GNRO-2020/00022, Report of Technical Specification Bases Changes
From kanterella
Jump to navigation
Jump to search
ML20203M087 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 07/21/2020 |
From: | Emily Larson Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
GNRO-2020/00022 | |
Download: ML20203M087 (326) | |
Similar Documents at Grand Gulf | |
---|---|
Category:Letter type:GNRO
MONTHYEARGNRO-2013/00079, 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013)2023-10-11011 October 2023
[Table view]2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013) GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes 2023-06-06 Category:Technical Specification MONTHYEARML24263A2712024-09-19019 September 2024
[Table view]Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML22223A0512022-08-11011 August 2022 Report of Technical Specification Bases Changes CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21105A0522021-04-15015 April 2021 EAL Technical Bases Document Revision 1 ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes ML20134H8872020-05-12012 May 2020 Technical Specification Bases 3.2 ML20134H9592020-05-12012 May 2020 Technical Specification Bases 3.10 ML20134H9562020-05-12012 May 2020 Technical Specification Bases 3.9 ML20134H9532020-05-12012 May 2020 Technical Specification Bases 3.8 ML20134H9502020-05-12012 May 2020 Technical Specification Bases 3.7 ML20134H9372020-05-12012 May 2020 Technical Specification Bases 3.6 ML20134H9352020-05-12012 May 2020 Technical Specification Bases 3.5 ML20134H9312020-05-12012 May 2020 Technical Specification Bases 3.4 ML20134H8892020-05-12012 May 2020 Technical Specification Bases 3.3 ML20134H8772020-05-12012 May 2020 Technical Specification Bases 3.0 ML20134H8802020-05-12012 May 2020 Technical Specification Bases 3.1 ML20134H8672020-05-12012 May 2020 Technical Specification Bases 2.0 CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/20142015-03-27027 March 2015 Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density2015-03-27027 March 2015 Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints GNRO-2014/00050, Correction of Technical Specification Typographical Error2014-07-31031 July 2014 Correction of Technical Specification Typographical Error ML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update2012-12-21021 December 2012 Technical Requirements Manual and Technical Specification Bases Update ML12277A0812012-10-0202 October 2012 Proposed Techincal Specification Changes ML11308A1032011-10-28028 October 2011 License Renewal Application - Appendix D - Technical Specification Changes GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. GNRO-2010/00042, Technical Specification Bases & Technical Requirements Manual Update2010-05-27027 May 2010 Technical Specification Bases & Technical Requirements Manual Update GNRO-2010/00009, Technical Specification Bases Update to the NRC for Period Dated January 20, 20092010-01-20020 January 2010 Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 GNRO-2009/00062, License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits2009-10-27027 October 2009 License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions GNRO-2009/00028, Technical Specification Bases Update to the NRC for Period Dated April 22, 20092009-04-22022 April 2009 Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 GNRO-2009/00017, Technical Specification Bases Update to the NRC for Period Dated March 4, 20092009-03-0404 March 2009 Technical Specification Bases Update to the NRC for Period Dated March 4, 2009 GNRO-2009/00008, Technical Specification Bases Update to the NRC for Period Dated January 23, 20092009-01-23023 January 2009 Technical Specification Bases Update to the NRC for Period Dated January 23, 2009 GNRO-2008/00069, Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 20082008-10-22022 October 2008 Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 2024-09-19 Category:Bases Change MONTHYEARML24116A0372024-04-25025 April 2024
[Table view]Report of Technical Specification Bases Changes ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML22223A0512022-08-11011 August 2022 Report of Technical Specification Bases Changes ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21105A0522021-04-15015 April 2021 EAL Technical Bases Document Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes ML20134H8892020-05-12012 May 2020 Technical Specification Bases 3.3 ML20134H9312020-05-12012 May 2020 Technical Specification Bases 3.4 ML20134H8872020-05-12012 May 2020 Technical Specification Bases 3.2 ML20134H8772020-05-12012 May 2020 Technical Specification Bases 3.0 ML20134H8672020-05-12012 May 2020 Technical Specification Bases 2.0 ML20134H9352020-05-12012 May 2020 Technical Specification Bases 3.5 ML20134H9372020-05-12012 May 2020 Technical Specification Bases 3.6 ML20134H9502020-05-12012 May 2020 Technical Specification Bases 3.7 ML20134H9532020-05-12012 May 2020 Technical Specification Bases 3.8 ML20134H9562020-05-12012 May 2020 Technical Specification Bases 3.9 ML20134H9592020-05-12012 May 2020 Technical Specification Bases 3.10 ML20134H8802020-05-12012 May 2020 Technical Specification Bases 3.1 CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density2015-03-27027 March 2015 Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints ML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update2012-12-21021 December 2012 Technical Requirements Manual and Technical Specification Bases Update ML11308A1032011-10-28028 October 2011 License Renewal Application - Appendix D - Technical Specification Changes GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. GNRO-2010/00042, Technical Specification Bases & Technical Requirements Manual Update2010-05-27027 May 2010 Technical Specification Bases & Technical Requirements Manual Update GNRO-2010/00009, Technical Specification Bases Update to the NRC for Period Dated January 20, 20092010-01-20020 January 2010 Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 GNRO-2009/00028, Technical Specification Bases Update to the NRC for Period Dated April 22, 20092009-04-22022 April 2009 Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 GNRO-2009/00017, Technical Specification Bases Update to the NRC for Period Dated March 4, 20092009-03-0404 March 2009 Technical Specification Bases Update to the NRC for Period Dated March 4, 2009 GNRO-2009/00008, Technical Specification Bases Update to the NRC for Period Dated January 23, 20092009-01-23023 January 2009 Technical Specification Bases Update to the NRC for Period Dated January 23, 2009 GNRO-2008/00069, Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 20082008-10-22022 October 2008 Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 GNRO-2008/00049, Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-4482008-09-0202 September 2008 Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 GNRO-2008/00025, Technical Specification Bases Update to the NRC for Period Dated March 5, 20082008-03-0505 March 2008 Technical Specification Bases Update to the NRC for Period Dated March 5, 2008 GNRO-2007/00073, Technical Specification Bases Update to the NRC for Period Dated December 03, 20072007-12-0303 December 2007 Technical Specification Bases Update to the NRC for Period Dated December 03, 2007 GNRO-2007/00049, Technical Specification Bases Update to the NRC for Period Dated July 25, 20072007-07-25025 July 2007 Technical Specification Bases Update to the NRC for Period Dated July 25, 2007 GNRO-2007/00043, Technical Specification Bases Update to the NRC for Period Dated June 13, 20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for Period Dated June 13, 2007 GNRO-2007/00021, Technical Specification Bases, Technical Requirements Manual and Core Operating Limits Updates to the NRC for Period Dated April 7, 20072007-04-11011 April 2007 Technical Specification Bases, Technical Requirements Manual and Core Operating Limits Updates to the NRC for Period Dated April 7, 2007 GNRO-2007/00019, Technical Specification Bases Update to the NRC for Period Dated March 30, 20072007-03-30030 March 2007 Technical Specification Bases Update to the NRC for Period Dated March 30, 2007 GNRO-2006/00054, Technical Specification Bases Update to the NRC for Period Dated September 28, 20062006-09-28028 September 2006 Technical Specification Bases Update to the NRC for Period Dated September 28, 2006 GNRO-2006/00030, Technical Specification Bases Update to the NRC for Period Dated February 16, 20062006-05-15015 May 2006 Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 GNRO-2006/00008, Technical Specification Bases Update to the NRC for Period Dated February 16, 20062006-02-16016 February 2006 Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 2024-04-25 |