U-603587, October 2002 Monthly Operating Report for Clinton Power Station

From kanterella
(Redirected from ML023310190)
Jump to navigation Jump to search
October 2002 Monthly Operating Report for Clinton Power Station
ML023310190
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/18/2002
From: Iliff W
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
U-603587
Download: ML023310190 (5)


Text

AmerGen An Exelon/British Energy Company Clinton Power Station R R. 3 Box 228 Clinton, IL 61727-9351 10CFR50.36 U-603587 November 18, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

October 2002 Monthly Operating Report Please find in Attachment 1 the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending October 31, 2002.

Respectfully, W. S. Iliff Regulatory Assurance Manager Clinton Power Station MJS/bIf Attachments cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Clinton Power Station Office of Nuclear Facility Safety - Illinois Department of Nuclear Safety 3,

ATTACHMENT I CHALLENGES TO MAIN STEAM SAFETY/RELIEF VALVES Month October 2002 None

ATTACHMENT 2 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-461 UNIT Clinton 1 DATE 10/31/02 COMPLETED BY M. J. Sloan TELEPHONE (217)937-3280

/I f MONTH October2002 1 1018 17 1019 2 1019 18 1020 3 1019 19 1021 4 1019 20 1023 5 1019 21 1024 6 1018 22 1024 7 1019 23 1025 8 1019 24 1025 9 1019 25 1026 10 1020 26 1024 11 1020 27 1069 12 1021 28 1024 13 1020 29 1025 14 1019 30 1025 15 1020 31 1023 16 1020

ATTACHMENT 3 OPERATING DATA REPORT DOCKET NO. 50-461 UNIT Clinton 1 DATE 10/31/02 COMPLETED BY M. J. Sloan TELEPHONE (217)937-3280 OPERATING STATUS

1. REPORTING PERIOD: October 2002 GROSS HOURS IN REPORT PERIOD: 745
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3473 MAX. DEPEND. CAPACITY (MDC) (MWe-Net): 1022 DESIGN ELECTRICAL RATING (MWe-Gross): 1062
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL 745 0 6461 6 87,272.8
6. REACTOR RESERVE SHUTDOWN HOURS 00 00 0.0 HOURS GENERATOR ON LINE 745.0 6341 8 85,125 5 7.
8. UNIT RESERVE SHUTDOWN HOURS 00 00 4.0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,395,636 0 19,547,564 235,064,903 6
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 790,307.5 6,423,901.5 77,869,532
11. NET ELECTRICAL ENERGY GENERATED (MWH) 760,914 6,158,841 74,326,279
12. REACTOR SERVICE FACTOR 1000% 886% 667%
13. REACTOR AVAILABILITY FACTOR 1000% 886% 66.7%
14. UNIT SERVICE FACTOR 1000% 869% 650%

UNIT AVAILABILITY FACTOR 100 0% 869% 650%

15.

16. UNIT CAPACITY FACTOR (Using MDC) 109 8% 90.8% 61 0%
17. UNIT CAPACITY FACTOR (Using Design MWe) 1004% 866% 558%
18. UNIT FORCED OUTAGE RATE 00% 1.8% 6 9%
19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, DURATION OF EACH):

TYPE DATE DURATION NONE

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

F, ATTACHMENT 4 I' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-461 UNIT Clinton 1 DATE 10/31/02 COMPLETED BY M. J. Sloan REPORT MONTH October 2002 METHOD OF TYPE SHUTTING DOWN FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE F: SCHEDULED (HOURS) REASON (1) REDUCING POWER ACTIONS/COMMENTS (2)

NONE (1) Reason A - Equipment Failure (explain), B - Maintenance or Test, C - Refueling, D - Regulatory Restriction E - Operator training & License Examination, F - Administrative, G - Operational Error (explain)

(2) Method I - Manual, 2 - Manual Scram, 3 - Automatic Scram, 4 - Other (explain)

(