ML16133A444

From kanterella
Jump to navigation Jump to search
Technical Specification 3.7.5, Amendments 282 and 261
ML16133A444
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/28/2016
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
Download: ML16133A444 (5)


Text

0 0 Date: 4/28/2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-003005

1. Gardner, Troy R DOCUMENTTRANSMITTALFORM

Purpose:

Issue 2.

3.

Mc Ginnis, Vickie L Mccree, Victor M 1------------------------1 Released By:

Facility: MCGUIRE NUCLEAR STATION Duke Energy

4. OPS HUMAN PERFORMANCE -

SUBJECT 13225 Hagers Ferrv Road

5. OPS TRNG MGR.

MNS -TS - 3.7.5 Amendment 282/261 Document Management

6. QATS-MG02DM
7. RESIDENT NRC INSPECT Huntersville. NC 28078
8. SCIENTECH CLEARWTR, FL

, 9. MNSDCRM@duke-energy.com SERV BLDG FILE ROOM -

10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 2 3 4 5 6 1 8 9 10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE Remarks:

AFW System 3.7.5 0

3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.


NOTE--------------------------------------

0 nly one AFW train, which includes a motor driven pump, is required to be OPERABLE in MODE 4.

APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS


N 0 TE----------------------------------------------------------------------

LCO 3.0.4.b is not applicable when entering MODE 1.

0 CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW OPERABLE status.

pump inoperable. AND 10 days from discovery of failure to meetthe LCO B. One AFW train B.1 Restore AFW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

inoperable in MODE 1; 2 OPERABLE status.

or 3 for reasons other AND than Condition A.

10 days from discovery of failure to meet the LCO (continued) 0 McGuire Units 1 and 2 3.7.5-1 Amendment Nos 282/261

AFW System

(, 3.7.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

c. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A AND or B not met.

C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR Two AFW trains inoperable in MODE 1, 2, or3.

D. Three AFW trains D.1 -------------NOTE-------------

inoperable in MODE 1, LCO 3.0.3 and all other 2, or 3. LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.

0 Initiate action to restore Immediately one AFW train to OPERABLE status.

E. Required AFW train E.1 Initiate action to restore Immediately inoperable in MODE 4. AFW train to OPERABLE status.


N 0TE------------------------------------------------------------

  • 'A' Train AFW is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond.

(SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments described in MNS LAR submittal correspondence letter MNS-16-005.

0 McGuire Units 1 and 2 3.7.5-2 Amendment Nos. 282/261

AFW System 3.7.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 7. 5 .1 --------------------------------NOTE----------------------------------

Not applicable to automatic valves when THERMAL POWER is.::, 10% RTP.

Verify each AFW manual, power operated, and automatic In accordance valve in each water flow path, and in both steam supply with the flow paths to the steam turbine driven pump, that is not Surveillance locked, sealed, or otherwise secured in position, is in the Frequency correct position. Control Program SR 3. 7 .5 .2 --------------------------------NOTE----------------------------------

Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after ;;::: 900 psig in the steam generator.

0 Verify the developed head of each AFW pump at the flow test point is greater than or equal to the required In accordance with the lnservice Testing Program developed head.

SR 3. 7 .5 .3 --------------------------------NOTE----------------------------------

Not applicable in MODE 4 when steam generator is relied upon for heat removal.

Verify each AFW automatic valve that is not locked, In accordance sealed, or otherwise secured in position, actuates to the with the correct position on an actual or simulated actuation Surveillance signal. Frequency Control Program (continued) 0 McGuire Units 1 and 2 3.7.5-3 Amendment Nos. 261/241

AFW System 3.7.5 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3. 7. 5 .4 --------------------------------NO TE----------------------------------

1. Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after~ 900 psig in the steam generator.
2. Not applicable in MODE 4 when steam generator is relied upon for heat removal.

Verify each AFW pump starts automatically on an actual In accordance or simulated actuation signal. with the Surveillance Frequency Control Program 0

0 McGuire Units 1 and 2 3.7.5-4 Amendment Nos. 261 /241

0 0 Date: 4/28/2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-003005

1. Gardner, Troy R DOCUMENTTRANSMITTALFORM

Purpose:

Issue 2.

3.

Mc Ginnis, Vickie L Mccree, Victor M 1------------------------1 Released By:

Facility: MCGUIRE NUCLEAR STATION Duke Energy

4. OPS HUMAN PERFORMANCE -

SUBJECT 13225 Hagers Ferrv Road

5. OPS TRNG MGR.

MNS -TS - 3.7.5 Amendment 282/261 Document Management

6. QATS-MG02DM
7. RESIDENT NRC INSPECT Huntersville. NC 28078
8. SCIENTECH CLEARWTR, FL

, 9. MNSDCRM@duke-energy.com SERV BLDG FILE ROOM -

10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 2 3 4 5 6 1 8 9 10 11 12 FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE Remarks:

AFW System 3.7.5 0

3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.


NOTE--------------------------------------

0 nly one AFW train, which includes a motor driven pump, is required to be OPERABLE in MODE 4.

APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS


N 0 TE----------------------------------------------------------------------

LCO 3.0.4.b is not applicable when entering MODE 1.

0 CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW OPERABLE status.

pump inoperable. AND 10 days from discovery of failure to meetthe LCO B. One AFW train B.1 Restore AFW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s*

inoperable in MODE 1; 2 OPERABLE status.

or 3 for reasons other AND than Condition A.

10 days from discovery of failure to meet the LCO (continued) 0 McGuire Units 1 and 2 3.7.5-1 Amendment Nos 282/261

AFW System

(, 3.7.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

c. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A AND or B not met.

C.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OR Two AFW trains inoperable in MODE 1, 2, or3.

D. Three AFW trains D.1 -------------NOTE-------------

inoperable in MODE 1, LCO 3.0.3 and all other 2, or 3. LCO Required Actions requiring MODE changes are suspended until one AFW train is restored to OPERABLE status.

0 Initiate action to restore Immediately one AFW train to OPERABLE status.

E. Required AFW train E.1 Initiate action to restore Immediately inoperable in MODE 4. AFW train to OPERABLE status.


N 0TE------------------------------------------------------------

  • 'A' Train AFW is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond.

(SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments described in MNS LAR submittal correspondence letter MNS-16-005.

0 McGuire Units 1 and 2 3.7.5-2 Amendment Nos. 282/261

AFW System 3.7.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 7. 5 .1 --------------------------------NOTE----------------------------------

Not applicable to automatic valves when THERMAL POWER is.::, 10% RTP.

Verify each AFW manual, power operated, and automatic In accordance valve in each water flow path, and in both steam supply with the flow paths to the steam turbine driven pump, that is not Surveillance locked, sealed, or otherwise secured in position, is in the Frequency correct position. Control Program SR 3. 7 .5 .2 --------------------------------NOTE----------------------------------

Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after ;;::: 900 psig in the steam generator.

0 Verify the developed head of each AFW pump at the flow test point is greater than or equal to the required In accordance with the lnservice Testing Program developed head.

SR 3. 7 .5 .3 --------------------------------NOTE----------------------------------

Not applicable in MODE 4 when steam generator is relied upon for heat removal.

Verify each AFW automatic valve that is not locked, In accordance sealed, or otherwise secured in position, actuates to the with the correct position on an actual or simulated actuation Surveillance signal. Frequency Control Program (continued) 0 McGuire Units 1 and 2 3.7.5-3 Amendment Nos. 261/241

AFW System 3.7.5 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3. 7. 5 .4 --------------------------------NO TE----------------------------------

1. Not required to be performed for the turbine driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after~ 900 psig in the steam generator.
2. Not applicable in MODE 4 when steam generator is relied upon for heat removal.

Verify each AFW pump starts automatically on an actual In accordance or simulated actuation signal. with the Surveillance Frequency Control Program 0

0 McGuire Units 1 and 2 3.7.5-4 Amendment Nos. 261 /241