ML16133A445

From kanterella
Jump to navigation Jump to search
Technical Specification 3.7.6, Amendments 282 and 261
ML16133A445
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/28/2016
From:
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TR-NUC-MC-002840
Download: ML16133A445 (3)


Text

0 0 0 Date: 4l28l2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-002840

1. Gardner, Troy R
2. Mc Ginnis, Vickie L DOCUMENT TRANSMITTAL FORM

Purpose:

Issue Released By:

3. Mccree, Victor M Facility: MCGUIRE NUCLEAR STATION Duke Energy
4. OPS HUMAN PERFORMANCE -

SUBJECT 13225 Hagers Ferry Road

5. OPS TRNG MGR.

MNS TS 3.7.6 - AMENDMENT 282l261 Document Management

6. QATS-MG02DM
7. RESIDENT NRC INSPECT Huntersville, NC 2807!;1
8. SCIENTECH CLEARWTR, FL MNSDCRM@dl!ke-en~rgy.com
9. SERV BLDG FILE ROOM -
10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1

~W:<};;nt'*<'"""2L'; '.:\~;1M

,,,,,, M 1 2 3 4 5 6 7 8 9 10 11 12 ttiZtJ~7r~9=~MN's'"r~f~i7
~
,srooi~~~tssa~[)ttt:0~~!i'+/-f:'?$f:\'1\I": ;\*'1:1 FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE Remarks:

CCW System 3.7.6 0

3. 7 PLANT SYSTEMS 3.7.6 Component Cooling Water (CCW) System LCO 3. 7.6 Two CCW trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A One CCW train A.1 -------------NOTE--------------

inoperable. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops-MODE 4,"

for residual heat removal loops made inoperable by ccw.

0 -----------------------------------

Restore CCW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s* I OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.

B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />


NOTE-,..-----------------------------------------------------

  • 'A' Train CCW is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of

'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.

0 McGuire Units 1 and 2 3.7.6-1 Amendment Nos. 282/261

CCW System 3.7.6 0

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 7. 6 .1 --------------------------------NOTE----------------------------------

1solation of CCW flow to individual components does not render the CCW System inoperable.

Verify each CCW manual, power operated, and In accordance with automatic valve in the flow path servicing safety related the Surveillance equipment, that is not locked, sealed, or otherwise Frequency Control secured in position, is in the correct position. Program SR 3.7.6.2 Verify each CCW automatic valve in the flow path In accordance with servicing safety related equipment, that is not locked, the Surveillance sealed, or otherwise secured in position, actuates to the Frequency Control correct position on an actual or simulated actuation Program signal.

0 SR 3.7.6.3 Verify each CCW pump starts automatically on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program 0

McGuire Units 1 and 2 3.7.6-2 Amendment Nos. 261/241

0 0 0 Date: 4l28l2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-002840

1. Gardner, Troy R
2. Mc Ginnis, Vickie L DOCUMENT TRANSMITTAL FORM

Purpose:

Issue Released By:

3. Mccree, Victor M Facility: MCGUIRE NUCLEAR STATION Duke Energy
4. OPS HUMAN PERFORMANCE -

SUBJECT 13225 Hagers Ferry Road

5. OPS TRNG MGR.

MNS TS 3.7.6 - AMENDMENT 282l261 Document Management

6. QATS-MG02DM
7. RESIDENT NRC INSPECT Huntersville, NC 2807!;1
8. SCIENTECH CLEARWTR, FL MNSDCRM@dl!ke-en~rgy.com
9. SERV BLDG FILE ROOM -
10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1

~W:<};;nt'*<'"""2L'; '.:\~;1M

,,,,,, M 1 2 3 4 5 6 7 8 9 10 11 12 ttiZtJ~7r~9=~MN's'"r~f~i7
~
,srooi~~~tssa~[)ttt:0~~!i'+/-f:'?$f:\'1\I": ;\*'1:1 FYIIE FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE Remarks:

CCW System 3.7.6 0

3. 7 PLANT SYSTEMS 3.7.6 Component Cooling Water (CCW) System LCO 3. 7.6 Two CCW trains shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A One CCW train A.1 -------------NOTE--------------

inoperable. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops-MODE 4,"

for residual heat removal loops made inoperable by ccw.

0 -----------------------------------

Restore CCW train to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s* I OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.

B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />


NOTE-,..-----------------------------------------------------

  • 'A' Train CCW is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of

'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.

0 McGuire Units 1 and 2 3.7.6-1 Amendment Nos. 282/261

CCW System 3.7.6 0

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 7. 6 .1 --------------------------------NOTE----------------------------------

1solation of CCW flow to individual components does not render the CCW System inoperable.

Verify each CCW manual, power operated, and In accordance with automatic valve in the flow path servicing safety related the Surveillance equipment, that is not locked, sealed, or otherwise Frequency Control secured in position, is in the correct position. Program SR 3.7.6.2 Verify each CCW automatic valve in the flow path In accordance with servicing safety related equipment, that is not locked, the Surveillance sealed, or otherwise secured in position, actuates to the Frequency Control correct position on an actual or simulated actuation Program signal.

0 SR 3.7.6.3 Verify each CCW pump starts automatically on an actual or simulated actuation signal.

In accordance with the Surveillance Frequency Control Program 0

McGuire Units 1 and 2 3.7.6-2 Amendment Nos. 261/241