ML023370537
| ML023370537 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/13/2002 |
| From: | Dominion Energy Co |
| To: | Document Control Desk, NRC/FSME |
| References | |
| MP-02-OST-BAP01, Rev 24 | |
| Download: ML023370537 (2) | |
Text
"rp-fl To DOCUMENT CONTROL DESK Facility MP Department : 806 TRANSMITTAL Address NUC REGULATORY COMMISSION (0140)
DOCUMENT CONTROL DESK WASHINGTON, DC 20555 Page:
1 From NDS CONT DOCUMENTSHil1111111 Date/Time 11/13/02 10:07 C11O1N111111 1111111111 Trans No.
- 000037269 Transmittal Group Id: 02317KA-6 Total Items: 00001 See Notes and Comments below.
Item Facility Type Sub Document Number/ Title Sheet Revision Doc Date Copy #
Media Copies
- 0001 MP PROC OST MP-02-OST-BAP01 024 02 P
01 QUALITY ASSURANCE PROGRAM TOPICAL REPORT (NO IMAGE -
TOO COMPLEX TO Notes and Comments THERE WAS AN ERROR IN THE MEMO IN THE ORIGINAL DISTRIBUTr ION.
MEMO BEING RE-DISTRIBUTED.
Marked (*) documents require your acknowledgement.
Acknowledgement Date:
Signature:
Please check the appropriate response and return form to sender.
All documents received.
Documents noted above not received (identify those not received).
I no longer require distribution of these documents.
Signature:
PASSPORT DOCUMENT Date:
nDominion Memorandum NO-02-0137, Rev. I November 12, 2002 TO:
Quality Assurance Program Topical Report - Controlled Copy Owners FROM:
Dorothy B;uce, QAP Coordinator Nuclear Oversight, Ext. 3185
SUBJECT:
Quality Assurance Program (QAP) Topical Report - Millstone Power Station Revision 24, Change 2 (Document No. MP-02-OST-BAP01)
Enclosed please find Quality Assurance Program (QAP) Topical Report - Millstone Power Station, Revision 24, Change 2.
The change modifies QAP Appendices D and G. QAP Appendix D, was modified to clarify the definitions for "Audits" to be consistent with QAP commitments to ANSI N45.2.12-1977, and the definition of "Deficiency", which is not defined in ANSI standards, to be consistent with Dominion NBU practices. QAP Appendix G (Technical Specification Cross-reference) was modified to address Technical Specification changes approved by the NRC and issued as License Amendments #111 (Unit 1), #270 (Unit 2) and #212 (Unit 3).
Please note that the effective date of Revision 24, Change 2, is November 12, 2002. Please replace the entire contents of Quality Assurance Program, Appendices D and G with the enclosed sections. If you have any questions, please contact D. Bruce at X3185.
Attachments:
Summary of Changes, Rev. 24, Change 2
Enclosure:
Quality Assurance Program Topical Report - Millstone Power Station, Revision 24, Change 2 DSB/dsb