ML053570276

From kanterella
Jump to navigation Jump to search
Quality Assurance Program Topical Report
ML053570276
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/12/2005
From:
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME
References
MP-02-OST-BAP01, Rev 27
Download: ML053570276 (2)


Text

To C Facility

DOCUMENT CONTROL
MP Department : 806 DESK C PASSPORT DOCUMEC TRANSMITTAL Address  : NUC REGULATORY COMMISSION (0140) So--I DOCUMENT CONTROL DESK WASHINGTON, DC 20555 Page: 1 From Date/Time Trans No.
NDS
12/12/05
000080505 15:41 CONT DOCUMENTS Tr ansmittal Group Id: 05-05646 1111111 hI111 IMIM1 Total Items: 00001 Item Facility Type Sub Document Number I Title Sheet Revision Doc Date Copy # Media Copies
  • 0001 MP PROC OST MP-02-OST-BAP01 027 01 P 01 QUALITY ASSURANCE PROGRAM TOPICAL REPORT (NO IMAGE - TOO COMPLEX TO Please check the appropriate response and return form to NDS Bldg 475/3 Millstone Power Station or Fax to 860-440-2057.
lAll documents received.

Documents noted above not received (identify those not received).

I no longer require distribution of these documents.

Date: Signature:

Ce)

9/7/04 9/15/04 Approval Date Effective Date Procedure Action Request Document No.: MP-02-OST-BAP01 Writer: M. McGuire Rev. No. Minor Rev.

Initiator M. McGuire D a

Title:

Quality Assurance Program Topical Report - Millstone Station For New Documents: Document is QA a DH

Title:

O Revision 0 Minor Revision D Cleanup Revision E Biennial Review 0 Cancel E Void (Do Not Use) [ Expire 0 Superceded By: DNAP-2812 Comments: 0l Administrative Correction FLS:

This document is being cancelled and superseded by a common nuclear fleet QAP, DOM-QA-1, "Dominion Nuclear Fleet Quality Assurance Program Description Topical Report..

Associated ARs Reviews Print Sign Date Department

.l __ _ _ _ _ _

WC 9 Att 3 Req. vYes O No M. McGuire

  • W Licensing Basis / RCD WWI (50.59/72.48 Screen Req. E Yes 0No) R. eq. S.,,., /.' ISOrA I ITech Independent _JIj'R. _ . itf E S .wI(

Validation IXNone M Field - Use El Simulated Performance - El Table Top and El Comparison MP-05-DC-SAP01-004 Use MP-05-DC-SAPO1-004 Walk-through (minimum of two) Print Sign Date I Dept Coordinator I Member Training: [N None 5Nuclear Training 5Briefing D Familiarization vSOR Review and ADproval n SORC Review and Approval F DePartment Head Review and Approval Approval G Disapproval El N/A N/A

/ J °- (1)Department Head Sign/Date (1) Department Head Approval Sign Sign/Date (2) SORC Meeting Number (2) Department Head Approval Sign (3) SORC Approval Sign Approval Date: Effective Date: /,2//AZO S N:K/J)N-JJ to~ egA Jsto A-~Ocw- QA4 I-MP-05-DC-FAPO 1.1-005 Rev. 002 Page I of 4