MONTHYEARRA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0232, Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS2019-02-0505 February 2019 Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS RA-18-0166, Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs2018-09-13013 September 2018 Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs ML18191A5452018-07-10010 July 2018 Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages RA-18-001, Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages2018-07-10010 July 2018 Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. ML17237A0492017-08-17017 August 2017 Technical Specification Bases - List of Effected Sheets ML17237A0482017-08-17017 August 2017 Technical Specification Bases (Rev. 150) ML17237A0462017-08-17017 August 2017 Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275 ML17186A0682017-06-26026 June 2017 Tech Spec Bases - List of Affected Sections ML17186A0672017-06-26026 June 2017 Revision 151 to Tech Spec Bases - B 3.6.13 and B 3.6.14 ML17186A0662017-06-26026 June 2017 TS 3.6.13 Amendment 292/271 and TS 3.6.14 Amendment 294/273 ML17186A0692017-06-26026 June 2017 Issue Tech Spec - List of Affected Pages ML17136A2792017-05-0303 May 2017 Technical Specification Leep, Rev. 109 ML17136A2782017-05-0303 May 2017 Technical Specification Bases - Loes, Rev. 133 ML17136A3612017-05-0303 May 2017 Technical Specification Bases, Revision 149 ML17136A3602017-05-0303 May 2017 Technical Specification Amendment Nos. 285/264 ML17124A3682017-04-19019 April 2017 Tech Spec Bases List of Effected Pages ML17124A3712017-04-19019 April 2017 Bases B 3.5.1 - Accumulators ML17094A6722017-03-29029 March 2017 Issue Selected License Commitment Cslcl 16.7.14 Revision ML17094A6732017-03-29029 March 2017 Issue SLC List of Effected Pages ML17090A4522017-03-23023 March 2017 Revision to Technical Specification 3.3.2 - Amendment 293/272 ML17090A4512017-03-23023 March 2017 Revision to Technical Specification 3.8.1 - Amendment 293/272 ML17090A4352017-03-22022 March 2017 Technical Specification Bases ML17090A4502017-03-22022 March 2017 Revision to Technical Specification Bases - B 3.6.15 ML17094A6702017-03-15015 March 2017 Issue MNS-SLC-16.9.15. Snubbers MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-19019 December 2016 License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16305A1442016-10-20020 October 2016 Issue MNS Technical Specification 5.5 RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML16265A5312016-08-30030 August 2016 Issue MNS Tech Spec Bases List of Effective Sections ML16265A5322016-08-30030 August 2016 Technical Specification Bases 3.6.14 Revisions, List of Revisions and Dates ML16250A0142016-08-29029 August 2016 Amendment 287 ML16243A3492016-08-23023 August 2016 Mccguire, Units 1 and 2, Revision 143 to Issue MNS Technical Specification Bases 3.3.1 ML16243A3482016-08-23023 August 2016 Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation. ML16243A3512016-08-23023 August 2016 Revision 105 to Technical Specifications List of Effective Pages ML16243A3502016-08-23023 August 2016 Revision 129 to Technical Specification Bases ML16243A3572016-08-18018 August 2016 Technical Specification Bases Revision 001, List of Revised Sections 2023-02-16
[Table view] Category:Bases Change
MONTHYEARRA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-18-0232, Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS2019-02-0505 February 2019 Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS RA-18-0166, Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs2018-09-13013 September 2018 Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs ML18191A5452018-07-10010 July 2018 Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages RA-18-001, Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages2018-07-10010 July 2018 Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. ML17237A0462017-08-17017 August 2017 Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275 ML17237A0482017-08-17017 August 2017 Technical Specification Bases (Rev. 150) ML17237A0492017-08-17017 August 2017 Technical Specification Bases - List of Effected Sheets ML17186A0662017-06-26026 June 2017 TS 3.6.13 Amendment 292/271 and TS 3.6.14 Amendment 294/273 ML17186A0672017-06-26026 June 2017 Revision 151 to Tech Spec Bases - B 3.6.13 and B 3.6.14 ML17186A0682017-06-26026 June 2017 Tech Spec Bases - List of Affected Sections ML17186A0692017-06-26026 June 2017 Issue Tech Spec - List of Affected Pages ML17136A3612017-05-0303 May 2017 Technical Specification Bases, Revision 149 ML17136A3602017-05-0303 May 2017 Technical Specification Amendment Nos. 285/264 ML17136A2792017-05-0303 May 2017 Technical Specification Leep, Rev. 109 ML17136A2782017-05-0303 May 2017 Technical Specification Bases - Loes, Rev. 133 ML17124A3682017-04-19019 April 2017 Tech Spec Bases List of Effected Pages ML17124A3712017-04-19019 April 2017 Bases B 3.5.1 - Accumulators ML17094A6722017-03-29029 March 2017 Issue Selected License Commitment Cslcl 16.7.14 Revision ML17094A6732017-03-29029 March 2017 Issue SLC List of Effected Pages ML17090A4522017-03-23023 March 2017 Revision to Technical Specification 3.3.2 - Amendment 293/272 ML17090A4512017-03-23023 March 2017 Revision to Technical Specification 3.8.1 - Amendment 293/272 ML17090A4352017-03-22022 March 2017 Technical Specification Bases ML17090A4502017-03-22022 March 2017 Revision to Technical Specification Bases - B 3.6.15 ML17094A6702017-03-15015 March 2017 Issue MNS-SLC-16.9.15. Snubbers RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML16265A5312016-08-30030 August 2016 Issue MNS Tech Spec Bases List of Effective Sections ML16265A5322016-08-30030 August 2016 Technical Specification Bases 3.6.14 Revisions, List of Revisions and Dates ML16250A0142016-08-29029 August 2016 Amendment 287 ML16243A3482016-08-23023 August 2016 Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation. ML16243A3502016-08-23023 August 2016 Revision 129 to Technical Specification Bases ML16243A3512016-08-23023 August 2016 Revision 105 to Technical Specifications List of Effective Pages ML16243A3492016-08-23023 August 2016 Mccguire, Units 1 and 2, Revision 143 to Issue MNS Technical Specification Bases 3.3.1 ML16243A3572016-08-18018 August 2016 Technical Specification Bases Revision 001, List of Revised Sections ML16243A3552016-08-17017 August 2016 Renewed Facility Operating License, Amendment 284 ML16243A3522016-08-17017 August 2016 Technical Specification 3.4.18, Amendment Nos. 284/263, Steam Generator (SG) Tube Integrity. ML16243A3542016-08-17017 August 2016 Technical Specification Bases 3.4.18, Revision 144, Steam Generator (SG) Tube Integrity RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16139A5572016-05-10010 May 2016 Technical Specification Bases 3.3.1 Rev. 001, Revision 141 ML16139A5552016-05-10010 May 2016 Technical Specification Bases 3.9.3, Revision 001, Revision 142 MNS-16-020, License Amendment Request Removal of Superseded Technical Specification Requirements2016-05-0505 May 2016 License Amendment Request Removal of Superseded Technical Specification Requirements MNS-16-015, License Amendment Request (LAR) for One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval2016-02-18018 February 2016 License Amendment Request (LAR) for One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval ML16056A2432016-02-18018 February 2016 Emergency Action Level Technical Bases Document Redline MNS-16-016, Emergency Action Level Technical Bases, Revision 1 Redline. Part 1 of 22016-02-18018 February 2016 Emergency Action Level Technical Bases, Revision 1 Redline. Part 1 of 2 ML16056A2452016-02-18018 February 2016 Emergency Action Level Technical Bases, Revision 1 Redline. Part 2 of 2 2023-02-16
[Table view] |
Text
Date: 3/22/2017 Distribution: Duke Energy Document Transmittal#: TR-NUC-MC-005612
- 1. Boyer, Robert P
- 2. Carroll, Michael E DOCUMENTTRANSMITTALFORM
Purpose:
~
- 3. Gardner, Troy R 1-------------------------1 Released By:
Facility: MCGUIRE NUCLEAR STATION Duke Eneray
- 4. Howell, Pamela T SUBJECT 13225 Haqers Ferry Road
- 5. Mc Ginnis, Vickie L Issue Tech Spec Bases - B 3.6.15 Document Management
- 6. OPS HUMAN PERFORMANCE -
MG02DM
- 7. OPS TRNG MGR.
Huntersville. NC 28078
- 8. QATS-MNSDCRM@duke-energy.com
- 9. RESIDENT NRC INSPECT
- 10. SERV BLDG FILE ROOM -
(})>u S-NUC REG WASHINGTON, DC
- 12. USNRC
- 13. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 2 3 4 5 6 7 8 9 10 11 12 13 FYIIE FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE PRINTILI FYIIE R&AIE R&AIE R&AIE Remarks:
Containment Recirculation Drains B 3.6.15 B 3.6 CONTAINMENT SYSTEMS B 3.6.15 Containment Recirculation Drains BASES
.BACKGROUND The containment recirculation drains consist of the ice condenser drains and the refueling canal drains. The ice condenser is partitioned into 24 bays, each having a pair of inlet doors that open from the bottom plenum to allow the hot steam-air mixture from a Design Basis Accident (OBA) to enter the ice condenser. Twenty of the 24 bays have an ice condenser floor drain at the bottom to drain the melted ice into the lower compartment (in the 4 bays that do not have drains, the water drains through the floor drains in the adjacent bays). Each drain leads to a drain pipe that drops down several feet, then makes one or more 90° bends and exits into the lower compartment. A check (flapper) valve at the end of each pipe keeps warm air from entering during normal operation, but when the water exerts pressure, it opens to allow the water to spill into the lower compartment. This prevents water from backing up and interfering with the ice condenser inlet doors. The water delivered to the lower containment serves to cool the atmosphere as it falls through to the floor and provides a source of borated water at the containment sump for long term use by the Emergency Core Cooling System (ECCS) and the Containment Spray System during the recirculation mode of operation.
The six refueling canal drains are positioned in ttie bottom and sides of the refueling canal. During a refueling, valves are closed in the side drains and a blind flange is installed in the bottom drain and the canal is flooded to facilitate the refueling process. The water acts to shield and cool the spent fuel as it is transferred from the reactor vessel to storage.
After refueling, the canal is drained and the valves in the side drains are locked open and the blind flange in the bottom drain is removed. In the event of a OBA, the refueling canal drains are the main return path to the lower compartment for Containment Spray System water sprayed into the upper compartment.
The ice condenser drains and the refueling canal drains function with the ice bed, the Containment Spray System, and the ECCS to limit the
- pressure and temperature that could be expected following a OBA.
APPLICABLE The limiting DBAs considered relative to containment temperature and SAFETY ANALYSES pressure are the loss of coolant accident (LOCA) and the steam line break (SLB). The LOCA and SLB are analyzed using computer codes designed to predict the resultant containment pressure and temperature transients. DBAs are assumed not to occur simultaneously or consecutively. Although the ice condenser is a passive system that McGuire Units 1 and 2 B 3.6.15-1 Revision No. 147
Containment Recirculation Drains B 3.6.15 BASES APPLICABLE SAFETY ANALYSES (continued) requires no electrical power to perform its function, the Containment Spray System and the Air Return System (ARS) also function to assist the ice bed in limiting pressures and temperatures. Therefore, the analysis of the postulated DBAs, with respect to Engineered Safety Feature (ESF) systems, assumes the loss of one ESF bus, which is the worst case single active failure and results in one train of the Containment Spray System and one train of the ARS being rendered inoperable.
The limiting OBA analyses (Ref. 1) show that the maximum peak containment pressure results from the LOCA analysis and is calculated to be less than the containment design pressure. The maximum peak containment atmosphere temperature results from the SLB analysis and is discussed in the Bases for LCO 3.6.5, "Containment Air Temperature."
In addition to calculating the overall peak containment pressures, the OBA analyses include calculation of the transient differential pressures that occur across subcompartment walls during the initial blowdown phase of the accident transient. The internal containment walls and structures are designed to withstand these local transient pressure differentials for the limiting DBAs.
The containment recirculation drains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 2).
LCO This LCO establishes the minimum requirements to ensure that the containment recirculation drains perform their safety functions. The ice condenser floor drain valve disks must be closed to minimize air leakage into and out of the ice condenser during normal operation and must open in the event of a OBA when water begins to drain out. The refueling canal drain valves in the side drains must be locked open and the blind flange in the bottom drain must be removed and remain clear to ensure the return of Containment Spray System water to the lower containment in the event of a OBA. The containment recirculation drains function with the ice condenser, ECCS, and Containment Spray System to limit the pressure and temperature that could be expected following a OBA.
APPLICABILITY In MODES 1, 2, 3, and 4, a OBA could cause an increase in containment pressure and temperature, which would require the operation of the containment recirculation drains. Therefore, the LCO is applicable in MODES 1, 2, 3, and 4.
The probability and consequences of these events in MODES 5 and 6 are low due to the pressure and temperature limitations of these MODES.
McGuire Units 1 and 2 B 3.6.15-2 Revision No. 147
Containment Recirculation Drains B 3.6.15 BASES APPLICABILITY (continued)
As such, the containment recirculation drains are not required to be OPERABLE in these MODES.
ACTIONS If one ice condenser floor drain is inoperable, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is allowed to restore the drain to OPERABLE status. The Required Action is necessary to return operation to within the bounds of the containment analysis. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is consistent with the ACTIONS of LCO 3.6.1, "Containment," which requires that containment be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
- If one refueling canal drain is inoperable, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> is allowed to restore the drain to OPERABLE status. The Required Action is necessary to return operation to within the bounds of the containment analysis. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time is consistent with the ACTIONS of LCO 3.6.1, which requires that containment be restored to OPERABLE status in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
C.1 and C.2 If the affected drain(s) cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.6.15.1 and SR 3.6.15:2 REQUIREMENTS Verifying the OPERABILITY of the refueling canal drains ensures that they will be able to perform their functions in the event of a OBA. SR 3.6.15.1 confirms that the refueling canal drain valves in the side drains have been locked open and the blind flange in the bottom drain has been removed and that the drains are clear of any obstructions that could impair their functioning. In addition to debris near the drains, SR 3.6.15.2 requires attention be given to any debris that is located where it could be McGuire Units 1 and 2 B 3.6.15:.3 Revision No. 147
Containment Recirculation Drains B 3.6.15 BASES SURVEILLANCE REQUIREMENTS (continued) moved to the drains in the event that the Containment Spray System is in operation and water is flowing to the drains. SR 3.6.15.1 must be performed before entering MODE 4 from MODE 5 after every filling of the canal to ensure that the valves in the side drains have been locked open and the blind flange in the bottom drain has been removed and that no debris that could impair the drains was deposited during the time the canal was filled. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
SR 3.6.15.3 Verifying the OPERABILITY of the ice condenser floor drains ensures that they will be able to perform their functions in the event of a OBA.
Inspecting the drain valve disk ensures that the valve is performing its function of sealing the drain line from warm air leakage into the ice condenser during normal operation, yet will open if melted ice fills the line following a OBA. Verifying that the drain lines are not obstructed ensures their readiness to drain water from the ice condenser. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.
REFERENCES 1. UFSAR, Section 6.2.
- 2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
McGuire Units 1 and 2 B 3.6.15-4 Revision No. 147