|
---|
Category:Letter
MONTHYEARML24311A1882024-11-0808 November 2024 Request to Remove Document from Public Availability and Withhold Proprietary Information from Public Disclosure, Mcguire Nuclear Station, Unit No. 1 ML24304A9602024-11-0505 November 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations IR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection – U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20234012023-08-0404 August 2023 – Security Baseline Inspection Report 05000369/2023401 and 05000370/2023401 (OUO-SRI) Cover IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 – Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000369/20220062023-03-0101 March 2023 Annual Assessment Letter for McGuire Nuclear Station Units 1 and 2 (NRC Inspection Report 05000369/2022006 and 05000370 2022006) 2024-08-26
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-17017 February 2023 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2021-12-20020 December 2021 License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-06-0909 June 2021 Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-001, McGuire Nuclear Station, Units 1 and 2 - Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating.2018-07-10010 July 2018 McGuire Nuclear Station, Units 1 and 2 - Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating. RA-18-0015, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating.2018-07-10010 July 2018 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating. MNS-18-001, Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable2018-05-31031 May 2018 Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications MNS-18-017, Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs2018-02-26026 February 2018 Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs MNS-17-026, Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles2017-12-0808 December 2017 Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing MNS-17-031, License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition2017-09-14014 September 2017 License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition RA-17-0035, Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating.2017-07-20020 July 2017 Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating. RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules MNS-17-023, Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies2017-05-25025 May 2017 Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML17122A1162017-05-0202 May 2017 Catawba and McGuire - License Amendment Request Proposing Changes to Technical Specification 3.8.1, AC Sources - Operating. RA-17-0003, Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers2017-01-11011 January 2017 Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-19019 December 2016 License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies MNS-16-091, License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity.2016-12-0808 December 2016 License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity. ML16305A1412016-10-20020 October 2016 Document Transmittal Regarding Issue MNS FOL U-2, Rev. 3 RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process MNS-16-046, License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity2016-06-30030 June 2016 License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity MNS-16-039, Submittal Revising Attachment s of License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program2016-04-26026 April 2016 Submittal Revising Attachment s of License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.2016-03-24024 March 2016 License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors. MNS-16-015, License Amendment Request (LAR) for One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval2016-02-18018 February 2016 License Amendment Request (LAR) for One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval MNS-15-099, Submittal Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program2016-01-14014 January 2016 Submittal Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program MNS-16-002, Proposed Technical Specifications (TS) Amendment TS 3.7.10, Control Room Area Chilled Water System (Mns), and TS 3.7.11, Control Room Area Chilled Water System (CNS)2016-01-0707 January 2016 Proposed Technical Specifications (TS) Amendment TS 3.7.10, Control Room Area Chilled Water System (Mns), and TS 3.7.11, Control Room Area Chilled Water System (CNS) ML15258A0582015-09-0909 September 2015 Amendment 280 ML15258A0592015-09-0909 September 2015 Renewed Facility Operating License ML15258A0552015-09-0808 September 2015 Renewed Facility Operating License ML15258A0572015-09-0808 September 2015 Mcgurie Nuclear Station - MNS-TS-1.1 Amendment 280/260 Distribution MNS-15-069, Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.2015-08-28028 August 2015 Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating. RA-15-0020, License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding2015-08-20020 August 2015 License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding RA-15-001, Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Foot2015-07-15015 July 2015 Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footn RA-15-0013, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112015-07-15015 July 2015 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 MNS-15-025, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation2015-07-0909 July 2015 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation MNS-15-026, License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System Degraded Condition - Drawing MCFD-2574-03.01, Rev. 11, Flow Diagram of Nuclear Service.2015-06-30030 June 2015 License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System Degraded Condition - Drawing MCFD-2574-03.01, Rev. 11, Flow Diagram of Nuclear Service. ML15191A0252015-06-30030 June 2015 License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded Condition ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 2024-04-30
[Table view] Category:Technical Specification
MONTHYEARRA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0232, Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS2019-02-0505 February 2019 Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS RA-18-0166, Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs2018-09-13013 September 2018 Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs ML18191A5452018-07-10010 July 2018 Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages RA-18-001, Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages2018-07-10010 July 2018 Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. ML17237A0492017-08-17017 August 2017 Technical Specification Bases - List of Effected Sheets ML17237A0482017-08-17017 August 2017 Technical Specification Bases (Rev. 150) ML17237A0462017-08-17017 August 2017 Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275 ML17186A0682017-06-26026 June 2017 Tech Spec Bases - List of Affected Sections ML17186A0672017-06-26026 June 2017 Revision 151 to Tech Spec Bases - B 3.6.13 and B 3.6.14 ML17186A0662017-06-26026 June 2017 TS 3.6.13 Amendment 292/271 and TS 3.6.14 Amendment 294/273 ML17186A0692017-06-26026 June 2017 Issue Tech Spec - List of Affected Pages ML17136A2792017-05-0303 May 2017 Technical Specification Leep, Rev. 109 ML17136A2782017-05-0303 May 2017 Technical Specification Bases - Loes, Rev. 133 ML17136A3612017-05-0303 May 2017 Technical Specification Bases, Revision 149 ML17136A3602017-05-0303 May 2017 Technical Specification Amendment Nos. 285/264 ML17124A3682017-04-19019 April 2017 Tech Spec Bases List of Effected Pages ML17124A3712017-04-19019 April 2017 Bases B 3.5.1 - Accumulators ML17094A6722017-03-29029 March 2017 Issue Selected License Commitment Cslcl 16.7.14 Revision ML17094A6732017-03-29029 March 2017 Issue SLC List of Effected Pages ML17090A4522017-03-23023 March 2017 Revision to Technical Specification 3.3.2 - Amendment 293/272 ML17090A4512017-03-23023 March 2017 Revision to Technical Specification 3.8.1 - Amendment 293/272 ML17090A4352017-03-22022 March 2017 Technical Specification Bases ML17090A4502017-03-22022 March 2017 Revision to Technical Specification Bases - B 3.6.15 ML17094A6702017-03-15015 March 2017 Issue MNS-SLC-16.9.15. Snubbers MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-19019 December 2016 License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16305A1442016-10-20020 October 2016 Issue MNS Technical Specification 5.5 RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML16265A5312016-08-30030 August 2016 Issue MNS Tech Spec Bases List of Effective Sections ML16265A5322016-08-30030 August 2016 Technical Specification Bases 3.6.14 Revisions, List of Revisions and Dates ML16250A0142016-08-29029 August 2016 Amendment 287 ML16243A3492016-08-23023 August 2016 Mccguire, Units 1 and 2, Revision 143 to Issue MNS Technical Specification Bases 3.3.1 ML16243A3482016-08-23023 August 2016 Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation. ML16243A3512016-08-23023 August 2016 Revision 105 to Technical Specifications List of Effective Pages ML16243A3502016-08-23023 August 2016 Revision 129 to Technical Specification Bases ML16243A3572016-08-18018 August 2016 Technical Specification Bases Revision 001, List of Revised Sections 2023-02-16
[Table view] Category:Amendment
MONTHYEARRA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-19019 December 2016 License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16305A1442016-10-20020 October 2016 Issue MNS Technical Specification 5.5 ML16133A4462016-05-0202 May 2016 Technical Specification 3.7.7, Amendments 282 and 261 ML16133A4692016-05-0202 May 2016 Technical Specification 3.8.1, Amendments 282 and 261 ML16133A4662016-05-0202 May 2016 Technical Specification 3.7.7 - Rev. 140, Amendments 282/261 ML16133A4422016-04-28028 April 2016 Technical Specification 3.5.2, Amendments 282 and 261 ML16133A4432016-04-28028 April 2016 Technical Specification 3.6.6, Amendments 282 and 261 ML16133A4672016-04-28028 April 2016 Technical Specification 3.7.9, Amendments 282 and 261 ML16133A4452016-04-28028 April 2016 Technical Specification 3.7.6, Amendments 282 and 261 ML16133A4442016-04-28028 April 2016 Technical Specification 3.7.5, Amendments 282 and 261 ML16133A4682016-04-28028 April 2016 Technical Specification 3.7.11, Amendment 282/261 MNS-15-069, Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.2015-08-28028 August 2015 Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating. MNS-14-045, Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 20132014-06-0303 June 2014 Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 2013 ML13304B4452013-10-28028 October 2013 Revised License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement ML12340A0682012-11-0707 November 2012 Technical Specifications & Tech Spec Bases Updates ML12153A3282012-05-31031 May 2012 Proposed Technical Specifications Amendment TS 3.1.3, Moderator Temperature Coefficient (Mtc) TS 5.6.5, Core Operating Limits Report (COLR) License Amendment Request for Conditional Exemption of the End of Cycle (EOC) Mtc Measurement Method ML11311A1622011-10-31031 October 2011 Technical Specifications & Tech Spec Bases Updates ML1100500792010-12-28028 December 2010 Technical Specifications and Tech Spec Bases Manual Holders ML1026500392010-09-16016 September 2010 License Amendment Request to Revise Technical Specification 5.3, Unit Staff Qualifications ML1019002672010-06-29029 June 2010 License Amendment Request to Revise Reactor Trip System and Engineered Safety Feature Actuation System Technical Specifications ML0928600672009-09-30030 September 2009 Units 1 & 2 and Oconee, Units 1, 2, & 3 - License Amendment Request (LAR) Catawba and McGuire Containment Spray Nozzle and Oconee Reactor Building Spray and Cooling Systems Technical Specification Surveillance Requirement ML0913800922009-05-11011 May 2009 Technical Specification Update ML0911202002009-02-27027 February 2009 Duke Energy Carolinas, LLC - License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0829005322008-10-0202 October 2008 Units 1 and 2 - Amendment to Technical Specification 3.6.13, Ice Condenser Doors, Revised Surveillance Requirements ML0804305652008-02-13013 February 2008 Tech Spec Pages for Amendment 244 Regarding Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0734804452007-12-11011 December 2007 Units 1 & 2 - Proposed Technical Specification (TS) Amendment to Relax Completion Times and Surveillance Intervals for the Reactor Trip System (RTS) Instrumentation TS 3.3.1, Engineered Safety Feature ML0726301322007-09-18018 September 2007 Corrected Technical Specification Pages Regarding Steam Generator Tube Integrity, TSTF-449, Rev 4 ML0723301182007-08-0909 August 2007 Response to Request for Additional Information Re Proposed Technical Specification (TS) Amendment TS 5.5.2 Containment Leak Rate Testing Program ML0706006602007-03-0101 March 2007 Technical Specification Pages Regarding Steam Generator Tube Integrity ML0706503552007-02-21021 February 2007 Proposed Technical Specification Amendment TS 5.5.2 Containment Leak Rate Testing Program ML0626901092006-09-25025 September 2006 Technical Specifications, Changes to the Updated Final Safety Analysis Report and Emergency Operating Procedures ML0520202062005-07-0707 July 2005 Units 1 & 2 - License Amendment Request Applicable to Technical Specification 3.9.1, Boron Concentration. ML0509701422005-04-0404 April 2005 Tech Spec Pages for Amendments 227, Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0509701552005-04-0404 April 2005 Tech Spec Pages for Amendments 209, Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0423804812004-08-18018 August 2004 License Amendment Request for Technical Specification 3.3.2, Engineered Safety Features Actuation System Instrumentation ML0409101232004-03-23023 March 2004 Duke Energy Corp License Amendment Request Applicable to Technical Specifications 5.5.7, Reactor Coolant Pump Flywheel Inspection Program, Using the Consolidated Line Item Improvement Process (CLIIP) ML0327604442003-09-29029 September 2003 Technical Specifications Pages, Amendments 217 & 199 ML0321304972003-06-25025 June 2003 Proposed Technical Specifications and Bases Amendment 2.0, Safety Limits; 3.3, Instrumentation; 3.4, Reactor Coolant System; 5.6, Reporting Requirements 2023-02-16
[Table view] |
Text
Duke Duke Power rw Power McGuire Nudear Station 12700 Hagers Ferry Road Huntersville, NC 28078-9340 (704) 875-4000 D.M. Jamil Vice President,McGuire (704) 875-5333 OFFICE Nuclear GenerionDepartmenn (704) 875-4809 FAX June 3, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
SUBJECT:
Duke Energy Corporation McGuire Nuclear Station Units 1 and 2 Docket Nos. 50-369, 50-370 License Amendment Request for:
McGuire Technical Specifications 3.7.11, Auxiliary Building Filtered Ventilation Exhaust System Pursuant to 10CFR50.90, Duke Energy Corporation is submitting a license amendment request (LAR) for the McGuire Nuclear Station Facility Operating Licenses and Technical Specifications (TS). This LAR addresses degraded pressure boundaries for the Auxiliary Building Filtered Ventilation Exhaust System (ABFVES) and is applicable to McGuire TS 3.7.11. The change proposed in this LAR adds a Note to LCO 3.7.11 which will allow the Auxiliary Building pressure boundary to be opened intermittently under administrative control.
The change being proposed to McGuire TS 3.7.11 is consistent with an NRC-approved Industry Technical Specifications Task Force (TSTF) standard TS traveler.' This proposed change to McGuire TS 3.7.11 has been previously requested2 3 and approved4 for Catawba Nuclear Station.
'TSTF-287, Rev. 5, "Ventilation System Envelope Allowed Outage Time" 2M. S. Tuckman, Duke Energy Corporation, Letter to the NRC Dated April 18, 2000,
SUBJECT:
License Amendment Request for Technical Specification 3.7.10, Control Room Area Ventilation System; and Technical Specification 3.7.12, Auxiliary Building Filtered Ventilation Exhaust System 3
M. S. Tuckman, Duke Energy Corporation, Letter to the NRC Dated July 27, 2000,
SUBJECT:
Supplement to License Amendment Request for Technical Specification 3.7.10, Control Room Area Ventilation System; and Technical Specification 3.7.12, Auxiliary Building Filtered Ventilation Exhaust System 4
NRC Letter and Safety Evaluation Dated September 5, 2000,
SUBJECT:
Catawba Nuclear Station, Units 1 and 2, RE: Issuance of Amendments Nos. 187/180 (TACS MA8888 and MA8889)
-ADDI
U. S. Nuclear Regulatory Commission June 3, 2003 Page 2 The contents of this amendment package are as follows:
- Attachment 1 provides a marked copy of the existing TS for McGuire Units 1 and 2. The marked copy shows the proposed changes.
- Attachment 2 provides the reprinted Technical Specifications pages for McGuire Units 1 and 2.
- Attachment 3 provides a Description of the Proposed Changes and Technical Justification.
- Pursuant to 10CFR50.92, Attachment 4 documents Duke's determination that this LAR contains No Significant Hazards Considerations.
- Pursuant to 10CFR51.22(c)(9), Attachment 5 provides the basis for the categorical exclusion from performing an Environmental Assessment/Impact Statement.
Implementation of this LAR in the Facility Operating Licenses and Technical Specifications will not impact the McGuire Updated Final Safety Analysis Report. In accordance with Duke administrative procedures and the Quality Assurance Program Topical Report, the changes contained in this LAR have been reviewed and approved by the McGuire Plant Operations Review Committee. This LAR has also been reviewed and approved by the Duke Nuclear Safety Review Board. Pursuant to 10CFR50.91, a copy of this LAR is being sent to the designated official of the State of North Carolina.
Implementation of the changes proposed in this LAR at McGuire will provide additional operational flexibility without a significant increase in risk. Duke Energy Corporation is requesting NRC review and approval of this LAR by June 1, 2004. It has been determined that the NRC's standard 30-day implementation grace period will be adequate for this LAR. There are no additional regulatory commitments contained in this submittal package.
U. S. Nuclear Regulatory Commission June 3, 2003 Page 3 Inquiries on this matter should be directed to J. S. Warren at 704-382-4986.
Very truly yours, D. M. Jamil xc w/Attachments:
L. A. Reyes, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 R. E. Martin NRC Senior Project Manager (MNS)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 S. M. Shaeffer Senior Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Site Beverly 0. Hall, Section Chief Radiation Protection Section 1645 Mail Service Center Raleigh, NC 27699-1645
U. S. Nuclear Regulatory Commission June 3, 2003 Page 4 D. M. Jamil, affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.
D. M. Jamil, Vice President Subscribed and sworn to me: 23n., 3. QC?5 Date
, Notary Public o
-A ror S. R?crno-My commission expires: tCeer 9, 4 Date 7,-
7 SEAL
Attachment 1 McGuire Units 1 and 2 Technical Specifications Marked Copy
ABFVES 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Auxiliary Building Filtered Ventilation Exhaust System (ABFVES)
LCO 3.7.11 Two ABFVES shall be OPERABLE.
5EkT 1-G - -
/
APPUCABILITY: MODES 1, 2,3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ABFVES A.1 Restore ABFVES to 7 days inoperable. OPERABLE status.
B. Two ABFVES B.1 Restore one ABFVES to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable. OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> McGuire Units 1 and 2 3.7.1 1-1 Amendment Nos)
INSERT 1
NOTE----------------------------
The Auxiliary Building pressure boundary may be opened intermittently under administrative controls.
ABFVES B 3.7.11 BASES LCO (continued)
Use of any other two fan combination requires surveillance testing in that configuration prior to taking credit for that combination.
- b. HEPA filter and carbon adsorbers are not excessively restricting flow, and are capable of performing their filtration functions; and
- c. Ductwork, valves, and dampers are OPERABLE and air circulation can be maintained.
The ABFVES is shared between the two units. The system must be OPERABLE for each unit when that unit is In the MODE of Applicability. Additionally, both normal and emergency power must also be OPERABLE because the system is shared. If a ABFVES component becomes inoperable, or normal or emergency power to a ABFVES component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.
APPLICABILITY Either unit in MODES 1, 2, 3, and 4, the ABFVES is required to be OPERABLE consistent with the OPERABILITY requirements of the ECCS.
Both units in MODE 5 or 6, the ABFVES is not required to be OPERABLE since the ECCS is not required to be OPERABLE.
ACTIONS A.1 With one units ABFVES inoperable, action must be taken to restore OPERABLE status within 7 days. During this time, the remaining OPERABLE unit's system is adequate to perform the ABFVES function. One unit's system of ABFVES may be made inoperable from, but not limited to, the filter assembly, fans, flowpath, or the ability to maintain the required negative 0.125 inches of water gauge (wg) for the ECCS pump rooms relative to atmospheric pressure.
The 7 day Completon Time is appropriate because the risk contribution is less than that for the ECCS (72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time), and this system is not a direct support system for the ECCS. The 7 day Completion Time is based on the low McGuire Units 1 and 2 B 3.7.1 1-3 Revision No.j
INSERT 2 The LCO is modified by a NOTE allowing the Auxiliary Building pressure boundary to be opened intermittently under administrative controls. For entry and exit through doors, the administrative control of the opening is performed by the person(s) entering or exiting the area. For other openings, these controls consist of stationing a dedicated individual at the opening who is in continuous communication with the control room. This individual will have a method to rapidly close the opening when a need for Auxiliary Building pressure boundary isolation is indicated.
Attachment 2 McGuire Units 1 and 2 Technical Specifications Reprinted Pages Remove Page Insert Page 3.7.11-1 3.7.11-1 B3.7.11-1 B3.7.11-1 thru thru B3.7.11-5 B3.7.11-6
ABFVES 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Auxiliary Building Filtered Ventilation Exhaust System (ABFVES)
LCO 3.7.11 Two ABFVES shall be OPERABLE.
The Auxiliary Building pressure boundary may be opened intermittently under administrative controls.
APPLICABILITY: MODES 1, 2,3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One ABFVES A.1 Restore ABFVES to 7 days inoperable. OPERABLE status.
B. Two ABFVES B.1 Restore one ABFVES to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable. OPERABLE status.
C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> McGuire Units 1 and 2 3.7.1 1-1 Amendment
ABFVES B 3.7.11 B 3.7 PLANT SYSTEMS B 3.7.11 Auxiliary Building Filtered Ventilation Exhaust System (ABFVES)
BASES BACKGROUND The ABFVES filters air from the area of the active ECCS components during the recirculation phase of a loss of coolant accident (LOCA).
The ABFVES, in conjunction with other normally operating systems, also provides environmental control of temperature and humidity in the ECCS pump room area and the auxiliary building.
The ABFVES consists of a system, made up of prefilter, a high efficiency particulate air (HEPA) filter, a carbon adsorber section for removal of gaseous activity (principally iodines), and two fans.
Ductwork, valves or dampers, and instrumentation also form part of the system. The system initiates filtered ventilation of the pump room following receipt of a safety injection (SI) signal.
The ABFVE systems are designed to be shared between units. Each unit's system is constructed with two 50% capacity fans providing flow to a 100% capacity filter package. With this design, both Units l's and Units 2's ABFVE systems are required to be OPERABLE with either unit in MODES 1, 2, 3, or 4.
The ABFVES is a standby system, aligned to bypass the system HEPA filters and carbon adsorbers. During emergency operations, the ABFVES dampers are realigned to begin filtration. Upon receipt of the actuating Engineered Safety Feature Actuation System signal(s), air is pulled from the mechanical penetration area and the ECCS pump rooms, and the stream of ventilation air discharges through the system filters. The prefilters remove any large particles in the air, and any entrained water droplets present, to prevent excessive loading of the HEPA filters and carbon adsorbers.
The ABFVES was not initially designed as a safety related system.
However, during initial plant licensing, the ABFVES was re-classified as an engineered safety feature (ESF) atmosphere cleanup system and partially upgraded to meet most of the recommendations of Regulatory Guide 1.52. A comparison of the current ABFVES design to Regulatory Guide 1.52 (Ref. 6) is presented in UFSAR Table 9-38 (Ref. 8) and is discussed in UFSAR Section 9.4 (Ref. 1).
McGuire Units 1 and 2 B 3.7.1 1-1 Revision No.
ABFVES B 3.7.11 BASES BACKGROUND (Continued)
The ABFVES is discussed in the UFSAR, Sections 9.4, 12.2, and 15.6.5 (Refs. 1, 2, and 3, respectively) since It may be used for normal, as well as post accident, atmospheric cleanup functions.
APPLICABLE The design basis of the ABFVES is established by the large break SAFETY ANALYSES LOCA. The system evaluation assumes a passive failure of the ECCS outside containment, such as an Si pump seal failure, during the recirculation mode. In such a case, the system limits radioactive release to within the 10 CFR 100 (Ref. 4) limits, or the NRC staff approved licensing basis (e.g., a specified fraction of Reference 5 limits). The analysis of the effects and consequences of a large break LOCA is presented in Reference 3. The ABFVES also actuates following a small break LOCA, in those cases where the ECCS goes into the recirculation mode of long term cooling, to clean up releases of smaller leaks, such as from valve stem packing.
Two types of system failures are considered in the accident analysis: complete loss of function, and excessive LEAKAGE.
Either type of failure may result in a lower efficiency of removal for any gaseous and particulate activity released to the ECCS pump rooms following a LOCA.
The ABFVES satisfies Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO The ABFVES is required to be OPERABLE with either unit in MODES 1, 2, 3, or 4. Total system failure could result in the atmospheric release from the ECCS pump room exceeding 10 CFR 100 limits in the event of a Design Basis Accident (DBA).
ABFVES is considered OPERABLE when the individual components necessary to maintain the ECCS pump room filtration are OPERABLE in both units systems.
An ABFVES is considered OPERABLE when its associated:
- a. Fans in configuration as described below are OPERABLE:
Both fans OPERABLE in any one set of fans listed below:
1A and 1B, or 2A and 2B, or 1A and 2A, or 1B and 2B McGuire Units 1 and 2 B 3.7.11-2 Revision No.
ABFVES B 3.7.11 BASES LCO (continued)
Use of any other two fan combination requires surveillance testing in that configuration prior to taking credit for that combination.
- b. HEPA filter and carbon adsorbers are not excessively restricting flow, and are capable of performing their filtration functions; and
- c. Ductwork, valves, and dampers are OPERABLE and air circulation can be maintained.
The ABFVES is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability. Additionally, both normal and emergency power must also be OPERABLE because the system is shared. If a ABFVES component becomes inoperable, or normal or emergency power to a ABFVES component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.
The LCO is modified by a NOTE allowing the Auxiliary Building pressure boundary to be opened intermittently under administrative controls. For entry and exit through doors, the administrative control of the opening is performed by the person(s) entering or exiting the area. For other openings, these controls consist of stationing a dedicated individual at the opening who is in continuous communication with the control room. This individual will have a method to rapidly close the opening when a need for Auxiliary Building pressure boundary isolation is indicated.
APPLICABILITY Either unit in MODES 1, 2, 3, and 4, the ABFVES is required to be OPERABLE consistent with the OPERABIUTY requirements of the ECCS.
Both units in MODE 5 or 6, the ABFVES is not required to be OPERABLE since the ECCS is not required to be OPERABLE.
ACTIONS A.1 With one unit's ABFVES inoperable, action must be taken to restore OPERABLE status within 7 days. During this time, the McGuire Units 1 and 2 B 3.7.1 1-3 Revision No.
ABFVES B 3.7.11 BASES ACTIONS (continued) remaining OPERABLE units system is adequate to perform the ABFVES function. One unit's system of ABFVES may be made inoperable from, but not limited to, the filter assembly, fans, flowpath, or the ability to maintain the required negative 0.125 inches of water gauge (wg) for the ECCS pump rooms relative to atmospheric pressure.
The 7 day Completion Time is appropriate because the risk contribution is less than that for the ECCS (72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time), and this system is not a direct support system for the ECCS. The 7 day Completion Time is based on the low probability of a DBA occurring during this time period, and ability of the remaining unWs system to provide the required capability.
B.1 With both unit's ABFVE systems inoperable, action must be taken to restore to OPERABLE status one unit's ABFVE system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is based on an adequate period of time to determine the cause of the inoperability and affect repairs without the need of shutting down both units. In addition, the probability of a DBA is low for this short period of time.
C.1 and C.2 If the ABFVES cannot be restored to OPERABLE status within the associated Completion Time, the unit must be placed in a MODE in which the LCO does not apply. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.
SURVEILLANCE SR 3.7.11.1 REQUIREMENTS Standby systems should be checked periodically to ensure that they function properly. As the environment and normal operating conditions on this system are not severe, testing each train once a month provides an adequate check on this system. Systems without heaters need only be operated from the control room for 2 15 minutes with flow through the HEPA filters and charcoal McGuire Units 1 and 2 B 3.7.11-4 Revision No.
ABFVES B 3.7.11 BASES SURVEILLANCE REQUIREMENTS (continued) adsorbers to demonstrate the function of the system. The 31 day Frequency is based on the known reliability of equipment.
SR 3.7.11.2 This SR verifies that the required ABFVES testing is performed in accordance with the Ventilation Filter Testing Program (VFTP).
The ABFVES filter tests are in accordance with Reference 4. The VFTP includes testing HEPA filter performance, carbon adsorbers efficiency, minimum system flow rate, and the physical properties of the carbon (general use and following specific operations).
Specific test Frequencies and additional information are discussed in detail in the VFTP.
SR 3.7.11.3 This SR verifies that ABFVES starts and operates with flow through the HEPA filters and charcoal adsorbers on an actual or simulated actuation signal. The 18 month Frequency is consistent with that specified in Regulatory Guide 1.52 (Ref. 6).
SR 3.7.11.4 This SR verifies the integrity of the ECCS pump room enclosure.
The ability of the ECCS pump room to maintain a negative pressure, with respect to potentially uncontaminated adjacent areas, is periodically tested to verify proper functioning of the ABFVES. During the post accident mode of operation, the ABFVES is designed to maintain a slight negative pressure in the ECCS pump room area, with respect to adjacent areas, to prevent unfiltered LEAKAGE. The ABFVES is designed to maintain a
- -0.125 inches water gauge relative to atmospheric pressure.
This SR is required to be performed for each fan combination (1A and 1B, 2A and 2B, 1A and 2A, 1B and 2B) described in the LCO Bases. The Frequency of 18 months is consistent with the guidance provided in NUREG-0800, Section 6.5.1 (Ref. 7).
An 18 month Frequency on a STAGGERED TEST BASIS is consistent with that specified in Reference 6.
McGuire Units 1 and 2 B 3.7.1 1-5 Revision No.
ABFVES B 3.7.11 BASES REFERENCES 1. UFSAR, Section 9.4.
- 2. UFSAR, Section 12.2.
- 3. UFSAR, Section 15.6.5.
- 4. 10 CFR 100.11.
- 5. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6. Regulatory Guide 1.52 (Rev. 2).
- 7. NUREG-0800, Section 6.5.1, Rev. 2, July 1981.
- 8. UFSAR, Table 9-38.
McGuire Units 1 and 2 B 3.7.11-6 Revision No.
Attachment 3 Description of Proposed Changes and Technical Justification Description of Proposed Changes The proposed change adds a LCO Note to TS 3.7.11, Auxiliary Building Filtered Ventilation Exhaust System (ABFVES). The note will allow the Auxiliary Building pressure boundary to be opened intermittently under administrative controls.
Corresponding Bases changes are also being made and these establish the administrative controls that are required to minimize the consequences of the open pressure boundary.
Technical Justification
Background
McGuire Surveillance Requirement 3.7.11.4 tests the integrity of the Auxiliary Building pressure boundary and requires a negative pressure limit to be satisfied for each fan combination described in the LCO Bases. While other surveillance requirements in the same specification test the operability and function of the ventilation trains, the pressure test ensures that the boundary's leak tightness is adequate to meet design assumptions. There are no provisions in current TS 3.7.11 to address situations where the acceptance criteria of the ventilation boundary pressure test could not be met due to an intermittent opening of the pressure boundary.
Discussion Currently there are no LCO or Bases notes in McGuire TS 3.7.11 that address the opening of the Auxiliary Building pressure boundary intermittently under administrative controls. The proposed TS change would add a note to LCO 3.7.11 and its Bases that allows intermittent opening of the pressure boundary under administrative controls. The proposed administrative controls establish appropriate compensatory measures to minimize the consequences of an event during this time. For example, when the pressure boundary is opened for other than normal entry through doors, the proposed Bases would require that a dedicated individual be stationed in the area. This individual must be in continuous communication with the control room in order to rapidly restore the pressure boundary if needed.
1
Attachment 3 Description of Proposed Changes and Technical Justification Precedent Licensing Actions The change being proposed to McGuire TS 3.7.11 is consistent with an NRC-approved industry Technical Specifications Task Force (TSTF) standard TS traveler.1 Additionally, the change being proposed herein to McGuire TS 3.7.11 is similar to changes previously approved by the NRC for McGuire TS 3.7.9, Control Room Area Ventilation System (CRAVS) .' It is also similar to changes previously approved for Catawba Nuclear Station TS 3.7.10, Control Room Area Ventilation System (CRAVS) 4 and consistent with changes previously approved for Catawba TS 3.7.12, Auxiliary Building Filtered Ventilation Exhaust System (ABFVES) .4 Conclusion The proposed changes to McGuire TS 3.7.11 will permit the opening of a pressure boundary on an intermittent basis while under administrative controls. These changes are consistent with a nuclear industry initiative that has been approved by the NRC and previous NRC-approved license amendment requests that have been implemented at McGuire and Catawba.
' TSTF-287, Rev. 5, "Ventilation System Envelope Allowed Outage Time" 2 NRC Letter and Safety Evaluation, F. Rinaldi (USNRC) to H. B. Barron (Duke), Dated June 11, 1999, SlTBJECT:
"Emergency Technical Specifications Change, RE: McGuire Nuclear Station, Units 1 and 2, Amendments Nos.
185/167 (TACS MA5671 and MA5672) 3 Letter and Safety Evaluation, F. Rinaldi (USNRC), to H. B. Barron (Duke). Dated September 22, 1999,
SUBJECT:
"McGuire Nuclear Station, Units 1 and 2, RE: Issuance of Amendments Nos. 187/168 (TAC Nos. MA6428 and MA6429)"
4 NRC Letter and Safety Evaluation Dated September 5, 2000,
SUBJECT:
Catawba Nuclear Station, Units 1 and 2, RE: Issuance of Amendments Nos. 187/180 (TACS MA8888 and MA8889) 2
Attachment 4 No Significant Hazards Consideration In accordance with the criteria set forth in 10CFR50.91 and 50.92, Duke Energy Corporation has evaluated this license amendment request and determined it does not represent a significant hazards consideration. The following is provided in support of this conclusion.
- 1. Does the change involve a significant increase in the probability or consequences of an accident previously evaluated?
No, the Auxiliary Building Filtered Ventilation Exhaust System (ABFVES) is not assumed to be an initiator of any analyzed accident. Therefore, the proposed change contained in this license amendment request has no significant impact on the probability of occurrence of any previously analyzed accident.
The ABFVES provides a means of filtering air from the area of the active emergency core cooling system (ECCS) components, thereby providing environmental control for temperature and humidity in the ECCS pump room area and the Auxiliary Building. During emergency operations, the ABFVES exhausts air from the mechanical penetration area and the ECCS pump room area and discharges it through the system filters.
For cases where the Auxiliary Building pressure boundary is opened intermittently under administrative controls, appropriate compensatory measures would be required by the proposed Technical Specification to ensure the pressure boundary can be rapidly restored.
Based on the compensatory measures available to the plant operators and the administrative controls required to rapidly restore an opened pressure boundary, the accident consequences do not cause a significant increase in dose above the applicable General Design Critera, Standard Review Plan, or 10CFR100 limits.
1
Attachment 4 No Significant Hazards Consideration
- 2. Does the change create the possibility of a new or different kind of accident from any accident previously evaluated?
No, there are no changes being made to actual plant hardware which will result in any new accident causal mechanisms. Also, no changes are being made to the way in which the plant is being operated. Therefore, no new accident causal mechanisms will be generated.
- 3. Does this change involve a significant reduction in a margin of safety?
No, margin of safety is related to the ability of the fission product barriers to perform their design functions during and following accident conditions.
These barriers include the fuel cladding, the reactor coolant system, and the containment system. The performance of these barriers will not be significantly degraded by the proposed changes. When the Auxiliary Building pressure boundary is open on an intermittent basis, as permitted by the changes proposed in this license amendment request, administrative controls would be in place to ensure that the integrity of the pressure boundary could be rapidly restored. Therefore, it is expected that the plant, and the operating personnel, would maintain the ability to mitigate design basis events, and that none of the fission product barriers would be significantly affected by this change. Therefore, the proposed change is not considered to result in a significant reduction in a margin of safety.
Conclusion Based upon the preceding discussion, Duke Energy Corporation has concluded that this proposed license amendment does not involve a significant hazards consideration.
2
Attacment 5 Environmental Assessment/Impact Statement The proposed license amendment request has been reviewed against the criteria of 10CFR51.22 for environmental considerations.
The proposed amendment does not involve a significant hazards consideration (as shown in Attachment 4), nor increase the types and amounts of effluents that may be released offsite, nor increase individual or cumulative occupational radiation exposures. Therefore, the proposed amendment meets the criteria given in 10CFR51.22(c)(9) for a categorical exclusion from the requirement for performing an Environmental Assessment/Impact Statement.
1