TS 3.6.13 Amendment 292/271 and TS 3.6.14 Amendment 294/273
ML17186A066
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 06/26/2017
From:
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17186A066 (7)


Text

Date: 6/26'/2017 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-006433

1. Boyer, Robert P
2. Gardner, Troy R DOCUMENTTRANSMilTALFORM

Purpose:

.IUl!§

3. Howell, Pamela T 1-------------------------1 Released By:

Facility: MCGUIRE NUCLEAR STATION Duke Energy

4. Mc Ginnis, Vickie L SUBJECT 13225 Hagers Feriy Road
5. OPS HUMAN PERFORMANCE -

Issue TS 3.6.13 Amendment 292/271 8t TS 3.6.14 Amendment Document Management

6. OPS TRNG MGR.

294/273 MG02DM

7. QATS-Huntersville. NC 28078
8. RESIDENT NRC INSPECT
9. SERV BLDG FILE ROOM - MNSDCRM@duke-energy.com
10. U S NUC REG WASHINGTON, DC I
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1

-*- - -- 2 -3 4 - -- 6 7 8 9 10 11 12 FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE PRINTILP FYIIE R&AIE R&AIE R&A(E FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE PRINT I LP FYIIE R&A(E R&AIE R&AIE Remarks:

Ice Condenser Doors 3.6.13 3.6 CONTAINMENT SYSTEMS 3.6.13 Ice Condenser Doors LCO 3.6.13 The ice condenser lower inlet doors, intermediate deck doors, and top deck doors shall be OPERABLE and closed.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS


NOTE---------------------------------:.-----------------------

1. Separate Condition entry is allowed for each ice condenser door.
2. Entry into Condition B is not required due to personnel standing on or opening an intermediate deck or top deck door for short durations to perform required surveillances, minor maintenance such as ice removal or routine tasks such as system walkdowns.

CONDITION REQUIRED ACTION COMPLETION TIME A.

  • One or more ice A.1 *Restore lower inlet door to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> condenser lower inlet OPERABLE status.

doors inoperable due to being physically restrained from opening.*

(continued)

  • McOuire Units 1 and 2 3.6.13-1 Amendment No. 292/271

Ice Condenser Doors 3.6.13 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One or more ice B.1 Verify maximum ice bed Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> condenser doors temperature is~ 27°F.

inoperable for reasons other than Condition A AND or not closed. ----------NOTE-----------

Required Action B.2.1 applies only when one or more ice condenser lower inlet doors are inoperable due to having an invalid open alarm.

B.2.1 Verify affected lower inlet Once per 14 days door is closed.

OR B.2.2 Restore ice condenser door 14 days to OPERABLE status and closed positions.

I .

c. Required Action and C.1 Restore ice condenser door 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> associated Completion to OPERABLE status and Time of Condition B not closed position.

met.

D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or C AND not met.

D.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> McGuire Units 1 and 2 3.6.13-2 Amendment No. 292/271

Ice Condenser Doors 3.6.13 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.13.1 Verify all lower inlet doors indicate closed by the Inlet In accordance with Door Position Monitoring System. the Surveillance Frequency Control Program SR 3.6.13.2 Verify, by visual inspection, each intermediate deck door In accordance with is closed and not impaired by ice, frost, or debris. the Surveillance Frequency Control Program SR 3.6.13.3 Verify, by visual inspection, each top deck door: In accordance with the Surveillance

a. Is in place; and Frequency Control

- Program

b. Has no condensation, frost, or ice formed on the door that would restrict its opening .
  • SR 3.6.13.4 Verify, by visual inspection, each lower inlet door is not impaired by ice, frost, or debris.

In accordance with the Surveillance Frequency Control Program SR 3.6.13.5 Verify torque required to cause each lower inlet door to In accordance with begin to open is ::;; 675 in-lb, and verify free movement of the Surveillance the door. Frequency Control Program SR 3.6.13.6 (deleted)

SR 3.6.13.7 Verify for each intermediate deck door: In accordance with the Surveillance

a. No visual evidence of structural deterioration; Frequency Control Program
b. Free movement of the vent assemblies; and
c. Free movement of the door.
  • McGuire Units 1 and 2 3.6.13-3 Amendment No. 292/271 L_

Divider Barrier Integrity 3.6.14 3.6 CONTAINMENT SYSTEMS 3.6.14 Divider Barrier Integrity LCO 3.6.14 Divider barrier integrity shall be maintained.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. ----------NOTE------------ A.1 Restore personnel access 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> For this action, separate doors and equipment Condition entry is hatches to OPERABLE allowed for each status and closed personnel access door positions.

or equipment hatch.

  • One or more personnel access doors or equipment hatches (other than one pressurizer or one steam generator enclosure hatch addressed by Condition D) open or inoperable, other than for personnel transit entry.

B. Divider barrier seal B.1 Restore seal to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND C.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D. One pressurizer or one D.1 Restore affected hatch to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> steam generator OPERABLE status and enclosure hatch open or closed position.

inoperable .

McGuire Units 1 and 2 3.6.14-1 Amendment No. 294/273

Divider Barrier Integrity 3.6.14 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.14.1 Verify, by visual inspection, all personnel access doors Prior to entering and equipment hatches between upper and lower MODE 4 from containment compartments are closed. MODES SR 3.6.14.2 Verify, by visual inspection, that the seals and sealing Prior to final surfaces of each personnel access door and equipment closure after each hatch have: opening

a. No detrimental misalignments; AND
b. No cracks or defects in the sealing surfaces; and --------NOTE-------

Only required for

c. No apparent deterioration of the seal material. seals made of resilient materials In accordance with the Surveillance Frequency Control Program SR 3.6.14.3 Verify, by visual inspection, each personnel access door After each opening or equipment hatch that has been opened for personnel transit entry is closed.

I SR 3.6.14.4 Remove two divider barrier seal test coupons and verify In accordance with both test coupons' tensile strength is;;::::: 39.7 lbs. the Surveillance Frequency Control Program (continued)

McGuire Units 1 and 2 3.6.14-2 Amendment No. 270/250

Divider Barrier Integrity 3.6.14 SURVEILLANCE FREQUENCY SR 3.6.14.5 Visually inspect~ 95% of the divider barrier seal length, In accordance with and verify: the Surveillance Frequency Control

a. Seal and seal mounting bolts are properly Program installed; and
b. Seal material shows no evidence of deterioration due to holes, ruptures, chemical attack, abrasion, radiation damage, or changes in physical appearance .
  • McGuire Units 1 and 2 3.6.14-3 Amendment No. 261/241