Tech Spec Pages for Amendment No. 234 Elimination of Requirements for Hydrogen and Oxygen Monitors Using the Consolidated Line Item Improvement Process
ML050400276
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/02/2005
From:
NRC/NRR/DLPM
To:
mozafari B, NRR/DLPM, 415-2020
References
TAC MC3866, TAC MC3867
Download: ML050400276 (3)


Text

PAM Instrumentation 3.3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Enter the Condition Immediately associated Completion Time referenced in of Condition C not met. Table 3.3.3.1-1 for the channel.

E. As required by Required E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action D.1 and referenced in Table 3.3.3.1-1.

F. As required by Required F.1 Initiate action in accordance Immediately Action D.1 and referenced in with Specification 5.6.6.

Table 3.3.3.1-1.

SURVEILLANCE REQUIREMENTS


NOTE ----------------------------------------------------------

These SRs apply to each Function in Table 3.3.3.1-1.

SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK. 31 days SR 3.3.3.1.2 (Not Used.)

I (continued)

Brunswick Unit 1 3.3-27 Amendment No. 234 1

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.3.1.3 Perform CHANNEL CALIBRATION for each required 24 months PAM Instrumentation channel.

I Brunswick Unit 1 3.3-28 Amendment No. 234 l

PAM Instrumentation 3.3.3.1 Table33.3.1-1 (page I of 1)

Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION D.1

1. Reactor Vessel Pressure 2 E
2. Reactor Vessel Water Level
a. .150Inchesto*150Inches 2 E
b. 0 inches to *210 inches 2 E
e. 4150 Inches to +560 Inches 2 E
3. Suppression Chanber Water Level 2 E
4. Suppression Chanber Water Ternperature 2 E
5. Suppression Chamner Pressure 2 E
6. Drywell Pressure 2 E
7. Drywea3 Ternperature 2 E
8. PCIV Position 2 per penetration E now pathP"
9. (Not Used.) I
10. Drywet Area Radiation 2 F (a) lot required forisolation valves whose assocIated penetradon flowpath is isoisled by at least one dosed and deactivated autornatic valve closed rnanual valve brind flange, or check valve wnthflow through the valve secured.

(b) Only one position indcealln channel Is required for penetration flow paths with only one Installed control room indcation chennef Brunswick Unit I 3.3-29 Amendment No. 234 l