray initiation is not required to meet this SR. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.3.6 overlaps this SR to provide complete testing of the safety function. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.1.7.5 This surveillance is performed to verify the spray nozzles are not obstructed. This surveillance may be accomplished by verifying the nozzle openings are free of material that would obstruct the flow of water or the performance of an air flow test through each nozzle. The type of testing utilized should be based on system operating history and the availability of the appropriate testing equipment. UFSAR Section 6.2.2.2 (Reference 3) defines preoperational testing performed on the system, which is not required to be duplicated by the performance of this surveillance testing. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.6-40a LBDCR 18127

RHR Containment Spray System B 3.6.1.7 BASES SURVEILLANCE SR 3.6.1.7.5 and TRM SR 3.6.1.7.1 (continued)

REQUIREMENTS TRM SR 3.6.1.7.1 This surveillance will be performed following a maintenance activity that had the potential to introduce foreign material into the normally dry section of the systems. This test will utilize an air or smoke flow testing methodology to demonstrate the nozzles remain free of obstruction. The event based frequency will ensure that it is performed following a maintenance activity that could have resulted in nozzle blockage. (Reference 4)

REFERENCES 1. FSAR, Section 6.2.1.1.5.

2. ASME, Boiler and Pressure Vessel Code,Section XI.
3. FSAR, Section 6.2.2.2 Containment Heat Removal System Design
4. FSAR, Section 6.2.2.4 Testing and Inspection GRAND GULF B 3.6-40b LBDCR 16033

FWLCS B 3.6.1.8 BASES APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations of these MODES. Therefore, the FWLCS is not required to be OPERABLE in MODES 4 and 5 to prevent leakage of radioactive material from primary containment.

ACTIONS A.1 With one FWLCS subsystem inoperable, the inoperable subsystem must be restored to OPERABLE status within 30 days. In this Condition, the remaining OPERABLE FWLCS subsystem is adequate to perform the leakage control function. The 30 day Completion Time is based on the low probability of the occurrence of a LOCA, the amount of time available after the event for operator action to prevent exceeding this limit, the low probability of failure of the OPERABLE FWLCS subsystem, and the availability of the PCIVs.

B.1 With two FWLCS subsystems inoperable, at least one subsystem must be restored to OPERABLE status within 7 days. The 7 day Completion Time is based on the low probability of the occurrence of a DBA LOCA, the availability of operator action, and the availability of the PCIVs.

C.1 If the inoperable FWLCS subsystem cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 2) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

(continued)

GRAND GULF B 3.6-42 LBDCR 14043

FWLCS B 3.6.1.8 BASES (continued)

ACTIONS C.1 (continued)

Required Action C.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.1.8.1 REQUIREMENTS Proper operation of the RHR jockey pump is required to verify the capability of the FWLCS to provide sufficient sealing water to each isolated section of each feedwater line to initiate and maintain the fluid seal for long term leakage control. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. FSAR, Section 15.6.5.

2. NEDC-32988-A, Revision 2, Technical Justification to Support Risk Informed Modification to Selected Required End States for BWR Plants, December 2002.

GRAND GULF B 3.6-43 LBDCR 18127

MSIV LCS B 3.6.1.9 BASES ACTIONS C.1 (continued)

If the MSIV LCS subsystem cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 4) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action C.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Times is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.1.9.1 REQUIREMENTS Each outboard MSIV LCS blower is operated for 15 minutes to verify OPERABILITY. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.6-46 LBDCR 18127

MSIV LCS B 3.6.1.9 BASES SURVEILLANCE REQUIREMENTS SR 3.6.1.9.2 (continued)

Deleted SR 3.6.1.9.3 A system functional test is performed to ensure that the MSIV LCS will operate through its operating sequence. This includes verifying that the automatic positioning of the valves and the operation of each interlock and timer are correct, that the blowers start and develop the required flow rate and the necessary vacuum. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. FSAR, Section 6.7.1.

2. FSAR, Section 15.6.5.
3. NEDC-32988-A, Revision 2, Technical Justification to Support Risk Informed Modification to Selected Required End States for BWR Plants, December 2002.

GRAND GULF B 3.6-47 LBDCR 18127

Suppression Pool Average Temperature B 3.6.2.1 BASES ACTIONS E.1 and E.2 (continued) basis maximum allowable values for primary containment temperature or pressure.

SURVEILLANCE SR 3.6.2.1.1 REQUIREMENTS The suppression pool average temperature is regularly monitored to ensure that the required limits are satisfied. Average temperature is determined by taking an arithmetic average of the functional suppression pool water temperature channels. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. When heat is being added to the suppression pool by testing, however, it is necessary to monitor suppression pool temperature more frequently. The 5 minute Frequency during testing is justified by the rates at which testing will heat up the suppression pool, has been shown to be acceptable based on operating experience, and provides assurance that allowable pool temperatures are not exceeded. The 5 minute Frequency is further justified in view of other indications available in the control room, including alarms, to alert the operator to an abnormal suppression pool average temperature condition.

REFERENCES 1. UFSAR, Section 6.2.

2. UFSAR, Section 15.2.

GRAND GULF B 3.6-52 LBDCR 18127

Suppression Pool Water Level B 3.6.2.2 BASES APPLICABLE swell loads for a DBA LOCA, and calculated loads due to S/RV SAFETY ANALYSES discharges. Suppression pool water level must be maintained (continued) within the limits specified so that the safety analysis of Reference 1 remains valid.

Suppression pool water level satisfies Criteria 2 and 3 of the NRC Policy Statement.

LCO A limit that suppression pool water level be 18 ft 4-1/12 inches and 18 ft 9-3/4 inches is required to ensure that the primary containment conditions assumed for the safety analysis are met. Either the high or low water level limits were used in the safety analysis, depending upon which is conservative for a particular calculation.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause significant loads on the primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced because of the pressure and temperature limitations in these MODES. Requirements for suppression pool level in MODE 4 or 5 are addressed in LCO 3.5.2, "RPV Water Inventory Control."

ACTIONS A.1 With suppression pool water level outside the limits, the conditions assumed for the safety analysis are not met. If water level is below the minimum level, the pressure suppression and iodine scrubbing function still exists as long as horizontal vents are covered, RCIC turbine exhaust is covered, and S/RV quenchers are covered. If suppression pool water level is above the maximum level, protection against overpressurization still exists due to the margin in the peak containment pressure analysis and due to OPERABLE containment sprays. Prompt action to restore the suppression pool water level to within the normal range is prudent, however, to retain the margin to weir wall overflow from an inadvertent upper pool dump and reduce the risks of increased pool swell and dynamic loading. Therefore, continued operation for a limited time is allowed. The 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Completion Time is sufficient to restore suppression pool water level to within specified limits. Also, it takes into account the low probability of an event impacting the suppression pool water level occurring during this interval.

(continued)

GRAND GULF B 3.6-54 LBDCR 18128

Suppression Pool Water Level B 3.6.2.2 BASES ACTIONS B.1 and B.2 (continued)

If suppression pool water level cannot be restored to within limits within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.2.2.1 REQUIREMENTS Verification of the suppression pool water level is to ensure that the required limits are satisfied. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 6.2.

2. ER 97/0089-00-00, ECCS Suction Strainer Installation.

GRAND GULF B 3.6-55 LBDCR 18127

RHR Suppression Pool Cooling B 3.6.2.3 BASES APPLICABLE The RHR Suppression Pool Cooling System satisfies SAFETY ANALYSES Criterion 3 of the NRC Policy Statement.

(continued)

LCO During a DBA, a minimum of one RHR suppression pool cooling subsystem is required to maintain the primary containment peak pressure and temperature below the design limits (Ref. 1). To ensure that these requirements are met, two RHR suppression pool cooling subsystems must be OPERABLE. Therefore, in the event of an accident, at least one subsystem is OPERABLE, assuming the worst case single active failure.

An RHR suppression pool cooling subsystem is OPERABLE when the pump, two heat exchangers, and associated piping, valves, instrumentation, and controls are OPERABLE. Management of gas voids is important to RHR Suppression Pool Cooling System OPERABILITY.

APPLICABILITY In MODES 1, 2, and 3, a DBA could cause a release of radioactive material to primary containment and cause a heatup and pressurization of primary containment. In MODES 4 and 5, the probability and consequences of these events are reduced due to the pressure and temperature limitations in these MODES. Therefore, the RHR Suppression Pool Cooling System is not required to be OPERABLE in MODE 4 or 5.

ACTIONS A.1 With one RHR suppression pool cooling subsystem inoperable, the inoperable subsystem must be restored to OPERABLE status within 7 days. In this Condition, the remaining RHR suppression pool cooling subsystem is adequate to perform the primary containment cooling function. However, the overall reliability is reduced because a single failure in the OPERABLE subsystem could result in reduced primary containment cooling capability. The 7 day Completion Time is acceptable in light of the redundant RHR suppression pool cooling capabilities afforded by the OPERABLE subsystem and the low probability of a DBA occurring during this period.

B.1 If one RHR suppression pool cooling subsystems inoperable and is not restored to OPERABLE status within the required Completion Time, the plant must be brought to a condition in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(continued)

GRAND GULF B 3.6-57 LBDCR 14044

RHR Suppression Pool Cooling B 3.6.2.3 BASES ACTIONS B.1 (continued)

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 2) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action B.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, an establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

C.1 With two RHR suppression pool cooling subsystems inoperable, one subsystem must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. In this condition, there is a substantial loss of the primary containment pressure and temperature mitigation function. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time is based on this loss of function and is considered acceptable due to the low probability of a DBA and the potential avoidance of a plant shutdown transient that could result in the need for the RHR suppression pool cooling subsystems to operate.

D.1 and D.2 If the Required Actions and required Completion Time of Condition C cannot be met, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

GRAND GULF B 3.6-58 LBDCR 18048

RHR Suppression Pool Cooling B 3.6.2.2 BASES SURVEILLANCE SR 3.6.2.3.1 REQUIREMENTS Verifying the correct alignment for manual, power operated, and automatic valves, in the RHR suppression pool cooling mode flow path provides assurance that the proper flow path exists for system operation.

This SR does not apply to valves that are locked, sealed, or otherwise secured in position since these valves were verified to be in the correct position prior to being locked, sealed, or secured. A valve is also allowed to be in the nonaccident position, provided it can be aligned to the accident position within the time assumed in the accident analysis. This is acceptable, since the RHR suppression pool cooling mode is manually initiated. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.2.3.2 RHR Suppression Pool Cooling System piping and components have the potential to develop voids and pockets of entrained gases. Preventing and managing gas intrusion and accumulation is necessary for proper operation of the RHR suppression pool cooling subsystems and may also prevent water hammer and pump cavitation.

Selection of RHR Suppression Pool Cooling System locations susceptible to gas accumulation is based on a review of system design information, including piping and instrumentation drawings, isometric drawings, plan and elevation drawings, and calculations. The design review is supplemented by system walk downs to validate the system high points and to confirm the location and orientation of important components that can become sources of gas or could otherwise cause gas to be trapped or difficult to remove during system maintenance or restoration.

Susceptible locations depend on plant and system configuration, such as stand-by versus operating conditions.

The RHR Suppression Pool Cooling System is OPERABLE when it is sufficiently filled with water. Acceptance criteria are established for the volume of accumulated gas at susceptible locations. If accumulated gas GRAND GULF B 3.6-59 LBDCR 18127

RHR Suppression Pool Cooling B 3.6.2.2 BASES SURVEILLANCE SR 3.6.2.3.2 (continued)

REQUIREMENTS is discovered that exceeds the acceptance criteria for the susceptible location (or the volume of accumulated gas at one or more susceptible locations exceeds an acceptance criteria for gas volume at the suction or discharge of a pump), the Surveillance is not met. If it is determined by subsequent evaluation that the RHR Suppression Pool Cooling System is not rendered inoperable by the accumulated gas (i.e., the system is sufficiently filled with water), the Surveillance may be declared met.

Accumulated gas should be eliminated or brought within the acceptance criteria limits.

RHR Suppression Pool Cooling System locations susceptible to gas accumulation are monitored and, if gas is found, the gas volume is compared to the acceptance criteria for the location. Susceptible locations in the same system flow path which are subject to the same gas intrusion mechanisms may be verified by monitoring a representative subset of susceptible locations. Monitoring may not be practical for locations that are inaccessible due to radiological or environmental conditions, the plant configuration, or personnel safety. For these locations alternative methods (e.g., operating parameters, remote monitoring) may be used to monitor the susceptible location. Monitoring is not required for susceptible locations where the maximum potential accumulated gas void volume has been evaluated and determined to not challenge system OPERABILITY.

The accuracy of the method used for monitoring the susceptible locations and trending of the results should be sufficient to assure system OPERABILITY during the Surveillance interval.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. The Surveillance Frequency may vary by location susceptible to gas accumulation.

SR 3.6.2.3.3 Verifying each RHR pump develops a flow rate 7450 gpm, with flow through the associated heat exchangers to the suppression pool, ensures that pump performance has not degraded during the cycle. Flow is a normal test of centrifugal pump performance required by ASME Section XI (Ref. 2). This test confirms one point on the pump design curve, and the results are indicative of overall performance. Such inservice inspections confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. The Frequency of this SR is in accordance with the INSERVICE TESTING PROGRAM.

GRAND GULF B 3.6-59a LBDCR 18127

RHR Suppression Pool Cooling B 3.6.2.3 BASES REFERENCES 1. FSAR, Section 6.2.

2. ASME, Boiler and Pressure Vessel Code,Section XI.

GRAND GULF B 3.6-59b LBDCR 18048

SPMU System B 3.6.2.4 BASES ACTIONS B.1 (continued)

Therefore, the upper containment pool water temperature must be restored to within limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is sufficient to restore the upper containment pool to within the specified temperature limit. It also takes into account the low probability of an event occurring that would require the SPMU System.

C.1 With one SPMU subsystem inoperable for reasons other than Condition A or B, the inoperable subsystem must be restored to OPERABLE status within 7 days. The 7 day Completion Time is acceptable in light of the redundant SPMU System capabilities afforded by the OPERABLE subsystem and the low probability of a DBA occurring during this period.

D.1 and D.2 If any Required Action and required Completion Time cannot be met, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.2.4.1 REQUIREMENTS The upper containment pool water level is regularly monitored to ensure that the required limits are satisfied. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.6-63 LBDCR 18127

SPMU System B 3.6.2.4 BASES SURVEILLANCE SR 3.6.2.4.2 REQUIREMENTS (continued) The upper containment pool water temperature is regularly monitored to ensure that the required limit is satisfied. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.2.4.3 Verifying the correct alignment for manual, power operated, and automatic valves in the SPMU System flow path provides assurance that the proper flow paths will exist for system operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these valves are verified to be in the correct position prior to being locked, sealed, or secured. This SR does not require any testing or valve manipulation.

Rather, it involves verification that those valves capable of potentially being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.2.4.4 The upper containment pool has two gates used to separate the pool into distinct sections to facilitate fuel transfer and maintenance during refueling operations and two additional gates in the separator pool weir wall extension, which, when installed, limit personnel exposure and ensure adequate water submergence of the separator when the separator is stored in the pool. The SPMU System dump line penetrations are located in the steam separator storage section of the pool. To provide the required SPMU System dump volume to the suppression pool, the gates must be removed (or placed in their stored position) to allow communication between the various pool sections. The Surveillance is modified by a Note that allows leaving (continued)

GRAND GULF B 3.6-64 LBDCR 18127

SPMU System B 3.6.2.4 BASES SURVEILLANCE SR 3.6.2.4.4 (continued)

REQUIREMENTS the gates installed if the Suppression Pool Low Level limit is increased to 18 ft 5 1/12 inches. (See Reference 3). The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

The provision to allow gate installation in MODES 1, 2, and 3 results in isolating a portion of the SPMU System dump volume. This provision does not apply to the separator pool weir wall extension gates. These gates are not readily accessible with the upper containment pool at its required level.

Supporting analyses have shown that increasing the minimum suppression pool level adequately compensates for water trapped by isolating the fuel storage and/or fuel transfer canal areas.

SR 3.6.2.4.5 This SR requires a verification that each SPMU subsystem automatic valve actuates to its correct position on receipt of an actual or simulated automatic initiation signal. This includes verification of the correct automatic positioning of the valves and of the operation of each interlock and timer. As noted, actual makeup to the suppression pool may be excluded. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.4.6 overlaps this SR to provide complete testing of the safety function. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

This SR is modified by a NOTE that excludes makeup to the suppression pool. Since all active components are testable, makeup to the suppression pool is not required.

(continued)

GRAND GULF B 3.6-65 LBDCR 18127

Primary Containment and Drywell Hydrogen Igniters B 3.6.3.2 BASES (continued)

SURVEILLANCE SR 3.6.3.2.1 and SR 3.6.3.2.2 REQUIREMENTS These SRs verify that there are no physical problems that could affect the igniter operation. Since the igniters are mechanically passive, they are not subject to mechanical failure. The only credible failures are loss of power or burnout. The verification that each required igniter is energized is performed by circuit current versus voltage measurement.

The Surveillance Frequencies are controlled under the Surveillance Frequency Control Program. SR 3.6.3.2.2 is modified by a Note that indicates that the Surveillance is not required to be performed until 92 days after four or more igniters in the division are discovered to be inoperable.

SR 3.6.3.2.3 and SR 3.6.3.2.4 These functional tests are performed to verify system OPERABILITY.

The current draw to develop a surface temperature of t 1700°F is verified for igniters in inaccessible areas, e.g., in a high radiation area.

Additionally, the surface temperature of each accessible igniter is measured to be t 1700°F to demonstrate that a temperature sufficient for ignition is achieved. The Surveillance Frequencies are controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.6-76 LBDCR 18127

Drywell Purge System B 3.6.3.3 B 3.6 CONTAINMENT SYSTEMS B 3.6.3.3 Drywell Purge System BASES BACKGROUND The Drywell Purge System ensures a uniformly mixed post accident containment atmosphere, thereby minimizing the potential for local hydrogen burns due to a pocket of hydrogen above the flammable concentration.

The drywell purge compressor also performs the function of diluting the drywell source term within the containment and suppression pool environment by pressurizing the drywell and discharging the drywell source term through the drywell suppression pool vents. With the implementation of the Extended Power Up rate this dilution of drywell source term is credited in the Equipment Qualification analysis.

The Drywell Purge System is an Engineered Safety Feature and is designed to operate in post accident environments without loss of function. The system has two independent subsystems, each consisting of a compressor and associated valves, controls, and piping. Each subsystem is sized to pump 1000 scfm. Each subsystem is powered from a separate emergency power supply. Since each subsystem can provide 100% of the mixing requirements, the system will provide its design function with a worst case single active failure.

Following an accident, the drywell is immediately pressurized due to the release of steam into the drywell environment. This pressure is relieved by the lowering of the water level within the weir wall, clearing the drywell vents and allowing the mixture of steam and noncondensibles to flow into the primary containment through the suppression pool, removing much of the heat from the steam. The remaining steam in the drywell begins to condense. As steam flow from the reactor pressure vessel ceases, the drywell pressure falls rapidly. Both drywell purge compressors start automatically 30 seconds after a signal is received from the Emergency Core Cooling System instrumentation, but only when drywell pressure has decreased to within approximately 0.87 psi above primary containment pressure.

(continued)

GRAND GULF B 3.6-78 LBDCR 12035

Drywell Purge System B 3.6.3.3 BASES ACTIONS B.1 and B.2 (continued) provided by one division of the hydrogen igniters. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time allows a reasonable period of time to verify that a loss of hydrogen control function does not exist. The verification may be performed as an administrative check by examining logs or other information to determine the availability of the alternate hydrogen control system. It does not mean to perform the surveillances needed to demonstrate OPERABILITY of the alternate hydrogen control system. If the ability to perform the hydrogen control function is maintained, continued operation is permitted with two drywell purge subsystems inoperable for up to 7 days. Seven days is a reasonable time to allow two drywell purge subsystems to be inoperable because the hydrogen control function is maintained and because of the low probability of the occurrence of an accident.

C.1 If any Required Action and associated Completion Time cannot be met, the plant must be brought to a MODE in which the LCO does not apply.

To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.3.3.1 REQUIREMENTS Performance of a CHANNEL FUNCTIONAL TEST demonstrates the associated channel will function properly. Any setpoint adjustment shall be consistent with the assumptions of the current plant specific setpoint methodology. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.3.3.2 Operating each drywell purge subsystem from the control room for 15 minutes ensures that each subsystem is OPERABLE and (continued)

GRAND GULF B 3.6-81 LBDCR 18127

Drywell Purge System B 3.6.3.3 BASES SURVEILLANCE SR 3.6.3.3.2 (continued)

REQUIREMENTS that all associated controls are functioning properly. It also ensures that blockage, compressor failure, or excessive vibration can be detected for corrective action. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.3.3.3 Operating each drywell purge subsystem for > 15 minutes and verifying that each drywell purge subsystem flow rate is > 1000 scfm ensures that each subsystem is capable of maintaining drywell hydrogen concentrations below the flammability limit. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.3.3.4 This SR verifies that the pressure differential required to open the vacuum breakers is < 1.0 psid and that the isolation valve differential pressure actuation instrumentation opens the valve at 0.0 to 1.0 psid (drywell minus containment). This SR includes a CHANNEL CALIBRATION of the isolation valve differential pressure actuation instrumentation. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. Regulatory Guide 1.7, Revision 1.

2. UFSAR, Section 6.2.5.
3. Technical Specification Amendment 145 to GGNS Operating License.

GRAND GULF B 3.6-82 LBDCR 18127

Secondary Containment B 3.6.4.1 B 3.6 CONTAINMENT SYSTEMS B 3.6.4.1 Secondary Containment BASES BACKGROUND The function of the secondary containment is to contain, dilute, and hold up fission products that may leak from primary containment following a Design Basis Accident (DBA). In conjunction with operation of the Standby Gas Treatment (SGT) System and closure of certain valves whose lines penetrate the secondary containment, the secondary containment is designed to reduce the activity level of the fission products prior to release to the environment and to isolate and contain fission products that are released during certain operations that take place inside primary containment (e.g., during movement of recently irradiated fuel assemblies in the primary or secondary containment), when primary containment is not required to be OPERABLE, or that take place outside primary containment.

The secondary containment is a structure that completely encloses the primary containment and those components that may be postulated to contain primary system fluid. This structure forms a control volume that serves to hold up and dilute the fission products. It is possible for the pressure in the control volume to rise relative to the environmental pressure (e.g., due to pump/motor heat load additions). To prevent ground level exfiltration while allowing the secondary containment to be designed as a conventional structure, the secondary containment requires support systems to maintain the control volume pressure at less than the external pressure.

The isolation devices for the penetrations in the secondary containment boundary are a part of the secondary containment barrier. To maintain this barrier:

a. All secondary containment penetrations required to be closed during accident conditions are either:
1. capable of being closed by an OPERABLE secondary containment automatic isolation system, or (continued)

GRAND GULF B 3.6-83 LBDCR 18128

Secondary Containment B 3.6.4.1 BASES LCO to the environment. For the secondary containment to be (continued) considered OPERABLE, it must have adequate leak tightness to ensure that the required vacuum can be established and maintained.

APPLICABILITY In MODES 1, 2, and 3, a LOCA could lead to a fission product release to primary containment that leaks to secondary containment. Therefore, secondary containment OPERABILITY is required during the same operating conditions that require primary containment OPERABILITY.

In MODES 4 and 5, the probability and consequences of the LOCA are reduced due to the pressure and temperature limitations in these MODES. Therefore, maintaining secondary containment OPERABLE is not required in MODE 4 or 5 to ensure a control volume, except for other situations for which significant releases of radioactive material can be postulated, such as during movement of recently irradiated fuel assemblies in the primary or secondary containment. Due to radioactive decay, secondary containment is required to be OPERABLE only during that fuel movement involving the handling of recently irradiated fuel (i.e.,

fuel that has occupied part of a critical reactor core within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />).

ACTIONS A.1 If secondary containment is inoperable, it must be restored to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Completion Time provides a period of time to correct the problem that is commensurate with the importance of maintaining secondary containment during MODES 1, 2, and 3. This time period also ensures that the probability of an accident (requiring secondary containment OPERABILITY) occurring during periods where secondary containment is inoperable is minimal.

B.1 If the secondary containment cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(continued)

GRAND GULF B 3.6-85 LBDCR 18128

Secondary Containment B 3.6.4.1 BASES ACTIONS B.1 (continued)

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 3),

because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action B.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

(continued)

GRAND GULF B 3.6-85a LBDCR 14043

Secondary Containment B 3.6.4.1 BASES ACTIONS C.1 (continued)

Movement of recently irradiated fuel assemblies in the primary or secondary containment can be postulated to cause significant fission product release to the secondary containment. In such cases, the secondary containment is the only barrier to release of fission products to the environment. Therefore, movement of recently irradiated fuel assemblies must be immediately suspended if the secondary containment is inoperable.

Suspension of these activities shall not preclude completing an action that involves moving a component to a safe position.

Required Action C.1 has been modified by a Note stating that LCO 3.0.3 is not applicable. If moving recently irradiated fuel assemblies while in MODE 4 or 5, LCO 3.0.3 would not specify any action. If moving recently irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, in either case, inability to suspend movement of recently irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.

SURVEILLANCE SR 3.6.4.1.1 and SR 3.6.4.1.2 REQUIREMENTS Verifying that Auxiliary Building and Enclosure Building equipment hatches, blowout panels, and one access door in each access opening are closed ensures that the infiltration of outside air of such a magnitude as to prevent maintaining the desired negative pressure does not occur.

Verifying that all such openings are closed provides adequate assurance that exfiltration from the secondary containment will not occur. In this application the term "sealed" has no connotation of leak tightness.

Maintaining secondary containment OPERABILITY requires verifying one door in the access opening is closed, except when the access opening is being used for entry and exit or when maintenance is being performed on an access opening. No maintenance should be performed that disables the closure/isolation function of (continued)

GRAND GULF B 3.6-86 LBDCR 18128

Secondary Containment B 3.6.4.1 BASES SURVEILLANCE SR 3.6.4.1.1 and SR 3.6.4.1.2 (continued)

REQUIREMENTS the access opening. The Surveillance Frequencies are controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.6-86a LBDCR 18127

Secondary Containment B 3.6.4.1 BASES SURVEILLANCE SR 3.6.4.1.3 and SR 3.6.4.1.4 REQUIREMENTS (continued) The SGT System exhausts the secondary containment atmosphere to the environment through appropriate treatment equipment. To ensure that all fission products are treated, SR 3.6.4.1.3 verifies that the SGT System will rapidly establish and maintain a pressure in the secondary containment that is less than the lowest postulated pressure external to the secondary containment boundary.

SR 3.6.4.1.4 demonstrates that each OPERABLE SGT subsystem can maintain a reduced pressure in the secondary containment sufficient to allow the secondary containment to be in thermal equilibrium at steady state conditions. The test criterion specified by SR 3.6.4.1.4 includes an allowance for building degradation between performances of the surveillance. This allowance represents additional building in-leakage of 115 scfm.

The primary purpose of these SRs is to ensure secondary containment boundary integrity. The secondary purpose of (continued)

GRAND GULF B 3.6-87 LBDCR 18027

Secondary Containment B 3.6.4.1 BASES SURVEILLANCE SR 3.6.4.1.3 and SR 3.6.4.1.4 (continued)

REQUIREMENTS these SRs is to ensure that the SGT subsystem, being used for the test, functions as designed. There is a separate LCO 3.6.4.3 with Surveillance Requirements which serves the primary purpose of ensuring OPERABILITY of the SGT system. The inoperability of the SGT system does not necessarily constitute a failure of these Surveillances relative to the secondary containment OPERABILITY. The Surveillance Frequencies are controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 15.6.5.

2. UFSAR, Section 15.7.4.
3. NEDC-32988-A, Revision 2, Technical Justification to Support Risk Informed Modification to Selected Required End States for BWR Plants, December 2002.

GRAND GULF B 3.6-87a LBDCR 18127

SCIVs B 3.6.4.2 BASES BACKGROUND Analysis have shown that in addition to building leakage (continued) paths, the failure of nonqualified lines 2 inches and smaller penetrating the secondary containment plus the following additional failures will not jeopardize the functional integrity of the secondary containment by providing a leakage path which exceeds the capacity of the standby gas treatment system.

System Failure Fire Protection (water) Critical Crack Fire Protection (carbon dioxide) Critical Crack Plant Service Water Critical Crack Plant Chilled Water Critical Crack Instrument Air Critical Crack In the absence of other active failures, analyses have shown that the required negative pressure can be maintained given the additional failure of a single nonisolated line as large as 4 inches. As a result, the following lines which penetrate the secondary containment and terminate there (i.e., they do not continue through the secondary containment and also penetrate the primary containment) are provided with a single isolation valve, rather than two, at the secondary penetration:

a. 4-inch makeup water supply line
b. 3-inch domestic water supply line
c. 4-inch RHR backwash line
d. 3-inch backwash transfer pump discharge line
e. 3-inch floor and equipment drain line The single isolation valve for each of the above lines is an air-operated valve which fails closed; in addition, each operator is provided with redundant solenoid valves which receive actuation signals from redundant sources. In this manner, it is ensured that, given any single failure, only one of the above lines will be nonisolated, which as stated above is within the capacity of the SGTS.

continued)

GRAND GULF B 3.6-89 LBDCR 18027

SCIVs B 3.6.4.2 BASES APPLICABLE Maintaining SCIVs OPERABLE with isolation times within SAFETY ANALYSES limits ensures that fission products will remain trapped (continued) inside secondary containment so that they can be treated by the SGT System prior to discharge to the environment.

SCIVs satisfy Criterion 3 of the NRC Policy Statement.

LCO SCIVs form a part of the secondary containment boundary. The SCIV safety function is related to control of offsite radiation releases resulting from DBAs.

The power operated automatic isolation dampers and valves are considered OPERABLE when their isolation times are within limits.

Additionally, power operated automatic dampers and valves are required to actuate on an automatic isolation signal.

The normally closed isolation dampers and valves, rupture disks, or blind flanges are considered OPERABLE when manual dampers and valves are closed or open in accordance with appropriate administrative controls, automatic dampers and valves are de-activated and secured in their closed position, rupture disks or blind flanges are in place. The SCIVs covered by this LCO, along with their associated stroke times, if applicable, are listed in the applicable plant procedures.

APPLICABILITY In MODES 1, 2, and 3, a DBA could lead to a fission product release to the primary containment that leaks to the secondary containment.

Therefore, OPERABILITY of SCIVs is required.

In MODES 4 and 5, the probability and consequences of these events are reduced due to pressure and temperature limitations in these MODES.

Therefore, maintaining SCIVs OPERABLE is not required in MODE 4 or 5, except for other situations under which significant releases of radioactive material can be postulated, such as during movement of recently irradiated fuel assemblies (i.e., fuel that has occupied part of a critical reactor core within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />). Moving recently irradiated fuel assemblies in the primary or secondary containment may also occur in MODES 1, 2, and 3.

(continued)

GRAND GULF B 3.6-90 LBDCR 18128

SCIVs B 3.6.4.2 BASES ACTIONS C.1 and C.2 (continued) reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

D.1 If any Required Action and associated Completion Time cannot be met, the plant must be placed in a condition in which the LCO does not apply. If applicable, the movement of recently irradiated fuel assemblies in the primary and secondary containment must be immediately suspended. Suspension of these activities shall not preclude completion of movement of a component to a safe position.

Required Action D.1 has been modified by a Note stating that LCO 3.0.3 is not applicable. If moving recently irradiated fuel assemblies while in MODE 4 or 5, LCO 3.0.3 would not specify any action. If moving recently irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, in either case, inability to suspend movement of recently irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.

SURVEILLANCE SR 3.6.4.2.1 REQUIREMENTS This SR verifies each secondary containment isolation manual valve, damper, rupture disk, and blind flange that is required to be closed during accident conditions is closed. The SR helps to ensure that post accident leakage of radioactive fluids or gases outside of the secondary containment boundary is within design limits. This SR does not require any testing or SCIV manipulation. Rather, it involves verification that those SCIVs in secondary containment that are capable of being mispositioned are in the correct position.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.6-93 LBDCR 18127, 18128

SCIVs B 3.6.4.2 BASES SURVEILLANCE SR 3.6.4.2.1 (continued)

REQUIREMENTS Two Notes have been added to this SR. The first Note applies to valves, dampers, rupture disks, and blind flanges located in high radiation areas and allows them to be verified by use of administrative controls. Allowing verification by administrative controls is considered acceptable, since access to these areas is typically restricted during MODES 1, 2, and 3 for ALARA reasons. Therefore, the probability of misalignment of these SCIVs, once they have been verified to be in the proper position, is low.

A second Note has been included to clarify that SCIVs that are open under administrative controls are not required to meet the SR during the time the SCIVs are open.

SR 3.6.4.2.2 Verifying the isolation time of each power operated, automatic SCIV is within limits is required to demonstrate OPERABILITY. The isolation time test ensures that the SCIV will isolate in a time period less than or equal to that assumed in the safety analyses. Generally, SCIVs must close within 120 seconds to support the functioning of the Standby Gas Treatment System. SCIVs may have analytical closure times based on a function other than secondary containment isolation, in which case the more restrictive time applies. The Frequency of this SR is in accordance with the INSERVICE TESTING PROGRAM.

SR 3.6.4.2.3 Verifying that each automatic SCIV closes on a secondary containment isolation signal is required to prevent leakage of radioactive material from secondary containment following a DBA or other accidents. This SR ensures that each automatic SCIV will actuate to the isolation position on a secondary containment isolation signal. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.2.6 overlaps this SR to provide complete testing of the safety function.

(continued)

GRAND GULF B 3.6-94 LBDCR 18127

SCIVs B 3.6.4.2 BASES SURVEILLANCE SR 3.6.4.2.3 (continued)

REQUIREMENTS The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 15.6.5.

2. UFSAR, Section 6.2.3.
3. UFSAR, Section 15.7.4.

GRAND GULF B 3.6-95 LBDCR 18127

SGT System B 3.6.4.3 BASES APPLICABILITY In MODES 4 and 5, the probability and consequences of these (continued) events are reduced due to the pressure and temperature limitations in these MODES. Therefore, maintaining the SGT System OPERABLE is not required in MODE 4 or 5, except for other situations under which significant releases of radioactive material can be postulated, such as or during movement of recently irradiated fuel assemblies in the primary or secondary containment. Due to radioactive decay, the SGT System is required to be OPERABLE only during fuel movement involving the handling of recently irradiated fuel (i.e., fuel that has occupied part of a critical reactor core within the previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />).

ACTIONS A.1 With one SGT subsystem inoperable, the inoperable subsystem must be restored to OPERABLE status within 7 days. In this Condition, the remaining OPERABLE SGT subsystem is adequate to perform the required radioactivity release control function. However, the overall system reliability is reduced because a single failure in the OPERABLE subsystem could result in the radioactivity release control function not being adequately performed. The 7 day Completion Time is based on consideration of such factors as the availability of the OPERABLE redundant SGT subsystem and the low probability of a DBA occurring during this period.

B.1 If the SGT subsystem cannot be restored to OPERABLE status within the required Completion Time in MODE 1, 2, or 3, the plant must be brought to a MODE in which overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 3) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

(continued)

GRAND GULF B 3.6-98 LBDCR 18128

SGT System B 3.6.4.3 BASES ACTIONS B.1 (continued)

Required Action C.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

C.1, C.2.1, and C.2.2 During movement of recently irradiated fuel assemblies in the primary or secondary containment when Required Action A.1 cannot be completed within the required Completion Time, the OPERABLE SGT subsystem (continued)

GRAND GULF B 3.6-98a LBDCR 18128

SGT System B 3.6.4.3 BASES ACTIONS C.1 and C.2 (continued) should be immediately placed in operation. This Required Action ensures that the remaining subsystem is OPERABLE, that no failures that could prevent automatic actuation have occurred, and that any other failure would be readily detected.

An alternative to Required Action C.1 is to immediately suspend activities that represent a potential for releasing a significant amount of radioactive material to the secondary containment, thus placing the unit in a Condition that minimizes risk. If applicable, movement of recently irradiated fuel assemblies must be immediately suspended. Suspension of these activities shall not preclude completion of movement of a component to a safe position.

The Required Actions of Condition C have been modified by a Note stating that LCO 3.0.3 is not applicable. If moving recently irradiated fuel assemblies while in MODE 4 or 5, LCO 3.0.3 would not specify any action. If moving recently irradiated fuel assemblies while in MODE 1, 2, or 3, the fuel movement is independent of reactor operations. Therefore, in either case, inability to suspend movement of recently irradiated fuel assemblies would not be a sufficient reason to require a reactor shutdown.

D.1 If both SGT subsystems are inoperable in MODE 1, 2, or 3, the SGT System may not be capable of supporting the required radioactivity release control function. Therefore, the plant must be brought to a MODE in which the overall plant risk is minimized. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 4) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

(continued)

GRAND GULF B 3.6-99 LBDCR18128

SGT System B 3.6.4.3 BASES ACTIONS D.1 (continued)

Required Action D.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

E.1 When two SGT subsystems are inoperable, if applicable, movement of recently irradiated fuel assemblies in the primary and secondary containment must be immediately suspended. Suspension of these activities shall not preclude completion of movement of a component to a safe position.

SURVEILLANCE SR 3.6.4.3.1 REQUIREMENTS Operating each SGT subsystem from the control room for 15 continuous minutes ensures that both subsystems are OPERABLE and that all associated controls are functioning properly. It also ensures that blockage, fan or motor failure, or excessive vibration can be detected for corrective action. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.4.3.2 This SR verifies that the required SGT filter testing is performed in accordance with the Ventilation Filter Testing Program (VFTP). The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum system flow rate, and the physical properties of the activated charcoal (general use and following specific operations).

(continued GRAND GULF B 3.6-100 LBDCR 18127, 18128

SGT System B 3.6.4.3 BASES SURVEILLANCE SR 3.6.4.3.2 (continued)

REQUIREMENTS Specific test frequencies and additional information are discussed in detail in the VFTP.

SR 3.6.4.3.3 The SR requires verification that each SGT subsystem starts upon recipt of an actual or simulated initiation signal.

The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.2.6 overlaps this SR to provide complete testing of the safety function. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. 10 CFR 50, Appendix A, GDC 41.

2. UFSAR, Section 6.5.3.
3. NEDC-32988-A, Revision 2, Technical Justification to Support Risk-Informed Modification to Selected Required End States for BWR Plants, December 2002.

GRAND GULF B 3.6-101 LBDCR 18127

Drywell B 3.6.5.1 BASES SURVEILLANCE SR 3.6.5.1.1 (continued)

REQUIREMENTS the safety analysis. The normal Surveillance Frequency is controlled under the Surveillance Frequency Control Program. If during the performance of this required Surveillance the drywell bypass leakage rate is greater than the drywell bypass leakage limit the Surveillance Frequency is increased to every 48 months. If during the performance of the subsequent consecutive Surveillance the drywell bypass leakage rate is less than or equal to the drywell bypass leakage limit, the Frequency specified in the Surveillance Frequency Control Program may be resumed. If during the performance of two consecutive Surveillances the drywell bypass leakage is greater than the drywell bypass leakage limit the Surveillance Frequency is increased to at least once every 24 months. The 24 months Frequency is maintained until during the performance of two consecutive surveillances the drywell bypass leakage rate is less than or equal to the drywell bypass leakage limit, at which time the Frequency specified in the Surveillance Frequency Control Program. For two Surveillances to be considered consecutive the Surveillances must be performed at least 12 months apart.

SR 3.6.5.1.2 The exposed accessible drywell interior and exterior surfaces are inspected to ensure there are no apparent physical defects that would prevent the drywell from performing its intended function. This SR ensures that drywell structural integrity is maintained. The Frequency was chosen so that the interior and exterior surfaces of the drywell can be inspected in conjunction with the inspections of the primary containment required by 10 CFR 50, Appendix J (Ref. 2). Due to the passive nature of the drywell structure, the specified Frequency is sufficient to identify (continued)

GRAND GULF B 3.6-105 LBDCR 18127

Drywell B 3.6.5.1 BASES SURVEILLANCE SR 3.6.5.1.2 (continued)

REQUIREMENTS component degradation that may affect drywell structural integrity.

SR 3.6.5.1.3 This SR requires a test to be performed to verify air lock leakage of the drywell air lock at pressures 3 psid. This Surveillance verifies that the drywell air lock leakage rate supports meeting the drywell bypass leakage limit (SR 3.6.5.1.1). For performance monitoring purposes the test administrative limit on drywell air lock leakage is 2 scfh. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Chapter 6 and Chapter 15.

2. 10 CFR 50, Appendix J.
4. GNRI-96/00162, Issuance of Amendment No. 126 to Facility Operating License No. NPF Grand Gulf Nuclear Station, Unit 1 (TAC No. M94176), dated August 1, 1996.

GRAND GULF B 3.6-105a LBDCR 18127

Page Intentionally Left Blank

Drywell Air Lock B 3.6.5.2 BASES ACTIONS D.1 and D.2 (continued) based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.6.5.2.1 REQUIREMENTS The air lock door interlock is designed to prevent simultaneous opening of both doors in the air lock. Since both the inner and outer doors of the air lock are designed to withstand the maximum expected post accident drywell pressure, closure of either door will support drywell OPERABILITY. Thus, the door interlock feature supports drywell OPERABILITY while the air lock is being used for personnel transit in and out of the drywell. Periodic testing of this interlock demonstrates that the interlock will function as designed and that simultaneous inner and outer door opening will not inadvertently occur. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

The Surveillance is modified by a Note requiring the Surveillance to be performed only upon entry into the drywell.

(continued)

GRAND GULF B 3.6-111 LBDCR 18127

Drywell Isolation Valve(s)

B 3.6.5.3 BASES SURVEILLANCE SR 3.6.5.3.1 REQUIREMENTS This SR ensures that the 20 inch drywell purge isolation valves are closed as required or, if open, open for an allowable reason. This SR is intended to be used for drywell purge isolation valves that are fully qualified to close under accident conditions; therefore, these valves are allowed to be open for limited periods of time. This SR has been modified by a Note indicating the SR is not required to be met when the drywell purge supply or exhaust valves are open for pressure control, ALARA or air quality considerations for personnel entry, or Surveillances or special testing of the purge system (e.g., testing of the containment and drywell ventilation radiation monitors) that require the valves to be open provided that, in MODES 1 and 2 the 20 inch and 6 inch containment vent and purge system supply and exhaust lines are isolated. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.6.5.3.2 This SR requires verification that each drywell isolation manual valve and blind flange that is required to be closed during accident conditions is closed. The SR helps to ensure that drywell bypass leakage is maintained to a minimum. Due to the location of these devices, the Frequency specified as "prior to entering MODE 2 or 3 from MODE 4, if not performed in the previous 92 days," is appropriate because of the inaccessibility of the devices and because these devices are operated under administrative controls and the probability of their misalignment is low.

Two Notes are added to this SR. The first Note allows valves and blind flanges located in high radiation areas to be verified by use of administrative controls. Allowing verification by administrative controls is considered acceptable since access to these areas is typically restricted during MODES 1, 2, and 3. Therefore, the probability of misalignment of these devices, once they have been verified to be in their proper position, is low. A second Note is included to clarify that the drywell isolation valves that are open under administrative controls are not required to meet the SR during the time that the devices are open.

(continued)

GRAND GULF B 3.6-118 LBDCR 18127

Drywell Isolation Valve(s)

B 3.6.5.3 BASES SURVEILLANCE SR 3.6.5.3.3 REQUIREMENTS (continued) Verifying that the isolation time of each power operated, automatic drywell isolation valve is within limits is required to demonstrate OPERABILITY.

The isolation time test ensures the valve will isolate in a time period less than or equal to that assumed in the safety analysis. The isolation time and Frequency of this SR are in accordance with the INSERVICE TESTING PROGRAM.

SR 3.6.5.3.4 Verifying that each automatic drywell isolation valve closes on a drywell isolation signal is required to prevent bypass leakage from the drywell following a DBA. This SR ensures each automatic drywell isolation valve will actuate to its isolation position on a drywell isolation signal. The LOGIC SYSTEM FUNCTIONAL TEST in SR 3.3.6.1.7 overlaps this SR to provide complete testing of the safety function. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 6.2.4.

2. GNRI-96/00162, Issuance of Amendment No. 126 to Facility Operating License No. NPF Grand Gulf Nuclear Station, Unit 1 (TAC No. M94176), dated August 1, 1996.

GRAND GULF B 3.6-119 LBDCR 18127

Drywell Pressure B 3.6.5.4 BASES (continued)

SURVEILLANCE SR 3.6.5.4.1 REQUIREMENTS This SR provides assurance that the limitations on drywell-to-primary containment differential pressure stated in the LCO are met. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 6.2.1.

2. UFSAR, Section 3.8.
3. UFSAR, Section 6.2.1.1.6.
4. UFSAR, Section 6.2.7.

GRAND GULF B 3.6-122 LBDCR 18127

Drywell Air Temperature B 3.6.5.5 BASES SURVEILLANCE SR 3.6.5.5.1 (continued)

REQUIREMENTS The drywell average air temperature is the arithmetical average of the temperatures at the following locations:

Elevation Azimuth

a. ~119'-0" 20° A 70°
b. ~119'-0" 110° A 160°
c. ~119'-0" 200° A 250°
d. ~119'-0" 290° A 340°

°. ~139'-0" 20° A 70°

f. ~139'-0" 110° A 160°
g. ~139'-0" 200° A 250°
h. ~139'-0" 290° A 340°
i. ~166'-0" 20° A 70°
j. ~166'-0" 110° A 160°
k. ~166'-0" 200° A 250°
l. ~166'-0" 290° A 340° The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 6.2.

GRAND GULF B 3.6-125 LBDCR 18127

Drywell Vacuum Relief System B 3.6.5.6 BASES ACTIONS A.1 (continued) maintained, and is considered a reasonable length of time needed to complete the Required Action.

A Note has been added to provide clarification that separate Condition entry is allowed for each vacuum relief subsystems not closed.

B.1 and C.1 With one or two drywell post-LOCA vacuum relief subsystems inoperable for reasons other than Condition A or one drywell purge vacuum relief subsystem inoperable for reasons other than Condition A, the inoperable subsystem(s) must be restored to OPERABLE status within 30 days. In these Conditions, the remaining OPERABLE vacuum relief subsystems are adequate to perform the depressurization mitigation function since two 10 inch lines remain available. The 30 day Completion Time takes into account the redundant capability afforded by the remaining subsystems, a reasonable time for repairs, and the low probability of an event requiring the vacuum relief subsystems to function occurring during this period.

D.1 If one or two drywell post-LOCA vacuum relief subsystems are inoperable for reasons other than not being closed or one drywell purge vacuum relief subsystem is inoperable for reasons other than not being closed, and not restored within the provided Completion Time, the plant must be brought to a condition in which the overall plant risk is minimized.

To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Remaining in the Applicability of the LCO is acceptable because the plant risk in MODE 3 is similar to or lower than the risk in MODE 4 (Ref. 2) and because the time spent in MODE 3 to perform the necessary repairs to restore the system to OPERABLE status will be short. However, voluntary entry into MODE 4 may be made as it is also an acceptable low-risk state.

Required Action D.1 is modified by a Note that states that LCO 3.0.4.a is not applicable when entering MODE 3. This Note prohibits the use of LCO 3.0.4.a to enter MODE 3 during startup with the LCO not met.

(continued)

GRAND GULF B 3.6-128 LBDCR 14043

Drywell Vacuum Relief System B 3.6.5.6 BASES ACTIONS D.1 (continued)

However, there is no restriction on the use of LCO 3.0.4.b, if applicable, because LCO 3.0.4.b requires performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering MODE 3, and establishment of risk management actions, if appropriate. LCO 3.0.4 is not applicable to, and the Note does not preclude, changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

The allowed Completion Time is reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

E.1 and F.1 With two drywell purge vacuum relief subsystems inoperable or with two drywell post-LOCA and one drywell purge vacuum relief subsystems inoperable for reasons other than Condition A, at least one inoperable subsystem must be restored to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. In these Conditions, only one 10 inch line remains available. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time takes into account at least one vacuum relief subsystem is still OPERABLE, a reasonable time for repairs, and the low probability of an event requiring the vacuum relief subsystems to function occurring during this period.

G.1, G.2, H1, and H.2 If the inoperable drywell vacuum relief subsystem(s) cannot be closed or restored to OPERABLE status within the required Completion Time, or if two drywell purge vacuum relief subsystems are inoperable for reasons other than Condition A and one or two drywell post-LOCA vacuum relief subsystem(s) are inoperable for reasons other than Condition A, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.

(continued)

GRAND GULF B 3.6-129 LBDCR 14043

Drywell Vacuum Relief System B 3.6.5.6 BASES SURVEILLANCE SR 3.6.5.6.1 REQUIREMENTS Each vacuum breaker and its associated isolation valve is verified to be closed (except when being tested in accordance with SR 3.6.5.6.2 and SR 3.6.5.6.3 or when the vacuum breakers or isolation valves are performing their intended design function) to ensure that this potential large bypass leakage path is not present. This Surveillance is performed by observing the vacuum breaker or associated isolation valve position indication. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

Two Notes are added to this SR. The first Note allows drywell vacuum breakers or isolation valves opened in conjunction with the performance of a Surveillance to not be considered as failing this SR. These periods are controlled by plant procedures and do not represent inoperable drywell vacuum breakers or isolation valves. A second Note is included to clarify that vacuum breakers or isolation valves open due to an actual differential pressure, are not considered as failing this SR.

SR 3.6.5.6.2 Each vacuum breaker and its associated isolation valve must be cycled to ensure that it opens adequately to perform its design function and returns to the fully closed position.

This Surveillance includes a CHANNEL FUNCTIONAL TEST of the isolation valve differential pressure actuation instrumentation. This provides assurance that the safety analysis assumptions are valid. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.6-130 LBDCR 18127

Drywell Vacuum Relief System B 3.6.5.6 BASES SURVEILLANCE SR 3.6.5.6.3 REQUIREMENTS Verification of the opening pressure differential is necessary to ensure that the safety analysis assumption that the vacuum breaker or isolation valve will open fully at a differential pressure of 1.0 psid is valid. This SR verifies that the pressure differential required to open the vacuum breakers is < 1.0 psid and that the isolation valve differential pressure actuation instrumentation opens the valve at 0.0 to 1.0 psid for the drywell purge vacuum relief subsystem and -1.0 to 0.0 psid for the post-LOCA vacuum relief subsystems (drywell minus containment). This SR includes a CHANNEL CALIBRATION of the isolation valve differential pressure actuation instrumentation. This Surveillance includes a calibration of the position indication as necessary. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 6.2.

2. NEDC-32988-A, Revision 2, Technical Justification to Support Risk Informed Modification to Selected Required End States for BWR Plants, December 2002.

GRAND GULF B 3.6-131 LBDCR 18127