Connecticut and Virginia Electric & Power Company Response to Request for Additional Information Revision 22 of Quality Assurance Program Description Topical Report
ML16321A454
Person / Time
Site: Millstone, Kewaunee, Surry, North Anna, 07200002, 07200055  Dominion icon.png
Issue date: 11/10/2016
From: Stoddard D
Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML16321A454 (10)


Text

Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 November 10, 2016 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Serial No.

16-0928 NRA/DEA R1 Docket Nos.: 50-305 DOMINION ENERGY KEWAUNEE, INC.

DOMINION NUCLEAR CONNECTICUT, INC.

VIRGINIA ELECTRIC AND POWER COMPANY 50-245/336/423 50-338/339 50-280/281 72-47 72-16/56 72-2/55 72-64 KEWAUNEE POWER STATION AND ISFSI License Nos.:DPR-43 MILLSTONE POWER STATION UNITS 1, 2 & 3 AND ISFSI DPR-21/65 NORTH ANNA POWER STATION UNITS 1 & 2 AND ISFSI SURRY POWER STATION UNITS 1 & 2 AND ISFSI RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION QUALITY ASSURANCE TOPICAL REPORT REVISION 22 NPF-49 NPF-4/7 DPR-32/37 SNM-2501/2507 In a July 11, 2016 letter (Serial No.16-092), Dominion Energy Kewaunee, Inc. (DEK),

Dominion Nuclear Connecticut, Inc. (DNC), and Virginia Electric and Power Company (VEPCO) submitted Revision 21 to the Nuclear Facility Quality Assurance Program Description Topical Report DOM-QA-1 to the NRC for approval and Revision 22 for information only (Reference 1 ). The changes submitted in Reference 1 for Revision 22 were organization description changes resulting from the Nuclear Business Unit reorganization announced in March 2016. NRC approval of Revision 22 to the Nuclear Facility Quality Assurance Program Description Topical Report DOM-QA-1 was not required because the revision did not reduce any commitments in the program description as accepted by the NRC.

In an email dated October 13, 2016, the Nuclear Regulatory Commission (NRC) transmitted a request for additional information (RAI) related to Revision 22 to the Nuclear Facility Quality Assurance Program Description Topical Report DOM-QA-1.

The response to the RAI is provided in Attachment 1. In addition, as a result of the response to the RAI, a revised Facility Operating Organization for Millstone Power Station, North Anna Power Station, and Surry Power Station is provided in Attachment 2 for information only.

Serial No. 16-0928 Docket Nos. 50-305/245/336/423/338/339/280/281 72-4 7 /16/56/2/55/64 Page 2 of 5 Should you have any questions in regard to this submittal, please contact Ms. Diane E.

Aitken at (804) 273-2694.

Sincerely,.

D. G. Stoddard Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company Dominion Nuclear Connecticut, Inc.

Dominion Energy Kewaunee, Inc.

COMMONWEAL TH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Daniel G. Stoddard, who is Senior Vice President and Chief Nuclear Officer of Virginia Electric and Power Company, Dominion Nuclear Connecticut, Inc., and Dominion Energy Kewaunee, Inc.

He has affirmed before me that he is duly authorized to execute and file the foregoing document on behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ID+~ day of Nf)V~

Attachments:

\\:tll>1JU>

CRAIG D SLY Notary Public Commonwealth of Virginia Reg. # 7518653 My Commission Expires December 31, 2~

I 2016.

1. Response to Request for Additional Information, Revision 22 of Quality Assurance Program Description Topical Report
2. Revised MPS/NAPS/SPS Facility Operating Organization, Appendix A, DOM-QA-1, Rev. 22 (For Information Only)

Reference:

1. Letter from David A. Heacock (DEK) to NRC Document Control Desk, "Submission of Revision 21 of the Quality Assurance Topical Report for NRC Approval and Submission of Revision 22 for Information Only," dated July 11, 2016 [ADAMS Accession No. ML16196A292].

Commitments made in this letter: None.

Serial No. 16-0928 Docket Nos. 50-305/245/336/423/338/339/280/281 72-4 7 /16/56/2/55/64 Page 3 of 5 cc:

U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission Region Ill 2443 Warrenville Road Suite 210 Lisle, II 60532-4352 Mr. Richard Guzman NRC Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 C-2 Rockville, MD 20852-2738 Mr. Ted Carter NRC Senior Project Manager U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop T-8 F5 Rockville, MD 20852-2738 Ms. K. R. Cotton-Gross NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 G-9A Rockville, MD 20852-2738

Dr. V. Sreenivas NRG Project Manager Serial No. 16-0928 Docket Nos. 50-305/245/336/423/338/339/280/281 72-4 7 /16/56/2/55/64 Page 4 of 5 U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 08 G-9A Rockville, MD 20852-2738 Dr. Pamela Longmire NRG Project Manager U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop T-8 F5 Rockville, MD 20852-2738 Mr. J. M. Goshen NRG Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop EBB-E3-D2M Rockville, MD 20852-2738 Ms. Yen-Ju Chen Senior Project Manager U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop 4834 Rockville, MD 20852-2738 NRG Senior Resident Inspector Millstone Power Station NRG Senior Resident Inspector North Anna Power Station NRG Senior Resident Inspector Surry Power Station

Serial No. 16-0928 Docket Nos. 50-305/245/336/423/338/339/280/281 72-4 7 /16/56/2/55/64 Page 5 of 5 Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Mail Stop 8 A23 Rockville, MD 20852-2738 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, VA 23060 Public Service Commission of Wisconsin Electric Division P.O. Box 7854 Madison, WI 53707

Serial No. 16-0928 Docket Nos. 50-305/245/336/423/338/339/280/281 72-4 7 /16/56/2/55/64 ATTACHMENT 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REVISION 22 OF QUALITY ASSURANCE PROGRAM DESCRIPTION TOPICAL REPORT Dominion Energy Kewaunee, Inc. (DEK)

Dominion Nuclear Connecticut, Inc. (DNC)

Virginia Electric and Power Company (VEPCO)

Serial No. 16-0928 Docket Nos. 50-305/245/336/423/338/339/280/281 72-4 7 /16/56/2/55/64 Page 1of2 Response to Request for Additional Information CRAil Revision 22 of Quality Assurance Program Description Topical Report The requirements of Title 10 of the Code of Federal Regulations Part 50, Appendix B Criterion I "Organization," states in part, that, "The authority and duties of persons and organizations performing activities affecting the safety-related functions of structures, systems, and components shall be clearly established and delineated in writing. These activities include both the performing functions of attaining quality objectives and the quality assurance functions. The quality assurance functions are those of (1) assuring that an appropriate quality assurance program is established and effectively executed; and (2) verifying, such as by checking, auditing, and inspecting, that activities affecting the safety-related functions have been correctly performed."

Section 6, "Facility Safety Review Group (Kewaunee)," of Appendix B in the Dominion Nuclear Facility Quality Assurance Program Description, Revision 21 adds new responsibilities for a Facility Safety Review Group for the Kewaunee facility.

The Facility Safety Review group does not provide quality oversight for the Kewaunee facility. The responsibility for quality oversight is retained in Section 1.2.6., "Nuclear Oversight" of Dominion Nuclear Facility Quality Assurance Program Description, Revision 21.

Section 1. 2. 8, "Nuclear Oversight, 11 of the Dominion Nuclear Facility Quality Assurance Program Description, Revision 22 removes the statement, A management position is responsible for the effective performance of nuclear oversight activities. This position performs independent assessment of facility operations related to quality and safety with the lines of communication to the executive management position responsible for facility operations.

11 With the removal of the aforementioned statement, please provide clarification on the responsibility of quality oversight for the Kewaunee, Millstone, North Anna, and Surry facilities.

RAI RESPONSE:

As indicated in Section 1.2.2, of Revision 22 to the Dominion Nuclear Facility Quality Assurance Program Description Topical Report, DOM-QA-1, Subsections 1.2.3 through 1.2.8 apply to the Millstone Power Station (MPS), North Anna Power Station (NAPS),

and Surry Power Station (SPS) onsite facility organizations and their relationship to the supporting offsite organization.

Subsections 1.2.9 through 1.2.12 of Revision 22 to DOM-QA-1 similarly describe the Kewaunee Power Station (KPS) onsite facility organization and its relationship to the supporting offsite organization.

Serial No. 16-0928 Docket Nos. 50-305/245/336/423/338/339/280/281 72-4 7 /16/56/2/55/64 Page 2 of 2 Section 1.2.8 Nuclear Oversight, of DOM-QA-1, Revision 22, indicates the tasks for which the management position responsible for Nuclear Oversight at the MPS, NAPS and SPS facilities is accountable, as well as the position's authority and responsibilities.

To further clarify the responsibilities of the management position responsible for Nuclear Oversight at the MPS, NAPS, and SPS facilities, the bold italic text shown below will be added to the end of the first sentence in Section 1.2.8:

A management position is responsible for the verification of effective Company and Supplier QA program development, documentation, and implementation, and the effective performance of Nuclear Oversight activities.

This position is responsible for the performance of independent audits of facility operations related to quality and safety with lines of communication to the executive management position

  • responsible for facility operations.

For additional clarification, the MPS/NAPS/SPS Facility Operating Organization in Appendix A of Revision 22 to DOM-QA-1 will be revised to reflect the functional position relationships described above.

The revised organization chart is provided in

  • for information only.

Consistent with Section 1.2.2 of DOM-QA-1, Section 1.2.11 Nuclear Oversight, of Revision 22 to DOM-QA-1 indicates the tasks for which the management position responsible for Nuclear Oversight at the KPS facility is accountable, as well as the position's authority and responsibilities.

To further clarify the responsibilities of the management position responsible for Nuclear Oversight at the KPS facility, the bold italic text shown below will be added to the end of the first sentence in Section 1.2.11:

A management position is responsible for the verification of effective Company and Supplier QA program development, documentation, and implementation, and the effective performance of Nuclear Oversight activities.

This position is responsible for the performance of independent audits of facility operations related to quality and safety with lines of communication to the senior management position responsible for facility operations.

The KPS Facility Operating Organization in Appendix A of Revision 22 to DOM-QA-1 does not require revision since it currently reflects the functional position relationships described above in Section 1.2.11.

The changes indicated above and in Attachment 2 will be made during the next scheduled revision to DOM-QA-1 and submitted to the NRC in the next annual update in June 2017.

Serial No. 16-0928 Docket Nos. 50-305/245/336/423/338/339/280/281 72-4 7 /16/56/2/55/64 Page 1 of 2 REVISED MPS/NAPS/SPS FACILITY OPERATING ORGANIZATION APPENDIX A DOM-QA-1, REV. 22 (For Information Only)

Dominion Energy Kewaunee, Inc. (DEK)

Dominion Nuclear Connecticut, Inc. (DNC)

Virginia Electric and Power Company (VEPCO)

Serial No. 16-0928 Appendix A Response to RAI - Rev. 22 of QA Topical Report Organizational Relationships of Key Management And Functional Groups MPS/NAPS/SPS Facility Operating Organization Executive Management Position Page 2 of 2 Facility Safety Review 1---------------------------

Responsible for Facility Committee I

I I

I I

I I

anagement Position M

Re s11onsible for Nuclear Oversight I

Site Services I

Operations Support Senior Management Position Responsible for Facility Operations & Maintenance I

I Operations Maintenance I

I I

Operations Operations Work Manager Control I

Shift Manager I

Unit Supervisor I

Licensed and Non-Licensed Operators Operations I

Management Position Senior Management Responsible for Nuclear Position Responsible for Training Facility Safety & Licensing I

Organizational Radiological Effectiveness Protection Outage & Planning

& Chemistry Records Emergency I

Management Preparedness Fire Protection Program Procedures Licensing Facility QC Site Safety and Inspections Loss Prevention (VA)