ML022330136

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revisions
ML022330136
Person / Time
Site: Oyster Creek
Issue date: 08/07/2002
From: Degregorio R
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
-RFPFR, 2130-02-20232
Download: ML022330136 (70)


Text

AmerGen.

An Exelon/Briti Iý Fneg C nmpci AmerGen Fnergy Corpany, LLC Oyster Creek US Route 9 South P.O Box 388 Forked. River, NJ 08731-0388 10 CFR 50 App. E Aug 7, 2002 2130-02-20232 United States Nuclear Regulatory Commission Document Control Desk Washington DC 20555

Subject:

Oyster Creek Generating Station Docket 50-219 Emergency Plan Implementing Procedure Revisions In accordance with 10 CFR 50 Appendix E, Section V, enclosed is the revised index for the Oyster Creek Emergency Plan Implementing Procedures and the below listed procedures:

Procedure Number Title Revision EPIP-OC-. 10 The Operations Support Center 14 Emergency Radiological Surveys Offsite 18 EPIP-OC-. 11 If any further assistance or information is required, please contact Mr. John Rogers, of my staff, at 609.971.4893 Very truly yours, Ron J. DeGregorio c nt Oyster Creek Generating Station RJD/JJR cc: Administrator, Region 1 (2 copies)

NRC Senior Resident Inspector Al 45

EPIP SERIES - EMERGENCY PLAN IMPLEMENTING PROCEDURES PROCEDURE NO. TITLE REV. DATE 6630-ADM-4010.03 Emergency Dose Calculation Manual (EDCM) 11 07/23/00 EPIP-OC-.01 Classification of Emergency Conditions 13 05/31/02 EPIP-OC-.02 Direction of Emergency Response/Emergency 30 11/19/01 Control Center EPIP-OC-.03 Emergency Notification 29 11/07/01 EPIP-OC-.06 Additional Assistance and Notification 26 12/12/01 EPIP-OC-. 10 Emergency Radiological Surveys Onsite 14 08/05/02 EPIP-OC-. 11 Emergency Radiological Surveys Offsite 18 07/25/02 EPIP-OC-. 12 Personnel Accountability 9 07/07/01 EPIP-OC-. 13 Site Evacuation & Personnel Mustering at Remote 10 01/31/02 Assembly Areas EPIP-OC-.25 Emergency Operations Facility (EOF) 26 12/04/01 EPIP-OC-.26 The Technical Support Center 23 07/05/01 EPIP-OC-.27 The Operations Support Center 14 04/19/02 EPIP-OC-.31 Environmental Assessment Command Center 11 08/08/00 EPIP-OC-.33 Core Damage Estimation 5 08/08/00 EPIP-OC-.35 Radiological Controls Emergency Actions 15 12/17/01 EPIP-OC-.40 Site Security Emergency Actions 12 12/11/01 EPIP-OC-.41 Emergency Duty Roster Activation 8 07/02/02 EPIP-OC-.44 Thyroid Blocking 2 07/21/01 EPIP-OC-.45 Classified Emergency Termination/Recovery 3 12/04/01 OEP-ADM-1319.01 Oyster Creek Emergency Preparedness Program 11 01/22/02 OEP-ADM-1319.02 Emergency Response Facilities & Equipment 12 06/13/02 Maintenance OEP-ADM- 1319.04 Prompt Notification System 4 07/19/02 OEP-ADM- 1319.05 Emergency Preparedness Event Reports 2 07/02/01

Oyster Creek Licensing Correspondence Distribution Sheet File No. 02004 Letter Date 08/07/2002 Reference/Letter No. 2130-02-20232 Date Sent / Received 08/07/2002 Title

Description:

Revisions: EPIP-OC- .10, and -.11 LICENSING ENGINEER: John Rogers SPECIAL NOTES: Cover letter only Office of the President Oyster Creek R. J. DeGregorio (Letter Only) OCAB2 X E. Harkness MOB X R. Maldondo OCAB2 M. Trum MOB X Communications OCAB2 C. Wilson MOB R. Brown MOB Engineerin J. Vaccaro MOB V.Aggarwal OCAB3 X J..Bobba AOB M. Newcomer OCAB3 A. Krukowski NMB A. Agarwal OCAB3 R. Ewart OCAB2 D. Barnes OCAB3 G. True Whse2 T. E. Quintenz OCAB3 D. Norton Whse I M. Button OCAB3 W. Collier AOB Aux F. Buckley OCAB3 D. McMillan Bldg 12 T. Powell OCAB3 J. Magee NMB R. Larzo OCAB3 M. Massaro OCAB2 C. Lefler OCAB3 D. Slear OCAB2 x M. Moore AOB AmerGen/Exelon Other C. Pardee KSA 3-N NSRB (22 copies) X G. Vanderheyden KSA 3-N P Thompson OCAB2 X M. Gallagher (Outgoing Only) KSA 3-E J. Hufnagel (Outgoing Only) KSA 3-E D. Walker KSA 3-E X KS Document Ctr KSA 1-N X I Toncic KSB 3-W D Distel KSA 3-E Jeff Benjamin Cantera External Distribution NJBNE - K. Tosch X INPO ANI - R. Oliveira BPU - R. Chilton T. Gould GE - P. Ray File Index Number: 20.16.01.01 Cross Reference Number: 20.16.01.01

Am erGen Telephone No. 609-971-4652 RM Dept.

DOCUMENT TRANSMITTAL August 5, 2002 To:

NON-CONTROLLED COPY FOR NRC-WASHINGTON, DC C/O BARBARA JOHANSEN, OCAB-2 PLEASE NOTE: IT IS IMERATIVE THAT YOU NOTIFY RM OFADDRESS CHANGES!!

FILE INSTRUCTIONS: DESTROY OUTDATED:

EPIP-OC-.10 ENTIRE REV. 14 EPIP-OC-.10 ENTIRE REV. 13 FAILURE TO COMPLY WITH REQUIRED ACTION, WITHIN FIVE (5) WORKING DAYS OF THIS REQUEST, COULD RESULT IN A CAP.

REQUIRED ACTION: 1. ADD REVISION TO YOUR CONTROLLED COPIES.

2. DESTROY OUTDATED MATERIAL.
3. RETURN TRANSMITTAL SIGNED AND DATED.

SIGN AND RETURN TO: RECORDS MANAGEMENT, OCAB-1 NAME: DATE:

YOUR SIGNATURE ON THIS FORM INDICATES THAT YOU HAVE FILED THE CURRENT REVISION. THIS SIGNED FORM CAN BE USED FOR AUDITING PURPOSES.

Am erGen Telephone No. 609-971-4652 RM Dept.

DOCUMENT TRANSMITTAL July 25, 2002 To:

NON- CONTROLLED COPY FOR NRC-WASHINGTON, DC C/O BARBARA JOHANSEN, OCAB-2 I wit PLEASE NOTE: IT IS IMPERATIVE THAT YOU NOTIFY RM OFADDRESS CHANGES!!

FILE INSTRUCTIONS: DESTROY OUTDATED:

EPIP-OC-.11 ENTIRE REV. 18 EPIP-OC-.11 ENTIRE REV. 17 FAILURE TO COMPLY WITH REQUIRED ACTION, WITHIN FIVE (5) WORKING DAYS OF THIS REQUEST, COULD RESULT IN A CAP.

REQUIRED ACTION: 1. ADD REVISION TO YOUR CONTROLLED COPIES.

2. DESTROY OUTDATED MATERIAL.
3. RETURN TRANSMITTAL SIGNED AND DATED.

SIGN AND RETURN TO: RECORDS MANAGEMENT, OCAB-1 NAME: DATE:

YOUR SIGNATURE ON THIS FORM INDICATES THAT YOU HAVE FILED THE CURRENT REVISION. THIS SIGNED FORM CAN BE USED FOR AUDITING PURPOSES.

OYSTER CREEK Number AmerGen.

An Exelon/Brttlsh Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 Applicability/Scope Usage Level Responsible Department Applies to work at Oyster Creek 2 Emergency Preparedness Ef fective at/

Prior Revision 13 incorporated the This Revision 14 incorporates the following Temporary Changes: following Temporary Changes:

N/A N/A List of Pages (all pgs. rev'd to Rev. 14) 1.0 to 6.0 EI-I to E1-2 E2-1 E3-1 E4-1 E5-1 E6-1 to E6-2 E7-1 E8-1 E9-1 E10-1 El1-1 E12-1 El3-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek I Signature J Concurring Organization Element I Date nv4 *4 na*v 4f,6tAA4 AetdieA'4'o Emeraencv Planner

- x'~ - I 1 -

Approved Ration 1~i Protection Manaaer -1 (7Z a... f_ I - %

  • I- ' I i i

(EPIPI0) 1.0

OYSTER CREEK Number AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.10 An Exeion/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 PROCEDURE HISTORY REV DATE ORIGINATOR

SUMMARY

OF CHANGE 3 12/94 A. Smith Add Document History page and correct numbering on Exhibits 18 through 23.

4 09/95 J. Bontempo Use cellular phones as primary communications for FMT's.

5 01/96 J. Bontempo Correct references to Exhibits 8 through 21 (previously 9 through 22).

6 03/97 A. Smith Allow RAC to perform the RCC duties, update survey maps, delete Exhibit 13, recovery of radio communications due to cell phones being primary mode of comm.

D 06/97 J.W. Rayment Draft - when ready to be rev'd don't forget to put In your summary of change.

7 09/98 J.W. Rayment *Add initial spaces to section 4.2, delete initial spaces from exhibits 1, 2, & 4.

eAllow use of normal Rad Con procedures for surveys.

  • Change exhibits to reflect normal procedures.

eDelete exhibits that do not reflect normal procedures.

eChange 1/4 mile offsite map to be more accurate.

  • Change air sampling default to 1 minute samples.
  • Change air sampler to Lo volume instead of Hi volume.

8 10/99 A. Smith Update phone numbers for field teams. Remove reference to EPIP-OC-.04, this procedure was deleted.

9 12/99 G. Seals Procedure does not comply with minimum detectable activity requirements of NUREG 0654.

10 DOS A. Smith Change reference from GPU or GPUN to OCNGS 11 06/01 R. Finicle Changed Safety Review Required from "yes" to "no" on the cover page. Changed the title "GRCS" to "on-shift Radiological Assessment Coordinator. Update DC Air Sample info. Update vehicle usage.

12 11/01 A. Smith Remove reference to EPIP-OC-.04.

03/02 J. Bontempo Clarify flowrate criteria for air samples Pg. E3-1 13 14 07/02 J. Bontempo Clarify flowrate criteria for air samples Page E3-2 to include minimum flowrate to meet 1E-7 pCi/cc (EPIPI0) 2.0

OYSTER CREEK Number AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.10 An Exelon/Brttish EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 1.0 PURPOSE 1.1 This procedure describes the responsibilities and duties of personnel involved in the conduct of Onsite Radiological/Environmental Monitoring.

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to all emergency response personnel involved in Onsite Radiological/Environmental Monitoring Team activities.

2.2 This procedure is to be initiated upon any of the following conditions:

2.2.1 Alert, Site Area Emergency or General Emergency as determined by Procedure EPIP-OC-.01, Classification of Emergency Conditions.

2.2.2 Upon direction of the Emergency Director.

3.0 DEFINITIONS 3.1 None 4.0 RESPONSIBILITIES 4.1 Onsite RAC 4.1.1 The RAC may perform the responsibilities of the RCC. If that occurs, FMT activities will be reported to the RAC directly until there are personnel resources available to station the RCC function separately. When the resources are available, the RAC may transfer onsite FMT activities to the RCC.

(EPIPI0) 3.0

AAn eergyny en OYSTERPREPAREDNESS EMERGENCY CREEK Number EPIP-OC-.10 AnExelon/By*ttsh Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 4.2 Onsite Radioloaical/Environmental Survey Teams 4.2.1 The Onsite Radiological/Environmental Survey Team communicates directly to the RAC/RCC and is responsible for conducting emergency radiological monitoring within the Protected Area and up to 1/4 mile perimeter from the site boundary (Exhibit 12, 1/4 mile Offsite Map).

NOTE The Onsite Radiological/Environmental Survey Team may be directed beyond the 1/4 mile perimeter to perform offsite radiological monitoring until the Offsite Radiological/Environmental Survey Teams are fully manned and ready to be deployed.

NOTE Offsite monitoring points are found in Exhibit 12 of Procedure EPIP-OC-.I1, Offsite Radiological Environmental Surveys.

INITIALS 4.2.2 Team members shall assemble and complete actions identified in Exhibit 1, "Team Assembly and Formation" 4.2.3 Team members shall obtain monitoring instruments and equipment utilizing Exhibit 2, "Monitoring Instruments and Equipment".

4.2.4 Team members shall conduct air sampler pre-operational checks in accordance with Reference 6.8. Also, utilizing Exhibit 3, "Emergency Air Sampling".

4.2.5 Team members shall prepare the vehicle by completing action identified in Exhibit 4, "Vehicle Preparation".

4.2.6 Team members shall utilize survey instruments during cold weather by completing actions identified in Exhibit 5, "Cold Weather Instrument Operations".

(EPIPI0) 4.0

SOYSTER CREEK Number EPIP-OC-.10 EMERGENCY PREPAREDNESS An Exelon/Bftfis Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 INITIALS 4.2.7 Team members shall conduct onsite surveys utilizing Exhibit 6, "Conducting on Site Surveys" when so directed.

(Refer to Exhibit 10 and Exhibit 13).

4.2.8 Team members shall terminate monitoring activities by completing actions identified in Exhibit 7, "Termination of Monitoring Activities".

4.3 If the onsite team is dispatched offsite beyond the 1/4 mile radius, the team shall suspend use of this procedure and implement the appropriate sections of EPIP-OC-.11 for conducting surveys and collection of air samples.

5.0 PROCEDURE 5.1 Onsite Radiological/Environmental Survey Team(s) members shall implement this procedure during an emergency.

6.0 REFERENCES

6.1 2000-PLN-1300.01, OCNGS Emergency Plan.

6.2 OEP-ADM-1319.02, Emergency Response Facilities and Equipment Maintenance.

6.3 EPIP-OC-.01, Classification of Emergency Conditions.

6.4 Memorandum 9502-88-0098, Field Measurement of Airborne Releases of Radioactive Material, G.M. Lodde, May 25, 1988.

6.5 Radiological/Industrial Safety and Health Awareness Report,89-027, 9-25-89.

6.6 6630-ADM-4200.01, Radiological Surveys.

6.7 6630-ADM-4212.01, Air Sample Collection and Analysis.

(EPIPI0) 5.0

OYSTER CREEK Number AmerGen.

An Exelon/Bdttlsh Energy Company EMERGENCY PREPAREDNESS TMPLEMENTING PROCEDURE EPIP-OC-.10 Revision No.

Title Emergency Radiological Surveys Onuite 14 7.0 EXHIBITS 7.1 Exhibit 1, Team Assembly and Formation 7.2 Exhibit 2, Monitoring Instruments and Equipment 7.3 Exhibit 3, Emergency Air Sampling 7.4 Exhibit 4, Vehicle Preparation 7.5 Exhibit 5, Cold Weather Instrument Operations 7.6 Exhibit 6, Conducting On-Site Surveys 7.7 Exhibit 7, Termination of Monitoring Activities 7.8 Exhibit 8, Onsite Emergency Monitoring Points 7.9 Exhibit 9, Onsite Monitoring Point Map 7.10 Exhibit 10, Sample Record 7.11 Exhibit 11, Air Activity (Iodine) Nomogram 7.12 Exhibit 12, Approx. 1/4 Mile Offsite Map 7.13 Exhibit 13, Survey Form (EPIPI0) 6.0

SOYSTER CREEK Number EMERGENCY PREPAREDNESS EPIP-OC-.10 An Exelon/lritish Energy Company TMVT ,I*WRN'I'1 PROCEDURE Title Revision No.

Emergency Radiological Surveys Onuite 14 EXHIBIT 1 TEAM ASSEMBLY AND FORMATION 1.0 The Onsite Radiological/Environmental Survey Team will consist of two (2) team members. At least one member shall be a Radiological Controls Technician who shall be designated Team Leader.

2.0 The Onsite Radiological/Environmental Survey Team shall mobilize, and report as directed by the RAC/RCC.

3.0 Obtain the emergency monitoring vehicle key. If the key is not available, a backup key may be obtained from the guard at the Main Gate Processing Center.

3.1 Obtain cellular phone from On-Shift Radiological Assessment Coordinator lock box as primary mode of communications.

3.2 Obtain a portable radio for back up communications (Channel 1 would be used).

3.3 Team members shall conduct cell phone communications (primary) or radio communications (secondary) observing appropriate Radio Communications Protocol.

TEAM MEMBERS AVAILABLE NAME SSN DOSE (Team Leader)

(EPIPIO/S3) EI-I

SOYSTER CREEK Number EPIP-OC-. 10 PREPAREDNESS PROCEDURE El/tsErCmnEMERGENCY An____

AnExeln/British Energy Cpany IMPLEMENTING Title Revision No.

Emergency Radiological Surveys Onsite 14 EXHIBIT 1 (continued)

TEAM ASSEMBLY AND FORMATION NOTE When operating the phone while in vehicle pedestal the vehicle must be on or the key in the accessory mode in order for the phone to be unlocked, then speed dial can be accomplished.

When phone is hand held it operates normally.

3.3 The following is a list of locations, speed dial codes and actual phone numbers used by field teams and their respective contact.

LOCATION SPEED DIAL PHONE #

RAC/ECC 01 609-971-0335 RAC/TSC 02 609-971-4156 EAC/EACC 03 732-367-8805

  • 732-370-8990 FMT "A" 04 609-457-3560 FMT "B" 05 609-457-3441 FMT "C" 06 609-457-1525 ONSITE FMT 07 609-457-3592 RCC/OSC 08 609-971-4880 EMERG. 09 911 ECC 10 609-971-4666
  • 732-370-8990 Dial Manually 4.0 If the vehicle is not available, contact Security to obtain keys for any on-site vehicle and proceed with FMT response.

5.0 If a vehicle cannot be located or returned immediately, inform the RCC/RAC and request further guidance.

(EPIPIO/S3) E1-2

OYSTER CREEK Number EPIP-OC-.10 AmerGen. ENERGENcyPREPAREDNESS IMPLEWn*NTING PROCEDURE An Exelon/British Energy Company Revision No.

Title 14 Emergency Radiological Surveys Onsite EXHIBIT 2 MONITORING INSTRUMENTS AND EQUIPMENT the following 1.0 The onsite Radiological Survey Team shall ensure or obtain them, From:

instruments are available in the onsite van monitoring (ie. Rad Con Count Room, Radiac Trailer, the OSC checks as instrument locker), and perform the pre-operational required.

NOTE for use if Pre Op OP CS-137 check source is in emergency locker checks have not been done already.

of 1.1 One (1) doserate survey instrument with capability of determining measuring 0.2 mR/hr and greater and capable Beta readings.

a pancake style 1.2 One (1) countrate survey instrument with probe.

1.3 One (1) air sampler (Lo Vol RAS Pump) 1.4 One (1) DC air sampler (EPIP10/S4) E2-1

OYSTER CREEK Number AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.10 An ExeloTn/Brttish EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 EXHIBIT 3 EMERGENCY AIR SAMPLING NOTE 1 Silver zeolite cartridges to be used for all samples.

NOTE 2 Flow rate on all samples is to be a minimum of 23 1pm (23 - 30 1pm)

NOTE 3 Verify operation of power inverter in van prior to use.

Initials 1.0 DC Air Sampler Use 1.1 Ensure the 2 position switch (off-run) is in the OFF position.

1.2 Connect the air sampler directly to the vehicle's battery terminals via connection on bumper or grille.

1.4 Turn ON A/S and adjust flow as needed.

1.5 Turn OFF A/S and disconnect from the vehicle.

(EPIPIO/S5) E3-1

Ameru'n. EMERGENCY PREPAREDNESS Epip-0c-.10 An Exelon/B0tish EnergyCompany IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 EXHIBIT 4 VEHICLE PREPARATION 1.0 Verify emergency equipment lockers/kits are locked or sealed.

2.0 If the emergency locks are not locked or sealed, conduct an inventory using inventory checklist from Procedure OEP-ADM 1319.02, Emergency Response Facilities and Equipment Maintenance.

(Appendix B-2).

3.0 Perform radio check with RAC/RCC.

4.0 Log any deficiencies and report information to RAC/RCC.

NOTE Team members shall log into Rem-On-Line System or initiate a control point admission ticket. (An ESRD or a 0-200 mR and a 0-1500 mR SRD required.)

(EPIPIO/S6) E4-1

A rnr n _EMERGENCY OYSTER CREEK PREPAREDNESS Number EPIP-OC-. 10 An Exelon/Bittish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 EXHIBIT 5 COLD WEATHER INSTRUMENT OPERATIONS Caution must be observed to ensure instrument operation is not affected by 1.0 extreme cold temperatures.

0 instrument use is unlimited.

2.0 If ambient temperature is above 32 F (0°C),

3.0 If ambient temperature is below 32 0 F (0oC), continuous instrument use should be limited as follows:

Temperature Continuous Operating Time 0 - 32 0 F 5 minutes

[(-18 0 C) - (0 0 C)]

_200 - 0OF 2 minutes 0

[(-28 0 C) - (-18 C)]

4.0 For operation in temperatures below 32 0

F (0°C), a battery check should be performed before and after each measurement.

the battery check fails in either case, the measurement is not valid.

4.1 If warm up.

4.2 Return the instrument to the vehicle and allow the batteries to 4.3 Repeat the measurement as required.

(EPIPI0/S7)

E5-1

OYSTER CREEK Number AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.10 An Exelon/Brltish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 EXHIBIT 6 CONDUCTING ON-SITE SURVEYS 1.0 If the On-Site Team is dispatched Off-Site beyond the 1/4 mile radius, suspend use of this procedure and implement appropriate sections of EPIP-OC-.I1 for surveys.

2.0 The intent is to keep the vehicle within the Protected Area whenever possible. Monitoring Points ESE, SE, and SSE are outside the Protected Area. Due to the time required to enter and exit the Protected Area, verify with the OSC that those monitoring points are required.

3.0 Exhibit 8, "Onsite Emergency Monitoring Points" (describes the onsite locations).

4.0 Exhibit 9, "Onsite Monitoring Point Map" (identifies these locations).

5.0 Perform and document onsite surveys in accordance with established Rad Con procedures. (Exhibit 13: Survey Form - Example - Equivalent Form may be used).

5.1 A baseline perimeter survey should be performed when team is dispatched.

5.2 Perform surveys at the discretion of the RAC/RCC.

5.3 Identify on Survey Form whether survey location may be within the plume or not.

5.3.1 If open window reading is >110% of closed window reading, uncorrected, survey location may be within the plume.

5.4 Label all samples, (smears, air samples, water samples, etc.), with appropriate information (time, location, etc.).

(EPIPI0/S8) E6-1

OYSTER CREEK Number AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.10 An Exelon/Bi*tish Eyngy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 EXHIBIT 6 (continued)

CONDUCTING ON-SITE SURVEYS 5.5 Refer to Exhibit 11, "Air Activity (Iodine) Nomogram", for field counting iodine air samples to estimate air iodine activity.

5.6 Document Survey on Exhibit 13 or Equivalent Form; any water, soil, or air samples to be documented on Exhibit 10 - sample record.

5.7 Communicate all survey results to the RCC/RAC as soon as practical.

NOTE 1 Draw a 5 minute minimum air sample at 25 LPM. (20-30 LPM) as indicated on the scale if possible using a watch, stopwatch or time to measure the time duration unless otherwise directed by the RAC/EAC. Sample time based on Rad. Eng. Calc. 2820-01-004.

NOTE 2 In the event that the E-van or a team member becomes contaminated, notify the RCC/RAC for a replacement or directions.

(EPIPIO/S8) E6 -2

Number OYSTER CREEK EPIP-OC-.i0 SAmeGen. R*GENCY PREPAREDNESS An Exelon/British EneTgy Company IMP LEMENTING PROCEDURE Revision No.

Revision No.

Title Enmrgency Radiological Surveys Onmite EXHIBIT 7 TERMINATION OF MONITORING ACTIVITIES INITIALS 1.0 Upon direction of the RAC/RCC to cease monitoring activities.

1.1 Transport field monitoring samples to the Rad Con Counting Room or as directed by the RAC/RCC.

1.2 Log off the Rem-On-Line system as appropriate.

1.3 Inventory and return to storage all the emergency monitoring equipment in accordance with Appendix B of OEP-ADM-1319.0 2

, "Emergency Response Facilities and Equipment Maintenance".

1.4 Return vehicle and keys to assigned location.

review 1.5 Submit team logs and data forms to RAC/RCC for his and subsequent filing with the Document Control Center.

E7-1 (EPIP10/S9)

An*ne-- OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.10 An Exelon/BrItish Energy Company IMPLEMENTING PROCEDURE Revision No.

Title Emergency Radiological Surveys Onsite 14 EXHIBIT 8 ONSITE EMERGENCY MONITORING POINTS Sector Location Description 1 N RCA perimeter road - west of Gate 8 2 NNE RCA perimeter road - south side of Materials Warehouse 3 NE RCA perimeter road - east side, halfway between Gate 20 and Materials Warehouse 4 ENE RCA perimeter road - east side at Gate 20 5 E RCA perimeter road - south east corner at AOG Building 6 ESE Main site access road - directly south of AOG Building 7 SE Main parking lot - first row directly south of Fuel Oil Storage Tank 8 SSE Main parking log driveway at Main Gate 1 9 S Auxiliary office Building eastside adjacent to door 10 SSW Auxiliary Office Building - westside adjacent to door 11 SW Diesel Generator Building - eastside adjacent to door 12 WSW Access road - westside Protected Area, west of transformers 13 W Access road - westside Protected Area, west of demineralizer water storage tank 14 WNW Access road - northwest corner, west of Torus Water Storage Tank 15 NW Access road - adjacent to Gate 10A 16 NNW Access road - halfway between North Guard House and Materials Warehouse, south of LLRW west corner (EPIPI0/SI0) E8-1

Number OYST ER CREEK EpIP-OC-.10 AmerGen. PREPAREDNESS I!4PLE -EINTING PROCEDURE An Exelon/BTish Energy Company Revision No.

Title 14 Emergency Radiological Surveys Onsite EXHII 3IT 9

%p Point Ma Onsite Monitorin 1

16 N

NNW 15 rA.A 00 CM-4

______ V M (EPIP10/SIl) E9-1

EXHIBIT 10 Procedure EPIP-OC-10 Rev. 14 Sample Record DATE:

T AIR SAMPLE SURVEY AIR SAMPLE WINDOW WINDOW SILVER FLOW RUN TIME LOCATION CLOSED OPEN BKG PART ZEOLITE RATE TIME mr/hr mr/hr cpm cpm cpm LPM Min 2

3 4

5 6

I-7 8

9 10 SERIAL NO. CAL. DUE AIR SAMPLER TYPE SERIAL NO. CAL. DUE COUNTING INST. TYPE

  • T(* ED_________

TEAM LEADER (EPIP10/S12)

OYSTER CREEK Number AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.10 An Exeton/Bntish EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 14 EXHIBIT 11 AIR ACTIVITY (IODINE) 5.5 A rough idea of the approximate iodine concentration and DAC value can be obtained from the table below:

NTE'm C'OM TAflTTT1! CAT1(' (I1( IC!C I # of DAC's T.Irn I" t3m TnnTWW rONC tuCi/cc) 100 9E-8 4.5 500 5E-7 25 9E-7 45 1000 5000 5E-6 250 9E-6 450 10000 5E-5 2500 50000 NOTE This table is based on 5 minute sample times @ 25 LPM. Divide concentration and # of DAC's for all other sample times. The table is intended to give field teams a rough idea of what they are encountering. This data should not be used to make dose projections for the general public.

(EPIPIO/SI3) E11-1

OYSTER CREEK Number AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.10 An Exelon/Bftish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onuite 14 EXHIBIT 12 APPROX. 1/4 MILE OFFSITE MAP

,-:S

/'..*"-*'*,-- *'- _ --a=14 x

-. 1/4 MILE

  • --a-'Nh.---

- "- ' -- 4"

~4- _

- -qa-

ý- --

(EPIP10/S14) E12-1

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/Bultish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offiite 19 Applicability/Scope Usage Level Responsible Department Applies to work at Oyster Creek 2 Emergency Preparedness Effective Date 745 09.

Prior Revision 17 incorporated the This Revision 18 incorporates the following Temporary Changes: following Temporary Changes:

N/A N/A List of Pages (all pgs rev'd to Rev. 18 1.0 to 5.0 El-l to El-2 E2-1 to E2-6 E3-1 E4-1 E5-1 E6-1 to E6-2 E7-1 E8-1 E9-1 to E9-2 El0-1 to El0-2 Ell-l to Ell-13 E12-1 E13-1 to E13-3 E14-1 E15-1 El6-1 E17-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek I Signature I Concurring Organizational Element I Date 4

flri rn ntnr Lisa a. /'&r.tJnAA

~~

I~~~zec ,t) anfner17

-7 7 7 A," ý tcL II.. .1.Z-L1 IF~~oL7

  • 6 Concurred By IL¶kl&rk 4'1A orrs Radiation Protection Mana er I .

(EPIPII) 1.0

Number AmerGen.

An Exelon/BrItish Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.1I IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 PROCEDURE HISTORY Rev Date Originator Sumary of Change 4 A. T. Smith Delete Parsippany Field Monitoring Team and Add Document History Page 5 12/94 A. T. Smith Define RAC & EAC acronyms pg. 4.0 Delete Reference to PTFC pg. 5.0 Clarify dosimetry pg. E2-1 Clarify Plume search directions.

Remove names at locations in Exhibit 12 Clarify Dose Rate Survey Open and Closed readings.

6 09/95 J. Bontempo Use cellular phone as primary communications for FMTs.

7 12/95 J. Bontempo Delete initial block for repetitive tasks.

Rearrange order of task in El-l Delete term Teach Leader Pg. E1-2 Correct units to 1pm Pg. E2-6, El0-1, E15-1 Delete signature block of EACCE from pg. E15-1, E16 1, E17-1.

9 10/97 A. Smith Update area code.

10 01/98 P. Milligan Change air sample run time from 5 minutes to 1 minute.

11 07/98 J. Rayment New Rad Engineering Calculation determined that open window to closed window ratio needs to be changed.

12 05/99 A. T. Smith During annual review no other changes except the reference E-Plan # were identified.

13 10/99 A. T. Smith Update phone numbers for field teams and consolidate phone number information.

14 12/99 G. Seals Procedure does not comply with minimum detectable activity requirements of NURG 0654.

15 DOS A. T. Smith Required due to Sale of OCGS.

16 06/01 A. T. Smith Remove air sampler, update DC air sampler info change various bldg. Locations to reflect new locations.

Update cell phone instructions.

17 10/10 A. T. Smith Remove reference to Building 12.

18 03/02 J. Bontempo Exhibit 2 Section 9.0 correct step references Exhibit 2C Section 10.0 add flowrate criteria 23-30 1pm.

Exhibit 6 Section 3.0 correct air sample instructions.

(EPIPII) 2.0

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/BrItish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offoite 18 Rev Date Originator Swmnary of Change 18 07/02 J. Bontempo Pg 4.0, E2-1, E2-2, E2-3, E3-1 correct OCNGS to OCGS 0

Exh 1, Pg El-1 correct 32-F to 32 F Exh 2 Pg E2-1 Step 3.0 correct reference 4 from Exh 14 to Exh 13 Exh 10, Step 4.0 correct wording to prevent sample collection process. Addressed directed action for

_CAP 02002-0958-2.

(EPIPII) 3.0

Number AnmerGen OYSTER CREEK EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-. 11 An Exelon/British Energy Company Title Revision No.

Emergency Radiological Surveys Offsite i1 1.0 PURPOSE 1.1 This procedure describes the responsibilities and duties of personnel involved in conducting Offsite Radiological/Environmental Monitoring and Sampling.

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to all Emergency Response personnel involved in Offsite Radiological/Environmental Monitoring Team activities.

2.2 This procedure is to be initiated upon any of the following conditions:

2.2.1 Alert, Site Area Emergency or General Emergency or as directed by the Emergency Director.

3.0 DEFINITIONS 3.1 None 4.0 RESPONSIBILITIES 4.1 Radioloqical/Environmental Survey Teams The offsite Radiological/Environmental Survey Team performs offsite radiological and environmental monitoring and sampling in accordance with Exhibit 1, "Field Monitoring Team (FMT) Checklist".

5.0 PROCEDURE 5.1 The Offsite Radiological/Environmental Survey Team shall initially report to the Radiological Assessment Coordinator (RAC) until the Environmental Assessment Command Center (EACC) is manned and activated. When the EACC is manned and activated, the Offsite Radiological/Environmental Survey Teams then report to the Environmental Assessment Coordinator (EAC) who is responsible for directing emergency teams to conduct emergency radiological and environmental monitoring outside the protected area and to conduct plume tracking.

5.2 FMT members will proceed with Exhibit 1.

(EPIPII) 4.0

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/Bltfish EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18

6.0 REFERENCES

6.1 2000-PLN-1300.01, OCGS Emergency Plan.

6.2 OEP-ADM-1319.02, Emergency Response Facilities and Equipment Maintenance.

6.3 EPIP-OC-.01, Classification of Emergency Conditions.

6.4 Memorandum 9502-88-0098, Field Measurement of Airborne Releases of Radioactive Material, G.M. Lodge, May 25, 1988.

7.0 EXHIBITS 7.1 Exhibit 1, "Field Monitoring Team (FMT) Checklist" 7.2 Exhibit 2, "OCGS FMT Activation Checklist" 7.2.1 Exhibit 2A, ]Intentionally Left Blank 7.2.2 Exhibit 2B, "Dose Rate and Count Rate Instrument Op Check" 7.2.3 Exhibit 2C, "DC Air Sampler Op Check" 7.3 Exhibit 3, "OCGS FMT Termination Checklist" 7.4 Exhibit 4, "Conduct of a Dose Rate Survey' 7.5 Exhibit 5, "Conduct of a Count Rate Survey" 7.6 Exhibit 6, "Conduct of an Air Sample" 7.7 Exhibit 7, "Conduct of Noble Gas Sampling" 7.8 Exhibit 8, "Conduct of Soil or Snow Sampling" 7.9 Exhibit 9, "Conduct of Vegetation Sampling" 7.10 Exhibit 10, "Conduct of Water Sampling" 7.11 Exhibit ill "Offsite Monitoring Points" 7.12 Exhibit 12, "Plume Search Routes" 7.13 Exhibit 13, "Offsite Radiological/Environmental Survey Team Log" 7.14 Exhibit 14, "Sample Record" 7.15 Exhibit 15, "Count Rate Survey Record" 7.16 Exhibit 16. "Environmental Sample" 7.17 Exhibit 17, "Dose Rate Survey Record" (EPIPlI) 5.0

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.II An Exelon/Brltsh Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 1 Field Monitoring Team (FMT) Checklist Initials 1.0 OCGS FMTs will complete Exhibit 2, OCGS FMT Activation Checklist.

2.0 Upon direction from the EAC/RAC cease monitoring activities and complete Exhibit 3, FMT Termination Checklist" as appropriate.

3.0 Frequently monitor your SRDs. When a SRD indicates 3/4 or greater scale, record the dose on your Control Point Admission Ticket, rezero the SRD, and fill out a new ticket.

4.0 Monitor the dose rate in your vehicle. If the dose rate exceeds 2 mrem/hr at the driver or passenger locations due to field monitoring samples, notify the EACC/RAC. To determine this, conduct a dose rate survey in the vehicle cab while the vehicle is in an area of normal background.

5.0 Notify the EACC/RAC when any team member's accumulated dose approaches 1000 mrem TEDE.

6.0 If the outside temperature is less than 32 0 F the continuous instrument use should be limited as follows:

Temp Continuous Operation Time 0OF - 320F 5 minutes

-20OF - 0OF 2 minutes Battery checks must also be performed before and after each use.

If either check is not satisfactory, the measurement is not valid. The instrument should be returned to the vehicle and the batteries allowed to warm up.

7.0 Conduct surveys, air samples and biota sampling as directed by the EAC.

"*Dose rate surveys are performed in accordance with Exhibit 4

"*Count rate surveys are performed in accordance with Exhibit 5

"*Air samples are performed in accordance with Exhibit 6

"*Noble gas samples are performed in accordance with Exhibit 7

"* Snow and soil samples are performed in accordance with Exhibit 8

"*Vegetation samples are performed in accordance with Exhibit 9

"*Water samples are performed in accordance with Exhibit 10 (EPIPll/S3) EI-I

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/Sritish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys OffBite 18 EXHIBIT 1 (Continued)

Field Monitoring Team (FMT) Checklist Initials 8.0 Periodically conduct a whole body frisk and smear the surfaces of the vehicle.

If the Beta-Gammaa contamination is found to be above the following levels notify the EAC and report to the RAA or effect local decontamination and documentation as directed.

2 Beta Gamma 100 cpm/100cm Surface area of vehicle Beta Gamma 100 CPM above background, direct frisk of the wheels

  • Vehicles, contamination control station and instruments may be decontaminated in the field by wiping down with maslin cloth taking care to fold maslin inward after each wipe. By using the count rate instrument to check the maslin after each wipe, a rough order of level of Beta-Gamma contamination may be approximated. Always make one pass with the maslin cloth.

Never use the same side to decontaminate a surface. After decontamination place maslin cloth in poly bag, label and conduct a dose rate survey.

Time Signature (EPIPII/S3) EI-2

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/Brftish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

wiergency Radiological Surveys Offsite 18 EXHIBIT 2 OCGS FMT ACTIVATION CHECKLIST Initials 1.0 Two team members present. If a qualified team member is not available, an untrained individual may be used as a driver/assistant. The RAC or EAC must approve the individual.

NOTE The RAC or EAC may authorize or direct team dispatch without completing one or more checklist steps.

2.0 Obtain cellular phone for primary communications labeled for your team and a Hand Held Radio for backup communications from the FMT Equipment Locker. The cell phones have adapters to plug into the cigarette lighter for power.

3.0 Contact the RAC by phone and inform him that your team is beginning activation. If RAC unavailable contact EAC.

Obtain plant status and meteorological conditions from the RAC/EAC Document on Exhibit 13. The following is a list of locations, speed dial codes and actual phone numbers used by field teams and their respective contact.

Location Speed Dial Phone #

RAC/ECC 01 609-971-0335 RAC /TSC 02 609-971-4156 EAC/EACC 03 732-367-8805 732-370-8990 FMT "A" 04 609-457-3560 FMT "B" 05 609-457-3441 FMT G"C 06 609-457-1525 ONSITE FMT 07 609-457-3592 RCC /OSC 08 609-971-4880 EMERG. 09 911 ECC 10 609-971-4666

  • Dial Manually 732-370-8990 4.0 Each team member shall obtain one TLD, and one ESRD and initiate a Control Point Admission Ticket.

5.0 Check the seals on the storage container kits. If a seal is broken, an inventory must be performed in accordance with Appendix B-1 of OEP-ADM-1319.02.

6.0 Obtain one dose rate and two count rate survey instruments and Op Check in accordance with Exhibit 2B.

(EPIP1I/S4) E2-1

Number AmerGen.

An Exelon/Britisb Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.II IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offaite 18 EXHIBIT 2 (Continued)

OCGS FMT ACTIVATION CHECKLIST Initials 7.0 Obtain one DC Air Sampler and Op Check in accordance with Exhibit 2C.

8.0 Obtain two water-filled 500 ml sample bottles for noble gas sampling.

Fill each with water and seal tightly. Generally, filled bottles will be kept in the storage locker.

9.0 Transport the following to the vehicle.

1 cellular phone 2 sets of dosimetry (one each member) from step 3.0 1 hand held radio from step 4.0 1 dose rate survey instrument from step 6.0 2 count rate survey instruments from step 6.0 1 DC Air Sampler from step 8.0 2 500 ml sample bottles from step 9.0 1 Notebook binder containing EPIP-OC-.11 with attachments and OEP-ADM-1319.02, Appendix B 1 Map of Offsite Monitoring Points. The map is contained in the notebook.

1 portable search light 10.0 Place a 2ft x 2ft poly sheet on the back floor of the vehicle.

11.0 Tape up poly bags on the inside of the vehicle doors to be used for contaminated waste and gloves.

12.0 Turn the radio select knob on the vehicle emergency radio to "Position I". Set the hand held radio to "Position 5". Contact the EACC or RAC for a radio check.

13.0 Initiate a Survey Team Log using Exhibit 13. The log should include:

"* Dispatch locations and requested actions

"* Significant information (e.g., personnel or vehicle contamination, personnel over-exposure, requests for assistance, etc.)

"* Notifications of Emergency Classifications or Termination.

(EPIPII/S4) E2-2

Number AmerGen.

An Exelon/BrItIsh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 2 (Continued) 0CGS FMT ACTIVATION CHECKLIST Initials 14.0 Notify the EACC or RAC that you are ready to be dispatched.

Give the EAC/RAC the names, social security numbers, and remaining dose of each team member.

If remaining dose is not known for a team member, information can be obtained from the RAC/RCC at the ECC, TSC, or OSC as appropriate.

15.0 Proceed to the location directed by the EACC or RAC. If for some reason communications with the RAC or EACC are interrupted, one team will proceed to the nearest downwind sampling point identified in Exhibit 11. The second team will proceed on the plume search route as determined by the wind direction and the directions in Exhibit 12. Always continue to try and establish communications with the RAC or EACC.

This is the preferred method of directions for the plume search.

Time Completed Signature (EPIP1I/S4) E2-3

Number AmerGen.

An Exelon/Britlsh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offuite 18 EXHIBIT 2B Dose Rate and Count Rate Instrument Op Check Perform the following for each of the three instruments Initials 1.0 Record instrument serial number.

2.0 Record instrument calibration due date.

3.0 Inspect instrument for physical damage.

4.0 Inspect instrument for illegible labels.

5.0 Perform a battery check.

6.0 Obtain the button source from the lead pig within the locker.

Source check the instrument for response.

7.0 If the instrument fails any of the above checks, tag the instrument as bad and obtain a spare instrument. If no spare is available, contact the EAC/RAC. Document instructions in Survey Team Log.

NOTE DOSE RATE instruments and their detector probes are calibrated as a single unit and probes must not be interchanged with other instruments.

Serial Dose Rate Meter Count Rate Meter Count Rate Meter Serial Number Cal Due Date Physical Damage? YES/NO YES/NO YES/NO Illegible Labels? YES/NO YES/NO YES/NO Battery Check OK? YES/NO YES/NO YES/NO Source Check OK? YES/NO YES/NO YES/NO (EPIPII/S4) E2-4

Number AmerGen.

An Exelon/Brtltsh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 2C DC Air Sampler Op Check Initials 1.0 Record instrument serial number 2.0 Record instrument calibration due date 3.0 Physically inspect the air sampler for physical damage.

4.0 Ensure the 2 position switch (Off-Run) is in the Off position.

5.0 Unscrew the Particulate Filter, Silver Zeolite Cartridge, and "0" rings from the air sampler head, inspect "0" rings for damage.

6.0 Install a new Silver Zeolite Cartridge ensuring the arrow on the side of the cartridge points toward the air sampler.

7.0 Install a new Particulate Filter ensuring the side of the filter which has a woven appearance is nearest to the Silver Zeolite Cartridge.

8.0 Reassemble the air sample head and screw into the Air Sampler.

9.0 Connect the Air Sampler ON directly to the vehicle's battery terminals via bumper or grille.

10.0 Turn on the Air Sampler and enter the flow rate, ipm.

(EPIPII/S4) E2-5

Number AmerGen.

An Exelon/B1ttish Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.1I IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offnite 18 EXHIBIT 2C (Continued)

DC Air Sampler Op Check Initials 12.0 Turn off Air Sampler and disconnect from the vehicle.

13.0 Leave the DC air sampler in the vehicle.

14.0 If the air sampler does not pass the Op check, tag the instrument as bad and obtain a spare. If no spare is available, contact the EAC/RAC. Document instructions in the Survey Team Log. In the event that the DC air sampler is used, ensure the EAC/RAC is aware of the flow rate.

Signature (EPIP1I/S4) E2-6

Number AmerGen.

An Exelon/Brltish Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offaita 18 EXHIBIT 3 OCGS FMT Termination Checklist Initials 1.0 Transport Field Monitoring Samples to the Offsite Sample Storage Facility, designated by the EAC. Use FRH6 key. This should be the Environmental Lab (Building No. 18) on the Forked River Site.

NOTE For Drills and Exercises return all Field Monitoring Samples to the Environmental Controls Section for disposition.

2.0 Place signed Team Logs/Inventory Forms and Data Forms with the Field Monitoring Samples.

Turn in TLD's and completed Control Point Admission Tickets to the Dosimetry Radiological Support Group.

Contact EAC/RAC to determine where to turn in dosimetry if the center has been relocated.

NOTE After a drill, dosimetry should be returned to the Monitoring Kit Instrument Locker.

3.0 Return vehicle to OCAB parking lot, and return keys to the point of issue.

4.0 Return all the Emergency Monitoring Equipment to the Monitoring Kit Instrument Locker.

5.0 Return hand held radio to the charging rack inside the Monitoring Kit Instrument Locker.

6.0 Complete and sign all logs and checklist. Return to Emergency Preparedness.

Time Completed Signature (EPIPII/S5) E3-1

AmerGen.

AnExelonlBrsh Eneg*compa.y o~s~ OYSTERCREEKNumber EMERGENCY PREPAREDNESS Nube EPIP-OC-. 11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Of Emits is1 EXHIBIT 4 Conduct of a Dose rate Survey 1.0 Ensure a pre-operational check has been completed for the dose rate instrument in accordance with Exhibit 2B.

2.0 Observe Cold Weather Operations Limitation described in Exhibit 1, Step 6.0.

3.0 Switch the dose rate instrument range selector switch to the highest scale that will give the operator a mid range meter reading.

4.0 Dose rate measurement should be performed approximately one meter (1m) above the ground (waist level) outside the emergency vehicle, unless directed otherwise by the RAC.

5.0 Record the survey results on Exhibit 18, Dose Rate Survey Record.

6.0 Determine if the survey location may be within the radioactive plume and advise RAC/EAC.

6.1 IF Beta Gamma (OW) measurements are less than 110 % of the Gamma (CW) measurements, THEN dose rate measurements indicate that the plume is elevated over and/or horizontally displaced from the survey location.

6.2 Identify on Exhibit 17, Dose Rate Survey Record, that the location is not in plume.

6.3 IF Beta Gamma (OW) measurements are equal to or greater than 110%

of the Gamma (CW) measurements, THEN dose rate measurements indicate that the plume may have touched down at the Survey locations -ý Take an air sample and contact the RAC/EAC.

(EPIPII/S6) E4-1

Number Amer i E EMERENCYPREPAREDNESS IP OERGENCY CREEK EN IN PR OCEDN E EPIP-OC-.11 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offaite J_

EXHIBIT 5 Conduct of a Count Rate Survey 1.0 Don surgeons gloves and obtain smear discs and sample envelopes from the Emergency Monitoring Kit.

2.0 Record Date, Time and Survey Location on sample envelope.

2 3.0 Wipe smear disc on horizontal surfaces to obtain a sample of 100 cm .

4.0 Wipe the smear disc in a lazy S pattern approximately 16 inches long, or Wipe smear disc in an area of approximately 4 inches by 4 inches.

5.0 If smear samples are taken from a non-horizontal surface, provide a description of the sampled surface on the smear disc envelopes.

6.0 Determine Background Count Rate by reading count rate instrument with no sample present.

NOTE The smear sample counting area background count rate must be less than 300 counts per minute (cpm) using a count rate instrument.

NOTE A rough order of magnitude for Dose rate conversion to CPM is count rate (CPM) = 3000 x dose rate (mR/hr).

7.0 Record the Background counts per minute (Bcpm) on Exhibit 16, Count Rate Survey Record.

8.0 Obtain the smear Gross Count Rate.

"* Place detector probe within 1/2 inch of the smear disc with the sample surface toward the detector window.

"* Count the smear disc.

"* If activity is indicated within 15 seconds, allow the meter indicator to stabilize before recording.

"* Record the maximum smear sample Gross counts per minute (Gcpm) on Exhibit 15, Count Rate Survey Record.

"* Complete the appropriate data on Exhibit 15, Count Rate Survey Record.

(EPIPII/S7) E5-1

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/British EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offuite 18 EXHIBIT 6 Conduct of an Air Sample 1.0 Prerequisites

"* The Air Sampler shall be located in a manner that will minimize cross contamination.

"* All samples shall be labeled and saved for further analysis.

2.0 Set up Air Sampler if the filter and cartridge require replacement.

"* Unscrew the particulate filter and Silver Zeolite Cartridge rings from the air sampler head.

"* Install a new Silver Zeolite Cartridge ensuring the arrow on the side of the cartridge points toward the air sampler.

"* Install a new particulate filter ensuring the side of the filter which has a woven appearance is nearest to the Silver Zeolite Cartridge.

"* Reassemble the air sampler head and screw into air sampler.

NOTE The air sampler is calibrated with both the Particulate Filter and Silver Zeolite Cartridge in place. Both must be in place even if an iodine sample has not been requested and the Silver Zeolite Cartridge will not be analyzed in the field.

3.0 Draw a 5 minute minimum air sample at 25 1pm (20-30 1pm) as indicated on the scale if possible using a watch, stopwatch, or timer to measure the time duration unless otherwise directed by the RAC/EAC. Sample based on Rad Eng. Calc. 2820-01-004.

4.0 Obtain a general area count rate with the count rate instrument and pancake probe at approx. waist level. If the background exceeds 300 CPM move to a location where the background is less than 300 CPM.

5.0 Record air sampler run time and flow rate on the Air Sample Data Collection Envelope and Exhibit 14.

6.0 Wearing protective gloves, unscrew the filter holder section of the sampler head from the Silver Zeolite cartridge holder section such that the particulate filter is held in place in the removed section.

7.0 Remove the retainer ring from the filter holder and obtain a count rate on the particulate filter by holding the front side of the filter holder against the pancake probe. Record the count rate as Gross CPM on Air Sampler Data Collection Envelope and on Exhibit 14.

8.0 Using tweezers, remove the filter from the holder. Place the filter in an Air Sample Data Collection Envelope.

(EPIPII/S8) E6-1

Number AmerGen.

An Exelon/Bditish Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite __

EXHIBIT 6 (Continued)

Conduct of an Air Sample 9.0 Recount the filter holder without the particulate filter in place.

Enter this count rate as background CPM on the Air Sample Data Collection Envelope and on Exhibit 14.

10.0 Subtract the background cpm (Bcpm) from gross cpm (Gcpm) and record as "Net cpm" on the Air Sample Data Collection Envelopes.

11.0 Measure the contact Dose Rate and record on the Air Sample Data Collection Envelope.

12.0 Retain the sample for later analysis.

NOTE Monitor the driver and passenger area dose rates. If any area exceeds 2.0 mR/hr, notify the RAC/EAC and request guidance.

13.0 Wearing protective gloves remove the Silver Zeolite cartridge from the sampler head and place it in an Air Sample Data Collection Envelope.

14.0 Count both sides of the Silver Zeolite cartridge through the envelope.

Record the higher count rate as "Gross" on the Air Sample Data Collection Envelope and on Exhibit 14.

15.0 Subtract the background cpm (Bcpm) from the gross cpm (Gcpm) and record the result as "Net cpm" on the Air Sample Data Collection Envelope.

  • Measure the contact dose rate and record on the Air Sample Data Collection Envelope
  • Retain the sample for later analysis.

16.0 Establish contact with the EACC/RAC.

17.0 Transmit the data from the Air Sample Data from Exhibit 14.

(EPIPIl/S8) E6-2

Number OYSTER CREEK AmerGen.

An Exelon/Brttish EneTgy Company EMERGENCY PREPAREDNESS EPIP-OC-.1.

IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offtit. is EXHIBIT 7 Conduct of Noble Gas Sampling 1.0 Obtain a 500 ml bottle that was prefilled with clean water. When a sample is needed, stand well away from vehicles or other obstructions (10 ft or greater), remove the cap and pour the water from the container. Cap or close the container.

2.0 Label the sample container with the date/time of collection, and location. Record the same information in the first two columns of Exhibit 15. Write "Noble Gas" in the 3rd column and leave the other columns blank.

3.0 Retain all samples for later counting and analysis.

NOTE Monitor the driver and passenger area dose rates. If any area exceeds 2.0 mR/hr, notify the RAC/EAC and request guidance.

(EPIP1/S9) E7-1

Number Amoer~.~ OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite is EXHIBIT 8 Conduct of Soil or Snow Sampling 1.0 Soil and snow sampling shall be conducted with one team member collecting samples and the other team member providing radiation monitoring for the sample collector.

2.0 Obtain sample container and trowel from Emergency Monitoring Kit.

3.0 Label container with Time, Date, Monitoring Location, Type of Sample, and Dose rate.

Example:

Sample Label Date Time:

Sample Type Sample Location Contact Dose Rate _mr/hr mr/hr (OW) (CW)

Background bcpm Contact count rate __ gcpm Initials 4.0 Choose a sample area free from leaves, grass and other vegetation.

5.0 Wearing protective gloves scrape approximately the top 1/2 inch of soil or snow with trowel and place into container until full. Cap container.

6.0 Perform a contact dose rate survey of container with a dose rate meter.

7.0 Record dose rate on label.

8.0 If contact dose rate is less than 0.2 mR/hr, perform a contact count rate measurement of sample container.

  • Measure Background Count Rate (bcpm)
  • Measure Sample Contact Count Rate (gcpm) 9.0 Complete the appropriate data on Exhibit 16.

10.0 Record the following on the sample label

"* Background Count Rate bcpm

"* Gross Count Rate gcpm 11.0 Save all samples for future analysis.

12.0 Surgeon's gloves should be changed after each sample is collected to prevent cross-contamination.

(EPIPII/SI0) E8-1

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/Brltlsb EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 9 Conduct of Vegetation Samplinq 1.0 Vegetation sampling shall be conducted with one team member collecting samples and the other team member providing radiation monitoring for the sample collector.

2.0 Obtain clippers and medium plastic bag from Emergency Monitoring Kit.

3.0 Label sample bag with Time, Date, Monitoring Location, Type of Sample, and Dose rate.

Example:

Sample Label Date Time:

Sample Type Sample Location Contact Dose Rate _mr/hr mr/hr (OW) (CW)

Background bcpm Contact count rate gcpm Initials 4.0 Wearing protective gloves, take as large a sample of green (living) vegetation as can be fit into bag.

NOTE Do NOT include soil, large branches or roots.

5.0 Place sample in bag.

6.0 Seal the bag and perform a Contact Dose Rate.

7.0 Record Dose rate on label.

(EPIP1I/Sll) E9-1

Number OYSTER CREEK EPIP-oC-.11 AmerGen. EMERGENCY PREPAREDNESS An Exelon/Brftish Energy Company IMPLEMENTING PROCEDURE Revision No.

Title Emergency Radiological Surveys Offsite 18 EXHIBIT 9 (Continued)

Conduct of Vegetation Samtlinq 8.0 If contact dose rates are less than 0.2 mR/hr, perform a contact count rate measurement of sample container.

  • Measure Background Count Rate (bcpm)
  • Measure Sample Contact Count Rate (gcpm) 9.0 Complete the appropriate data on Exhibit 16.

10.0 Record the following on the sample label

"* Background Count Rate bcpm

"* Gross Count Rate gcpm 11.0 Save all samples for future analysis.

12.0 Surgeon's gloves should be changed after each sample is collected to prevent cross-contamination.

(EPIPII/Sll) E9-2

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/BrIltish EnergyCompany IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsit. 18 EXHIBIT 10 Conduct of Water Sampling 1.0 Water sampling shall be conducted with one team member collecting samples and the other team member providing radiation monitoring for the sample collector.

CAUTION Use life vest when collecting water samples from bodies of water i.e.

lakes, bay, ocean.

2.0 Obtain empty plastic screw-top sample bottle and a plastic bag.

3.0 Label bag with Time, Date, Monitoring Location, Type of Sample, and Dose rate.

Example:

Sample Label Date Time:

Sample Type Sample Location Contact Dose Rate mr/hr mr/hr (OW) (CW)

Background _ bcpm Contact count rate gcpm Initials 4.0 Wearing protective gloves, remove cap, submerge bottle to obtain a surface sample. Take care not to disturb sediment.

5.0 Recap bottle and place in a plastic bag. Seal the bag.

6.0 Perform a Contact Dose Rate survey of the bottle through the plastic bag.

7.0 Record Dose Rate on sample label.

(EPIPII/S12) E10-1

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.11 An Exelon/Brttish EneTgy Company Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 10 (Continued)

Conduct of Water SamDling 8.0 If contact dose rates is less than 0.2 mR/hr, perform a contact count rate measurement of sample container.

  • Measure Background Count Rate bcom
  • Measure Sample Contact Count Rate gcpm 9.0 Record the appropriate data on Exhibit 16.

10.0 Record the following on the sample label

  • Background Count Rate bcpm
  • Gross Count Rate gcpm 11.0 Save all samples for future analysis.

12.0 Surgeon's gloves should be changed after each sample is collected to prevent cross-contamination.

(EPIPII/SI2) E10-2

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.1I An Exelorr/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 11 OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

N1 00 0.65/ East end of old Left onto Rt. 9, left just after Crest 1045.9 Energy Spectrum intake canal, and proceed to the OC-3 parking lot old site of the Energy Spectrum N2 70 1.2/ Intersection of Left onto Rt. 9, left onto 1930.8 Taylor Lane and Taylor Lane, proceed 0.2 mile to Kennebec Rd. Kennebec Rd.

N2a N-2 20 1.8/ Playground Rt. 9 north Lakeside Drive, left

-1 2896.2 Lakeside Drive at onto Lakeside Dr. 3/4 miles to Moose Head St. playground at intersection with Crest Moose Head St.

OC-11 N3 --- 3520 2.5/ Along curb Left onto Rt. 9 approx. 1.5 4022.5 adjacent to park miles to Lakeside Dr., left onto at intersection Lakeside Dr. to Deer Head Lake of Lakeside Dr. Drive and Deer-Head Lake Drive N4 N-4 3540 3.2/ Lacey Township Left onto Rt. 9 to Rt. 614

-1 5148.8 Municipal Bldg. (Lacey Rd.), left onto Lacey parking lot. Road 1.7 miles to Lacey Township 110 AC available Municipal Bldg. on right N5 N-5 3540 4.21/ North commuter Left onto Rt. 9 to Rt. 614

-1 6773.9 parking lot at (Lacey Rd.), left onto Lacey Forked River Road to G.S. Pkwy., north on service area on Pkwy to Forked River service G.S. Pkwy. area 110 AC available N6 356.50 4.45/ Approx. 1/3 mile Left onto Rt. 9 to Rt. 614 west of Central (Lacey Rd.), left onto Lacey Rd.

Regional High to G.S. Pkwy. North on Pkwy.

School along for 2.2 miles at overpass of Pinewald-Keswick Pinewald-Keswick Rd. Mile Post Rd. at junction 77.2 with G.S. Pkwy.

N10 30 9.6/ Ocean County Left onto Rt. 9 to Rt. 614 Courthouse (EOC) (Lacey Rd.), left onto Lacey Rd.

Toms River, to G.S. Pkwy north to Exit 81, parking log. east on Water St. for 0.5 mile 110 AC available to Main St., left one block to Washington St., right on Washington to 2nd left to Horner St.

(EPIPi1/S13) El1-1

Number AmerGen.

An Exelon/Brttlsh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

Nl0a 3590 8.75/ Left side of road Left onto Rt. 9, continue left before traffic at Rt. 166 junction to G.S.

light at Pkwy. Interchange approaching intersection of intersection of Rt. 530 (Dover G.S. Pkwy, Rt. 530 Rd.), left to roadside area (Dover Rd.) and before intersection.

Rt.9 N20 N-20 351.50 10.8/ Rt. 37, DOT Left onto Rt. 9 to Rt. 614 17377 Maintenance Yard (Lacey Rd.) to G.S. Pkwy.,

West of Mule Rd. North to Exit 82W, 1.9 mile South side Rt. 37 west to DOT Maintenance Yard on left using jug handle west of Mule Road NNE1 --- 190 0.45/ Rt. 9 mile mrkr 80 Left onto Rt. 9 to intake canal C at O.C. intake bridge at mile marker 80 CREST 724.0 ca l canal OC-6 NNEla 230 0.7/ Intersection of Left onto Rt. 9, 0.7 mile to 1126.3 Biscayne Dr. and traffic light at Beach Blvd.,

Nantucket Dr. right on Beach Blvd. to Biscayne Dr. (IWt right) to Nantucket Rd.

NNE2 NNE-2 23.50 1.7/ Forked River State Left onto Rt. 9, 1.6 mile to

-I Marina SW corner Forked River State Marina of parking lot.

110 AC available NNE3 24.50 2.5/ Intersection of Left onto Rt. 9, 2.6 miles to 4022.5 Rt. 9 and Sunrise Sunrise Blvd.

Blvd.

NNE4 270 3.7/ Intersection of Left onto Rt. 9, 3.9 miles to Rt. 9 and Laurel Laurel Blvd.

Blvd. parking lot NNE5 260 4.6/ Intersection of Left onto Rt. 9, 4.9 miles to 7401.4 Rt. 9 and WOBM WOBM radio station access road access road NNE6 240 5.6/ Rt. 9, Pinewald Left onto Rt. 9, 6.2 miles on 9010.4 Substation, 0.1 right, 0.1 miles North miles North of Serpentine Dr. at large metal Serpentine Dr. utility poles NNE6a 32.50 6.8/ Edge of Bay, Left onto Rt. 9, 6.2 miles to 10,941 Bay Blvd. Bay Blvd. east on Bay Blvd. to I end of road (EPIPII/SI3) E11-2

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/Brttlsh EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite is EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

NNE7 NNE 23.50 6.0/ Bayville First Left onto Rt. 9, approx. 6.4 1 9654.0 Aid, Rt. 9, miles to Bayville, Rt. 9 @

Bayville, 110 AC Station Blvd.

available NNE10 21.50 7.55/ Intersection of Left onto Rt. 9, 7.6 miles to Rt. 9, Veeder multi-point intersection, just Lane, Ocean Gate past MacDonald's to parking Dr. & Mill Creek area near intersection on Rd. parking lot right NNEI0a 22.50 8.65/ Intersection of Left onto Rt. 9, 7.6 miles, go 13,918 Chelsea Ave and past MacDonald's, right on Ocean Gate Drive Ocean Gate Dr. to Chelsea Ave (near end)

NNEI0b 16.50 9.9/ Intersection of Left onto Rt. 9 to Rt. 614 Rt. 37 and Vaughn (Lacey Rd.) to G.S. Pkwy. to Ave, lot on first Rt. 37 (Exit 82) east approx.

jug-handle exit 2.9 miles to Vaughn Ave from Rt. 37 intersection right jughandle NNE20 27.50 10.5/ Bay Bridge Inn Left onto Rt. 9 to Rt. 614 16,895 parking lot near (Lacey Rd.) to G.S. Pkwy.,

Rt. 37 and west Exit 82, to Rt. 37 east to end of bridge at bridge, right into parking lot west shore of Barnegat Bay NEI 470 0.3/ Intersection of Left onto Rt. 9, 0.2 miles to 482.7 Rt. 9 and farm ra first right at farm road road NEla 420 0.9/ #732 Bermuda Dr. Left onto Rt. 9 to first 1448.1 near Nantucket Rd. traffic light, right onto Beach Blvd. to Bermuda Dr.,

right to end of road.

Address #732. Just past Nantucket Rd.

NE2 410 1.6/ Captain's Inn, Left onto Rt. 9 to second 2574.4 Lacey Rd. parking traffic light, right onto lot at rear Lacey Rd. to Captain's Inn (near end of road)

NE3 --- 42.50 2.4/ Game Farm Ocean Left onto Rt. 9, beyond second Residential Group traffic light, right onto Game Center Farm Rd. (concrete parking lot OC-12 near buildings)

(EPIPII/S13) Eli-3

Number AmerGen.

An Exelon/British Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

NE4 510 3.1/ End of Sail Dr. Left on Rt. 9, north 2.6 miles near intersection to Sunrise Blvd., turn right, of Sunrise Blvd. go approx. 1.4 miles to Sail Dr. (at bend in road), left on Sail Dr.

NE5 NE- 470 4.8/ Laurel Blvd. Left on Rt. 9, 3.9 miles (past 7723.2 Address #1063. (NJ 2nd traffic light) to Laurel 5-1 Location #1068) Blvd., right on Laurel Blvd. at curve (at street light,)

address #1063 NEl0 -44 9.5/ Intersection of Left onto Rt. 9, left at 2nd Central Ave. and traffic light onto Rt. 614 14th St., Seaside (Lacey Rd.) to G.S. Pkwy.,

Park north to Exit 82E, east onto Rt. 37 over bridge to Rt. 35 south (Central Ave), right onto Central Ave. to intersection of Central Ave. and 14th St.

NE20 370 11.8/ Near intersect-ion Left on Rt. 9, left at 2nd of Rt. 37 access traffic light on Rt. 614 (Lacey road and Rt. 35 Rd.) to G.S. Pkwy., north to north (Central Exit 82 east on Rt. 37, cross Ave.) bridge to Rt. 35 north, exit.

At first traffic light, turn right, "U-Turn" onto service rd. area ENEI 70 0 0.25/ Yellow N.J. Left onto Rt. 9, approx. 25 Natural Gas Co. 100 yds. South of North Gate access marker approx. road on left yds. north of main entrance ENE2a 670 1.15/ Intersection of Left onto Rt. 9 to 1st traffic 1850.4 Tampa Rd. and light (Beach Blvd.), right onto Sandy Hook Dr. Beach Blvd. to Forked River

(#701 Tampa Rd.) Bridge. Just over bridge turn right onto Sandy Hook Dr. to second left (Tampa Rd.)

ENE2 ENE- 59.50 1.15/ Beach Blvd. to Left onto Rt. 9 to Ist traffic left side of road light (Beach Blvd.), right onto after crossing Beach Blvd. to southeast end of OC-4 Forked River Forked River Bridge Bridge (EPIPII/S13) Eli-4

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/Biitish EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

ENE3 --- 700 2.3/ Intersection of Left on Rt. 9 to Ist traffic 3700.7 Beach Blvd. and light (Beach Blvd.), right onto Tamiami Road Beach Blvd., over Forked River Bridge to next bridge (wooden) continue over bridge to right fork (Tamiami Rd.)

ENE4 580 3.7/ Parking lot at Left on Rt. 9 to Sunrise Blvd.,

Sunrise Beach Club right on Sunrise to Capstan Dr.

on left. Capstan Dr. straight to Sunrise Beach Club ENE7 670 6.3/ Island Beach State Left onto Rt. 9 to 2nd traffic Park service area light, Rt. 614 Rd. (Lacey Rd.),

10,137 parking lot left on Lacey to G.S. Pkwy.

between north and North on Pkwy. to Exit 82E, south swimming east on Rt. 37 across bridge to area parking lots Rt. 35 south (Central Ave.) to Is. Beach State Park, 3.5 mi.

south of park entrance gate to swimming area parking lots ENE10 600 7.35/ Island Beach State Left on Rt. 9 to 2nd traffic 11,826 Park, 2.5 miles light, Rt. 614 (Lacey Road),

1 south of park left on Lacey Rd. to G.S. Pkwy entrance at North on Pkwy. to Exit 82E, chained access east on Rt. 37 across bridge to road, on right Rt. 35 south (Central Ave.) to Island Beach State Park, 2.5 miles south of park entrance gate to intersection of chained access road on right El --- 820 0.3/ Opposite Main Gate Exit Main Gate onto Rt. 9 482.7 on Rt. 9 CREST OC-7 Ela 87.50 0.85/ The Farm Area Left onto Rt. 9, right at first Northeast corner farm road to second left basin. to 1367.7 of dredge spoils corner of dredge spoils basin Key for gate lock in FMT vehicle E2 870 1.6/ Intersection of Left onto Rt. 9, right at 1st Albatross Ct. and traffic light to Forked River 2574.4 Bridge, cross bridge to Elks Orlando Dr.

Club, right on Club House Dr.,

4 blocks to Orlando Dr., left on Orlando Dr. to Albatross Ct.

(second left)

(EPIP1I/S13) Eli-5

Number AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.1I An Exelon/Brttlsh Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offoite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

E7 94.50 5.9/ Old Coast Guard Left onto Rt. 9, left at 2nd 9493.1 Station Watch traffic light onto Rt. 614 Tower, Island (Lacey Rd.) to G.S. Pkwy.,

Beach State Park north to Exit 82E, east on Rt.

11OAC 37 to Rt. 35 south (Central Ave.) to Is. Beach State Park, to 7 miles south of entrance gate to station on left ESE - 1110 0.3/ Yellow marker (NJ Right onto Rt. 9, approx. 0.1 482.7 Natural Gas Co.) mile south of O.C. Main Gate 0.1 mile south of O.C. Main Gate ESEla ESE 1110 0.8/ Fork area formed Right onto Rt. 9, 0.5 mile, 1 1287.2 at intersection left on Bay Pkwy. to Bay Pkwy. and Dock intersection with Willow and Ave. Willow also Dock Avenues intersects here ESE2 --- 109.50 1.85/ End of Bay Pkwy. Right onto Rt. 9, 0.5 mile, at Barnegat Bay left on Bay Pkwy. to end of CREST 2976.7 street at Barnegat Bay OC-14 ESE7 - 109 6.3/ Island Beach State Left onto Rt. 9 to 2nd traffic Park southern end light, Rt. 614 (Lacey Rd.),

of paved park road left onto Lacey Rd. to G.S.

Pkwy. North on Pkwy. to Exit 82E, east on Rt. 37 across bridge to Rt. 35 south (Central Ave) to Island Beach State Park; go 8.2 miles south of park entrance to southern end of paved road SE1 1260 0.36/ Rt. 9, south of Right onto Rt. 9, over South Access Rd., discharge canal bridge, just south of discharge past South Access Road canal bridge SEla 1400 0.5/ Southeast corner Right onto Rt. 9, left on Bay of Bay Pkwy., Parkway along Rt. 9, next to residence at 2 Bay Parkway (EPIP11/S13) E11-6

Number AmerGen.

An Exelon/Brttlsh EneTgy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

SE2 1300 1.7/ South end of Shore Right onto Rt. 9, approx. 0.75 2735.3 Dr. and on mile, left onto Main St., 0.4 Barnegat Bay, mile to Lighthouse Dr., left Waretown onto Lighthouse Dr. to Shore Dr., right onto Shore Dr. to end of Shore Dr.

SE7 SE- 1270 6.3/ Across the street Right onto Rt. 9 to 10,137 from the Coast intersection of Rt. 72, east Guard Station on onto Rt. 72 to Long Beach Bayview Ave., Blvd., left onto Long Beach Barnegat Light Blvd., left onto 6th St. to Borough Bayview Ave., left onto Bayview Ave. and across the street from the Coast Guard Station SSE2a 1640 1.6/ Waretown Vol. Fire Right onto Rt. 9, 1.6 miles, 2574.4 Co. right ontoonRt.

building left532, 1 block, SSE2 SSE 1540 1.55/ Area east side of Right onto Rt. 9, 0.75 mile, 1 2494.0 Main St. and south left onto Main St., 0.75 mile of Skippers Blvd. to just past intersection with Skippers Blvd.

SSE3 SSE3 1660 1.7/ Township of Ocean Township of Ocean Municipal Crest Municipal Building Building parking lot Route 9 OC-22735.3 Coraliss and to Rout 532. West on Route Railroad Ave. 532 to Coraliss St. Left on Coraliss to Railroad Ave.

SSE4 1640 2.65/ Lagoon (BBCA Right onto Rt. 9, 2.2 miles, 4263.9 Recreation Area) left onto Barnegat Beach Dr.,

near Bonita Blvd. 0.6 mile, right on Lagoon View Rd., 1-1/2 blocks to area on left next to lagoon SSEI0 1530 8.3/ Intersection south Right onto Rt. 9 to Anchor St. with intersection of Rt. 72, east Harvey Cedars onto Rt. 72 to intersection of Water Stand Pipe Long Beach Blvd., left onto Long Beach Blvd. to intersection of West 80th St.

to intersection with S. Anchor St. and Harvey Cedars Water Stand Pipe (EPIPI1/S13) Eli-7

Number AmerGen.

An ExelonlBritish Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offeite is EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

S2 --- 1840 1.6/ 0.7 mile west of Right onto Rt. 9, right onto Rt. 9 on Rt. 532 Rt. 532, 0.7 mile just beyond CREST 2574.4 residence #172 and dirt lane OC-15 S3 S-3 1780 2.3/ Waretown Right onto Rt. 9, 2.5 miles, 10

-1 3700.7 Substation yards in from Rt. 9, pole No. R 144 Z, JC 83. Residence #13 S3a 182.50 2.6/ Along Rt. 9, Right onto Rt. 9, 2.9 miles, Waretown junction pole #BT 1545 and 4" x 4" 4183.4 timber with gas pipeline leakage tester attached S4 1760 3.2/ Pebble Beach Water Right onto Rt. 9, 3.2 miles, 5148.8 Tower left onto Seneca Blvd. to intersection of Eighth St. and Water Tower S5 s-5 1870 4.45/ Roadside area, Right onto Rt. 9, 4.8 miles, 7160.0 Barnegat Service left on East Bay Ave., 0.6

-1 miles, to intersection of Lower Pole #27 on East Bay Ave. Shore Road.

S7 1830 6.3/ End of Taylor Lane Right onto Rt. 9, 6.2 miles, 10,137 at gate left onto Taylor Lane (dirt road), 1.6 miles to end of road at gate S1- 1860 9.65/ Intersection of Right onto Rt. 9 to Rt. 72, 15,527 Bay Ave. east on Rt. 72 for 2.5 miles, turn left, go 0.2 mile to intersection of Bay Ave.

S20 1690 10.65/ Surf City Stand Right onto Rt. 9 to Rt. 72, 17,136 Pipe east on Rt. 72 to end at Long Beach Blvd., left onto Long Beach Blvd., left onto N. 14th St. to Surf City Water Pipe on right SSW2 2100 1.7/ Intersection of Right onto Rt. 9 to right on 2735.3 Rt. 532 and Rt. 532 (Wells Mills Rd.), 1.3 Laurelwyck Dr. miles to intersection on left SSW4 205.50 3.45/ End of Rose Hill Right onto Rt. 9, 4.4 miles to Rd. at cemetery right on Rose Hill Rd., one 5551.1 mile to cemetery (EPIP11/S13) Eli-8

Number AmerGen.

An Exelon/British Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offnite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

SSW5a 210.50 4.5/ Opposite G.S. Pkwy Right onto Rt. 9 to third Maintenance Area traffic light. Right on 7240.5 on Rt. 554, east Rt. 554 (Bay Ave.) to Parkway of Garden State entrance area Parkway SSW5 193.50 4.35/ Barnegat Township Right onto Rt. 9, 4.8 miles, 6999.2 Municipal Bldg. right on Rt. 554 (Bay Ave.) 50 yards on right SSW7 1970 5.8/ Rt. 9 and Taylor Right onto Rt. 9, 6.2 miles, 9332.2 Lane left onto entrance of Taylor Lane SSWI0 1990 7.5/ Southern Reg'l Right onto Rt. 9, 8.2 miles, 12,068 High School right onto parking lot north of buildings SSWl0a 2000 9.0/ Entrance to Right onto Rt. 9, 10 miles to Atlantic City paved entrance of substation on Electric Co. left side of road substation on Rt. 9 SSW20 2010 11.0/ Dinner Point dr. Right onto Rt. 9, 11.9 miles to Staffordville Staffordville, left onto Dinner 17,699 Point Dr., 25 yds. on left side of road SW2 2210 1.8/ Ocean County Right onto Rt. 9 to first CREST 2896.2 Cemetery on traffic light, right onto Rt. 532 Rt. 532 (Wells Mills Rd.), 1.75 OC-8 miles to cemetery SW3 227.50 2.15/ Intersection of Right onto Rt. 9, right onto Rt. 532 and G.S. Rt. 532 (Wells Mills Rd.) to Pkwy. intersection with G.S. Pkwy.

SW4 SW- 2190 3.45/ Barnegat Toll Right onto Rt. 9, right onto 4-1 5551.1 booth on G.S. Rt. 532 (Wells Mills Rd.) to Pkwy. 110 AC G.S. Pkwy. south, right side of road just beyond toll booth near telephone booth.

SW5 2170 4.5/ Parking area Right onto Rt. 9 to Rt. 554 Bay 7240.5 between 1st and Ave. Right onto Rt. 554 to 2nd Sts. west of first right after G.S. Pkwy.

G.S. Pkwy. exit exit (First St.)

ramp, 110 AC (EPIPII/SI3) E11-9

Number OYSTER CREEK AmerGen.

An Exelon/BrTtish EneTgy Company EMERGENCY PREPAREDNESS EPIP-OC-.1I IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

SW7 --- 228.50 7.2/ Intersection of Right onto Rt. 9, right onto Meadow Rd. and Rt. Rt. 532 (Wells Mills Rd.) toExit 11,585 72 at Fawn Lakes G.S. Pkwy. south; south to 67 onto Rt. 554 west to 72 east to Meadow Rd. at Fawn Lakes SW10 2290 8.9/ Intersection of Right onto Rt. 9, south to 14,320 Hay Rd. and Rt. 72, west onto Rt. 72.

Micaja's Rd. Approx. 100 yds. past G.S.

Pkwy. intersection to Recovery NOTE: unimproved Rd. on south side of Rt. 72, dirt road right onto Hay Rd. Approx. 3 miles to Micaja's Rd.

SW20 214.50 13.2/ Intersection of Right onto Rt. 9, right onto Rt. 539 and G.S. Rt. 532 to G.S. Pkwy. Take 21,239 Pkwy. Pkwy. south to Exit 58 (Tuckerton) and make right onto Rt. 539. Park along right side of road WSWI 2490 0.3/ Southwest corner Right onto Rt. 9, over discharge canal bridge, right CREST 482.7 of O.C.

substation, 110 AC on South Access Road to OC-9 substation WSW2 247.50 1.55/ G.S. Pkwy. picnic Left onto Rt. 9, left on 2494.0 area Rt. 614 (Lacey Rd.) to G.S.

Pkwy. Take pkwy. north to Forked River service area on left. Make U-turn and go south into picnic area on left at mile marker 71.5 WSW3 2400 2.5/ Ocean County Voc. South on Rt. 9, right on School Rt. 532 0.6 mi. beyond G.S.

CREST 4022.5 Pkwy. on left OC-1 WSW4 WSW- 251.50 3.75/ Intersection of South on Rt. 9, right onto 6033.5 Rt. 532 and Bryant Rt. 532, continue 4.4 miles to 4-1 Rd. dirt road on right (Bryant Rd.)

just before steel guard rail WSW5 2550 4.35/ Intersection of Right on Rt. 9, right onto Rt. 532 and dirt Rt. 532, continue 4.85 miles to road dirt road on right (EPIP1/S13) Ell-10

Number OYSTER CREEK EPIP-OC-.11 AmerGen. EMERGENCY PREPAREDNESS An Exelon/Bribtsh Energy Company IMPLEMENTING PROCEDURE Revision No.

Title is Emergency Radiological Surveys Offeite EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS DISTANCE (From OCGS Main Gate & Rt. 9)

EMERGENCY N.J.

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

WSW6 2540 5.3/ Junction Rt. 532 Right on Rt. 9, right onto 8527.7 and Rt. 611 Rt. 532, 6 miles to junction of (Brookville Rd) Rt. 611 (Brookville Rd.) on opposite Southern left opposite Landfill entrance Ocean Landfill entrance WSWI0 2520 7.5/ Intersection of Right onto Rt. 9, right onto Rt. 532 and Rt. 72 Rt. 532 to intersection of 12,068 Rt. 72 (Barnegat Rd.)

WSW20 2430 11.45/ End of Rt. 608 Right onto Rt. 9, right onto (Simm Place Rd.) Rt. 532. At intersection of 18,423 at gate Rt. 532 and Rt. 72 and Rt. 610 go straight on Rt. 610 to intersection of Rt. 539, turn left, 1 mile to Rt. 608, stop at end of road.

W2 2700 1.25/ G.S. Pkwy. right Left on Rt. 9 to 2nd traffic grass area at light, left on Rt. 614 (Lacey 2011.3 side mile marker 72.2 Rd.) to G.S. Pkwy. north to service area, turn south on Pkwy. to mile marker 72.2 W2a W-2-1 2690 1.3/ G.S. Pkwy. picnic Left onto Rt. 9 to 2nd traffic area at mile light, left on Rt. 614 (Lacey 2091.7 marker 72.1 Rd.) to G.S. Pkwy. north to service area, turn south on Pkwy. to mile marker 72.1 2590 6.7/ 0.6 mile north of Right on Rt. 9 to ist traffic W7 Rt. 532 on light (Rt. 532), right onwith Rt.

10,780 Jones Rd. 532 through intersection Rt. 611 (Brookville Rd.) 1.2 miles to dirt access road on right (Jones Rd.), continue 0.6 mile to fork Wl0 2600 9.15/ Intersection of Right on Rt. 9 to Rt. 532, Rt. 72 (Barnegat right on Rt. 532 to Rt. 72 14,722 Rd.) and Rt. 539 (Barnegat Rd.). North on (Warren Grove - Rt. 72 to intersection with Whiting Rd.) Rt. 539 (Warren Grove - Whiting Rd.)

(EPIPl1/S13) Ell-11

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.11 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Off ite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

W20 2760 14.0/ Intersection of Right on Rt. 9 to Rt. 532, turn Rt. 72 (Barnegat right onto Rt. 532 to Rt. 72 22,526 Rd.) and Rt. 532 north. Approx. 7.3 miles to left fork junction with Rt. 532 WNWI --- 2840 0.6/ Forked River Met Left on Rt. 9, first left after intake canal, travel west past CREST 9654 Tower the old site of the Energy OC-16 Spectrum until 230V highline.

Turn right onto dirt road.

Unlock gate at south branch of Forked River, (key with Met Tower keys) continue across bridge and follow curve to the right. Turn right at second road (directly west of Met Tower) and continue to tower sight.

WNW2 2910 1.35/ G.S. Pkwy., right Left on Rt. 9 to 2nd traffic side at mile light, left on Rt. 614 (Lacey marker 72.4 Rd.) to G.S. Pkwy. north to service area, turn south on Pkwy. to mile marker 72.4 WNWI0 2850 9.7/ Rt. 539 (Warren Right on Rt. 9 to Ist traffic 15,607 Grove - Whiting light, right on Rt. 532 to Rd.) where it Rt. 72, right on Rts. 71/532 to crosses over Rt. 539 (Warren Grove - Whiting Chamberlain Brook Rd.), north on Rt. 539, approx. 3.3 miles to Chamberlain Brook NW2 322.50 1.7/ G.S. Pkwy. mile Left on Rt. 9 to 2nd traffic marker 73.0 light, left on Rt. 614 2735.3 (Lacey Rd.) to G.S. Pkwy. north to service area, turn south on Pkwy. to mile marker 73.0 NW6 3220 5.95/ Rt. 614 (Lacey Left on Rt. 9 to 2nd traffic Rd.) 0.1 mile down light, left on Rt. 614 9573.6 dirt road (west of (Lacey Rd.) to mile marker 7 Cranberry Bog) (3.2 mi. west of G.S. Pkwy.),

dirt access road on left after mile marker 7 (EPIPII/S13) Ell-12

Number OYSTER CREEK EPIP-OC-.11 AmerGe.

An Exelon/Brttish Eneygy Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offtite 18 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS N.J. DISTANCE (From OCGS Main Gate & Rt. 9)

EMERGENCY SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

NW10 3140 8.7/ Intersection of Left on Rt. 9 to 2nd traffic light, left on Rt. 614 13,998 Rt. 614 (Lacey Rd.) and Good Luck (Lacey Rd.) to mile marker 5 Rd. (5.3 mi. west of G.S. Pkwy.) at Good Luck Rd. intersection NW20 3170 13.3/ Town of Whiting, Left on Rt. 9 to 2nd traffic light, left on Rt. 614 21,400 junction at RR tracks and Whiting (Lacey Rd.), past Bamber Lake

- Lacey Rd. to Town of Whiting (RR tracks)

NNW3 3400 2.77/ G.S. Pkwy. mile Left on Rt. 9 to 2nd traffic marker 74.4 light, left on Rt. 614 (Lacey Rd.) to G.S. Pkwy.,

north to service area (1/2 mile) on left, enter service area, turn south on Pkwy. to mile marker 74.4 NNW4 3480 3.5/ Intersection of Left onto Rt. 9, left at 2nd Rt. 614 (Lacey traffic light on Rt. 614 5631.5 (Lacey Rd.) to intersection of Rd.) and G.S.

Pkwy. G.S. Pkwy.

3310 4.65/ Roadside at Pole Left onto Rt. 9, left at 2nd NNW5 traffic light onto Rt. 614 7481.9 #BT4112 at Rt. 614 (Lacey Rd.) at (Lacey Rd.), 1.7 miles west of Deep Hollow Creek G.S. Pkwy.

(intermittent stream) 3390 7.9/ Just before Left onto Rt. 9, left at NNW10 intersection of Rt. 618 (Central Pkwy. opposite 12,711 Pinewald - Keswick Butler Blvd.) to Rt. 530 Rd. and Rt. 530 (Dover Rd.)

(Dover Rd.) on rt.

3420 12.55/ Intersection of Left onto Rt. 9, left at 2nd NNW20 traffic light onto Rt. 614 20,193 Rt. 37 and Northampton Rd. (Lacey Rd.) to G.S. Pkwy.,

north to Exit 82, west on Rt. 37, 3.75 miles from Pkwy.

exit, turn right to offstreet parking (EPIPI1/S13) Ell-13

Number AmerGen.

AnExelon/Brftis En.gY Company I O

EMERGENCY IMPLEMENTINGPREPAREDNESS PROCEDURE EPIP-OC- .12 Title Revision No.

Surveys Offsite i8 Emergency Radiological EXHIBIT 12 PLUME SEARCH ROUTES

1. If the wind is from the north/northeast, proceed south from the plant on Route 9 to Route 72. West on Route 72 to Route 539 follow Route 539 north to Lacey Road, follow Lacey road to Route 9, then return to the plant on Route 9.
2. If the wind is from the south/southeast, proceed north from the plant on Route 9 to Route 530 (South Toms River), follow Route 530 to Route 539, follow Route 539 south to Route 72, follow Route 72 east to Route 554, continue east on Route 554 to Route 9 in Barnegat, follow Route 9 north to the plant.

from the southwest, proceed north on Route 9 to Ocean Gate;

3. If the wind is however, DO NOT proceed to Seaside Heights/Island beach State Park until communications have been established with the EAC. Proceed to Seaside do so by EAC.

Heights and Island Beach State Park ONLY when directed to on Route 9

4. If the wind is from the northwest, proceed south from the plant on Long to Route 72 at Manahawkin, east on Route 72 to Long Beach Boulevard Beach Island, proceed north on Long Beach Boulevard to Barnegat Lighthouse State Park.

NOTE Plume searches should be conducted while driving at no more than 30 mph. of The location of the plume edges and centerline, along with the magnitude be the open and closed window readings at the plume centerline should recorded and transmitted to the RAC/EAC. Unless otherwise directed, the plume search should be conducted with the dose rate instrument detector held outside the vehicle window.

(EPIPll/SI4) E12-1

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-

  • 11 An Exelon/Brttish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 13 OFFSITE RADIOLOGICAL/ENVIRONMENTAL SURVEY TEAM LOG Date: CHRONOLOGY OF EVENTS Team Members:

Team:

TIME EVENT Called the RAC/EAC (see 3.0 for numbers) and Plant Status and MET conditions are as follows:

An (UE/A/SAE/GE) was declared at on (Date)

(Circle One) (Time-24 Hr Clock)

There is (No) (A Controlled) (An Uncontrolled)

(Circle One)

(RADThrTOC*ICAL ) (NON-RADIOLOGICAL) Release in Progress.

(RADIOLOGICAL (Circle One - If Appropriate)

Wind Direction from: '/Wind Speed: MPH (Compass Point)

PAGE OF PAGES (EPIPII/S15) E13-1

Number Amer~en-

. ..--. OYSTER CREEK EPIP-oc-. 11 EMERGENCY PREPAREDNESS An Exelon/BrItish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 13 (Continued)

OFFSITE RADIOLOGICAL/ENVIRONMENTAL SURVEY TEAM LOG CHRONOLOGY OF EVENTS TIME EVENT PAGE OF PAGES (EPIP11/S15) E13-2

Number A ierGen. OYSTER EMERGENCY CREEK PREPAREDNESS IMPLEIENTING PROCEDURE EPIP-OC-.11 An Exelon/Bitlsh Energy Company Title Revision No.

Emergency Radiological Surveys Offsite 18 EXHIBIT 13 (Continued)

OFFSITE RADIOLOGICAL/ENVIRONMENTAL SURVEY TEAM LOG CHRONOLOGY OF EVENTS TIME EVENT Signed:

Team Member PAGE OF PAGES (EPIP11/SI5) E13-3

Procedure Rev. 17 EPIP-OC-.11 EXHIBIT 14 Sample Record Date:

TEAM:

AIR SAMPLE SURVEY Particulate Silver Zeolite Flow Rate Run Time Background 1mm Min Time Location Window Closed Window Open c_m Gross c_m Gross cpm mR/hr mR/hr 1

2 3

4 5

6 7

8 9

10 Signed: Team Member 6

(EPIPII/S1 )

Number OYSTER CREEK EPIP-OC-.I1 AmerGen. EMERGENCY PREPAREDNESS An Exelon/Bntsh Energy Company IMPLEMENTING PROCEDURE 1 1 Revision No.

Title 17 Emergency Radiological Surveys Offsite EXHIBIT 15 COUNT RATE SURVEY RECORD Date:

Team:

COUNT RATES SAMPLE TIME LOCATION GROSS BKGD 24 HR CLOCK DESCRIPTION (gcpm) (bcpm)

I -iI I I. I

_ _ _ _ _ I. i i

_______ 4 I 4 1 I I

_ __ _ _ I I.i I 4 t I r

I i t I I SIGNED:

Team Member (EPIP11/S17) E15-1

Number OYSTER CREEK AmerGen.

An Exelon/Mdtish Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Of faite 17 EXHIBIT 16 ENVIRONMENTAL SAMPLE Date:

DOSE RATES-MR/HR COUNT RATE cpm SAMPLE OPEN WINDOW CLOSED WINDOW GROSS TIME LOCATION (OW) (CW) (bcpm) (gcpm) 24 HR CLOCK DESCRIPTION BETA - GAMMA GAMMA BACKGROUND COUNT RATE

_ I__

1. 4 ti

__ 1. _ _ _ _ 1 +A I. i t 4 I I I T

_______ 4 I. f I I I + tii I + .t 1* I

4. - i f 1 J. I I I 4 1 1 I I SIGNED:

Team Member (EPIPII/SI8) E16-1

Number OYSTER CREEK AmerGen.

An Exelon/Brttish EneTgy Company EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offuite 17 EXHIBIT 17 DOSE RATE SURVEY RECORD Date: Team Members: Instrument Cal Due Date:

Team: _Instrument Beta Correction Factor:

DOSE RATES--mR/hr IS (ow)

SAMPLE READING

>110% OF (cw)

TIME LOCATION INSTRUMENT OPEN WINDOW CLOSED WINDOW READING?

(24 HR CLOCK) DESCRIPTION MODEL/SERIAL # (ow)

BETA-GAMMA (cw)

GAMMA `77 YES NO NO IF (YES),

THEN SURVEY LOCATION MAY BE WITHIN PLUME TAKE AN AIR SAMPLE CONTACT RAC/EAC.

SIGNED: Reviewed: /

Team Leader Rad Con Coordinator (EPIP11/S19) E17-1