ML16133A467

From kanterella
Jump to navigation Jump to search
Technical Specification 3.7.9, Amendments 282 and 261
ML16133A467
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/28/2016
From:
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16133A467 (5)


Text

0 0 Date: 4l28l2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-002842

1. Gardner, Troy R
2. Mc Ginnis, Vickie L DOCUMENT TRANSMITTAL FORM

Purpose:

~

Released By:

3. Mccree, Victor M Facility: MCGUIRE NUCLEAR STATION Duke Energy
4. OPS HUMAN PERFORMANCE -

SUBJECT 13225 Hagers Ferry Road

5. OPS TRNG MGR.

MNS TS 3.7.9 - AMENDMENT 282l261 Document Management

6. QATS-MG02DM
7. RESIDENT NRC INSPECT
8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078 MNSDCRM@dyke-~n~[gy.com
9. SERV BLDG FILE ROOM -
10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1

ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ; .~.,\<:

2 3 4 5 6 7 8 9 10 11 12 FYII: FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:

CRAVS

.3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)

LCO 3.7.9 Two CRAVS trains shall be OPERABLE.

0


~-------N TE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control.

APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRAVS train A.1 Restore CRAVS train to 7 days*

inoperable for reasons OPERABLE status.

other than Condition B.

0 B. One or more CRAVS B.1 Immediately trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.

boundary in MODE 1,2,3, or 4.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND 90 days 8.3 Restore CRE boundary to OPERABLE status.

c. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND 0 not met in MODE 1, 2, 3, or4. C.2 Bein MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

.(continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place OPERABLE CRAVS Immediately associated Completion train in emergency mode.

Time of Condition A not met in MODE 5 or 6, or OR during movement of irradiated fuel D.2.1 Suspend CORE Immediately assemblies, or during ALTERATIONS.

CORE ALTERATIONS.

AND D.2.2 Suspend movement of Immediately irradiated fuel assemblies.

E. Two CRAVS trains E.1 Suspend CORE Immediately inoperable in MODE 5 ALTERATIONS.

or 6, or during movement of irradiated AND fuel assemblies, or 0 during CORE ALTERATIONS.

E.2 Suspend movement of irradiated fuel assemblies.

Immediately OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

F. Two CRAVS trains F.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).

(continued) 0 McGuire Units 1 and 2 3.7.9-2 Amendment Nos. 249/229

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME G. One or more CRAVS G.1 Restore CRAVS train(s) 7 days train(s) heater heater to OPERABLE inoperable. status.

G.2 Initiate action in 7 days accordance with Specification 5.6.6.


NOTE-----------------------------------------------------------

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The 0 latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.

0 McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261

CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours In accordance with with the heaters operating. the Surveillance Frequency Control Program SR 3.7.9.2 Perform required CRAVS filter testing in accordance with In accordance with*

the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.9.3 Verify each CRAVS train actuates on an actual or In accordance with simulated actuation signal. the Surveillance Frequency Control Proo ram SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in

  • 1n accordance with accordance with the Control Room Envelope Habitability the Control Room Program. Envelope Habitability 0 Program 0

McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261

0 0 Date: 4l28l2016 Distribution: Duke Energy Document Transmittal #: TR-NUC-MC-002842

1. Gardner, Troy R
2. Mc Ginnis, Vickie L DOCUMENT TRANSMITTAL FORM

Purpose:

~

Released By:

3. Mccree, Victor M Facility: MCGUIRE NUCLEAR STATION Duke Energy
4. OPS HUMAN PERFORMANCE -

SUBJECT 13225 Hagers Ferry Road

5. OPS TRNG MGR.

MNS TS 3.7.9 - AMENDMENT 282l261 Document Management

6. QATS-MG02DM
7. RESIDENT NRC INSPECT
8. SCIENTECH CLEARwrR, FL Huntersville, NC 28078 MNSDCRM@dyke-~n~[gy.com
9. SERV BLDG FILE ROOM -
10. U S NUC REG WASHINGTON, DC
11. USNRC
12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1 1

ef1~:~~-;~~~i9;t)oo:.~;:~s:~~Q;~rr};;tr:;t;ss,:;",~ ; .~.,\<:

2 3 4 5 6 7 8 9 10 11 12 FYII: FYIIE FYIIE FYIIE R&AIE FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE 11 Remarks:

CRAVS

.3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Area Ventilation System (CRAVS)

LCO 3.7.9 Two CRAVS trains shall be OPERABLE.

0


~-------N TE-----------------------------------------------

The control room envelope (CRE) boundary may be opened intermittently under administrative control.

APPLICABILITY: MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRAVS train A.1 Restore CRAVS train to 7 days*

inoperable for reasons OPERABLE status.

other than Condition B.

0 B. One or more CRAVS B.1 Immediately trains inoperable due to Initiate action to implement inoperable CRE mitigating actions.

boundary in MODE 1,2,3, or 4.

AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B.2 Verify mitigating actions ensure CRE occupant exposures to radiological, chemical, and smoke hazards will not exceed limits.

AND 90 days 8.3 Restore CRE boundary to OPERABLE status.

c. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B AND 0 not met in MODE 1, 2, 3, or4. C.2 Bein MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

.(continued)

McGuire Units 1 and 2 3.7.9-1 Amendment No. 282/261

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Place OPERABLE CRAVS Immediately associated Completion train in emergency mode.

Time of Condition A not met in MODE 5 or 6, or OR during movement of irradiated fuel D.2.1 Suspend CORE Immediately assemblies, or during ALTERATIONS.

CORE ALTERATIONS.

AND D.2.2 Suspend movement of Immediately irradiated fuel assemblies.

E. Two CRAVS trains E.1 Suspend CORE Immediately inoperable in MODE 5 ALTERATIONS.

or 6, or during movement of irradiated AND fuel assemblies, or 0 during CORE ALTERATIONS.

E.2 Suspend movement of irradiated fuel assemblies.

Immediately OR One or more CRAVS trains inoperable due to an inoperable CRE boundary in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

F. Two CRAVS trains F.1 Enter LCO 3.0.3. Immediately inoperable in MODE 1, 2, 3, or 4 (for reasons other than Condition B).

(continued) 0 McGuire Units 1 and 2 3.7.9-2 Amendment Nos. 249/229

CRAVS 3.7.9 CONDITION REQUIRED ACTION COMPLETION TIME G. One or more CRAVS G.1 Restore CRAVS train(s) 7 days train(s) heater heater to OPERABLE inoperable. status.

G.2 Initiate action in 7 days accordance with Specification 5.6.6.


NOTE-----------------------------------------------------------

  • 'A' Train CRAVS is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of 'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The 0 latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.

0 McGuire Units 1 and 2 3.7.9-3 Amendment No. 282/261

CRAVS 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operate each CRAVS train for;;::: 10 continuous hours In accordance with with the heaters operating. the Surveillance Frequency Control Program SR 3.7.9.2 Perform required CRAVS filter testing in accordance with In accordance with*

the Ventilation Filter Testing Program (VFTP). the VFTP SR 3.7.9.3 Verify each CRAVS train actuates on an actual or In accordance with simulated actuation signal. the Surveillance Frequency Control Proo ram SR 3.7.9.4 Perform required CRE unfiltered air inleakage testing in

  • 1n accordance with accordance with the Control Room Envelope Habitability the Control Room Program. Envelope Habitability 0 Program 0

McGuire Units 1 and 2 3.7.9-4 Amendment No. 282/261