GNRO-2014/00050, Correction of Technical Specification Typographical Error

From kanterella
Jump to navigation Jump to search
Correction of Technical Specification Typographical Error
ML14212A113
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/31/2014
From: Nadeau J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2014/00050
Download: ML14212A113 (6)


Text

Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150 James Nadeau Manager, Regulatory Assurance Grand Gulf Nuclear Station Tel. (601) 437-2103 GNRO-2014/00050 July 31,2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Correction of Technical Specification Typographical Error Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

REFERENCES:

1. Electronic Request for Correction of Typographical Error in Condition L of Technical Specification 3.3.1.1, dated July, 18, 2014
2. Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Date March 18, 2014 (TAC MF2798)
3. Entergy Letter GNRO-2013/00012: Maximum Extended Load Line Limit Analysis Plus (MELLLA+) License Amendment Request, dated September, 25, 2013 (ADAMS Accession No. ML13269A140)

Dear Sir or Madam:

Entergy Operations, Inc. is providing in Attachment 1 the revised mark-up page and in , the revised clean technical specification page requested in the Reference 1 Request for Correction of Typographical Error in Condition L of Technical Specification 3.3.1.1.

This letter contains no new commitments. If you have any questions or require additional information, please contact James Nadeau at 601-437-2103.

Sincerely, . £..--..// t.k JN/ram {7GP,./ -

Attachments: 1. Revised Marked-up Technical Specification Page Correcting Typographical Error

2. Revised Clean Technical Specification Page Correcting Typographical Error

GNRO-2014/00050 Page 2 of 2 cc:

u.s. Nuclear Regulatory Commission ATTN: Mr. A. Wang, NRRlDORL Mail Stop OWFN/8 G14 11555 Rockville Pike Rockville, MD 20852-2378 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150

u. S. Nuclear Regulatory Commission ATTN: Marc L. Dapas (w/2)

Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 State Health Officer Mississippi Department of Health P.O. Box 1700 Jackson, MS 39215-1700

Attachment 1 to GNRO-2014/00050 Revised Marked-up Technical Specification Page Correcting Typographical Error

RPS Instrumentation 3.3.1.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME I. As requi red by 1.1 Initiate action to Immediately Required Action 0.1 fully insert all and referenced in insertable control Table 3.3.1.1-1. rods in core cells containing one or more fuel assemblies.

J. As required by J.1 Initiate action to Immediately Required Action 0.1 implement the Manual and referenced in BSP regions defined Table 3.3.1.1-1. in the COLR ANil 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> J.2 Implement the Automated BSP Scram region using the modified APRM Flow Biases Simulated Thermal Power - High rip function setpoints defined in the COLR.

J.3 Initiate action to Immediately submit an OPRM report in accordance with Specification 5.6.7.

K. Required Action and K.1 Initiate action to Immediately associated Completion implement the Manual Time of Condition J BSP Regions defined not met. in the COLR.

ANil K.2 Reduce operation to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> below the BSP Boundary defined in the COLR.

ANll K.3 ------- NOTE -------- 120 days LCO 3.0.4 is not applicable.

Restore required channels to OPERABLE.

L. Required Action and L.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Complet~9n to < 16.8% RTP.

Time of Condition~J<

not met.

GRAND GULF 3.3-2a Amendment No. +&8. +9+, __

Attachment 2 to GNRO-2014/00050 Revised Clean Technical Specification Page Correcting Typographical Error

RPS Instrumentation 3.3.1.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME I. As required by 1.1 Initiate action to Immediately Required Action 0.1 fully insert all and referenced in insertable control Table 3.3.1.1-1. rods in core cells containing one or more fuel assembl i es.

J. As required by J.1 Initiate action to Immediately Required Action 0.1 implement the Manual and referenced in BSP regions defined Table 3.3.1.1-1. in the COLR J.2 Implement the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Automated BSP Scram region using the modified APRM Flow Biases Simulated Thermal Power - Hi gh rip function setpoints defined in the COLR.

J.3 Initiate action to Immediately submit an OPRM report in accordance with Specification 5.6.7.

K. Required Action and K.1 Initiate action to Immediately associated Completion implement the Manual Time of Condition J BSP Regions defined not met. in the COLR.

Reduce operation to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> below the BSP Boundary defined in the COLR.


NOTE --------

LCO 3.0.4 is not applicable. 120 days Restore required channels to OPERABLE.

L. Required Action and L.1 Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion to < 16.8% RTP.

Time of Condition K not met.

GRAND GULF 3.3-2a Amendment No. +&8, +9+, __