Mcgurie Nuclear Station - MNS-TS-1.1 Amendment 280/260 Distribution
ML15258A057
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/08/2015
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
TR-NUC-MC-000647
Download: ML15258A057 (8)


Text

Distribution: Duke Energy Date: 91121 Document Transmittal #: TR-NUC-MC-000647

1. Gardner, Troy RDO U E TT NS IEA FO M ProeIsu
2. Mc Ginnis, Vickie L (At Mcguire)DO U E T RA MI ALF M Pups:iii
3. McCree, Victor M Released By:
4. SCIENTECH CLEARWTR, FL Facility: MCGUIRE NUCLEAR STATION Du~ke Enemy
5. SERV BLDG FILE ROOM - SUBJECT 13225 Haaers Ferry Road 6USNUREWAHGTNDCMNS-TS-1.1 AMENDMENT 280/260 DISTRIBUTION Document Manaaement
7. USNRC MG02M
8. WESTINGHOUSE ELECTRIC CO LLC Huntersville, NC 28078 Page 1 of 1 MNSDCRMl~duke-enerav~com Document ID 1 2 3 4 56 7 8 LICN - MC - MNS-TS-I.1 - 280 - ISSUED ..i:FYIIE FYIIE FYIIE R&AIE FYIIE R&AIE R&AIE R&AIE Remarks: DI!STRIBUTE MNS-TS-I.1 TO ALL MANUAL HOLDERS.

0

Definitions 1.1 1.0 USE AND APPLICATION 1.1 Definitions 1.0-- AND--APPLICATIONIt The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.

Term. Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.

ACTUATION LOGIC TEST An ACTUATION LOGIC TEST shall be the application of various simulated or actual input combinations in conjunction with each possible interlock logic state and the verification of the required logic output. The ACTUATION LOGIC TEST, as a minimum, shall include a continuity check of output devices.

AXIAL FLUX DIFFERENCE AFD shall be the difference in normalized flux signals (AFD) between the top and bottom halves of a two section excore neutron detector.

CHANNEL CALIBRATION A CHANNEL CALIBRATION shall be the adjustment, as necessary, of the channel so that it responds within the required range and accuracy to known input. The CHANNEL CALIBRATION shall encompass the entire channel, including the required sensor, alarm, interlock, display, and trip functions. Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an inplace qualitative assessment of sensor behavior and normal calibration' of the remaining adjustable devices in the channel. Whenever a sensing element is replaced, the next required CHANNEL CALIBRATION shall include an inplace cross calibration that compares the other sensing elements with the recently installed sensing element.

The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping calibrations or total channel steps so that the entire channel is calibrated.

(continued)

McGuire Units 1 and 2 1.1-1 Mc~ure UitsI an2 11-1Amendment Nos. 184/166

Definitions 1.1 1.1 Definitions (continued)

CHANNEL CHECK A CHANNEL CHECK shall be the qualitative assessment, by observation, of channel behavior during operation. This determination shall include, where possible, comparison of the channel indication and status to other indications or status derived from independent instrument channels measuring the same parameter.

CHANNEL OPERATIONAL A COT shall be the injection of a simulated or actual signal TEST (COT) into the channel as close to the sensor as practicable to verify the OPERABILITY of required alarm, interlock, and trip functions. The COT shall include adjustments, as necessary, of the required alarm, interlock, and trip setpoints so that the setpoints are within the required range and accuracy.

CORE ALTERATION CORE ALTERATION shall be the movement of any fuel, sources, or reactivity control components, within the reactor vessel with the vessel head removed and fuel in the vessel.

Suspension of CORE ALTERATIONS shall not preclude completion of movement of a component to a safe position.

CORE OPERATING LIMITS The COLR is the unit specific document that provides cycle REPORT (COLR) specific parameter limits for the current reload cycle. These cycle specific parameter limits shall be determined for each reload cycle in accordance with Specification 5.6.5. Unit operation within these limits is addressed in individual Specifications.

DOSE EQUIVALENT 1-131 DOSE EQUIVALENT 1-131 shall be that concentration of 1-131 (microcuries per gram) that alone would produce the same dose when inhaled as the combined activities of iodine isotopes 1-131, 1-132, 1-133, 1-134, and 1-135 actually present.

The determination of DOSE EQUIVALENT I-131 shall be performed using Committed Dose Equivalent (CDE) or Committed Effective Dose Equivalent (CEDE) dose conversion factors from Table 2.1 of the Environmental Protection Agency (EPA) Federal Guidance Report No. 11.

DOSE EQUIVALENT XE-I133 DOSE EQUIVALENT XE-I133 shall be that concentration of Xe-i133 (microcuries per gram) that alone would produce the same acute dose to the whole body as the combined activities of noble gas nuclides Kr-85m, Kr-85, Kr-87, Kr-88, Xe-131m, Xe-133m, Xe-133, Xe-135m, Xe-135, and Xe-138 actually present. If a specific noble gas nuclide is not detected, it should be assumed to be present at the minimum detectable activity. The determination of DOSE EQUIVALENT XE-133 shall be performed using effective dose conversion factors for air submersion listed in Table 111.1 of EPA Federal Guidance Report No. 12, 1993, "External Exposure to Radionuclides in Air, Water, and Soil."

(continued)

McGuire Units 1 and 2 1.1-2 Mc~ure Uits1 an2 11-2Amendment Nos. 266/246

Definitions 1.1 1.1 Definitions (continued)

ENGINEERED SAFETY The ESF RESPONSE TIME shall be that time interval from FEATURE (ESF) RESPONSE when the monitored parameter exceeds its ESF actuation TIME setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.). Times shall include diesel generator starting and sequence loading delays, where applicable. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and the methodology for verification have been previously reviewed and approved by the NRC.

LEAKAGE LEAKAGE shall be:

a. Identified LEAKAGE
1. LEAKAGE, such as that from pump seals or valve packing (except reactor coolant pump (RCP) seal water injection or leakoff), that is captured and conducted to collection systems or a sump or collecting tank;
2. LEAKAGE into the containment atmosphere from sources that are both specifically located and known either not to interfere with the operation of leakage detection systems or not to be pressure boundary LEAKAGE; or 3Reactor Coolant System (RCS) LEAKAGE through a steam generator to the Secondary System (primary to secondary LEAKAGE);
b. Unidentified LEAKAGE All LEAKAGE (except RCP seal water injection or leakoff) that is not identified LEAKAGE;
c. Pressure Boundary LEAKAGE LEAKAGE (except primary to secondary LEAKAGE) through a nonisolable fault in an RCS component body, pipe wall, or vessel wall.

(continued)

McGuire Units 1 and 2 1.1-3 Mc~ure UitsI an2 11-3Amendment Nos. 237 / 219

Definitions 1.1 1.1 Definitions (continued)

MASTER RELAY TEST A MASTER RELAY TEST shall consist of energizing each master relay and verifying the OPERABILITY of each relay. The MASTER RELAY TEST shall include a continuity check of each associated slave relay.

A MODE shall correspond to any one inclusive combination of MODE core reactivity condition, power level, average reactor coolant temperature, and reactor vessel head closure bolt tensioning specified in Table 1.1-1 with fuel in the reactor vessel.

NOMINAL TRIP SETPOINT The NOMINAL TRIP SETPOINT shall be the design value of a setpoint. The trip setpoint implemented in plant hardware may be less or more conservative than the NOMINAL TRIP SETPOINT by a calibration tolerance. Unless otherwise specified, if plant conditions warrant, the trip setpoint implemented in plant hardware may be set outside the NOMINAL TRIP SETPOINT calibration tolerance band as long as the trip setpoint is conservative with respect to the NOMINAL TRIP SETPOINT.

OPERABLE - OPERABILITY A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its specified safety function(s) are also capable of performing their related support function(s).

PHYSICS TESTS PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation. These tests are:

a. Described in Chapter 14 of the UFSAR;
b. Authorized under the provisions of 10 CFR 50.59; or
c. Otherwise approved by the Nuclear Regulatory Commission.

McGuire Units 1 and 2 1.1 -4 Mc~ure UitsI an2 11-4Amendment Nos. 194/1 75

Definitions 1.1 1.1 Definitions (continued)

QUADRANT POWER TILT QPTR shall be the ratio of the maximum upper excore RATIO (QPTR) detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater.

RATED THERMAL POWER RTP shall be a total reactor core heat transfer rate to the (RTP) reactor coolant of 3469 MWt.

REACTOR TRIP The RTS RESPONSE TIME shall be that time interval from SYSTEM (RTS) RESPONSE when the monitored parameter exceeds its RTS trip setpoint TIME at the channel sensor until loss of stationary gripper coil voltage. The response time may be measured, by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and the methodology for verification have been previously reviewed and approved by the NRC.

SHUTDOWN MARGIN (SDM) SDM shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:

a. All rod cluster control assemblies (RCCAs) are fully inserted except for the single RCCA of highest reactivity worth, which is assumed to be fully withdrawn. However, with all RCCAs verified fully inserted by two independent means, it is not necessary to account for a stuck RCCA in the SDM calculation. With any RCCA not capable of being fully inserted, the reactivity worth of the RCCA must be accounted for in the determination of SDM; and
b. In MODES 1 and 2, the fuel and moderator temperatures are changed to the nominal zero power design level.

SLAVE RELAY TEST A SLAVE RELAY TEST shall consist of energizing each slave relay and verifying the OPERABILITY of each slave relay. The SLAVE RELAY TEST shall include, as a minimum, a continuity check of associated testable actuation devices.

McGuire Units 1 and 2 1.1-5 Mc~ure UitsI an2 11-5Amendment Nos. 280/260

Definitions 1.1 1.1 Definitions (continued)

THERMAL POWER THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant.

TRIP ACTUATING DEVICE A TADOT shall consist of operating the trip actuating device OPERATIONAL TEST and verifying the OPERABILITY of required alarm, interlock, (TADOT) and trip functions. The TADOT shall include adjustment, as necessary, of the trip actuating device so that it actuates at the required setpoint within the required accuracy.

McGuire Units 1 and 2 1.1-6 Mc~ure UitsI an2 11-6Amendment Nos. 261/241

Definitions 1.1 Table 1.1-1 (page 1 of 1)

MODES AVERAGE REACTIVITY  % RATED REACTOR COOLANT CONDITION THERMAL TEMPERATURE MODE TITLE (kerr) POWER(a) (0F) 1 Power Operation > 0.99 > 5 NA 2 Startup _>0.99 <5 NA 3 Hot Standby < 0.99 NA > 350 4 Hot Shutdown(b) < 0.99 NA 350 > Tavg > 200 5 Cold Shutdown(b) < 0.99 NA < 200 6 Refueling(C) NA NA NA (a) Excluding decay heat.

(b) All reactor vessel head closure bolts fully tensioned.

(c) One or more reactor vessel head closure bolts less than fully tensioned.

McGuire Units 1 and 2 1.1-7 Mc~ure Uits1 an2 11-7Amendment Nos. 194/175