MONTHYEARRA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0232, Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS2019-02-0505 February 2019 Proposed Editorial Error Correction of Technical Specification (TS) 3.0, Surveillance Requirement Applicability, SR 3.0.5 and Proposed Removal of Expired TS Footnotes from the MNS RA-18-0166, Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs2018-09-13013 September 2018 Supplement to Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs ML18191A5452018-07-10010 July 2018 Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages RA-18-001, Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages2018-07-10010 July 2018 Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. ML17237A0492017-08-17017 August 2017 Technical Specification Bases - List of Effected Sheets ML17237A0482017-08-17017 August 2017 Technical Specification Bases (Rev. 150) ML17237A0462017-08-17017 August 2017 Document Transmittal Form Regarding Technical Specification Changes - Amendment Nos. 296/275 ML17186A0682017-06-26026 June 2017 Tech Spec Bases - List of Affected Sections ML17186A0672017-06-26026 June 2017 Revision 151 to Tech Spec Bases - B 3.6.13 and B 3.6.14 ML17186A0662017-06-26026 June 2017 TS 3.6.13 Amendment 292/271 and TS 3.6.14 Amendment 294/273 ML17186A0692017-06-26026 June 2017 Issue Tech Spec - List of Affected Pages ML17136A2792017-05-0303 May 2017 Technical Specification Leep, Rev. 109 ML17136A2782017-05-0303 May 2017 Technical Specification Bases - Loes, Rev. 133 ML17136A3612017-05-0303 May 2017 Technical Specification Bases, Revision 149 ML17136A3602017-05-0303 May 2017 Technical Specification Amendment Nos. 285/264 ML17124A3682017-04-19019 April 2017 Tech Spec Bases List of Effected Pages ML17124A3712017-04-19019 April 2017 Bases B 3.5.1 - Accumulators ML17094A6722017-03-29029 March 2017 Issue Selected License Commitment Cslcl 16.7.14 Revision ML17094A6732017-03-29029 March 2017 Issue SLC List of Effected Pages ML17090A4522017-03-23023 March 2017 Revision to Technical Specification 3.3.2 - Amendment 293/272 ML17090A4512017-03-23023 March 2017 Revision to Technical Specification 3.8.1 - Amendment 293/272 ML17090A4352017-03-22022 March 2017 Technical Specification Bases ML17090A4502017-03-22022 March 2017 Revision to Technical Specification Bases - B 3.6.15 ML17094A6702017-03-15015 March 2017 Issue MNS-SLC-16.9.15. Snubbers MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-19019 December 2016 License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16305A1442016-10-20020 October 2016 Issue MNS Technical Specification 5.5 RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process ML16265A5312016-08-30030 August 2016 Issue MNS Tech Spec Bases List of Effective Sections ML16265A5322016-08-30030 August 2016 Technical Specification Bases 3.6.14 Revisions, List of Revisions and Dates ML16250A0142016-08-29029 August 2016 Amendment 287 ML16243A3492016-08-23023 August 2016 Mccguire, Units 1 and 2, Revision 143 to Issue MNS Technical Specification Bases 3.3.1 ML16243A3482016-08-23023 August 2016 Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation. ML16243A3512016-08-23023 August 2016 Revision 105 to Technical Specifications List of Effective Pages ML16243A3502016-08-23023 August 2016 Revision 129 to Technical Specification Bases ML16243A3572016-08-18018 August 2016 Technical Specification Bases Revision 001, List of Revised Sections 2023-02-16
[Table view] Category:Amendment
MONTHYEARRA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-12-19019 December 2016 License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16305A1442016-10-20020 October 2016 Issue MNS Technical Specification 5.5 ML16133A4462016-05-0202 May 2016 Technical Specification 3.7.7, Amendments 282 and 261 ML16133A4692016-05-0202 May 2016 Technical Specification 3.8.1, Amendments 282 and 261 ML16133A4662016-05-0202 May 2016 Technical Specification 3.7.7 - Rev. 140, Amendments 282/261 ML16133A4422016-04-28028 April 2016 Technical Specification 3.5.2, Amendments 282 and 261 ML16133A4432016-04-28028 April 2016 Technical Specification 3.6.6, Amendments 282 and 261 ML16133A4452016-04-28028 April 2016 Technical Specification 3.7.6, Amendments 282 and 261 ML16133A4682016-04-28028 April 2016 Technical Specification 3.7.11, Amendment 282/261 ML16133A4442016-04-28028 April 2016 Technical Specification 3.7.5, Amendments 282 and 261 ML16133A4672016-04-28028 April 2016 Technical Specification 3.7.9, Amendments 282 and 261 MNS-15-069, Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.2015-08-28028 August 2015 Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating. MNS-14-045, Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 20132014-06-0303 June 2014 Responses to Request for Additional Information Related to License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement Dated October 28, 2013 ML13304B4452013-10-28028 October 2013 Revised License Amendment Request for One-Time Change to Technical Specification 3.8.4, DC Sources-Operating for Battery Replacement ML12340A0682012-11-0707 November 2012 Technical Specifications & Tech Spec Bases Updates ML12153A3282012-05-31031 May 2012 Proposed Technical Specifications Amendment TS 3.1.3, Moderator Temperature Coefficient (Mtc) TS 5.6.5, Core Operating Limits Report (COLR) License Amendment Request for Conditional Exemption of the End of Cycle (EOC) Mtc Measurement Method ML11311A1622011-10-31031 October 2011 Technical Specifications & Tech Spec Bases Updates ML1100500792010-12-28028 December 2010 Technical Specifications and Tech Spec Bases Manual Holders ML1026500392010-09-16016 September 2010 License Amendment Request to Revise Technical Specification 5.3, Unit Staff Qualifications ML1019002672010-06-29029 June 2010 License Amendment Request to Revise Reactor Trip System and Engineered Safety Feature Actuation System Technical Specifications ML0928600672009-09-30030 September 2009 Units 1 & 2 and Oconee, Units 1, 2, & 3 - License Amendment Request (LAR) Catawba and McGuire Containment Spray Nozzle and Oconee Reactor Building Spray and Cooling Systems Technical Specification Surveillance Requirement ML0913800922009-05-11011 May 2009 Technical Specification Update ML0911202002009-02-27027 February 2009 Duke Energy Carolinas, LLC - License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0829005322008-10-0202 October 2008 Units 1 and 2 - Amendment to Technical Specification 3.6.13, Ice Condenser Doors, Revised Surveillance Requirements ML0804305652008-02-13013 February 2008 Tech Spec Pages for Amendment 244 Regarding Extension of Appendix J, Type a Integrated Leakage Rate Test Interval ML0734804452007-12-11011 December 2007 Units 1 & 2 - Proposed Technical Specification (TS) Amendment to Relax Completion Times and Surveillance Intervals for the Reactor Trip System (RTS) Instrumentation TS 3.3.1, Engineered Safety Feature ML0726301322007-09-18018 September 2007 Corrected Technical Specification Pages Regarding Steam Generator Tube Integrity, TSTF-449, Rev 4 ML0723301182007-08-0909 August 2007 Response to Request for Additional Information Re Proposed Technical Specification (TS) Amendment TS 5.5.2 Containment Leak Rate Testing Program ML0706006602007-03-0101 March 2007 Technical Specification Pages Regarding Steam Generator Tube Integrity ML0706503552007-02-21021 February 2007 Proposed Technical Specification Amendment TS 5.5.2 Containment Leak Rate Testing Program ML0626901092006-09-25025 September 2006 Technical Specifications, Changes to the Updated Final Safety Analysis Report and Emergency Operating Procedures ML0520202062005-07-0707 July 2005 Units 1 & 2 - License Amendment Request Applicable to Technical Specification 3.9.1, Boron Concentration. ML0509701552005-04-0404 April 2005 Tech Spec Pages for Amendments 209, Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0509701422005-04-0404 April 2005 Tech Spec Pages for Amendments 227, Eliminating Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process ML0423804812004-08-18018 August 2004 License Amendment Request for Technical Specification 3.3.2, Engineered Safety Features Actuation System Instrumentation ML0409101232004-03-23023 March 2004 Duke Energy Corp License Amendment Request Applicable to Technical Specifications 5.5.7, Reactor Coolant Pump Flywheel Inspection Program, Using the Consolidated Line Item Improvement Process (CLIIP) ML0327604442003-09-29029 September 2003 Technical Specifications Pages, Amendments 217 & 199 ML0321304972003-06-25025 June 2003 Proposed Technical Specifications and Bases Amendment 2.0, Safety Limits; 3.3, Instrumentation; 3.4, Reactor Coolant System; 5.6, Reporting Requirements 2023-02-16
[Table view] |
Text
0 0 Date: 4/28/2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-003005
- 1. Gardner, Troy R DOCUMENTTRANSMITTALFORM
Purpose:
Issue 2.
3.
Mc Ginnis, Vickie L Mccree, Victor M 1------------------------1 Released By:
Facility: MCGUIRE NUCLEAR STATION Duke Energy
- 4. OPS HUMAN PERFORMANCE -
SUBJECT 13225 Hagers Ferrv Road
- 5. OPS TRNG MGR.
MNS -TS - 3.7.5 Amendment 282/261 Document Management
- 6. QATS-MG02DM
- 7. RESIDENT NRC INSPECT Huntersville. NC 28078
- 8. SCIENTECH CLEARWTR, FL
, 9. MNSDCRM@duke-energy.com SERV BLDG FILE ROOM -
- 10. U S NUC REG WASHINGTON, DC
- 11. USNRC
- 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 2 3 4 5 6 1 8 9 10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE Remarks:
AFW System 3.7.5 0
3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.
NOTE--------------------------------------
0 nly one AFW train, which includes a motor driven pump, is required to be OPERABLE in MODE 4.
APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.
ACTIONS
N 0 TE----------------------------------------------------------------------
LCO 3.0.4.b is not applicable when entering MODE 1.
0 CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW OPERABLE status.
pump inoperable. AND 10 days from discovery of failure to meetthe LCO B. One AFW train B.1 Restore AFW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*
inoperable in MODE 1; 2 OPERABLE status.
or 3 for reasons other AND than Condition A.
10 days from discovery of failure to meet the LCO (continued) 0 McGuire Units 1 and 2 3.7.5-1 Amendment Nos 282/261
AFW System
(, 3.7.5 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
- c. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A AND or B not met.
C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR Two AFW trains inoperable in MODE 1, 2, or3.
D. Three AFW trains D.1 -------------NOTE-------------
inoperable in MODE 1, LCO 3.0.3 and all other 2, or 3. LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.
0 Initiate action to restore Immediately one AFW train to OPERABLE status.
E. Required AFW train E.1 Initiate action to restore Immediately inoperable in MODE 4. AFW train to OPERABLE status.
N 0TE------------------------------------------------------------
- 'A' Train AFW is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond.
(SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments described in MNS LAR submittal correspondence letter MNS-16-005.
0 McGuire Units 1 and 2 3.7.5-2 Amendment Nos. 282/261
AFW System 3.7.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 7. 5 .1 --------------------------------NOTE----------------------------------
Not applicable to automatic valves when THERMAL POWER is.::, 10% RTP.
Verify each AFW manual, power operated, and automatic In accordance valve in each water flow path, and in both steam supply with the flow paths to the steam turbine driven pump, that is not Surveillance locked, sealed, or otherwise secured in position, is in the Frequency correct position. Control Program SR 3. 7 .5 .2 --------------------------------NOTE----------------------------------
Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after ;;::: 900 psig in the steam generator.
0 Verify the developed head of each AFW pump at the flow test point is greater than or equal to the required In accordance with the lnservice Testing Program developed head.
SR 3. 7 .5 .3 --------------------------------NOTE----------------------------------
Not applicable in MODE 4 when steam generator is relied upon for heat removal.
Verify each AFW automatic valve that is not locked, In accordance sealed, or otherwise secured in position, actuates to the with the correct position on an actual or simulated actuation Surveillance signal. Frequency Control Program (continued) 0 McGuire Units 1 and 2 3.7.5-3 Amendment Nos. 261/241
AFW System 3.7.5 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3. 7. 5 .4 --------------------------------NO TE----------------------------------
- 1. Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after~ 900 psig in the steam generator.
- 2. Not applicable in MODE 4 when steam generator is relied upon for heat removal.
Verify each AFW pump starts automatically on an actual In accordance or simulated actuation signal. with the Surveillance Frequency Control Program 0
0 McGuire Units 1 and 2 3.7.5-4 Amendment Nos. 261 /241
0 0 Date: 4/28/2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-003005
- 1. Gardner, Troy R DOCUMENTTRANSMITTALFORM
Purpose:
Issue 2.
3.
Mc Ginnis, Vickie L Mccree, Victor M 1------------------------1 Released By:
Facility: MCGUIRE NUCLEAR STATION Duke Energy
- 4. OPS HUMAN PERFORMANCE -
SUBJECT 13225 Hagers Ferrv Road
- 5. OPS TRNG MGR.
MNS -TS - 3.7.5 Amendment 282/261 Document Management
- 6. QATS-MG02DM
- 7. RESIDENT NRC INSPECT Huntersville. NC 28078
- 8. SCIENTECH CLEARWTR, FL
, 9. MNSDCRM@duke-energy.com SERV BLDG FILE ROOM -
- 10. U S NUC REG WASHINGTON, DC
- 11. USNRC
- 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 2 3 4 5 6 1 8 9 10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE Remarks:
AFW System 3.7.5 0
3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.
NOTE--------------------------------------
0 nly one AFW train, which includes a motor driven pump, is required to be OPERABLE in MODE 4.
APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.
ACTIONS
N 0 TE----------------------------------------------------------------------
LCO 3.0.4.b is not applicable when entering MODE 1.
0 CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW OPERABLE status.
pump inoperable. AND 10 days from discovery of failure to meetthe LCO B. One AFW train B.1 Restore AFW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*
inoperable in MODE 1; 2 OPERABLE status.
or 3 for reasons other AND than Condition A.
10 days from discovery of failure to meet the LCO (continued) 0 McGuire Units 1 and 2 3.7.5-1 Amendment Nos 282/261
AFW System
(, 3.7.5 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
- c. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A AND or B not met.
C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR Two AFW trains inoperable in MODE 1, 2, or3.
D. Three AFW trains D.1 -------------NOTE-------------
inoperable in MODE 1, LCO 3.0.3 and all other 2, or 3. LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.
0 Initiate action to restore Immediately one AFW train to OPERABLE status.
E. Required AFW train E.1 Initiate action to restore Immediately inoperable in MODE 4. AFW train to OPERABLE status.
N 0TE------------------------------------------------------------
- 'A' Train AFW is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond.
(SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments described in MNS LAR submittal correspondence letter MNS-16-005.
0 McGuire Units 1 and 2 3.7.5-2 Amendment Nos. 282/261
AFW System 3.7.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 7. 5 .1 --------------------------------NOTE----------------------------------
Not applicable to automatic valves when THERMAL POWER is.::, 10% RTP.
Verify each AFW manual, power operated, and automatic In accordance valve in each water flow path, and in both steam supply with the flow paths to the steam turbine driven pump, that is not Surveillance locked, sealed, or otherwise secured in position, is in the Frequency correct position. Control Program SR 3. 7 .5 .2 --------------------------------NOTE----------------------------------
Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after ;;::: 900 psig in the steam generator.
0 Verify the developed head of each AFW pump at the flow test point is greater than or equal to the required In accordance with the lnservice Testing Program developed head.
SR 3. 7 .5 .3 --------------------------------NOTE----------------------------------
Not applicable in MODE 4 when steam generator is relied upon for heat removal.
Verify each AFW automatic valve that is not locked, In accordance sealed, or otherwise secured in position, actuates to the with the correct position on an actual or simulated actuation Surveillance signal. Frequency Control Program (continued) 0 McGuire Units 1 and 2 3.7.5-3 Amendment Nos. 261/241
AFW System 3.7.5 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3. 7. 5 .4 --------------------------------NO TE----------------------------------
- 1. Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after~ 900 psig in the steam generator.
- 2. Not applicable in MODE 4 when steam generator is relied upon for heat removal.
Verify each AFW pump starts automatically on an actual In accordance or simulated actuation signal. with the Surveillance Frequency Control Program 0
0 McGuire Units 1 and 2 3.7.5-4 Amendment Nos. 261 /241