Text
0 0
Distribution:
Duke Energy Date: 4l28l20J,6 Document Transmittal #: TR-NUC-MC-002843
- 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM
Purpose:
Issue
- 2.
Mc Ginnis, Vickie L
- 3. Mccree, Victor M Released By:
- 4.
OPS HUMAN PERFORMANCE -
Facility: MCGUIRE NUCLEAR STATION Duke Energy
- 5. OPS TRNG MGR.
SUBJECT 13225 Hagers Fem Road
- 6. QATS-MNS TS 3.7.11 - AMENDMENT 282£261 Document Management
- 7. RESIDENT NRC INSPECT MG02DM
- 8. SOENTECH CLEARWTR, FL Hl!nmrsville, NC 28078
- 9. SERV BLDG FILE ROOM -
MNSDCRM@dyke-energy.~Qm
- 10. U S NUC REG WASHINGTON, DC
- 11. USNRC
- 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1
- '?;~~if;:~-" * * *** **, 10.:!)::::ri:..r:* *::!l\\{1';\\;' ;*,,~:f 1
2 3
4 5
6 7
8 9
10 11 12
!4~Ji~il'tf<;::'~N§;'.Ji~f?:?:ff~f0'.o~::"~§.~!:JE9H"!':'.itfr!~
1 l*;,ffff:t;':t FYIIE FYIIE FYIIE FYIIE R&AIE-FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE Remarks:
Q 0
0
- 3. 7 PLANT SYSTEMS 3.7.11 Auxiliary Building Filtered Ventilation Exhaust System (ABFVES)
LCO 3.7.11 Two ABFVES shall be OPERABLE.
ABFVES 3.7.11
NOTE-------------------------------------------------
The Auxiliary Building pressure boundary may be opened intermittently under administrative controls.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
OneABFVES A.1 Restore ABFVES to 7 days*
OPERABLE status.
B.
TwoABFVES B.1 Restore one ABFVES to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable.
OPERABLE status.
- c.
Required Action and
- c. 1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND C.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
*N 0 TE----------------------------------------------------------
- 'A' Train ABFVES is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of
'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
McGuire Units 1 and 2 3.7.11-1 Amendment No. 282/261 I
0 0
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3. 7.11.1 Operate each ABFVES for ;:::: 15 minutes.
SR 3. 7.11.2 Perform required ABFVES filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3. 7.11.3 Verify each ABFVES actuates on an actual or simulated actuation signal.
SR 3.7.11.4 Verify one ABFVES can maintain a pressure
NSWS B 3.7.7 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control ProQram In accordance with the Surveillance Frequency Control Program McGuire Units 1 and 2 3.7.11-2 Amendment No. 261/241
0 0
Distribution:
Duke Energy Date: 4l28l20J,6 Document Transmittal #: TR-NUC-MC-002843
- 1. Gardner, Troy R DOCUMENT TRANSMITTAL FORM
Purpose:
Issue
- 2.
Mc Ginnis, Vickie L
- 3. Mccree, Victor M Released By:
- 4.
OPS HUMAN PERFORMANCE -
Facility: MCGUIRE NUCLEAR STATION Duke Energy
- 5. OPS TRNG MGR.
SUBJECT 13225 Hagers Fem Road
- 6. QATS-MNS TS 3.7.11 - AMENDMENT 282£261 Document Management
- 7. RESIDENT NRC INSPECT MG02DM
- 8. SOENTECH CLEARWTR, FL Hl!nmrsville, NC 28078
- 9. SERV BLDG FILE ROOM -
MNSDCRM@dyke-energy.~Qm
- 10. U S NUC REG WASHINGTON, DC
- 11. USNRC
- 12. WESTINGHOUSE ELECTRIC CO LLC Page 1of1
- '?;~~if;:~-" * * *** **, 10.:!)::::ri:..r:* *::!l\\{1';\\;' ;*,,~:f 1
2 3
4 5
6 7
8 9
10 11 12
!4~Ji~il'tf<;::'~N§;'.Ji~f?:?:ff~f0'.o~::"~§.~!:JE9H"!':'.itfr!~
1 l*;,ffff:t;':t FYIIE FYIIE FYIIE FYIIE R&AIE-FYIIE R&AILP R&AIE FYIIE R&AIE R&AIE R&AIE Remarks:
Q 0
0
- 3. 7 PLANT SYSTEMS 3.7.11 Auxiliary Building Filtered Ventilation Exhaust System (ABFVES)
LCO 3.7.11 Two ABFVES shall be OPERABLE.
ABFVES 3.7.11
NOTE-------------------------------------------------
The Auxiliary Building pressure boundary may be opened intermittently under administrative controls.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
OneABFVES A.1 Restore ABFVES to 7 days*
OPERABLE status.
B.
TwoABFVES B.1 Restore one ABFVES to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable.
OPERABLE status.
- c.
Required Action and
- c. 1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND C.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />
*N 0 TE----------------------------------------------------------
- 'A' Train ABFVES is allowed to be inoperable for a total of 14 days for the correction of a degraded condition on the 'A' Train supply piping from the Standby Nuclear Service Water Pond (SNSWP). The 14 days may be taken consecutively or in parts until completion of the activity, or by March 1, 2017, whichever occurs first. During the period in which the 'A' Train NSWS supply piping from the SNSWP is not available, the 'A' Train NSWS will remain aligned to Lake Norman until the system is ready for post maintenance testing. Any maintenance that is performed on the remaining portions of
'A' Train NSWS during the period in which the 'A' NSWS from the SNSWP supply piping is not available will be limited to a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time. The latter will not count against the 14 day completion time. Allowance of the extended Completion Time is contingent on meeting the Compensatory Measures and Commitments as described in MNS LAR submittal correspondence letter MNS-16-005.
McGuire Units 1 and 2 3.7.11-1 Amendment No. 282/261 I
0 0
SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3. 7.11.1 Operate each ABFVES for ;:::: 15 minutes.
SR 3. 7.11.2 Perform required ABFVES filter testing in accordance with the Ventilation Filter Testing Program (VFTP).
SR 3. 7.11.3 Verify each ABFVES actuates on an actual or simulated actuation signal.
SR 3.7.11.4 Verify one ABFVES can maintain a pressure
NSWS B 3.7.7 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control ProQram In accordance with the Surveillance Frequency Control Program McGuire Units 1 and 2 3.7.11-2 Amendment No. 261/241