Letter Sequence Request |
---|
TAC:MC3866, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors (Open) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits 2024-09-04
[Table view] Category:Quality Assurance Program
MONTHYEARML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML21168A3392021-06-17017 June 2021 Virgil C. Summer Nuclear Station, North Anna Power Station, Surry Power Station -Submission of Revision 30 of the Quality Assurance Topical Report ML20182A6922020-06-29029 June 2020 & ISFSI, Millstone Power Station, Units 1, 2 3, & ISFSI, North Anna Power Station, Units 1, 2 & ISFSI, Virgil C. Summer Station, Surry Power Station, Units 1 & 2 and ISFSI - Submission of Revision 28 of the Quality Assurance. ML19175A0712019-06-13013 June 2019 ISFSI, Millstone, Units 1, 2, 3, & ISFSI, North Anna, Units 1, 2 & ISFSI, Surry, Units 1 & 2 & ISFSI - Submittal of Revision 27 of the Quality Assurance Topical Report ML18180A1412018-06-26026 June 2018 ISFSI, Millstone, Units 1, 2 and 3, ISFSI, North Anna, Units 1 and 2, ISFSI, Surry, Units 1 and 2, ISFSI - Submittal of Revision 27 of the Quality Assurance Topical Report ML18065A1942018-02-28028 February 2018 Submittal of Approval Version of the Quality Assurance Topical Report, Revision 24-A ML16321A4542016-11-10010 November 2016 Connecticut and Virginia Electric & Power Company Response to Request for Additional Information Revision 22 of Quality Assurance Program Description Topical Report ML16196A2922016-07-11011 July 2016 ISFSI, Millstone, Units 1, 2 & 3, and ISFSI, North Anna, Units 1 & 2, and ISFSI, Surry, Units 1 & 2, and ISFSI Submission of Rev. 21 of Quality Assurance Topical Report for NRC Approval and Submission of Revision 22 for Information Only ML15204A6052015-06-23023 June 2015 ISFSIs - Quality Assurance Topical Report, DOM-QA-1, Revision 19 ML13191A9132013-06-17017 June 2013 ISFSI, Millstone, Units 1, 2, & 3 & ISFSI, North Anna, Units 1 & 2 & ISFSI and Surry, Units 1 & 2 & ISFSI - Submission of Revision 14 of the Quality Assurance Topical Report ML11245A0772011-08-15015 August 2011 ISFSI, Millstone, Units 1, 2, & 3 and ISFSI, North Anna, Units 1, & 2 and ISFSI and Surry, Units 1 & 2 and ISFSI - Re-Submission of Quality Assurance Topical Report ML1118007302011-06-28028 June 2011 Connecticut, Inc., Virginia Electric and Power Company, Submission of Revision 11 of the Quality Assurance Topical Report ML0535702762005-12-12012 December 2005 Quality Assurance Program Topical Report ML0534701942005-12-0707 December 2005 ISFSI Associated Radioactive Material Packages - DOM-QA-A Cover Page - Index ML0522704202005-08-0808 August 2005 Revision 27, MP-02-OST-BAP01, Quality Assurance Program Topical Report. ML0519600482005-07-13013 July 2005 ISFSI Annual Reporting of Changes to the Quality Assurance Program Revision 27 to the Dominion Nuclear Connecticut. Inc. Quality Assurance Program Topical Report ML0519600612005-07-0101 July 2005 Appendix a to Quality Assurance Program (QAP) ML0519600562005-07-0101 July 2005 ISFSI - Revisions to Quality Assurance Program ML0515205322005-05-19019 May 2005 MP-02-OST-BAP01, Revision 26, Change 5, Quality Assurance Program Topical Report, Millstone Power Station ML0513005522005-04-22022 April 2005 Enclosure 3, Rev Oa to Topical Report DOM-QA-1, Nuclear Facility Quality Assurance Program Description. ML0513005502005-04-22022 April 2005 Enclosure 2, Marked-Up DOM-QA-1, Quality Assurance Program Description. ML0511003282005-04-0808 April 2005 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 26, Change 4 ML0503303292004-12-30030 December 2004 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 26, Change 3 (Document No. MP-02-OST-BAP01) ML0428804752004-10-0404 October 2004 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 26, Change 2 (Document No. MP-02-OST-BAP01) ML0424700212004-08-24024 August 2004 Attachment 6 - Current 10 CFR 50, Appendix B Quality Assurance Program Topical Report for Millstone Power Stations and Associated Radioactive Material Packages ML0424700172004-08-24024 August 2004 Attachment 2 - Discussion of Changes to Current QA Program Descriptions for the Above Dominion Facilities ML0424700202004-08-24024 August 2004 Attachment 5 - Current 10 CFR 50, Appendix B Quality Assurance Program Topical Report for North Anna and Surry Power Stations Associated Radioactive Material Packages and ISFSI ML0424700192004-08-24024 August 2004 Attachment 4 - Table of Where ANSI N18.7 Requirements Are Addressed by NQA-1-1994 Standards And/Or the New QA Topical Report ML0424700182004-08-24024 August 2004 Attachment 3 - Comparative Analysis of Current N45.2 Series QA Standards to NQA-1-1994 Standards ML0424003682004-08-13013 August 2004 MP-02-OST-BAP01, Rev 26, Change 1, Quality Assurance Program Topical Report. ML0424700162004-07-0606 July 2004 Attachment 1 - Proposed Nuclear Facility Quality Assurance Program Description - Topical Report DOM-QA-1, Revision 0, Final Draft July 06, 2004 ML0418904362004-06-29029 June 2004 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 26 (Document No. MP-02-OST-BAP01) ML0416301542004-05-26026 May 2004 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 25, Change 4 (Change 3 Correction - Document No. MP-02- OST-BAP01) ML0415603572004-05-25025 May 2004 Transmittal of Quality Assurance Program Topical Report ML0402107972004-01-0808 January 2004 MP-02-OST-BAP01, Rev 25, Quality Assurance Program (QAP) Topical Report, Charge 2 ML0329506292003-10-14014 October 2003 Quality Assurance Program Topical Report - Millstone Power Station, Revision 25 Document No. MP-02-OST-BAP01 ML0319600622003-07-0101 July 2003 Quality Assurance Program Topical Report ML0319600602003-06-30030 June 2003 Annual Reporting of Changes to the Quality Assurance Program Revision 25 to the Quality Assurance Program Topical Report ML0318205612003-06-19019 June 2003 Transmittal of Quality Assurance Program Topical Report ML0312000222003-04-16016 April 2003 Transmittal of Quality Assurance Topical Report, Revision 24, Change 3 ML0233705372002-11-13013 November 2002 Quality Assurance Program (QAP) Topical Report, Revision 24, Change 2 ML0232404452002-11-12012 November 2002 Quality Assurance Program Topical Report Revision 24, Change 2 ML0227700142002-09-25025 September 2002 Quality Assurance Program Topical Report - Millstone Power Station Revision 24 & Revision 24, Change 1(Document No. MP-02-OST-BAP01) ML0227503662002-09-19019 September 2002 Quality Assurance Program (QAP) Topical Report Revision 23, Change 10 (Document No. MP-02-OST-BAP01) ML0216502062002-05-31031 May 2002 Quality Assurance Program Topical Report ML0210002162002-03-23023 March 2002 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 23, Change 7 ML0204601432002-01-29029 January 2002 Quality Assurance Program (QAP) Topical Report - Millstone Power Station, Revision 23, Change 6 (Document MP-02-OST-BAP01) ML0204406382002-01-15015 January 2002 Quality Assurance Program Topical Report - Millstone Power Station, Revision 23, Change 5 (Document No. MP-02-OST-BAP01) 2022-06-23
[Table view] Category:Topical Report
MONTHYEARML20182A6922020-06-29029 June 2020 & ISFSI, Millstone Power Station, Units 1, 2 3, & ISFSI, North Anna Power Station, Units 1, 2 & ISFSI, Virgil C. Summer Station, Surry Power Station, Units 1 & 2 and ISFSI - Submission of Revision 28 of the Quality Assurance. ML19175A0712019-06-13013 June 2019 ISFSI, Millstone, Units 1, 2, 3, & ISFSI, North Anna, Units 1, 2 & ISFSI, Surry, Units 1 & 2 & ISFSI - Submittal of Revision 27 of the Quality Assurance Topical Report ML18065A1942018-02-28028 February 2018 Submittal of Approval Version of the Quality Assurance Topical Report, Revision 24-A ML18012A0982018-01-0404 January 2018 Submittal of Topical Report VEP-NE-1-A Revision 0, Minor Revision 3, Relaxed Power Distribution Control Methodology & Associated Fq Surveillance Technical Specifications & Topical Report. ML16196A2922016-07-11011 July 2016 ISFSI, Millstone, Units 1, 2 & 3, and ISFSI, North Anna, Units 1 & 2, and ISFSI, Surry, Units 1 & 2, and ISFSI Submission of Rev. 21 of Quality Assurance Topical Report for NRC Approval and Submission of Revision 22 for Information Only ML14188B1342014-06-30030 June 2014 Nuclear Facility Quality Assurance Programs Description Topical Report DOM-QA-1, Rev. 16 ML13191A9132013-06-17017 June 2013 ISFSI, Millstone, Units 1, 2, & 3 & ISFSI, North Anna, Units 1 & 2 & ISFSI and Surry, Units 1 & 2 & ISFSI - Submission of Revision 14 of the Quality Assurance Topical Report ML11245A0772011-08-15015 August 2011 ISFSI, Millstone, Units 1, 2, & 3 and ISFSI, North Anna, Units 1, & 2 and ISFSI and Surry, Units 1 & 2 and ISFSI - Re-Submission of Quality Assurance Topical Report ML1118007302011-06-28028 June 2011 Connecticut, Inc., Virginia Electric and Power Company, Submission of Revision 11 of the Quality Assurance Topical Report ML0936200862009-04-30030 April 2009 WCAP-17071-NP, Rev 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F) ML0816805082008-06-19019 June 2008 Stations - Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions ML0631904672006-11-0606 November 2006 Transmittal of Approved Topical Report DOM-NAF-3 NP-A, Gothic Methodology for Analyzing the Response to Postulated Pipe Ruptures Inside Containment. ML0626501842006-09-14014 September 2006 Approved Topical Report DOM-NAF-2, Rev 0.0-A, Reactor Core Thermal-Hydraulics Using the Vipre-D Computer Code Including Appendixes a & B ML0535702762005-12-12012 December 2005 Quality Assurance Program Topical Report ML0534701942005-12-0707 December 2005 ISFSI Associated Radioactive Material Packages - DOM-QA-A Cover Page - Index ML0530602732005-11-0101 November 2005 Request for Approval of Topical Report DOM-NAF-3, Gothic Methodology for Analyzing the Response to Postulated Pipe Ruptures Inside Containment. Topical Report Page 40 Through End ML0530602662005-11-0101 November 2005 Request for Approval of Topical Report DOM-NAF-3, Gothic Methodology for Analyzing the Response to Postulated Pipe Ruptures Inside Containment. Cover Letter Through Topical Report Page 40 ML0525104842005-09-0808 September 2005 Stations Units 1 & 2, Millstone Power Station Units 2 & 3, Information Regarding a Lynxt Error Supporting the Request for Approval of Topical Report DOM-NAF-2 Reactor Core Thermal-hydraulics Using the VIPRE-D Computer . ML0522704202005-08-0808 August 2005 Revision 27, MP-02-OST-BAP01, Quality Assurance Program Topical Report. ML0515205322005-05-19019 May 2005 MP-02-OST-BAP01, Revision 26, Change 5, Quality Assurance Program Topical Report, Millstone Power Station ML0511003282005-04-0808 April 2005 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 26, Change 4 ML0503303292004-12-30030 December 2004 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 26, Change 3 (Document No. MP-02-OST-BAP01) ML0428001182004-09-30030 September 2004 Request for Approval of Topical Report DOM-NAF-2 Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code Including Appendix a - Qualification of the F-ANP Bwu CHF Correlations in the Dominion VIPRE-D Computer Code ML0428001222004-09-30030 September 2004 Attachment 2 - Appendix a to Topical Report DOM-NAF-2, Qualification of the F-ANP Bwu CHF Correlations in the Dominion VIPRE-D Computer Code. ML0424700172004-08-24024 August 2004 Attachment 2 - Discussion of Changes to Current QA Program Descriptions for the Above Dominion Facilities ML0424700212004-08-24024 August 2004 Attachment 6 - Current 10 CFR 50, Appendix B Quality Assurance Program Topical Report for Millstone Power Stations and Associated Radioactive Material Packages ML0424700202004-08-24024 August 2004 Attachment 5 - Current 10 CFR 50, Appendix B Quality Assurance Program Topical Report for North Anna and Surry Power Stations Associated Radioactive Material Packages and ISFSI ML0424700182004-08-24024 August 2004 Attachment 3 - Comparative Analysis of Current N45.2 Series QA Standards to NQA-1-1994 Standards ML0424700192004-08-24024 August 2004 Attachment 4 - Table of Where ANSI N18.7 Requirements Are Addressed by NQA-1-1994 Standards And/Or the New QA Topical Report ML0424003682004-08-13013 August 2004 MP-02-OST-BAP01, Rev 26, Change 1, Quality Assurance Program Topical Report. ML0424700162004-07-0606 July 2004 Attachment 1 - Proposed Nuclear Facility Quality Assurance Program Description - Topical Report DOM-QA-1, Revision 0, Final Draft July 06, 2004 ML0418904362004-06-29029 June 2004 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 26 (Document No. MP-02-OST-BAP01) ML0416301542004-05-26026 May 2004 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 25, Change 4 (Change 3 Correction - Document No. MP-02- OST-BAP01) ML0410704722004-04-15015 April 2004 Request for Approval of Topical Report DOM-NAF-2, Reactor Core Thermal-Hydraulics Using VIPRE-D Computer Code Including Appendix a, Qualification of F-ANP Bwu CHF Correlations in Dominion VIPRE-D Computer Code. ML0332302252003-11-12012 November 2003 Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. ML0329506292003-10-14014 October 2003 Quality Assurance Program Topical Report - Millstone Power Station, Revision 25 Document No. MP-02-OST-BAP01 ML0329301032003-08-31031 August 2003 to WCAP-15813-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Millstone, Unit 2. ML0319600622003-07-0101 July 2003 Quality Assurance Program Topical Report ML0319600602003-06-30030 June 2003 Annual Reporting of Changes to the Quality Assurance Program Revision 25 to the Quality Assurance Program Topical Report ML0312000222003-04-16016 April 2003 Transmittal of Quality Assurance Topical Report, Revision 24, Change 3 ML0307101722003-02-28028 February 2003 WCAP-16012, Rev. 0, Analysis of Capsule W-83 from Dominion Nuclear Connecticut Millstone Unit 2 Reactor Vessel Radiation Surveillance Program, Table of Contents - Section 8 ML0306601702003-02-28028 February 2003 WCAP-16012, Rev. 0, Analysis of Capsule W-83 from Dominion Nuclear Connecticut Millstone Unit 2 Reactor Vessel Radiation Surveillance Program, Appendix a - D ML0233705372002-11-13013 November 2002 Quality Assurance Program (QAP) Topical Report, Revision 24, Change 2 ML0232404452002-11-12012 November 2002 Quality Assurance Program Topical Report Revision 24, Change 2 ML0227700142002-09-25025 September 2002 Quality Assurance Program Topical Report - Millstone Power Station Revision 24 & Revision 24, Change 1(Document No. MP-02-OST-BAP01) ML0227503662002-09-19019 September 2002 Quality Assurance Program (QAP) Topical Report Revision 23, Change 10 (Document No. MP-02-OST-BAP01) ML0223901832002-08-15015 August 2002 Combustion Engineering Owners Group Request for Review of CE Owners Group Report WCAP-15691 Rev 03, Joint Applications Report for Containment Integrated Leak Rate Test Interval Extension. ML0210002162002-03-23023 March 2002 Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 23, Change 7 2020-06-29
[Table view] |
Text
PASSPORT DOCUMENT T6 : DOCUMENT CONTROL DESK Facility : MP Department : 806 TRANSMITTAL Address : NUC REGULATORY COMMISSION (0140)
DOCUMENT CONTROL DESK WASHINGTON, DC 20555 Page: 1 From : NDS CONT DOCUMENTS Date/Time : 12/29/04 13:03 Trans No. : 000068564 Tr ansmittal Group Id: 04363JEP-1 Total Items: 00001 Item Facility Type Sub Document Number / Title Sheet Revision Doc Date Copy # Media Copies
- 0001 MP PROC OST MP-02-OST-BAP01 026 03 P 01 QUALITY ASSURANCE PROGRAM TOPICAL REPORT (NO IMAGE - TOO COMPLEX TO F.)
Please check the appropriate response and return form to NDS Bldg 475/3 Millstone Power Station or Fax to 860-440-2057.
All documents received.
Documents noted above not received (identify those not received).
I no longer require distribution of these documents.
Date: Signature:
I
> ; Dominion-Memorandum NO-04-0020 December 30, 2004 TO: Quality Assurance Program Topical Report - Controlled Copy Owners FROM: Dorothy BoLce, Millstone QAP Coordinator Nuclear Oversight, Ext. 3185
SUBJECT:
Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 26, Change 3 (Document No. MP-02-OST-BAP01)
Enclosed please find Quality Assurance Program (QAP) Topical Report - Millstone Power Station, Revision 26, Change 3. The change is to modify QAP Appendix E, to add an exception for the Quality Assurance audit schedule to allow a 25% extension to the frequency of most QA audits (excluding those mandated by the Code of Federal Regulations). The change adds y> exception number 21 to Appendix E. In addition, this change supersedes QAP Appendix E exception number 16, which will be deleted as noted in QAP Appendix E. The change modifies QAP Appendix E to reflect these changes.
Please note that the effective date of Revision 26, Change 3, is December 30, 2004. Please replace the current section of the Quality Assurance Program with the enclosed section (QAP 1.0 and Appendix E).
If you have any questions, please contact D. Bruce at X3 185.
Attachments: Summary of Changes for Revision 26, Change 3
Enclosure:
Quality Assurance Program Topical Report - Millstone Power Station, Revision 26, Change 3 DSB/dsb
APPENDIX E QUALITY ASSURANCE PROGRAM (QAP)
TOPICAL REPORT - MILLSTONE POWER STATION PROGRAM EXCEPTIONS
- 1. ANSI N45.2.9, states in part, "structure, doors, frames, and hardware should be Class A fire-related with a recommended four-hour minimum rating." The three record storage vaults onsite have a two-hour rating.
The licensee's vaults are used for storage of documentation that is unsuitable for filming or awaiting filming.
A records organization exists along with written procedures addressing the control of quality assurance records.
- 2. Deleted
- 3. ANSI N45.2.9-1974, paragraph 1.4, definition of "Quality Assurance Records" states in part: "For the purposes of this standard, a document is considered a quality assurance record when the document has been completed."
The licensee has developed the following alternative definition to provide guidance during the interim period from the time a document is completed until it is transmitted to the licensee records retention facilities:
"A record is considered a working document until it is transmitted to the licensee records retention facilities at which time it is designated as a Quality Assurance Record. The following maximum time limits are established for the transmittal of working documents to the licensee records retention facilities:
Operations Documents - Documentation generated during plant operations may be maintained, as needed, by operating plant departments, for up to one year.
New Construction or Betterment Documents - Documents which evolve during new construction or betterment projects shall be transmitted to licensee records retention facilities within 90 days of completion of a new construction project or turnover of a betterment project or plant operations.
Procurement Documents - Inspection/Surveillance/Audit Reports generated during vendor oversight activities which are used to maintain vendor status for current and future procurements may be maintained, as needed, by Document Administration for up to three years.
All Other Working Documents - All other working documents shall be transmitted to licensee records retention facilities within 6 months of their receipt or completion."
QAP - Appendix E Rev. 26, chg. 3 Date: 12/30/04 Page 1 of 6
The requirements of ANSI N45.2.9-1974 do not apply to these "working documents" based on paragraph 1.1 of the ANSI standard which states:
"It (ANSI N45.2.9) is not intended to cover the preparation of the records nor to include working documents not yet designated as Quality Assurance Records."
- 4. Regulatory Guide 1.64 - 6/76, the Regulatory position states, in part, "It should not be construed that such verification constitutes the required independent design verification."
The licensee has developed the following alternative to allow for adequate independent design verification:
This review may be performed by the originator's Supervisor, only if the Supervisor:
Did not specify a singular design approach; Did not establish the design inputs or did not rule out certain Design considerations; Is the only individual in the organization competent to perform the review.
Where the Supervisor performs the design review, the next level of management shall fulfill the Supervisor's responsibilities.
- 5. ANSI N45.2.13 - 1976, paragraph 10.3.4, states in part: "Post-Installation Test requirements and acceptance documentation (should) shall be mutually established by the purchaser and supplier." Involvement by the supplier in establishing Post-installation Test requirements and acceptance documentation is requested only when it is deemed necessary and proper by the responsible engineering organization.
The licensee no longer has any nuclear plants under construction. As a result, most procurements are made for spare parts from suppliers who are not the original equipment manufacturer. In these cases, the supplier may have little or no understanding or knowledge of either the operation of the system the component is to be installed in, or applicable Post-Installation Test requirements and acceptance documentation. As such, the licensee assumes responsibility for establishing Post Installation Test requirements and acceptance documentation.
- 6. ANSI N45.2.2 - 1972, paragraph 1.2, states in part that, "The requirements of this standard apply to the work of any individual or organization that participates in the packaging, shipping, receiving, storage, and handling of items to be incorporated into nuclear power plants."
Since a portion of the licensee procurement activities involve commercial suppliers which do not fully comply with the requirements of ANSI N45.2.2, the licensee's Supply Chain Management organization verifies through source inspections, receipt inspection, and/or survey activities that the quality of the materials, items, components or equipment is preserved by those suppliers to the extent that packaging, shipping, storage and handling methods are employed which are commensurate with the nature of the product.
QAP - Appendix E Rev.26, chg.3 Date: 12/30/04 Page 2 of 6
- 7. ANSI N18.1-1971, paragraph 4.2.2, states in part "The Operations Manager shall hold a Senior Reactor Operator's license". The licensee has developed an alternative to this requirement which has been accepted by the NRC via amendment 132 for the Millstone Power Station Unit No. 3 license which allows that:
If the Operations Manager does not hold a Senior Reactor Operator license for Millstone Unit No. 3, then the Operations Manager shall have held a Senior Reactor Operator license at a pressurized water reactor, and the Assistant Operations Manager (Supervisor
- Nuclear Shift Operations) shall hold a Senior Reactor Operator license for Millstone Unit No. 3 and meet the qualification requirements of Section 4.3.8, "Operations" of ANSI/ANS 3.1-1987, 'American National Standard for Selection, Qualification and Testing of Personnel for Nuclear Power Plants .(in accordance with Section 4.2.2 reference to the Operations Middle Manager).
- 8. ANSI N18.1-1971, paragraph 4.2.2, states in part "The Operations Manager shall hold a Senior Reactor Operator's license". The licensee has developed an alternative to this requirement which has been accepted by the NRC via amendments 178 and 190 for the Millstone Power Station Unit No. 2 license which allows that:
If the Operations Manager does not hold a Senior Reactor Operator license for Millstone Unit No. 2, then the Operations Manager shall have held a Senior Reactor Operator license at a pressurized water reactor, and an individual serving in the capacity of the Assistant Operations Manager (Supervisor - Nuclear Shift Operations) shall hold a Senior Reactor Operator license for Millstone Unit No. 2 and meet the qualification requirements of Section 4.3.8, 'Operations" of ANSI/ANS 3.1-1987, "American National Standard for Selection, Qualification and Testing of Personnel for Nuclear Power Plants" (in accordance with Section 4.2.2 reference to the Operations Middle Manager).
- 9. Renulatorv Guide 1.33 - 2/78, regarding audits, states in part:
(a) "The results of actions taken to correct deficiencies...at least once per 6 months."
(b) "...technical specifications and applicable license conditions - at least once per 12 months."
(c) "The performance, training, and qualifications of the facility staff - at least once per 12 months."
The licensee has developed an alternative which modifies these Audit frequencies to at least once per 24 months. This alternative has previously been accepted by the NRC via license amendments 79, 184, and 104 for MPI, MP2, and MP3, respectively.
- 10. Deleted.
- 11. ANSI N45.2.13-1976, paragraph 10.3.5., states in part, "in certain cases involving procurement of services only, such as third party inspection; engineering and consulting services, and installation, repair, overhaul or maintenance work; the Purchaser may accept the service by any or all of the following methods:
QAP - Appendix E Rev.26, chg.3 Date: 12/30/04 Page 3 of 6
(a) Technical verification of the data produced (b) Surveillance and/or audit of the activity (c) Review of the objective evidence for conformance to the procurement document requirements such as certifications, stress reports, etc."
In order to maintain the independence requirement of the NRC's August 14, 1996 Order, the licensee will not perform an acceptance review of the work produced by the vendors contracted to conduct the Independent Corrective Action Verification Program. This work will be performed in accordance with the vendor's own approved, 10 CFR 50 Appendix B Quality Assurance Program. Not applicable to Unit 1.
- 12. Deleted.
- 13. Regulatory Guide 1.70 Revision 3, November 1978 Section 17.1.2.4 states in part: 'The PSAR should include a listing of QA program procedures or instructions that will be used to implement the QA program for each major activity such as design, procurement, construction, etc. The procedure list should identify which criteria of Appendix B to 10 CFR 50 are implemented by each procedure". Not applicable to Unit 1.
The licensee has developed an alternative to this requirement where procedure indices are maintained which identify the procedures that implement the Quality Assurance Program for Millstone Power Station and which, by title and originating organization, indicate the Appendix B to 10 CFR 50 criterion being implemented.
- 14. ANSI N18.7-1976, Paragraph 5.2.15, "Review, Approval, and Control of Procedures,"
states in part: "Plant procedures shall be reviewed by an individual knowledgeable in the area affected by the procedure no less frequently than every two years to determine if changes are necessary or desirable."
The licensee implements administrative and programmatic controls that ensure procedures are maintained current in accordance with 10CFR50, Appendix B, thus meeting the intent of the biennial review.
The licensee implements administrative controls to perform biennial reviews of non-routine procedures such as Emergency Operating Procedures (EOP's), Abnormal Operating Procedures (AOP's), Off Normal Procedures (ONP's), Emergency Plan, Security and other procedures that may be dictated by an event.
Programmatic controls specify conditions when the mandatory review of plant procedures apply, and include a requirement to review applicable procedures following an accident or transient and following any modification to a system.
The licensee utilizes a pre-job briefing practice to ensure that personnel are aware of what is to be accomplished and what procedures will be used prior to beginning a job. In addition, the Procedure Compliance Policy requires that the job be stopped and the procedure be revised or the situation resolved prior to work continuing if procedures cannot be implemented as written.
QAP - Appendix E Rev. 26, chg. 3 Date: 12/30/04 Page 4 of 6
4 Additionally, the licensee's Quality Assurance Program requires the review of a representative sample of plant procedures as part of routine audits and surveillances to ensure that existing administrative controls for procedure verification, review and revision are effective in maintaining the quality of plant procedures. Significant procedural deficiencies are identified and corrected through the Station Corrective Action Program.
The Station Self-Assessment Program also periodically reviews selected procedures and identifies deficiencies and improvements through the Corrective Action Program.
- 15. Denied NRC approval. Number not reused.
- 16. Deleted. (Superceded by Exception # 21.)
- 17. ANSI N18.1-1971, paragraph 4.3.1, states in part, 'A Supervisor (requiring an AEC license) shall have a minimum of a high school diploma or equivalent, and four years of responsible power plant experience, of which a minimum of one year shall be nuclear power plant experience. A maximum of two years of the remaining three years of power plant experience may be fulfilled by academic or related technical training on a one-for-one basis." The licensee has developed an alternative to this requirement which has been accepted by the NRC via amendment 258 for the Millstone Power Station No. 2 which allows that:
Beginning November 1, 2001, applicants for senior reactor qualification shall meet or exceed the education and experience guidelines given in Revision 3 to Regulatory Guide 1.8 (May 2000).
- 18. ANSI N18.1-1971, paragraph 4.3.1, states in part, "A Supervisor (requiring an AEC license) shall have a minimum of a high school diploma or equivalent, and four years of responsible power plant experience, of which a minimum of one year shall be nuclear power plant experience. A maximum of two years of the remaining three years of power plant experience may be fulfilled by academic or related technical training on a one-for-one basis." The licensee has developed an alternative to this requirement which has been accepted by the NRC via amendment 199 for the Millstone Power Station No. 3 which allows that:
Beginning November 1, 2001, applicants for senior reactor qualification shall meet or exceed the education and experience guidelines given in Revision 3 to Regulatory Guide 1.8 (May 2000).
- 19. ANSI N18.1-1971, paragraph 4.5.1, states in part, "An operator (to be licensed by the AEC) shall have a minimum of a high school diploma or equivalent, and two years of power plant experience, of which a minimum of one year shall be nuclear power plant experience." The licensee has developed an alternative to this requirement which has been accepted by the NRC via amendment 258 for the Millstone Power Station No. 2 which allows that:
Beginning November 1, 2001, applicants for reactor qualification shall meet or exceed the education and experience guidelines given in Revision 3 to Regulatory Guide 1.8 (May 2000).
QAP - Appendix E Rev. 26, chg. 3 Date: 12/30/04 Page 5 of 6
-, e i
- 20. ANSI N18.1-1971, paragraph 4.5.1, states in part, "An operator (to be licensed by the AEC) shall have a minimum of a high school diploma or equivalent, and two years of power plant experience, of which a minimum of one year shall be nuclear power plant experience." The licensee has developed an alternative to this requirement which has been accepted by the NRC via amendment 199 for the Millstone Power Station No. 3 which allows that:
Beginning November 1, 2001, applicants for reactor qualification shall meet or exceed the education and experience guidelines given in Revision 3 to Regulatory Guide 1.8 (May 2000).
- 21. ANSI N18.7-1976, paragraph 4.5, states in part, "Audits of selected aspects of operational phase activities shall be performed with a frequency commensurate with their safety significance and in such a manner as to assure that an audit of all safety-related functions is completed within a period of two years."
The licensee has established a 25% extension to the 24-month frequency for most internal audits. This 25% extension will not be applied to those audits which have frequencies specifically delineated by the Code of Federal regulations (i.e. Emergency Preparedness Program which satisfies the requirements of 10CFR50.54(t), or Physical Security Plan which satisfy the requirements of 10CFR50.54(p)(3); 73.56(g)(1) and (g)(2); and 73.55(g)(4), and the Fitness for Duty Program which satisfies 10CFR26.80.
The frequencies of these audits are described in their respective plans and/or programs.
QAP - Appendix E Rev.26, chg.3 Date: 12/30/04 Page 6 of 6