ML050390503

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment No. 261 Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement Process
ML050390503
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/02/2005
From:
NRC/NRR/DLPM
To:
mozafari B, NRR/DLPM, 415-2020
References
TAC MC3866, TAC MC3867
Download: ML050390503 (3)


Text

PAM Instrumentation 3.3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Enter the Condition Immediately associated Completion Time referenced in of Condition C not met. Table 3.3.3.1-1 for the channel.

E. As required by Required E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action D.l and referenced in Table 3.3.3.1 -1.

F. As required by Required F.1 Initiate action in accordance Immediately Action D.1 and referenced in with Specification 5.6.6.

Table 3.3.3.1-1.

SURVEILLANCE REQUIREMENTS


NOTE ----------------------------------------------------------

These SRs apply to each Function in Table 3.3.3.1-1.

SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK. 31 days SR 3.3.3.1.2 (Not Used.)

I (continued)

Brunswick Unit 2 3.3-27 Amendment No. 261 I

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.3.1.3 Perform CHANNEL CALIBRATION for each required 24 months PAM Instrumentation channel.

I Brunswick Unit 2 3.3-28 Amendment No. 261 l

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page I ot 1 Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REOURED FUNCTION CHANNELS ACTION D.1

1. Reactor Vessel Pressure 2 E
2. Reactor Vessel Water Level
a. -150 inches to +160 inches 2 E
b. 0 inches to +210 inches 2 E
c. +150inches to +550 inches 2 E
3. Suppression Chamber Water Level 2 E
4. Suppresslon Chamber Water Terrperalura 2 E
5. Suppression Chanber Pressure 2 E
6. Drywell Pressure 2 E
7. Drywell Temperature 2 E
8. PCIV PosItion 2 per penetration E RawSpath" N"
9. (Not Used.) I
10. Drywall Area Radiation 2 F (a) Not required for isolatlIon valves whose essocdated penetraton flow path I isoated by at least one losed and deactivated automatic valve, closed nanual valve, blind flange, or check valve wIth fow through the valve secured.

(b) Only one position Incication channel I required for penetratfon flow paths with only one instaled contrd room indcatfon channel.

Brunswick Unit 2 3.3-29 Amendment No. 261 1