Technical Specification Bases 3.1
ML20134H880
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/12/2020
From: Siva Lingam
Plant Licensing Branch IV
To:
Lingam S, 301-415-1564
References
Download: ML20134H880 (54)


Text

Control Rod OPERABILITY B 3.1.3 BASES (continued)

SURVEILLANCE SR 3.1.3.1 REQUIREMENTS The position of each control rod must be determined, to ensure adequate information on control rod position is available to the operator for determining control rod OPERABILITY and controlling rod patterns.

Control rod position may be determined by the use of OPERABLE position indicators, by moving control rods to a position with an OPERABLE indicator, or by the use of other appropriate methods. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.1.3.2 Deleted SR 3.1.3.3 Control rod insertion capability is demonstrated by inserting each partially or fully withdrawn control rod at least one notch and observing that the control rod moves. The control rod may then be returned to its original position. This ensures the control rod is not stuck and is free to insert on a scram signal. This Surveillance is modified by a Note identifying that the Surveillance is not required to be performed when THERMAL POWER is less than or equal to the actual LPSP of the RPC since the notch insertions may not be compatible with the requirements of BPWS (LCO 3.1.6) and the RPC (LCO 3.3.2.1). This Note also provides a time allowance such that the Surveillance is not required to be performed until the next scheduled control rod testing for control rods of the same class (i.e., fully withdrawn or partially withdrawn). This Note provides this allowance to prevent unnecessary perturbations in reactor operation to perform this testing on a control rod whose surveillance class (i.e., fully withdrawn or partially withdrawn) has changed. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. At any time, if a control rod is immovable, a determination of that control rod's trippability (OPERABILITY) must be made and appropriate action taken.

(continued)

GRAND GULF B 3.1-18 LBDCR 18127

Control Rod Scram Times B 3.1.4 BASES SURVEILLANCE SR 3.1.4.2 (continued)

REQUIREMENTS the tested sample are determined to be "slow." If more than 7.5% of the sample is declared to be "slow" per the criteria in Table 3.1.4-1, additional control rods are tested until this 7.5% criterion (e.g., 7.5% of the entire sample size) is satisfied, or until the total number of "slow" control rods (throughout the core, from all surveillances) exceeds the LCO limit. For planned testing, the control rods selected for the sample should be different for each test. Data from inadvertent scrams should be used whenever possible to avoid unnecessary testing at power, even if the control rods with data were previously tested in a sample. The 7.5% of sample size criteria is intended to align with the 7.5% of the total control rods allowed to have scram times that exceed the specified limit. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.1.4.3 When work that could affect the scram insertion time is performed on a control rod or the CRD System, testing must be done to demonstrate that each affected control rod retains adequate scram performance over the range of applicable reactor pressures from zero to the maximum permissible pressure. The scram testing must be performed once before declaring the control rod OPERABLE. The required scram time testing must demonstrate that the affected control rod is still within acceptable limits. The limits for reactor pressures < 950 psig are established based on a high probability of meeting the acceptance criteria at reactor pressures 950 psig. Limits for 950 psig are found in Table 3.1.4-1. If testing demonstrates the affected control rod does not meet these limits, but is within the 7 second limit of Table 3.1.4-1 Note 2, the control rod can be declared OPERABLE and "slow."

Specific examples of work that could affect the scram times (continued)

GRAND GULF B 3.1-25 LBDCR 18127

Control Rod Scram Accumulators B 3.1.5 BASES ACTIONS D.1 (continued) that all insertable control rods are inserted and that the reactor is in a condition that does not require the active function (i.e., scram) of the control rods. This Required Action is modified by a Note stating that the Required Action is not applicable if all control rods associated with the inoperable scram accumulators are fully inserted, since the function of the control rods has been performed.

SURVEILLANCE SR 3.1.5.1 REQUIREMENTS SR 3.1.5.1 requires that the accumulator pressure be checked periodically to ensure adequate accumulator pressure exists to provide sufficient scram force. The primary indicator of accumulator OPERABILITY is the accumulator pressure. A minimum accumulator is well below the expected pressure of 1750 psig (Ref. 2). Declaring the accumulator inoperable when the minimum pressure is not maintained pressure is specified, below which the capability of the accumulator to perform its intended function becomes degraded and the accumulator is considered inoperable. The minimum accumulator pressure of 1520 psig ensures that significant degradation in scram times does not occur. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 4.3.2.5.5.

2. UFSAR, Section 4.6.1.1.2.5.3.
3. UFSAR, Section 5.2.2.2.3.
4. UFSAR, Section 15.4.1.

GRAND GULF B 3.1-31 LBDCR 18127

Control Rod Pattern B 3.1.6 BASES ACTIONS B.1 and B.2 (continued) withdrawals have. Required Action B.1 is modified by a Note that allows the affected control rods to be bypassed in RACS in accordance with SR 3.3.2.1.9 to allow insertion only.

With nine or more OPERABLE control rods not in compliance with BPWS, the reactor mode switch must be placed in the shutdown position within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. With the reactor mode switch in shutdown, the reactor is shut down, and therefore does not meet the applicability requirements of this LCO. The allowed Completion Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is reasonable to allow insertion of control rods to restore compliance, and is appropriate relative to the low probability of a CRDA occurring with the control rods out of sequence.

SURVEILLANCE SR 3.1.6.1 REQUIREMENTS The control rod pattern is verified to be in compliance with the BPWS periodically, ensuring the assumptions of the CRDA analyses are met.

The Surveillance Frequency is controlled under the Surveillance Frequency Control Program. The RPC provides control rod blocks to enforce the required control rod sequence and is required to be OPERABLE when operating at 10% RTP.

REFERENCES 1. NEDE-24011-P-A, "General Electric Standard Application for Reactor Fuel (GESTAR II)."

2. UFSAR, Section 15.4.9.
3. NUREG-0979, "NRC Safety Evaluation Report Related to the Final Design Approval of the GESSAR II BWR/6 Nuclear Island Design, Docket No. 50-447," Section 4.2.1.3.2, April 1983.
4. NUREG-0800, "Standard Review Plan," Section 15.4.9, "Radiological Consequences of Control Rod Drop Accident (BWR),"

Revision 2, July 1981.

5. 10 CFR 100.11, "Determination of Exclusion Area, Low Population Zone, and Population Center Distance."

(continued)

GRAND GULF B 3.1-35 LBDCR 18127

SLC System B 3.1.7 BASES APPLICABLE that is above the pump suction shutoff level in the boron SAFETY ANALYSES solution storage tank. No credit is taken for the portion (continued) of the tank volume that cannot be injected.

The SLC System is also credited in the LOCA radiological analysis. The sodium pentaborate solution has been shown to sufficiently buffer the post-accident suppression pool that iodine re-evaluation can be precluded.

The SLC System satisfies the requirements of the NRC Policy Statement because operating experience and probabilistic risk assessment have generally shown it to be important to public health and safety.

The leakage limit for the SLC system is 2.87 gpm. This includes the 0.13 gpm leakage for the restricting orifice on the class boundary at the SLC test tank. (Ref. 4)

LCO The OPERABILITY of the SLC System provides backup capability for reactivity control, independent of normal reactivity control provisions provided by the control rods.

The OPERABILITY of the SLC System is based on the conditions of the borated solution in the storage tank and the availability of a flow path to the RPV, including the OPERABILITY of the pumps and valves. Two SLC subsystems are required to be OPERABLE, each containing an OPERABLE pump, an explosive valve and associated piping, valves, and instruments and controls to ensure an OPERABLE flow path.

APPLICABILITY In MODES 1 and 2, shutdown capability is required. In MODES 3 and 4, control rods are not able to be withdrawn since the reactor mode switch is in shutdown and a control rod block is applied. This provides adequate controls to ensure the reactor remains subcritical. In MODE 5, only a single control rod can be withdrawn from a core cell containing fuel assemblies. Demonstration of adequate SDM (LCO 3.1.1, "SHUTDOWN MARGIN (SDM)") ensures that the reactor will not become critical. Therefore, the SLC System is not required to be OPERABLE during these conditions, when only a single control rod can be withdrawn.

(continued)

GRAND GULF B 3.1-38 LBDCR 17036

SLC System B 3.1.7 BASES ACTIONS B.1 If the volume of the sodium pentaborate solution is less than 4,200 gallons, the volume must be restored to greater than or equal to 4,200 gallons within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. When in Condition B.1, it is not necessary to enter Condition E for both SLC subsystems inoperable. The subsystems are capable of performing their original design basis function. Because of the low probability of an ATWS event and that the SLC System capability still exists for vessel injection under this condition, the allowed Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is acceptable and provides adequate time to restore the volume to within limits.

C.1 If the temperature of the sodium pentaborate solution is less than 45qF or greater than 150qF, the temperature must be restored to within limits within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. When in Condition C.1, it is not necessary to enter Condition E for both SLC subsystems inoperable. The subsystems are capable of performing their original design basis function. Because of the low probability of an ATWS event and that the SLC System capability still exists for vessel injection under this condition, the allowed Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is acceptable and provides adequate time to restore the temperature to within limits.

D.1 If one SLC subsystem is inoperable for reasons other than Conditions A, B or C, the inoperable subsystem must be restored to OPERABLE status within 7 days. In this condition, the remaining OPERABLE subsystem is adequate to perform the shutdown function. However, the overall reliability is reduced because a single failure in the remaining OPERABLE subsystem could result in reduced SLC System shutdown capability. The 7 day Completion Time is based on the availability of an OPERABLE subsystem capable of performing the intended SLC System function and the low probability of a Design Basis Accident (DBA) or severe transient occurring concurrent with the failure of the Control Rod Drive System to shut down the plant.

E.1 If both SLC subsystems are inoperable for reasons other than Conditions A, B or C, at least one subsystem must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The allowed Completion Time of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is considered acceptable, given the low probability of a DBA or transient occurring continued)

GRAND GULF B 3.1-39 LBDCR 16270

SLC System B 3.1.7 BASES ACTIONS E.1 (continued) concurrent with the failure of the controls rods to shut down the reactor.

F.1 If any Required Action and associated Completion Time is not met, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The allowed Completion Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.1.7.1 and SR 3.1.7.2 REQUIREMENTS SR 3.1.7.1 and SR 3.1.7.2 verify certain characteristics of the SLC System (e.g., the volume and temperature of the borated solution in the storage tank), thereby ensuring the SLC System OPERABILITY without disturbing normal plant operation. These surveillances ensure the proper borated solution and temperature, including the temperature of the pump suction piping, are maintained. Maintaining a minimum specified borated solution temperature is important to ensuring that the boron remains in solution and does not precipitate out in the storage tank or in the pump suction piping. Maintaining the temperature less than 150°F ensures the pump net positive suction head requirements for two pump operation and SLC System piping qualifications. The Surveillance Frequencies are controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.1-40 LBDCR 18127

SLC System B 3.1.7 BASES SURVEILLANCE SR 3.1.7.3 and SR 3.1.7.5 REQUIREMENTS The requirements of 10 CFR 50.62 are met by the use of a sodium pentaborate solution enriched in the boron-10 (B-10) isotope. SR 3.1.7.3 determines whether the sodium pentaborate concentration, in conjunction with the boron enrichment, is within limits to meet the requirements of 10 CFR 50.62. SR 3.1.7.5 ensures that the parameters used in the determination of sodium pentaborate concentration are within limits. The available solution volume is the solution volume above the pump suction penetration. This surveillance requires an examination of the sodium pentaborate solution by using chemical analysis to ensure the proper weight of B-10 exists in the storage tank. SR 3.1.7.5 must be performed anytime boron or water is added to the storage tank solution to establish that the weight of B-10 is within the specified limits. This SR must be performed anytime the solution temperature is restored to 45°F, to ensure no significant boron precipitation occurred.

The time interval based Surveillance Frequencies are controlled under the Surveillance Frequency Control Program.

SR 3.1.7.4 and SR 3.1.7.6 SR 3.1.7.4 verifies the continuity of the explosive charges in the injection valves to ensure proper operation will occur if required.

(continued)

GRAND GULF B 3.1-41 LBDCR 18127

SLC System B 3.1.7 BASES SURVEILLANCE SR 3.1.7.4 and SR 3.1.7.6 (continued)

REQUIREMENTS The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.1.7.6 verifies each valve in the system is in its correct position, but does not apply to the squib (i.e., explosive) valves. Verifying the correct alignment for manual, power operated, and automatic valves in the SLC System flow path ensures that the proper flow paths will exist for system operation. A valve is also allowed to be in the nonaccident position, provided it can be aligned to the accident position from the control room, or locally by a dedicated operator at the valve controls. This is acceptable since the SLC System is a manually initiated system. This Surveillance does not apply to valves that are locked, sealed, or otherwise secured in position, since they were verified to be in the correct position prior to locking, sealing, or securing. This verification of valve alignment does not apply to valves that cannot be inadvertently misaligned, such as check valves. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct positions. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.1-42 LBDCR 18127

SLC System B 3.1.7 BASES SURVEILLANCE SR 3.1.7.7 REQUIREMENTS (continued) Demonstrating each SLC System pump develops a flow rate r 41.2 Jpm at a discharge pressure 1370 psig without actuating the pump's relief valve ensures that pump performance has not degraded during the fuel cycle. This minimum pump flow rate requirement ensures that, when combined with the sodium pentaborate solution concentration requirements, the rate of negative reactivity insertion from the SLC System will adequately compensate for the positive reactivity effects encountered during power reduction, cooldown of the moderator, and xenon decay. This test confirms one point on the pump design curve, and is indicative of overall performance. Such inservice inspections confirm component OPERABILITY, trend performance, and detect incipient failures by indicating abnormal performance. The Frequency of this Surveillance is in accordance with the INSERVICE TESTING PROGRAM.

SR 3.1.7.8 This Surveillance ensures that there is a functioning flow path from the boron solution storage tank to the RPV, including the firing of an explosive valve. The replacement charge for the explosive valve shall be from the same manufactured batch as the one fired or from another batch that has been certified by having one of that batch successfully fired.

Other administrative controls, such as those that limit the shelf life of the explosive charges, must be followed. The Surveillance may be performed in separate steps to prevent injecting boron into the RPV. An acceptable method for verifying flow from the pump to the RPV is to pump demineralized water from a test tank through one SLC subsystem and into the RPV. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

(continued)

GRAND GULF B 3.1-43 LBDCR 18127

SLC System B 3.1.7 BASES SURVEILLANCE SR 3.1.7.9 REQUIREMENTS Enriched sodium pentaborate solution is made by mixing granular, enriched sodium pentaborate with water. Isotopic tests on the sodium pentaborate solution to determine the actual B-10 enrichment must be performed once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after boron is added to the solution in order to ensure that the B-10 enrichment is adequate. Enrichment testing is only required when boron addition is made since enrichment change cannot occur by any other processes.

REFERENCES 1. 10 CFR 50.62.

2. UFSAR, Section 9.3.5.3.
3. GNRI-91/00153, Issuance of Amendment No. 79 to Facility Operating License No. NPF Grand Gulf Nuclear Station, Unit 1, Regarding Standby Liquid Control System Technical Specifications, dated July 30, 1991.
4. MC-Q1C41-13001, Rev.1, SLC Leakage Limit GRAND GULF B 3.1-44 LBDCR 17036

SDV Vent and Drain Valves B 3.1.8 BASES ACTIONS C.1 (continued)

Time of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems.

SURVEILLANCE SR 3.1.8.1 REQUIREMENTS During normal operation, the SDV vent and drain valves should be in the open position (except when performing SR 3.1.8.2) to allow for drainage of the SDV piping. Verifying that each valve is in the open position ensures that the SDV vent and drain valves will perform their intended function during normal operation. This SR does not require any testing or valve manipulation; rather, it involves verification that the valves are in the correct position. The Surveillance Frequency are controlled under the Surveillance Frequency Control Program. Improper valve position (closed) would not affect the isolation function.

SR 3.1.8.2 During a scram, the SDV vent and drain valves should close to contain the reactor water discharged to the SDV piping. Cycling each valve through its complete range of motion (closed and open) ensures that the valve will function properly during a scram. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

SR 3.1.8.3 SR 3.1.8.3 is an integrated test of the SDV vent and drain valves to verify total system performance. After receipt of a simulated or actual scram signal, the closure of the SDV vent and drain valves is verified. The closure time of 30 seconds after a receipt of a scram signal is based on the bounding leakage case evaluated in the accident analysis. Similarly, after receipt of a simulated or actual scram (continued)

GRAND GULF B 3.1-48 LBDCR 18127

SDV Vent and Drain Valves B 3.1.8 BASES SURVEILLANCE SR 3.1.8.3 (continued)

REQUIREMENTS reset signal, the opening of the SDV vent and drain valves is verified.

The LOGIC SYSTEM FUNCTIONAL TEST in LCO 3.3.1.1 and the scram time testing of control rods in LCO 3.1.3, "Control Rod OPERABILITY,"

overlap this Surveillance to provide complete testing of the assumed safety function. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.

REFERENCES 1. UFSAR, Section 4.6.1.1.2.4.2.6.

2. 10 CFR 50.67, Accident Source Term.
3. NUREG-0803, "Generic Safety Evaluation Report Regarding Integrity of BWR Scram System Piping," August 1981.

GRAND GULF B 3.1-49 LBDCR 18127