ML003743849

From kanterella
Jump to navigation Jump to search
5 for EPIP-OC-.03, Emergency Notification for Oyster Creek
ML003743849
Person / Time
Site: Oyster Creek
Issue date: 01/19/2000
From:
AmerGen Energy Co, British Energy Co, PECO Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
-RFPFR
Download: ML003743849 (245)


Text

OYSTER CREEK Number AmerGen A PECO Energy/Brntsh Enrgy Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Revision No.

EMERGENCY NOTIFICATION 25 Applicability/Scope Responsible Office Applies to work at Oyster Creek Emergency Preparedness LJ-,'. ,..U.L,.,+- 40 ,. Cr, i1- co- X Yes No Effective Date Safety Reviews Required XYes-No Date of Sale Prior Revision 24 incorporated the This Revision 25 incorporates the following Temporary Changes: following Temporary Changes:

N/A List of Pages (all pages rev'd to Rev. 25) 1.0 to 7.0 El-I to El-5 E2-1 to E2-2 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek

______u_ _ (Concurring Organization Element Date Originator ergency laner Concurred By D _ _ OC___0

___irector, Approved By Emergency Preparedness Mgr, OC 4 &

/

(EPIP03) 1.0

Number OYSTER CREEK AmerGen A PEOO EnegyW/is nergy Compaiy EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Revision No.

EMERGENCY NOTIFICATION 25 PROCEDURE HISTORY Revision Date Originator Summary of Change 11 06/07/94 A. Smith Update NRC telephone numbers and add Document History page.

12 05/94 A. Smith Remove requirement for SS checklist to be transmitted to BNE at end of UE. Modify off-site notification forms to align with states, clarify NRC notification following state and local notifications.

Add BNE phone #, Block and route to SAE and GE Forms.

13 A. Smith Change beeper number for L. Briggs NRC 14 A. Smith Remove INPO & ANI notifications from EXHIBIT lB. Communications now taking that over.

15 06/95 A. Smith Update phone numbers and add new notes to Exhibit 4, NRC Status Board data, to clarify this exhibit only used when ERDS is down.

16 12/95 T. Blount Correct ED information, modify Notification Matrix, capture cont. inj.

person notification requirements, remove North Gate as point of egress.

17 01/96 T. Blount Pager changes requires changing phone numbers.

18 07/96 P. Hays Prevent confusion as to whether a form is related to a drill event or a real event.

19 10/96 T. Blount Allow use of other forms for documentation of Notification process.

Incorporate follow-up notifications.

20 06/97 T. Blount Delete AEOF consistent w/E-Plan Rev. 11, Add Sample forms to use. Remove/change NRC resident information. Remove reference to PTFC. Also, delete Exhibit 4 NRC Status Board Data and clean up signature blocks.

21 10/97 A. Smith Delete reference to EPIP-.04. Correct nomenclature on ERF telephone circuits correct typo on E3-2 "T" to "U".

22 09/98 P. Hays Clarify offsite notification forms by removing the notification matrix and related exhibits and keeping the new NCR triplicate form. Update the Plant Condition Follow-up Form.

23 05/99 A. Smith Clarify off-site notifi:cation transfer between the ECC and EOF.

24 01/00 A. Smith Clarify emergency notification sequence to on-site and off-site agencies.

25 01/00 A. Smith Change references from GPU to OCNGS.

(EPIP03) 2.0

OYSTER CREEK Number AmerGen A PECO Erefgb EI EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Revision No.

EMERGENCY NOTIFICATION 125 1.0 PURPOSE 1.1 This procedure provides the mechanism for emergency notifications to be made to on-site personnel and off-site agencies (as required in the Emergency Plan) in an accurate and timely manner.

1.2 This procedure shall be-initiated by the Emergency Director and implemented by the ECC and EOF Communications Coordinator.

1.2.1 A communicator designated by the Emergency Director will initially implement this procedure until relieved by the on-call ECC or EOF Communications Coordinator.

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to those persons making notifications and/or providing information to on-site personnel or off-site agencies during a declared or simulated emergency.

2.2 This procedure applies to the IOCFR50.72 requirement for immediate notification of any declared emergency class. All other notifications shall be made in accordance with the applicable station procedure.

3.0 DEFINITIONS None 4.0 RESPONSIBILITIES 4.1 The GSS/Emergency Director shall:

4.1.1 Designate a communicator to implement this procedure until properly relieved by the on-call ECC or EOF Communications Coordinator.

4.1.2 Direct all off-site notifications made in accordance with this procedure until the ESD has activated the EOF and assumed the off-site notifications. The EOF Communicator will notify the ECC of the transfer.

4.1.3 Direct Control Room Staff to make appropriate on-site announcements.

(EPIP03) 3.0

OYSTER CREEK Number AmerGen APECOErergy/Bntsti Energouay EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Re vision No.

EMERGENCY NOTIFICATION j25 4.2 The On-Shift ECC Communications Coordinator (designated CRO) shall:

4.2.1 Complete Off-Site Notifications Checklist (Exhibit IA) until relieved of this duty by the on call ECC or EOF Communications Coordinator.

4.2.2 Complete On-Site Notifications Checklist (Exhibit 1A).

4.3 The On-Call ECC Communications Coordinator shall relieve the On-Shift ECC Communicator and complete Off-Site Notification Checklist (Exhibit 1A) until directed to transfer the offsite notifications to the EOF Communications Coordinator.

NOTE When offsite notifications are transferred to the EOF, the EOF Communication Coordinator shall be notified via telephone of the transfer and inform the communicator that a fax of all completed offsite notifications from the ECC will follow.

5.0 PROCEDURE 5.1 Emergency Notifications should be performed using forms similar to Exhibit 1A to document off-site and on-site notifications.

5.1.1 Page announcements and notifications should be made in the following order:

1. Plant Page (on-site copy)
2. OEM State Police (off-site copy)
3. Only at GE, Lacey Twp., Ocean Twp., and Ocean County (off-site copy)
4. NRC (off-site copy)
5. Other On-site Notifications (on-site copy) 5.1.2 Exhibit lB (or similar form) is used to document the communication of a follow-up Protective Action Recommendation (PAR) or a change in plant conditions that is not associated with an escalation of the declaration.

5.1.3 Exhibit-2 should be used to document plant operating conditions. Other forms or methods are permitted so long as the pertinent information is provided (e.g. Major Transients, ECCS Status, Rad Monitoring).

(EPIP03) 4.0

OYSTER CREEK Number AmerGenEMERGENCYErW Cofy I PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 A PECOEnegylBjs Title EMERGENCY NOTIFICATION IRevisi 125 No.

5.1.4 Emergency notifications to on-site personnel will be accomplished by using the Plant Paging System.

5.2 Emergency notifications to the New Jersey State Police will be accomplished within 15 minutes of the declaration of any emergency classification.

5.2.1 If a General Emergency has been declared, Ocean County, Lacey and Ocean Townships will also be notified within 15 minutes.

5.2.2 Notifications to the New Jersey State Police and Ocean County will be verified by a return call from each organization.

This verification call must be answered to ensure validity of incident. If the verification has not been received within 5 minutes of the notification call then contact the agency via the notification line to request a verification call.

5.3 Emergency notifications to the Nuclear Regulatory Commission (NRC) will be made as soon as possible after making the state and local notifications but within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the declaration of any emergency classification. NRC may request continuous manning of this line.

Only one (1) Emergency Center at one time should provide this continuous communication link.

5.3.1 The NRC should be notified of the "Protective Action" implemented by the State of New Jersey. This info should be verified through the NJSP-OEM by the ED/ESD. Use Ex. 1C - Protective Action Notification (to NRC) form or similar form to document transmittal.

(EPIP03) 5".0

OYSTER CREEK Number AmerGen A PECO Energy/Bnsh Enr*y Cvmpany EMERGENCY PREPAREDNESS IIMPLEMENTING PROCEDURE I EPIP-OC-.03 Title Revision No.

EMERGENCY NOTIFICATION 25 5.4 The Station Status Checklist will be completed and updated every 30 minutes or as changes occur for transmittal to the N.J. Bureau of Nuclear Engineering (BNE) when requested. Only initial, and any significant changes require a SSC to be sent when in a UE level of emergency. After BNE is established at the EOF, no further transmittal of the SSC is required. Refer to Station Status Checklist (Exhibit 2).

5.5 If Communication equipment problems or failures arise, attempt to utilize alternate means and contact the TSC to initiate repairs.

5.6 If additional notification phone numbers are needed, refer to Procedure EPIP-OC-.06, "Additional Assistance and Notifications".

5.7 The "Simulator Communications Interface" switch on the operators communication console shall be left in the OFF position unless the GSS has authorized placing the switch in ON. The switch should be placed in ON only for Emergency Preparedness Drills, training evolutions and communication system testing and then returned to OFF when completed.

NOTE When both the Simulator Communications Interface switch in the Control Room and the same switch in the Simulator Control Room are in the ON position the following communications are affected:

  • Phone systems transferred to the Simulator completely:

NRC ENS NJSP notification & verification Ocean County notification & verification All ERF Circuits 693-8728 Plant Status Update Line Alt. (Fax) 971-4959 971-0220 971-4550 BNE Info Line ECC/EACC Direct Line ED/ESD Hotline NJ State ED Hotline

  • Plant page and Radio capability are provided to the Simulator Control-Room without affecting onsite systems.

(EPIP03) 6.0

OYSTER CREEK Number AmerGen APECO Energy./Bnb EnergyComany EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC- .03 Title Revision No.

EMERGENCY NOTIFICATION 25

6.0 REFERENCES

6.1 Title 10, Code of Federal Regulations, Part 50.72 "Immediate Notification requirements for Operating Nuclear Power Reactors".

6.2 Procedure EPIP-OC.06 "Additional Assistance and Notifications" 6.3 Procedure 8000-IMP-1720.01, Emergency Public Information Implementing Procedure.

7.0 EXHIBITS 7.1 Exhibit 1A Notification Checklist 7.2 Exhibit lB PAR/Plant Conditions Follow-up 7.3 Exhibit 1C Protective Action Notification to NRC 7.4 Exhibit 2 Station Status Checklist (EPIP03) 7.0

Number OYSTER CREEK AmerGen A PECO Energy/BMtsh Energy Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Revision No.

EMERGENCY NOTIFICATION 25 EXHIBIT lA SAMPLE - NOTIFICATION FORM OCNGS EMERGENCY REPORT FORM - OC Part 1 of 3 (Press Firmly and Write Clearly) ED-Copy o This is a Drill. This is a Drill. Q This is NOT a Drill. This is NOT a Drill.

o EMERGENCY CLASSIFICATION An/a Event Declared was declared at 24 Hour Clock on -

Date The EAL is o The Event has been de-escalated to an/a Event Declared at 24 Hour Clock on -

Date The EAL is o The Event has been terminated at 24 Hour Clock on Date EVENT DESCRIPTION RADIOACTIVE RELEASE STATUS o] There is no abnormal radioactive release in progress.

(i.e. exceeds ODCM Limits)

[] There is an abnormal radioactive release in progress.

airborne and/or liquid METEOROLOGICAL CONDITION Wind direction is from degrees and wind speed is miles per hour. Use 380' Elev For wind direction and speed OFF-SITE PROTECTIVE ACTION RECOMMENDATION (Only at GE)

[] PAR will be given at a later time.

o We recommend EVACUATION for the general population living with 2 miles of the plant of miles.

and Compass Sectors and _ out to a distance o We recommend SHELTERING for the general population living with 2 miles of the plant of miles.

and Compass Sectors and out to a distance other - Describe:

o We also recommend SHELTERING for the general population living within all other areas of the EPZ.

ON-SITE PROTECTIVE ACTION 11 (UE) All personnel should continue with their normal duties pending further notice.

(ALERT/SAE/GE) All on-duty members of the Emergency Response Organization report to emergency centers.

El (ALERT only) All other personnel should continue with their normal duties pending further instruction.

13 El 03 (ALERT/SAE/GE Eating, Drinking and Smoking is prohibited until further notice.

(SAE only) Site Accountability has been ordered. All non-essential personnel in the protected area report to the Emergency Assembly Area in the (select one) O.0CAB Cafeteria or [3 Warehouse. Route (if needed)

Q (GE only) Site Evacuation has been ordered. All non-essential personnel, who do not have a specific emergency assignment shall leave the site through the Main Gate Processing Center. Use the (SOUTH/NORTH) evacuation route.

Route to Main Gate (if needed)

NOTES ONLY DO NOT WRITE IN THIS SPACE

  • In the special case of a security event which does not upgrade current classification, ensure the NRC is notified of the event and status of plant security VIA the ENS line.
  • If an environmental injured person must be transported off-site, ensure appropriate notifications are complete.
  • If a contaminated injured person must be transported off-site, ensure appropriate notifications are complete.
  • The Station Status Checklist should be completed and communicated to the NJBNE once per half-hour or as conditions change. Only initial and any signficant changes require SSC to be sent when in a UE level of emergency. After confirmation that the BNE is established at the EOF the SSC is no longer required to be transmitted.

eAt a GE level of emergency provide PAR to NJSP. If the NJSP EOC is not staffed, provide PAR to Ocean County, Lacey Township and Ocean Township . If the BNE is staffed at the EOF providg the initial PAR in writing to BNE first, and then only notify the NJSP.

  • Ensure the organizations contacted as listed on the notification forms are notified of termination.

APPROVAL Signature 24 Hour Clock Date Commnicator Signature 24 Hour Clock Date (EPIP03/S2) EI-I

OYSTER CREEK Number AmerGen A PECO Energy/Brrash Energy cfmParY EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Revision No.

EMERGENCY NOTIFICATION 1 25 EXHIBIT 1A SAMPLE - NOTIFICATION FORM (Cont'd)

OCNGS EMERGENCY REPORT FORM - OC Part 2 of 3 (Press Firmly and Write Clearly) On-Site Copy Start here for notification or contact. Read Message - Slowly - Clearly Attention all personnel. Attention all personnel.

Sound Station Alarm for 10 seconds.

This is a Drill. This is NOT a Drill. This is NOT a Drill.

[] This is a Drill.

EMERGENCY CLASSIFICATION o An/a Event Declared was declared at 24 Hour Clock on _

Date The EAL is o The Event has been de-escalated to an/a Event Declared at 24 Hour Clock on _

Date The EAL is o The Event has been terminated at 24 Hour Clock on Date EVENT DESCRIPTION RADIOACTIVE RELEASE STATUS o There is no abnormal radioactive release in progress.

o There is an abnormal radioactive release in progress. (i.e. exceeds ODCM Limits) airborne and/or liquid ON-SITE PROTECTIVE ACTION 0] (UE) All personnel should continue with their normal duties pending furtherreport notice.

0] (ALERT/SAE/GE) All on-duty members of the Emergency Response Organization to emergency centers.

pending further instruction.

0] (ALERT only) All other personnel should continue with their normal duties 0] (ALERT/SAE/GE Eating, Drinking and Smoking is prohibited until further notice.

(SAE only) Site Accountability has been ordered. All non-essential personnel in the protected area report to the Emergency Assembly Area in the (select one) [] OCAB Cafeteria or 5 Warehouse. Route (if needed) o (GE only) Site Evacuation has been ordered. All non-essential personnel, through the Main Gate Processing Center.

who do not have a specific emergency Use the (SOUTH/NORTH) assignment shall leave the site evacuation ro4te.

Route to Main Gate (if needed)

TIME INITIALS TITLE and/or NAME to be Notified OFFICE HOME BEEPER On-shift - Shift Technical Advisor On-call Emergency Director (Unusual Event Only)

Team 1 - P. Scallon 4625 609-660-3472 4119 609-660-3420 Team 2 - K. Mulligan 609-660-3463 Team 3 - W. Stewart 4775 Senior RadCon Representative 4660/2599 Communications Dept. Representative 4020 Emergency- Preparedness Manager/Alternate 4188/2411 609-660-3470 609-660-3372 Resident NRC Inspectors 4978 Sr. Resident 1-800-398-6650 Resident 1-800-398-7497 APPROVAL Signature 24 Hour Clock Date Communicator Signature 24 Hour Clock Date' (EPIP03/S2) E1-2

OYSTER CREEK Number merGen EMERGENCY PREPAREDNESS EPIP-OC-.03 A PECO EneWritsh Ewgy Corps IMPLEMENTING PROCEDURE Title Revvision No.

EMERGENCY NOTIFICATION 25 EXHIBIT lA SAMPLE - NOTIFICATION FORM (Cont'd)

OCNGS EMERGENCY REPORT FORM - OC Part 3 of 3 (Press Firmly and Write Clearly) Off-Site Copy Start Here for notification or contact. Read Message - Slowly - Clearly E] This is a Drill. This is a Drill. [] This is NOT a Drill. This is NOT a Drill.

This is at Oyster Creek Nuclear Generating Station (select one) Q CR [ TSC---- EOF Communicator's Name EMERGENCY CLASSIFICATION E] An/a was declared at on The EAL is Event Declared 24 Hour Clock Date O The Event has been de-escalated to an/a at 24 Hour Clock on Date

- The EAL is Event Declared

[ The Event has been terminated at on 24 Hour Clock Date EVENT DESCRIPTION RADIOACTIVE RELEASE STATUS

[3 There is no abnormal radioactive release in progress.

O There is an abnormal radioactive release in progress. (i.e. exceeds ODCM Limits) airborne and/or liquid METEOROLOGICAL CONDITION Wind direction is from degrees and wind speed is - miles per hour. Use 380' Elev For wind direction and speed OFF-SITE PROTECTIVE ACTION RECOMMENDATION (Only at GE)

[3 PAR will be given at a later time.

o We recommend EVACUATION for the general population living with 2 miles of the plant and Compass Sectors , , and _ out to a distance of miles.

o We recommend SHELTERING for the general population living with 2 miles of the plant and Compass Sectors , , and - out to a distance of _ miles.

o Other - Describe:

o We also recommend SHELTERING for the general population living within all other areas of the EPZ.

OFF-SITE NOTIFICATION RECORD

[3 NJ State Police (within 15 minutes of all declarations) via State Notification-Line or Alternate 609-882-2000 Time of initial contact Person Contacted Time of verification Person Calling NOTE: Verifications should be within 5 minutes of initial contact.

o Ocean County (at GE only) (within 15 minutes of declaration of General Emergency) via Dedicated Line or Alter. 732-349 9100 Time of Contact Person Contacted Time of Verification Person Calling o

6637 Lacey Township Time (at GE only) (within 15 minutes of declaration of General Emergency) via 609-693-6636 or Alter. 609-639 of Contact Person Contacted o OceanTimeTownship of Contact (at GE only) (within 15 minutes of General Emergency) via 609-693-4007 or Alter. 609-693-4008 Person Contacted o NRC Time (immediately following of Contact State and Local Notifications) via ENS Line or Alter.

Person Contacted 301-816-5100 or 301-951-0550

                            • *** *** ****************************** **************** ************* *** ***~***************** *******

o ERDS initiated at (within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of a declaration of an ALERT or higher)

O On-call BNE Information (Contact NJSP if BNE has not called within 30 minutes of initial NJSP Notification Name Voice Phone # FAX #

APPROVAL Signature 24 Hour Clock Date Ccommunicator Signature 24 Hour Clock Date (EPIP03/S2) E1-3

OYSTER CREEK Number AP*oCO merGen Enerf g Coawy EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-. 03 Title Revision No.

EMERGENCY NOTIFICATION j25 EXHIBIT IB OCNGS PAR/PLANT CONDITIONS FOLLOW-UP o This is a Drill. This is a Drill.

at Oyster Creek Nuclear Generating Station.

[] This is NOT a Drill. This is NOT a Drill.

This is Name/Title

[3 I am notifying you of an INITIAL/UPGRADED protective action recommendation.

Circle One O We recommend EVACUATION for the general population living within 2 miles of the plant and compass sectors

-- ,_ __,_ and __ out to a distance of __ miles.

0 We recommend SHELTERING for the general population living within all other areas of the EPZ.

O Other O The following plant/events conditions have changed:

OFF-SITE NOTIFICATION RECORD o NJ State Police (within 15 minutes of all declarations) via State Notification Line or Alternate 609-882-2000 Person Contacted Time of initial contact Time of verification Person Calling

      • *..**** *** * *** *** ** * **** *** ******* ** ** * **** t*.* * * * * ** * * * * ** * *** S**

NOTE: Verifications should be within 5 minutes of initial contact.

[o Ocean County (at GE only) (viithin 15 minutes of declaration of General Emergency) via Dedicated Line or Alter. 732-349 9100 Time of Contact Person Contacted Time of verification Person Calling NOTE: verifications should be within 5 minutes of initial contact.

[o Lacey Township (at GE only) (within 15 minutes of declaration of General Emergency) via 609-693ý6636 or Alter. 609-639 6637 Time of Contact Person Contacted SO.cean Township (at GE only) (within 15 minutes of General Emergency) via 609-693-4007 or Alter. 609-693-4008 Time of Contact Person Contacted o NRC (immediately following State and Local Notifications) via ENS Line or Alter. 301-816-5100 or 301-951-0550 Person Contacted Time of Contact.

o ERDS initiated at (within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of a declaration of an ALERT or higher) o On-call BNE Information (Contact NJSP if BNE has not called within 30 minutes of initial NJSP Notification Voice Phone # FAX #

Name APPROVAL "Signature 24 Hour Clock Date Communicator Signature 24 Hour Clock Date (EPIP03/S2) EI-4

Number OYSTER CREEK AmerGen A PECO Energy*/*ibsh Enefg CoMnPanY EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Revision No.

EMERGENCY NOTIFICATION 1 25 EXHIBIT 1C PROTECTIVE ACTION NOTIFICATION (to NRC)

AS IMPLEMENTED BY THE STATE OF NEW JERSEY "THIS IS NOT A DRILL - I REPEAT, THIS IS NOT A DRILL"

-OR "THIS IS A DRILL - THIS IS A DRILL" "This is at Oyster Creek Nuclear Generating Station.

(Name/Title)

ED/ESD Approve/Time "Please State Your Name" NRC (ENS Phone)

MAID (301) 816-5100 BACKUP (301) 951-0550 Name of NRC Representative/Time Call Initiated Notification Complete: Call Initiated NRCof Representative/Time Name Communicator Signature/Name/Title ED Asst/ESD Asst Review:

Signature/Title (EPIP03/S2) EI-5

Number OYSTER CREEK AmerGen APEOc Energy/B1 Enegy Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Revision No.

25 EMERGENCY NOTIFICATION EXHIBIT 2 STATION STATUS CHECKLIST (page 1 of 2)

EXAMPLE "THIS IS NOT A DRILL - I REPEAT, THIS IS NOT A DRILL'

- OR "THIS IS A DRILL - THIS IS A DRILL"

1. Message Date: Time: Transmitted by:

Name/Title or Position

2. Emergency E] Unusual Event 0l Site Area Emergency Classification: F1 Alert El General Emergency at Date: Time:
3. EAL Number:_ Description of Emergency:

i.)

(EPIP-OC-.01 Appendix

4. Reactor Status: E] Scrammed @_ ( U At Power_  %

E] Hot Shutdo Dl Cold Shutdown

5. Reactor Pressure: PSIG Recirc Loop Temp: °F Reactor Water Level: "TAF
6. Off-site Power available? El Yes El No "7. EDG 1 operable? El Yes El No On Line? El Yes [E No EDG 2 operable? El Yes El No On Line? El Yes El No
8. Did Isolation Condenser(s) initiate? El Yes ElNo Did Core Spray(s) inject? 0l Yes ElNo Did ADS actuate? El Yes ElNo
9. Primary Containment operable? El Yes ElNo Isolated? E Yes El No Secondary Containment operable? [E Yes EuNo Isolated? El Yes ElNo (Reactor Building)
10. Other Pertinent Information:

"THIS IS NOT A DRILL - I REPEAT, THIS IS NOT A DRILL

- OR "THIS IS A DRILL - THIS IS A DRILLN (EPIP03/S4) E2-1

"OYSTER CREEK Number AmerGen A PECO Energy/Brifth Energy Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.03 Title Revision No.

EMERGENCY NOTIFICATION 25 EXHIBIT 2 STATION STATUS CHECKLIST (page 2 of 2)

EXAMPLE "THIS IS NOT A DRILL - I REPEAT, THIS IS NOT A DRILL"

- - OR "THIS IS A DRILL - THIS IS A DRILL" RADIOLOGICAL INFORMATION Message Date Time (Obtain Rad information from RAC or Group Leader R & EC)

11. Gaseous Release: I] YES Start Time , Terminated El YES Time ONO ElNO Anticipated or Known Duration Hrs.

Type of Release: [] Ground [I Elevated Wind Speed (mph) Wind Direction From_____ (deg)

Stability Class A B C D E F G_

Iodine (DEI) Release Rate: .. Ci/s Noble Gas Release Rate:ICi/s

12. Projected Off-Site Dose Rate Calculations (As Soon As Data is Available)

Distance (miles) Total Whole Body Adult Thyroid Dose Dose Rate (TEDE) Rate (CDE) Commitment SB .25 ________mrem/hr _mrem/hr 2 ________mrem/hr _ mrem/hr 5 _______mrem/hr m____rem/hr 10 mrem/hr mrem/hr (Millirem Per Inhalation Hour)

13. Liquid Releas e: YES Start Time_ _ [erminated C] YES Time El NO C3 NO Anticipated or Known Duration Hrs Estimated Concentration JlCi/ml Release Flow Rate Gallons/min
14. Other Information:_____________________________

Appro'vred (Licensed Operator or STA)

"THIS IS NOT A DRILL - I REPEAT, THIS IS NOT A DRILLN

- OR "THIS IS A DRILL - THIS IS A DRILLN (EPIP03/S4) E2-2

Number AmerGen A PECO Energy/Brish Energy ComDany OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-. 06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 Applicability/Scope Responsible Office Applies to work at Oyster Creek Emergency Preparedness

""4--, ....-. - n I 1, - X Y ve No Effective Date Safety Reviews Required X Yes No Date of Sale Prior Revision 21 incorporated the This Revision 22 incorporates the following Temporary Changes: following Temporary Changes:

N/A N/A List of Pages (all pages rev'd to Rev. 22) 1.0 to 4.0 El-i TO El-2 E2-1 E3-1 E4-1 E5-1 E6-1 E7-1 E8-1 to E8-5 E9-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek

  • reJConcurring Organization Element J Date originator ergency Planner Concurred By Director, Ops. & Maintenance, OC ApprovedBy Emergency Preparedness Mgr. OC 7 / /

(EPIP06) 1.0

Number AmerGen A PECO Energy/8intsh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 PROCEDURE HISTORY REVISION DATE ORIGINATOR

SUMMARY

OF CHANGE 8 6/94 A. Smith Updated NRC telephone numbers and add document page.

9 07/94 A. Smith Update Inpo telephone numbers.

10 A. Smith Update NRC HPN telephone numbers.

11 A. Smith Update phone numbers.

12 06/95 A. Smith Update and remove phone numbers. Add Coordinator to Site Services title.

13 08/95 A. Smith Update Inpo Telephone and Fax numbers.

14 08/95 A. Smith Update BNE telephone numbers.

15 11/95 A. Smith Update Ocean County Telephone Number.

16 04/96 A. Smith Update Mgr. Plant Ops, Admin. Support EOF, ESD @ EOF, Nat'l. Weather, DOE, RMC and JIC OEM phone numbers.

17 03/97 A. Smith Update GSS title to SSM, delete AEOF phone numbers, correct environmental affairs title, add OEM phone number for voice contact in addition to the existing fax phone number.

18 10/97 A. Smith Update Area Codes. Also delete reference to EPIP-oc-.04 and the documentation of phone call for additional aviation support.

19 05/98 A. Smith Add an exhibit for additional assistance request.

20 10/98 A. Smith Add additional page to Exhibit 8A to provide generic instructions for requesting additional assistance.

21 08/99 A. Smith Delete 732-244-4746 RAA Phone Number.

22 DOS A. Smith Change references from GPU to OCNGS.

(EPIP06) 2.0

AmerGen Amer~enOYSTER CREEK Number Nme EMERGENCY PREPAREDNESS EPIP-OC-.06 APECO Ementsh EneW Company IMPLEMENTING PROCEDURE Title Re vision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION J22 1.0 PURPOSE To provide the Emergency Response Organization (ERO) personnel with a phone number directory of additional emergency response assistance from organizations and agencies.

2.0 APPLICABILITY/SCOPE This document applies to all ERO personnel.

3.0 DEFINITIONS None 4.0 RESPONSIBILITIES 4.1 Any ERO member may use this directory.

5.0 PROCEDURE 5.1 When additional assistance is required, refer to Section 7.0 for appropriate exhibit.

5.2 Refer to INPO Emergency Resources Manual for additional information concerning outside organizations and their contacts.

5.3 If assistance personnel are going to respond to the site, provide Group Leader - Administration with pertinent information including name, company, and social security number.

5.4 To obtain Emergency Aviation Support complete Exhibit 8. For other types of support complete Exhibit 8A.

5.4.1 The following personnel are authorized to request emergency aviation or other support as determined by the Emergency Director (senior person on shift) or Emergency Support Director.

a. GSS/SSM Oyster Creek
b. Oyster Creek Emergency Preparedness Manager
c. -Manager of Emergency Preparedness
d. Group Leader Administrative Support
e. ED/ESD Assistants (EPIP06) 3.0

Am rPnoW= Number Ameruen A PECO EneW/Bftsh Eneg Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-. 06 IMPLEMENTING PROCEDURE Title Re vision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION J 22

6.0 REFERENCES

6.1 INPO Emergency Resources Manual.

7.0 EXHIBITS 7.1 Exhibit 1 - Oyster Creek Onsite Emergency Response Directory.

7.2 Exhibit 2 - Offsite Emergency Response Directory.

7.3 Exhibit 3 - Emergency Telephone Numbers for NRC Notification.

7.4 -Exhibit 4 - Federal Agencies 7.5 Exhibit 5 - State Agencies 7.6 Exhibit 6 - County/Local Agencies 7.7 Exhibit 7 - Support Agencies 7.8 Exhibit 8 - Emergency Aviation Support Instructions Form 7.9 Exhibit 8A - Additional Assistance Request 7.10 Exhibit 9 - Additional Assistance Responsibilities (EPIP06) 4.0

Number AmerGen A PECO EnergY/BatSh Erwgy CoMPany OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 1 OYSTER CREEK EMERGENCY RESPONSE DIRECTORY Work Phone No.

Dosimetry (609)-971-4604 TLD Room Clerk (609)-971-4467 Supervisor (609)-971-4955 Emergency Assembly Areas OCAB (609)-971-5276 (609)-971-5277 OCAB (609)-971-4058 Warehouse Emergency Control Center (ECC) (Control Room)

Outside Lines (609)-971-0335*

Control Room (609)-971-0220*

(609)-971-4959 (609)-971-4962 (609)-971-4666 Control Room (PC Plant Status) (609)-971-4003 Group Shift Supervisor/Site Shift Mgr. (609)-971-4667 Group Operating Supervisor (609)-971-4656 Computer Room (609)-971-4763 EmerqencV Preparedness Department (609)-971-4011 Environmental Affairs Dept. (609)-971-4022 Office (609)-971-1126*

FORKED RIVER ASSEMBLY AREA GET Instructors Instrument Shop Shop area (609)-971-5099 MAINFRAME COMPUTER SUPPORT (215) -375-5555 Medical Department (609)-971-4270 Nurse (609)-971-4890 NRC Resident Inspector's Office (609)-971-4978 t Direct dial. All others: Dial 9, then number.

(EPIP06/S3) EI-I

Number AmerGen A PECO Erew/Brtrsh Energy CompamY OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 1 (Continued)

,-vcm'D CDV MCN('V F.Pfl1'J.F. ThTPCTORY n1_10MVV r'VVVV vmvV('-r7,T('Y RESPONSE DIRECTORY Work Phone No.

Operations (609)-971-4119 Manager Plant Operations (OSC) (609)-971-4880 Operations Support Center (609)-971-4240 In Plant Ext.

(609)-971-0976*

Outside Line (609)-971-2568 Radiological Controls (609)-971-4660 Rad Con Technicians (609)-971-4600 Rad Con Field Ops Security Department (609)-971-4954 Security Shift Supervisor (609)-971-4957 Central Alarm Station (CAS)

(609)-971-4272 Processing Center Main Gate (609)-971-4950 (609)-971-4608 North Gate (609)-971-4951 Secondary Alarm Station (SAS)

Technical Support Center (TSC)

(609)-971-4158 (609)-971-4161 Outside Lines (609)-971-0961*

(609)-971-1379 NRC Conference Room in TSC (609)-971-4159 (609)-971-4160 Outside Lines (609)-971-1423*

(609)-971-1433*

Rad Engineering (609)-971-4156 Transportation Department (609)-971-4128 Whole Body Count Blda #14 (609)-971-4280

  • Direct dial. All others: Dial 9, then number.

(EPIP06/S3) E1-2

Number AmerGen A PECO Energy/Bribsh Erne COmPany OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Re vision No.

22 ADDITIONAL ASSISTANCE AND NOTIFICATION EXHIBIT 2 OFFSITE EMERGENCY RESPONSE DIRECTORY Lakewood, New Jersey Phone No.

EOF, Operations Facility, (732) -901-2313 Admin. Support (732)-905-6574 (BNE) (732)-370-8073 Bureau of Nuclear Engineering (732)-370-8083 - Fax (732)-905-9007 (732)-367-8812 Emergency Support Director's Office (732)-367-8814 (732)-367-8805 Environmental Assessment Command Center (EACC)

(732)-370-8990 (732)-367-7130 Public Information (732)-367-8921 (732)-370-7310 Radiological/Chemistry Support (732)-370-1211 Security (732)-367-8771 Technical Support JIC (732)-901-2305 Joint Information Center - (732)-901-2333 (732)-901-2332 (732)-364-2897 - Fax OEM at the JIC (732)-370-7332 (973)-316-7512 Parsippany Engineering Support (973)-263-2009 (732)-244-4714 Remote Assembly Area (RAA) (732)-244-4742 (732)-244-4754 (EPIP06/S4) E2 -1

Number AmerGen A PECO Energy/British Energy Comparny OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 3 EMERGENCY TELEPHONE NUMBERS FOR NRC NOTIFICATION TELEPHONE NUMBER NRC Operations Center (301)-816-5100 (via White Flint North, Rockville)

NRC Operations Center (301)-951-0550 Back Up Number NRC Headquarters Operator (301)-816-5100 Oyster Creek Resident Inspector's Office (609)-971-4978 (EPIP06/S5) E3-i

Number AmerGen A PECO Energy/Bi'snh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPII '-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 4 OFFSITE EMERGENCY RESPONSE DIRECTORY NRC Rockville, Maryland Primary (301)-816-5100 Back Up' (301)-951-0550 Telecopier (301)-816-5151 Region I (610)-337-5000 (610) -337-5128 after 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> (301)-816-5100 NRC/HPN Headquarters Main (301)-816-5100 Back Up (301)-951-0550 DO NOT DIAL "1" before (301) area codes NOTE To establish communications with NRC Health Physics Network you must dial the main or backup numbers for NRC Headquarters. Inform the NRC OPS Officer that you are establishing HPN communications and the officer will connect you.

Coast Guard (Water Pollution Response) (718)-354-4121 (718)-354-4137 (718)-354-4136 (718) -354-4138 (609)-562-4250 Department of the Army, 60th Ord.

Detachment (609)-562-6156 Department of Energy (DOE) (24 Hours) (516)-344-2200 FBI (Federal Bureau of Investigation, Newark, NJ) (973)-622-5613 National Weather Service (Recording) (609)-261-6600 (EPIP06/S6) E4-1

Number AmerGen A PECO Ernergy/wwns Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

22 ADDITIONAL ASSISTANCE AND NOTIFICATION EXHIBIT 5 OFFSITE EMERGENCY RESPONSE DIRECTORY STATE AGENCIES (609)-538-6050 Major/Director OEM (609)-538-6008 EOC Representative (609)-984-7700 Bureau of Nuclear Engineering (BNE)

(609)-292-7172 24 Hour Hotline (Trenton Dispatch)

(732)-341-4685 BNE Field Command Trailers (732)-349-8349 (732)-349-6814 (732)-349-6721 (732)-349-6923 (Fax)

Department of Environmental Protection (609)-984-5636 Assistant Director - Rad Protection Department of Health (609)-984-1863 (609),-292-6789 NJ Marine Police (732)-899-5052 NJ State Police, Marine Bureau (609)-296-5807 Marine Law Enforcement Bureau (Ocean Station)

(609)-296-5808 (Point Pleasant) (732)-899-5050 Marine Law Enforcement Bureau (732)-899-5051 (732)-899-5052 NJ (609)-882-4201 OEM - Office of Emergency Management, NOTE For OEM notifications after 4 p..m., weekends and Holidays ask for State EOC.

State Police, New Jersey (609)-296-3131 (EPIP06/S7) E5-1

Number AmerGen A PECO Eer* /tbsh Enegy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 1 22 EXHIBIT 6 OFFSITE EMERGENCY RESPONSE DIRECTORY COUNTY/LOCAL AGENCIES Civil Defense, Ocean County (732)-341-3451 Radiological Office Emergency Radio and Police, Ocean County (732)-349-9100 Teletype Network 24 Hrs.

(732)-341-3451 OEM, Ocean County Lacey Township (609)-693-6637 Civil Defense and Disaster Control, Civil Defense and Disaster Control, Ocean Township (609)-693-4006 Fire Department, Lacey (609)-693-6636 Hospitals:

Community Medical Center (732)-240-8000 Main Switchboard Southern Ocean County Hospital (609)-597-6011 Main Switchboard Lacey Police (609)-693-6636 Rescue Squad, Lacey (609)-693-6636 Lakewood Police (732)-363-0200 (EPIP06/S8) E6-1

Number AmerGen A PECOEnergy/tnbsh Energy CowPany OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 7 OFFSITE EMERGENCY RESPONSE DIRECTORY SUPPORT AGENCIES American Nuclear Insurers (ANI) (860)-561-3433

  • Babcock & Wilcox NNFD Research Laboratory (804)-522-5833
  • General Electric Company (408)-971-1038 (800) -321-0614 Institute of Nuclear Power Operations (INPO) (770)-644-8549 (For assistance for professional and technical (Fax)

(770)-644-8567 (Fax) expertise, refer to INPO Emergency Resources Manual located in the ECC and EOF).

(RMC) (24hr) (215)-243-2990 Radiation Management Consultants (215)-824-1300 (8 to 5)

  • Horsham Valley Airways, Inc. (215)-674-2100 working hours (215)-674-2101 after hours (215)-578-6466 pager
  • S. Levy Incorporated (8 to 5) (If no answer call (408)-377-4870 one of the numbers listed below)

(408)-371-6804 (Fax)

  • If activated contact Contracts Department to arrange for payment.

(EPIP06/S9) E7-1

Number AmerGen A PECO Energyiffnsh rergy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 8 EMERGENCY AVIATION SUPPORT INSTRUCTION FORM 1.1 Request for Aviation Support Authorized by:

Title:

Name: Signature:

1.2 Contact Horsham Valley Airways, Inc.

(215)-674-2100 working hours (215)-574-2101 after hours (215)-578-6466 pager Identify yourself by title and name. Record the date and time and name of the person contacted:

Name:

Time and Date:__

1.3 Describe the extent of the emergency aviation support needed.

1.4 Provide the Aviation Support Contractor with the location of the pick up and destination.

1.4.1 Record the location and cargo to be picked up, as well as the estimated time of arrival at the pick up site.

(Location)

(Cargo)

(Estimated Time of Arrival)

(EPIP06/SlO) ES-I

Number AmerGen APECO ErWgy/5Bnsh Energy ComPaY OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 8 (Continued)

EMERGENCY AVIATION SUPPORT INSTRUCTION FORM 1.4.2 Record the destination of the cargo from Step 1.4.1 and estimated time of arrival.

(Cargo)

(Estimated Time of Arrival) 1.5 Arrangements have been made to deliver the cargo to the pick up site by the estimated arrival time.

1.6 Arrangements have been made to pick up the cargo at the destination by the estimated arrival time.

1.7 Upon completion of emergency aviation requirements, notify the aviation services contractor to terminate services. Record the name of the individual and the time of the notification.

(Name) Date/Time (EPIP06/SO) E8-2

Number AmerGen APECO Energy/Bdtsh Energy Cor Y OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 8 (Continued)

Oyster Creek Aviation Facility Information Form

1. Airports
a. Miller Air Park located west of Toms River on Pinewald-Keswick Road.
2. Heliports
a. Onsite heliport is designated as FAA Site Number H-205 and is equipped with a wind sock but no lights.

(EPIP06/SlO) E8-3

Number AmerGen A PECO Enegy/*tis' Enegy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 8A GENERIC INSTRUCTIONS FOR REQUESTING ADDITIONAL ASSISTANCE When requesting additional assistance from outside agencies or other vendors, contractors or utilities the following should be considered as appropriate or if applicable:

1. Provide the requested organization with information pertaining to site admission procedures. i.e. contact the access center for processing personnel to the site and coordinate between OCNGS and the organization.
2. Provide the OCNGS contact name and telephone number of who will coordinate the arrival of requested organization.
3. Identify potential airports for chartered aircraft arrival as requested from the organization.
4. Assist the requested organization with transportation and escort as applicable to the event. i.e. work with the New Jersey State Police to minimize delays for the organization, request clearances and escorts as appropriate.

NOTE When requesting services from GE Nuclear Energy, BWR Nuclear Emergency support program, it is important not to activate the program during DRILLS. For drills the GE security officer is now authorized to confirm contact with GE Nuclear without requiring a return phone call from the GE Nuclear Energy Duty Manager.

(EPIP06/SI0) E8-4

Number AmerGen A PECO Enrey/Brebsh Erwgy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 8A (continued)

Additional Assistance Request "This is not a drill - I repeat, This is not a drill"

- or "This is a drill - This is a drill" NOTE One major source for obtaining assistance is the INPO Emergency Resources Manual which is located in the GSS/SMM office, ESD's office and the TSC.

1. This is At Oys ter Creek Nuclear Generating Name/Title Station we have declared a at hours Type of Emergency Time Oyster Creek request your assistance as follows:

Identify the problem and give a brief description:

Identify necessary personnel/equipment needed and request assistance Identify telephone number that can be-used by the assisting organization on which to return follow up information as appropriate Area Code Telephone Number List the company or agency called for assistance:

Follow up with the requested organization as appropriate to ensure an expedient arrival, refer to the generic instructions in this exhibit.

(EPIP06/SlO) E8-5

Number AmerGen A PECO E*,wgy/8*itish Energy Company "OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.06 IMPLEMENTING PROCEDURE Title Revision No.

ADDITIONAL ASSISTANCE AND NOTIFICATION 22 EXHIBIT 9 ADDITIONAL ASSISTANCE RESPONSIBILITIES Expertise Needed Contact Operations ESD Assistant - EOF Management Engineering TSC Coordinator Radiological Controls R.A.C.

Environmental Controls Environmental Assessment Coordinator Maintenance OSC Coordinator Security Security Shift Commander Safety OSC Coordinator Administrative Gr. Ldr. Admin. - EOF Communications OSC Coordinator (EPIP06/Sll) E9-1

OYSTER CREEK Number AmerGen A PECO Erwgy/BEesh Energy Compay EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 Applicability/Scope Responsible Office Applies to work at Oyster Creek Emergency Preparedness m1,* d i,,,s within QA plrn scone X Yes No Effective Date Safety Reviews Required X Yes No Date of Sale Prior Revision 9 incorporated the This Revision 10 incorporates the following Temporary Changes: following Temporary Changes:

N/A N/A List of Paces (all pgs. rev'd to Rev. 10) 1.0 to 6.0 EI-I to E1-2 E2-1 E3-1 E4-1 E5-1 E6-1 to E6-2 E7-1 E8-1 E9-1 El0-1 Eli-1 E12-1 E13-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek

________IConcurring Organization Element ure IDate Originator i Lead Emergency Planner AAV Concurred Bv Radioloaical Controls Director Approvedy II EmegencyPreparedness Manager, OC J /,

I S/

(EPIPI0) 1.0

Number OYSTER CREEK AmerGen A PECO Enrgy/Brts Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 PROCEDURE HISTORY REV DATE ORIGINATOR

SUMMARY

OF CHANGE 3 12/94 A. Smith Add Document History page and correct numbering on Exhibits 18 through 23.

4 09/95 J. Bontempo Use cellular phones as primary communications for FMT's.

5 01/96 J. Bontempo Correct references to Exhibits 8 through 21 (previously 9 through 22).

6 03/97 A. Smith Allow RAC to perform the RCC duties, update survey maps, delete Exhibit 13, recovery of radio communications due to cell phones being primary mode of comm.

D 06/97 J.W. Rayment Draft - when ready to be rev'd don't forget to put In your summary of change.

7 09/98 J.W. Rayment -Add initial spaces to section 4.2, delete initial spaces from exhibits 1, 2, & 4.

  • Allow use of normal Rad Con procedures for surveys.

eChange exhibits to reflect normal procedures.

  • Delete exhibits that do not reflect normal procedures.

eChange 1/4 mile offsite map to be more accurate.

  • Change air sampling default to 1 minute samples.

sChange air sampler to Lo volume instead of Hi volume.

8 10/99 A. Smith Update phone numbers for field teams. Remove reference to EPIP-OC-.04, this procedure was deleted.

9 12/99 G. Seals Procedure does not comply with minimum detectable activity requirements of NUREG 0654.

10 DOS A. Smith Change reference from GPU or GPUN to OCNGS (EPIPI0) 2.0

OYSTER CREEK Number AmerGen A PECO Energy/Bfbsh Energy Compan' EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Emergency Radiological Surveys Onsite J Revision No.

0 1.0 PURPOSE 1.1 This procedure describes the responsibilities and duties of personnel involved in the conduct of Onsite Radiological/Environmental Monitoring.

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to all emergency response personnel involved in Onsite Radiological/Environmental Monitoring Team activities.

2.2 This procedure is to be initiated upon any of the following conditions:

2.2.1 Alert, Site Area Emergency or General Emergency as determined by Procedure EPIP-OC-.01, Classification of Emergency Conditions.

2.2.2 Upon direction of the Emergency Director.

3.0 DEFINITIONS 3.1 None 4.0 RESPONSIBILITIES 4.1 Onsite RAC 4.1.1 The RAC may perform the responsibilities of the RCC. If that occurs, FMT activities will be reported to the RAC directly until there are personnel resources available to station the RCC function separately. When the resources are available, the RAC may transfer onsite FMT activities to the RCC.

(EPIPI0) 3.0

AmerGen APEO Fnery/Si*

nefy*IMPLEMENTING EreWy/Bffsh Enefy ComParY A PECO OYSTER CREEK EMERGENCY PREPAREDNESS PROCEDURE Number EPIP-OC-. 0 Title Revision No.

Emergency Radiological Surveys Onsite 10 4.2 Onsite Radiological/Environmental Survey Teams 4.2.1 The Onsite Radiological/Environmental Survey Team communicates directly to the RAC/RCC and is responsible for conducting emergency radiological monitoring within the Protected Area and up to 1/4 mile perimeter from the site boundary (Exhibit 12, 1/4 mile Offsite Map).

NOTE The Onsite Radiological/Environmental Survey Team may be directed beyond the 1/4 mile perimeter to perform offsite radiological monitoring until the Offsite Radiological/Environmental Survey Teams are fully manned and ready to be deployed.

NOTE Offsite monitoring points are found in Exhibit 12 of Procedure EPIP-OC-.II, Offsite Radiological Environmental Surveys.

INITIALS 4.2.2 Team members shall assemble and complete actions identified in Exhibit 1, "Team Assembly and Formation".

4.2.3 Team members shall obtain monitoring instruments and equipment utilizing Exhibit 2, "Monitoring Instruments and Equipment".

4.2.4 Team members shall conduct air sampler pre-operational checks in accordance with Reference 6.8. Also, utilizing Exhibit 3, "Emergency Air Sampling".

4.2.5 Team members shall prepare the vehicle by completing action identified in Exhibit 4, "Vehicle Preparation".

4.2.6 Team members shall utilize survey instruments during cold weather by completing actions identified in Exhibit 5, "Cold Weather Instrument Operations".

(EPIPI0) 4.0

OYSTER CREEK Number AmerGen APECO Ener/Bbsh ErWgy ComPary EMERGENCY PREPAREDNESS EPIP-OC-. 10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 INITIALS 4.2.7 Team members shall conduct onsite surveys utilizing Exhibit 6, "Conducting on Site Surveys" when so directed.

(Refer to Exhibit 10 and Exhibit 13).

4.2.8 Team members shall terminate monitoring activities by completing actions identified in Exhibit 7, "Termination of Monitoring Activities".

4.3 If the onsite team is dispatched offsite beyond the 1/4 mile radius, the team shall suspend use of this procedure and implement the appropriate sections of EPIP-OC-.11 for conducting surveys and collection of air samples.

5.0 PROCEDURE 5.1 Onsite Radiological/Environmental Survey Team(s) members shall implement this procedure during an emergency.

6.0 REFERENCES

6.1 2000-PLN-1300.01, OCNGS Emergency Plan.

6.2 OEP-ADM-1319.02, Emergency Response Facilities and Equipment Maintenance.

6.3 EPIP-OC-.01, Classification of Emergency Conditions.

6.4 Memorandum 9502-88-0098, Field Measurement of Airborne Releases of Radioactive Material, G.M. Lodde, May 25, 1988.

6.5 Radiological/Industrial Safety and Health Awareness Report,89-027, 9-25-89.

6.6 6630-ADM-4200.01, Radiological Surveys.

6.7 6630-ADM-4212.01, Air Sample Collection and Analysis.

(EPIPI0) 5.0

OYSTER CREEK Number AmerGen A PECO Energy/Bntsh Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 7.0 EXHIBITS 7.1 Exhibit 1, Team Assembly and Formation 7.2 Exhibit 2, Monitoring Instruments and Equipment 7.3 Exhibit 3, Emergency Air Sampling 7.4 Exhibit 4, Vehicle Preparation 7.5 Exhibit 5, Cold Weather Instrument Operations 7.6 Exhibit 6, Conducting On-Site Surveys 7.7 Exhibit 7, Termination of Monitoring Activities 7.8 Exhibit 8, Onsite Emergency Monitoring Points 7.9 Exhibit 9, Onsite Monitoring Point Map 7.10 Exhibit 10, Sample Record 7.11 Exhibit 11, Air Activity (Iodine) Nomogram 7.12 Exhibit 12, Approx. 1/4 Mile Offsite Map 7.13 Exhibit 13, Survey Form (EPIPI0) 6.0

AmerGen Cornny EnergyA8ftish Energy A PECO OYSTER CREEK IEMERGENCY IMPLEMENTING PREPAREDNESS PROCEDURE EPIP-OC-. 10 Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 1 TEAM ASSEMBLY AND FORMATION 1.0 The Onsite Radiological/Environmental Survey Team will consist of two (2) team members. At least one member shall be a Radiological Controls Technician who shall be designated Team Leader.

2.0 The Onsite Radiological/Environmental Survey Team shall mobilize, and report as directed by the RAC/RCC.

3.0 Obtain the emergency monitoring vehicle key. If the key is not available, a backup key may be obtained from the guard at the Main Gate Processing Center.

3.1 Obtain cellular phone from GRCS lock box as primary mode of communications.

3.2 Obtain a portable radio for back up communications (Channel 1 would be used).

3.3 Team members shall conduct cell phone communications (primary) or radio communications (secondary) observing appropriate Radio Communications Protocol.

TEAM MEMBERS AVAILABLE NAME SSN DOSE (Team Leader)

(EPIPI0/S3) EI-I

Number AmerGen A PECO EeWgy/Bnbsh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-oc-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT I (continued)

TEAM ASSEMBLY AND FORMATION NOTE When operating the phone while in vehicle pedestal the vehicle must be on or the key in the accessory mode in order for the phone to be unlocked, then speed dial can be accomplished.

When phone is hand held it operates normally.

3.3 The following is a list of locations, speed dial codes and actual phone numbers used by field teams and their respective contact.

LOCATION SPEED DIAL PHONE #

RAC/ECC 01 609-971-0335 RAC/TSC 02 609-971-4156 EAC/EACC 03 732-367-8805

  • 732-370-8990 FMT "A" 04 609-457-3560 FMT "B" 05 609-457-3441 FMT "C" 06 609-457-1525 ONSITE FMT 07 609-457-3592 RCC/OSC 08 609-971-4880 EMERG. 09 911 ECC 10 609-971-4666
  • 732-370-8990 Dial Manually 3.4 Communications and log keeping shall be conducted in accordance with EPIP-OC-.04, Communications and Recordkeeping.

4.0 If the vehicle is not in the assigned parking location, check the Rad Con Field Ops Sign Out Sheet, determining if the user has a radio, and contact the user directing him/her to return the vehicle immediately.

5.0 If the vehicle cannot be located or returned immediately, inform the RCC/RAC and request further guidance.

(EPIPI0/S3) E1-2

AmerGen ArnerGen OYSE CREKNube EMERGENCY PREPAREDNESS EPIP-OC-. 10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 2 MONITORING INSTRUMENTS AND EQUIPMENT 1.0 The onsite Radiological Survey Team shall ensure the following instruments are available in the onsite van or obtain them, From:

(ie. Rad Con Count Room, Radiac Trailer, the OSC monitoring instrument locker), and perform the pre-operational checks as required.

NOTE OP CS-137 check source is in emergency locker for use if Pre Op checks have not been done already.

1.1 One (1) doserate survey instrument with capability of measuring 0.2 mR/hr and greater and capable of determining Beta readings.

1.2 One (1) countrate survey instrument with a pancake style probe.

1.3 One (1) air sampler (Lo Vol RAS Pump) 1.4 One (1) DC air sampler (EPIPIO/S4) E2-1

Number AmerGen A PECOEnergy/Bdtish Enerw Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite _ 0 EXHIBIT 3 EMERGENCY AIR SAMPLING NOTE 1 Silver zeolite cartridges to be used for all samples.

NOTE 2 Flow rate on all samples to be 50-62 1pm.

NOTE 3 Verify operation of power inverter in van prior to use.

Initials 1.0 DC Air Sampler Use 1.1 Ensure the 3 position switch (charge-off-run) is in the OFF position.

1.2 Ensure the 2 battery clips are connected together to prevent sparking while A/S is being moved or handled.

1.3 Connect the air sampler battery clips to the appropriate terminals.

1.3.1 Red-Positive, Black-Negative 1.4 Turn ON A/S and adjust flow as needed.

1.5 Turn OFF A/S and reconnect the 2 battery clips together.

(EPIPI0/S5) E3 -1

AmerGen A PECOEne8a~s1 EnewyCompany OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 4 VEHICLE PREPARATION 1.0 Verify emergency equipment lockers are locked.

2.0 If the emergency locks are not locked, Conduct an inventory using inventory checklist from Procedure OEP-ADM-1319.02, Emergency Response Facilities and Equipment Maintenance. (Appendix B-2).

3.0 Perform radio check with RAC/RCC.

4.0 Log any deficiencies and report information to RAC/RCC.

NOTE Team members shall log into Rem-On-Line System or initiate a control point admission ticket. (An ESRD or a 0-200 mR and a 0-1500 mR SRD required.)

(EPIPIO/S6) E4-1

AmerGen APECOErs A *OEeCom Ee*/8*EI E

IEMERGENCY SER CREEK PREPAREDNESS IMPLEM4ENTING PROCEDURE Number EPIP-OC-.G10 Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 5 COLD WEATHER INSTRUMENT OPERATIONS 1.0 Caution must be observed to ensure instrument operation is not affected by extreme cold temperatures.

0 unlimited.

2.0 If ambient temperature is above 32 F (0°C), instrument use is 0

3.0 If ambient temperature is below 32 F (0°C), continuous instrument use should be limited as follows:

Temperature Continuous Operating Time 0 5 minutes 0 - 32 F 0 0

[(-18 C) - (0 C)]

-200 - 0OF 2 minutes 0

[(-28 C) - (-18 0 C)]

0 4.0 For operation in temperatures below 32 F (0°C), a battery check should be performed before and after each measurement.

4.1 If the battery check fails in either case, the measurement is not valid.

4.2 Return the instrument to the vehicle and allow the batteries to warm up.

4.3 Repeat the measurement as required.

(EPIPI0/S7) E5-1

Number AmerGen A PECO Enery/Msh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-oc-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 6 CONDUCTING ON-SITE SURVEYS 1.0 If the On-Site Team is dispatched Off-Site beyond the 1/4 mile radius, suspend use of this procedure'and implement appropriate sections of EPIP-OC-.11 for surveys.

2.0 The intent is to keep the vehicle within the Protected Area whenever possible. Monitoring Points ESE, SE, and SSE are outside the Protected Area. Due to the time required to enter and exit the Protected Area, verify with the OSC that those monitoring points are required.

3.0 Exhibit 8, "Onsite Emergency Monitoring Points" (describes the onsite locations).

4.0 Exhibit 9, "Onsite Monitoring Point Map" (identifies these locations).

5.0 Perform and document onsite surveys in accordance with established Rad Con procedures. (Exhibit 13: Survey Form - Example - Equivalent Form may be used).

5.1 A baseline perimeter survey should be performed when team is dispatched.

5.2 Perform surveys at the discretion of the RAC/RCC.

5.3 Identify on Survey Form whether survey location may be within the plume or not.

5.3.1 If open window reading is >110% of closed window reading, uncorrected, survey location may be within the plume.

5.4 Label all samples, (smears, air samples, water samples, etc.), with appropriate information (time, location, etc.).

(EPIPI0/S8) E6-1

AmerGen EReopy APECOEnrgyfEnbsiE OYSERs IMGENCY IMPLEMENTING CREEK PREPAREDNESS PROCEDURE Number EPIP-OC-. 10 Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 6 (continued)

CONDUCTING ON-SITE SURVEYS 5.5 Refer to Exhibit 11, "Air Activity (Iodine) Nomogram", for field counting iodine air samples to estimate air iodine activity.

5.6 Document Survey on Exhibit 13 or Equivalent Form; any water, soil, or air samples to be documented on Exhibit 10 - sample record.

5.7 Communicate all survey results to the RCC/RAC as soon as practical.

NOTE 1 Air samples to be 2 minute minimum samples with a flow between 50 and 62 LPM unless otherwise directed by RCC/RAC.

NOTE 2 In the event that the E-van or a team member becomes contaminated, notify the RCC/RAC for a replacement or directions.

(EPIPI0/S8) E6-2

OYSTER CREEK Number AmerGen A PECO Energy/Britsh Energy CompanY EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 7 TERMINATION OF MONITORING ACTIVITIES INITIALS 1.0 Upon direction of the RAC/RCC to cease monitoring activities.

1.1 Transport field monitoring samples to the Rad Con Counting Room or as directed by the RAC/RCC.

1.2 Log off the Rem-On-Line system as appropriate.

1.3 Inventory and return to storage all the emergency monitoring equipment in accordance with Appendix B of OEP-ADM-1319.02, "Emergency Response Facilities and Equipment Maintenance".

1.4 Return vehicle and keys to assigned location.

1.5 Submit team logs and data forms to RAC/RCC for his review and subsequent filing with the Document Control Center.

(EPIPl0/S9) E7-1

AmerGen APECO Energy/rtash Energy Company OYSTER CREEK EENIN PROCEDUE IIMPLEMIENTING PROCEDURE Number EPXP-0-. 10 Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 8 ONSITE EMERGENCY MONITORING POINTS Sector Location Description 1 N RCA perimeter road - west of Gate 8 2 NNE RCA perimeter road - south side of Materials Warehouse 3 NE RCA perimeter road - east side, halfway between Gate 20 and Materials Warehouse 4 ENE RCA perimeter road - east side at Gate 20 5 E RCA perimeter road - south east corner at AOG Building 6 ESE Main site access road - directly south of AOG Building 7 SE Main parking lot -. first row directly south of Fuel Oil Storage Tank 8 SSE Main parking log driveway at Main Gate 1 9 S Auxiliary Office Building eastside adjacent to door 10 SSW Auxiliary Office Building - westside adjacent to door 11 SW Diesel Generator Building - eastside adjacent to door 12 WSW Access road - westside Protected Area, west of transformers 13 W Access road - westside Protected Area, west of demineralizer water storage tank 14 WNW Access road - northwest corner, west of Torus Water Storage Tank 15 NW Access road - adjacent to Gate 10A 16 NNW Access road - halfway between North Guard House and Materials Warehouse, south of LLRW west corner (EPIPIO/SI0) E8-1

Number AmerGen A PECO Energy//ns Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 9 Onsite Monitoring Point Map 14 13 9

(EPIPI0/Sll) E9-1

/

EXHIBIT 10 Procedure EPIP-OC-10 Sample Record Rev. 10 DATE:

SURVEY AIR SAMPLE TIME LOCATION WINDOW WINDOW SILVER FLOW RUN CLOSED OPEN BKG PART ZEOLITE RATE TIME mr/hr mr/hr cpm cpm cpm Cfm Min 1

2 3

4 5

6 0

H 7 8

9 10 AIR SAMPLER TYPE SERIAL NO. CAL. DUE COUNTING INST. TYPE SERIAL NO. CAL. DUE SIGNED TEAM LEADER (EPIP10/S12)

OYSTER CREEK Number AmerGen A PECO Energy/ftrsh Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.10 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Onsite 10 EXHIBIT 11 AIR ACTIVITY (IODINE) 5.5 A rough idea of the approximate iodine concentration and DAC value can be obtained from the-table below:

NET CPM IODINE CONC (uCi/cc) # of DAC's NET CPM 100 2E-7 10 500 1E-6 50 1000 2E-6 100 5000 1E-5 500 10000 2E-5 1000 50000 IE-4 5000 NOTE This table is based on 1 minute sample times @ 60 LPM. Divide concentration and # of DAC's for all other sample times. The table is intended to give field teams a rough idea of what they are encountering. This data should not be used to make dose projections for the general public.

(EPIPIO/S13) E11-1

AmerGenOYSTER SEMERGENCY PREPAREDNESS CREEK Number EPIP-OC-. 10 A PECO EnergW/Bsh Energy Company IMPLEMENTING PROCEDURE Revision No.

Title Emergency Radiological Surveys Onsite I 0 EXHIBIT 12 APPROX. 1/4 MILE OFFSITE MAP

---" " -' "a -'"* f I

~~20

/=14MILEK -' -"

I  ;- ..: . -. .- . _

k "* =ý114 MILE 7.

- +/-Power planI.

X-FORMER YARD

__ -S- 4 .m*.

- - - , =1/4 MILE t -*,t.

  • ac..r,

-. . .,~- I --

  • k*, ..-..- _ ._ _

iit

'LL (EPIPIO/S14) E12-1

( (

t;~

H UC ULPdI3 RMMiULUOiI1AL SURVEY NO. Date Trime Location Location

___ I i ',OO -

Reason SIS Rx Pose:.

U M

DOsE RATES DOG&RATES A Ss A O*sE s A DOSE RATES A SMEARABLE CONTAMINATION INSTRUMENTATION DATA a

9C~

jk7 IZ* R alw I cw (OM) R 0L R LOCATION LCTOA',.*IR

~ B E'CPM2* PMI-QPM IAREAI RADIATION SURVEY N ý RA J_ INST I

NNE S A2 SMSN BCF NE 5~ iNST ENE S6 :i I SIN BCF 7 CODD 4

S~~CO0NTA-MINATIOloF; RVEY 10-" *ST ESE 11, DaBCF " SiN a

SSE 14 i i EFF 10% BKG cpMv is .  ! i TNST Lii -  ; 6. iI SIN I..

Sow 10 I%9 EI  ! F BKG CPM 0 inýF AIR SAMPLE DATA H

SW 2S*

'wy' 11 Signature 'Date,"

12 flS NC - Not Counted Rleriewer: l d GW - Gross Wipe 13 Signature Datal NA - Not Applicable NW WNW NT - Not Taken Is ifonitac Dos' RDtesaCe.ea Locations areBsoX* N= HeadIC,-CliessiT T.,h I Al UOSE Motes sea Gleneral Area Readinoc in mr/hr Unless Oohl~rw, i[ Nara~d No BETA Detected Unless Otherwise Noted .. No BETA Readings Takern sedw W~10 lta5Iaupbab.POJeiinp I mu - mu NOTE: RItFSR TO EPIP-OC.*10 0eIHESa a & a FOR sIRVOy LOCATIONS& DMSCR*ITK -

- Remarks:

~itl<0 01 (I

II H

0

Number OYSTER CREEK AmerGen A PECO Erergy/Bribsh Energy ComanY EMERGENCY PREPAREDNESS EPIP-oc-.12I IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 Applicability/Scope Responsible Office Applies to work at Oyster Creek Emergency Preparedness This document is within QA Plan scope X Yes No Effective Date Safety Reviews required X Yes No Date of Sale Prior Revision 14 incorporated the This Revision 15 incorporates the following Temporary Changes: following Temporary Changes:

N/A N/A List of Pages (all pgs rev'd to Rev. 15) 1.0 to 4.0 El-l to El-2 E2-1 to E2-7 E3-1 E4-1 E5-1 E6-1 to E6-2 E7-1 E8-1 E9-1 to E9-2 El0-1 to E10-2 Ell-1 to Ell-13 E12-1 E13-1 to E13-3 E14-1 E15-1 E16-1 E17-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek

___ _a Concurring Organizational Element Date Originator Emera-en Planner /

Concurred By Rad. Controls/Safety Dir., OC Rad.Contols/afet Dir, O Manaaer, Environmental Affairs ill 7/,ý.ad Approved RX?

~~. -- I I - -

Emergency Preparedness Manager, OC 1/1 V200o I $

(EPIPII) 1.0

Number OYSTER CREEK AmerGen A PECO Energy/Benbsh Energy CoWpany EMERGENCY PREPAREDNESS EPIP-OC-.12.

IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite is PROCEDURE HISTORY REV DATE ORIGINATOR

SUMMARY

OF CHANGE 4 A.T. Smith Delete Parsippany Field Monitoring Team and Add Document History Page 5 12/94 A.T. Smith Define RAC & EAC Acronyms pg. 4.0.

Delete Reference to PTFC pg. 5.0.

Clarify dosimetry pg. E2-1.

Clarify Plume search directions.

Remove names at locations in Exhibit 12.

-Clarify Dose Rate Survey Open and Closed readings.

6 09/95 J. Bontempo Use cellular phones as primary communications for FMTs.

7 12/95 J. Bontempo Add cell phones to activation checklist for FMTs.

Delete Parsippany FMT. Correct typo.

8 10/96 J. Bontempo Delete initial block for repetitive tasks.

Rearrange order of task in El-l.

Delete term Team Leader Pg. El-2.

Correct units to 1pm Pg. E2-6, El0-1, E15-1.

Delete signature block of EACCE from Pg. E15-1, E16-1, E17-1.

9 10/97 A. Smith Update area codes.

10 01/98 P. Milligan Change air sample run time from 5 minutes to 1 minute.

11 07/98 J. Rayment New Rad Engineering Calculation determined that open window to closed window ratio needs to be changed.

12 05/99 A. T. Smith During annual review no other changes except the reference E-Plan # were identified.

13 10/99 A. T. Smith Update phone numbers for field teams and consolidate phone number information.

14 12/99 G. Seals Procedure does not comply with minimum detectable activity requirements of NUREG 0654.

15 DOS A.T. Smith Required due to Sale of OCNGS.

(EPIPII) 2.0

AmerGen AerG/ CREEK PEMERGENCY PREPAREDNESS Number EPIP-OC-.NIO APECO E~nergy/Bniish EWfY CafnanY I IMPLEMENTING PROCEDURE I Title Revision No.

Emergency Radiological Surveys Offsite 15 1.0 PURPOSE 1.1 This procedure describes the responsibilities and duties of personnel involved in conducting Offsite Radiological/Environmental Monitoring and Sampling.

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to all Emergency Response personnel involved in Offsite Radiological/Environmental Monitoring Team activities.

2.2 This procedure is to be initiated upon any of the following conditions:

2.2.1 Alert, Site Area Emergency or General Emergency or as directed by the Emergency Director.

3.0 DEFINITIONS 3.1 None 4.0 RESPONSIBILITIES 4.1 Radioloqical/Environmental Survey Teams The offsite Radiological/Environmental Survey Team performs offsite radiological and environmental monitoring and sampling in accordance with Exhibit 1, "Field Monitoring Team (FMT) Checklist".

5.0 PROCEDURE 5.1 The Offsite Radiological/Environmental Survey Team shall initially report to the Radiological Assessment Coordinator (RAC) until the Environmental Assessment Command Center (EACC) is manned and activated. When the EACC is manned and activated, the Offsite Radiological/Environmental Survey Teams then report to the Environmental Assessment Coordinator (EAC) who is responsible for directing emergency teams to conduct emergency radiological and environmental monitoring outside the protected area and to conduct plume tracking.

5.2 FMT members will proceed with Exhibit 1.

(EPIPII) 3.0

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIp-oc-.11 A PECO Energy/E'bSh Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15

6.0 REFERENCES

6.1 2000-PLN-1300.01, OCNGS Emergency Plan.

6.2 OEP-ADM-1319.02, EmergencyResponse Facilities and Equipment Maintenance.

6.3 EPIP-OC-.01, Classification of Emergency Conditions.

6.4 Memorandum 9502-88-0098, Field Measurement of Airborne Releases of Radioactive Material, G.M. Lodge, May 25, 1988.

7.0 EXHIBITS 7.1 Exhibit 1, "Field Monitoring Team (FMT) Checklist" 7.2 Exhibit 2, "OCNGS FMT Activation Checklist" 7.2.1 Exhibit 2A, Intentionally Left Blank 7.2.2 Exhibit 2B, "Dose Rate and Count Rate Instrument Op Check" 7.2.3 Exhibit 2C, "AC Air Sampler Op Check" 7.2.4 Exhibit 2D, "DC Air Sampler Op Check" 7.3 Exhibit 3, "OCNGS FMT Termination Checklist" 7.4 Exhibit 4, "Conduct of a Dose Rate Survey" 7.5 Exhibit 5, "Conduct of a Count Rate Survey" 7.6 Exhibit 6, "Conduct of an Air Sample" 7.7 Exhibit 7, "Conduct of Noble Gas Sampling" 7.8 Exhibit 8, "Conduct of Soil or Snow Sampling" 7.9 Exhibit 9, "Conduct of Vegetation Sampling" 7.10 Exhibit 10, "Conduct of Water Sampling" 7.11 Exhibit 11, "Offsite Monitoring Points" 7.12 Exhibit 12, "Pluine Search Routes" 7.13 Exhibit 13, "Offsite Radiological/Environment al Survey Team Log" 7.14 Exhibit 14, "Sample Record" 7.15 Exhibit 15, "Count Rate Survey Record" 7.16 Exhibit 16,- "Environmental Sample" 7.17 Exhibit 17, "Dose Rate Survey Record" (EPIPII) 4.0

AmerGen AmerTeR CREKNmbe EMERGENCY PREPAREDNESS EPbP-OC-.11 APECO Eng/MshEnewgCompa1y IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offoite i5 EXHIBIT 1 Field Monitoring Team (FMT) Checklist Initials 1.0 OCNGS FMTs will complete Exhibit 2, OCNGS FMT Activation Checklist.

2.0 Upon direction from the EAC/RAC cease monitoring activities and complete Exhibit 3, FMT Termination Checklist" as appropriate.

3.0 Frequently monitor your SRDs. When a SRD indicates 3/4 or greater scale, record the dose on your Control Point Admission Ticket, rezero the SRD, and fill out a new ticket.

4.0 Monitor the dose rate in your vehicle. If the dose rate exceeds 2 mrem/hr at the driver or passenger locations due to field monitoring samples, notify the EACC/RAC. To determine this, conduct a dose rate survey in the vehicle cab while the vehicle is in an area of normal background.

5.0 Notify the EACC/RAC when any team member's accumulated dose approaches 1000 mrem TEDE.

6.0 If the outside temperature is less than 32oF the continuous instrument use should be limited as follows:

Temp Continuous Operation Time 0°F - 32 0 F 5 minutes 0

-20°F - 0 F 2 minutes Battery checks must also be performed before and after each use.

If either check is not satisfactory, the measurement is not valid. The instrument should be returned to the vehicle and the batteries allowed to warm up.

7.0 Conduct surveys, air samples and biota sampling as directed by the EAC.

"* Dose rate surveys are performed in accordance with Exhibit 4

"* Count rate surveys are performed in accordance with Exhibit 5

"* Air samples are performed in accordance with Exhibit 6

"* Noble gas samples are performed in accordance with Exhibit 7

  • Snow and soil samples are performed in accordance with Exhibit 8

"* Vegetation samples are performed in accordance with Exhibit 9

"* Water samples are performed in accordance with Exhibit 10 (EPIPII/S3) EI-I

Number OYSTER CREEK AmerGen A PECO Enr*y/*itish Ene,rgy parry EMERGENCY PREPAREDNESS EPIP-oc-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 1 (Continued)

Field Monitoring Team (FMT) Checklist Initials 8.0 Periodically conduct a whole body frisk and smear the surfaces of the vehicle.

If the Beta-Gamma contamination is found to be above the following levels notify the EAC and report to the RAA or effect local decontamination and documentation as directed.

Beta Gamma 100 cpm/100cm2of vehicle Surface area Beta Gamma 100 CPM above background, direct frisk of the wheels

  • Vehicles, contamination control station and instruments may be decontaminated in the field by wiping down with maslin cloth taking care to fold maslin inward after each wipe. By using the count rate instrument to check the maslin after each wipe, a rough order of level of Beta-Gamma contamination may be approximated. Always make one pass with the maslin cloth.

Never use the same side to decontaminate a surface. After decontamination place maslin cloth in poly bag, label and conduct a dose rate survey.

Time Signature (EPIPll/S3) EI-2

Number OYSTER CREEK AmerGen A PECO Energy/wthsh Energy COmPanY EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 2 OCNGS FMT ACTIVATION CHECKLIST Initials 1.0 Two team members present. If a qualified team member is not available, an untrained individual may be used as a driver/assistant. The RAC or EAC must approve the individual.

NOTE The RAC or EAC may authorize or direct team dispatch without completing one or more checklist steps.

2.0 Obtain cellular phone for primary communications labeled for your team and a Hand Held Radio for backup communications from the FMT Equipment Locker.

3.0 Contact the RAC by phone and inform him that your team is beginning activation. If RAC unavailable contact EAC.

NOTE When operating the phone in the vehicle pedestal the vehicle must be on or the key in the accessory mode in order for the phone to be unlo-cked, then speed dial can be accomplished. When phone is hand held it operates normally.

Obtain plant status and meteorological conditions from the RAC/EAC Document on Exhibit 14. The following is a list of locations, speed dial codes and actual phone numbers used by field teams and their respective contact.

Location Speed Dial Phone #

RAC/ECC 01 609-971-0335 RAC/TSC 02 609-971-4156 EAC/EACC 03 732-367-8805 732-370-8990 FMT "A" 04 609-457-3560 FMT "B" 05 609-457-3441 FMT "C" 06 609-457-1525 ONSITE FMT 07 609-457-3592 RCC/OSC 08 609-971-4880 EMERG. 09 911 ECC 10 609-971-4666

  • Dial Manually 732-370-8990 4.0 Each team member shall obtain one TLD, and one 0-1500 mRem and, if available, a 0-200 mRem Self-Reading Dosimeter SRD. Zero the SRDs and initiate a Control Point Admission Ticket.

5.0 Check the seal on the storage door on the right side of the monitoring vehicle. If the seal is broken, an inventory must be performed in accordance with Appendix B-1 of OEP-ADM-1319.02.

6.0 Obtain one dose rate and two count rate survey instruments and Op Check in accordance with Exhibit 2B.

(EPIPII/S4) E2-1

Number OYSTER CREEK AmerGen A PECO Energy'flnbsh Energy Comepany EMERGENCY PREPAREDNESS EPIP-oc-. 11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 2 (Continued)

OCNGS FMT ACTIVATION CHECKLIST Initials 7.0 Obtain one AC Air Sampler and Op Check in accordance with Exhibit 2C.

8.0 Obtain one DC Air Sampler and Op Check in accordance with Exhibit 2D.

9.0 Obtain two water-filled 500 ml sample bottles for noble gas sampling.

Fill each with water and seal tightly. Generally, filled bottles will be kept in the storage locker.

10.0 Transport the following to the vehicle.

1 cellular phone 2 sets of dosimetry (one each member) from step 3.0 1 hand held radio from step 4.0 1 dose rate survey instrument from step 6.0 2 count rate survey instruments from step 6.0 1 AC Air Sampler from step 7.0 1 DC Air Sampler from step 8.0 2 500 ml sample bottles from step 9.0 1 Notebook binder containing EPIP-OC-.11 with attachments and OEP-ADM-1319.02, Appendix B 1 Map of Offsite Monitoring Points. The map is contained in the notebook.

1 portable search light 11.0 Place a 2ft x 2ft poly sheet on the back floor of the vehicle.

12.0 Tape up poly bags on the inside of the vehicle doors to be used for contaminated waste and gloves.

13.0 Start the vehicle. Test the DC/AC inverter by plugging the AC Air Sampler to the inverter. Ensure the inverter is turned on and the circuit breaker is in ON position.

14.0 Turn the radio select knob on the vehicle emergency radio to "Position 1". Set the hand held radio to "Position 5". Contact the EACC or RAC for a radio check.

15.0 Initiate a Survey Team Log using Exhibit 13. The log should include:

"* Dispatch locations and requested actions

" Significant information (e.g., personnel or vehicle contamination, personnel over-exposure, requests for assistance, etc.)

" Notifications of Emergency Classifications or Termination.

(EPIPII/S4) E2-2

Number OYSTER CREEK AmerGen A PECO ErnW/rrbsh Enewy COirpY EMERGENCY PREPAREDNESS EPIP-oc-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 2 (Continued)

OCNGS FMT ACTIVATION CHECKLIST Initials 16.0 Notify the EACC or RAC that you are ready to be dispatched.

Give the EAC/RAC the names, social security numbers, and remaining dose of each team member.

If remaining dose is not known for a team member, information can be obtained from the RAC/RCC at the ECC, TSC, or OSC as appropriate.

17.0 Proceed to the location directed by the EACC or RAC. If for some reason communications with the RAC or EACC are interrupted, one team will proceed to the nearest downwind sampling point identified in Exhibit 11. The second team will proceed on the plume search route as determined by the wind direction and the directions in Exhibit 12. Always continue to try and establish communications with the RAC or EACC.

This is the preferred method of directions for the plume search.

Time Completed Signature (EPIPII/S4) E2 -3

Number OYSTER CREEK AmerGen A PECO Energy/fsh EneMy CoParY EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 2B Dose Rate and Count Rate Instrument OT Check Perform the following for each of the three instruments Initials 1.0 Record instrument serial number.

2.0 Record instrument calibration due date.

3.0 Inspect instrument for physical damage.

4.0 Inspect instrument for illegible labels.

5.0 Perform a battery check.

6.0 Obtain the button source from the lead pig within the locker.

Source check the instrument for response.

7.0 If the instrument fails any of the above checks, tag the instrument as bad and obtain a spare instrument. If no spare is available, contact the EAC/RAC. Document instructions in Survey Team Log.

NOTE DOSE RATE instruments and their detector probes are calibrated as a single unit and probes must not be interchanged with other instruments.

Dose Rate Meter Count Rate Meter Count Rate Meter Serial Number Cal Due Date Physical Damage? YES/NO YES/NO YES/NO Illegible Labels? YES/NO YES/NO YES/NO Battery Check OK? YES/NO YES/NO YES/NO Source Check OK? YES/NO YES/NO YES/NO (EPIPII/S4) E2-4

Number OYSTER CREEK AmerGen A PECO Ener*W/Bbsh Energy CoiarY EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 2C AC Air Sampler Op Check Initials 1.0 Record instrument serial number 2.0 Record instrument calibration due date 3.0 Visually inspect the air sampler for physical damage.

4.0 Unscrew the Particulate Filter, Silver Zeolite Cartridge, and "0" rings from the air sampler head, inspect "0" rings for damage.

5.0 Install a new Silver Zeolite Cartridge ensuring the arrow on the side of the cartridge points toward the air sampler.

6.0 Install a new Particulate Filter ensuring the side of the filter which has a woven appearance is nearest to the Silver Zeolite Cartridge.

7.0 Reassemble the air sample head and screw into the Air Sampler.

8.0 Plug Air Sampler into 11OV AC power source.

9.0 Turn Air Sampler on.

10.0 Adjust the flow control knob to achieve a 56 1pm (50-62 1pm) flow rate as indicated on calibrated paper scale.

11.0 After ensuring the air sampler operates satisfactorily, turn off the air sampler and unplug the unit.

12.0 If the instrument fails the Op check, tag the instrument as bad and obtain a spare. If no spare is available, contact the EAC/RAC. Document instructions in Survey Team Log.

Signature (EPIPII/S4) E2-5

Number OYSTER CREEK AmerGen A PECO Energyfl8thls Energy CWmwIY EMERGENCY PREPAREDNESS EPIP-OC-.11I IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 2D DC Air Sampler Op Check Initials 1.0 Record instrument serial number 2.0 Record instrument calibration due date 3.0 Physically inspect the air sampler for physical damage.

4.0 Ensure the 3 position switch (Charge-Off-Run) is in the Off position.

5.0 Ensure the two Battery Clips are connected together to prevent sparking while air sampler is being handled or moved.

6.0 Unscrew the Particulate Filter, Silver Zeolite Cartridge, and "0" rings from the air sampler head, inspect "0" rings for damage.

7.0 Install a new Silver Zeolite Cartridge ensuring the arrow on the side of the cartridge points toward the air sampler.

8.0 Install a new Particulate Filter ensuring the side of the filter which has a woven appearance is nearest to the Silver Zeolite Cartridge.

9.0 Reassemble the air sample head and screw into the Air Sampler.

10.0 Obtain the keys for the emergency monitoring vehicle.

11.0 Connect the Air Sampler Battery Clips directly to the vehicle's battery terminals.

  • e Black - Negative
  • 0 Red - Positive 12.0 Turn on the Air Sampler and enter the flow rate, 1pm.

(EPIP1I/S4) E2-6

Number OYSTER CREEK AmerGen APECO Energy/B&t"h Energy CmpaWy EMERGENCY PREPAREDNESS EPIP-OC-.II IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offaite is EXHIBIT 2D (Continued)

DC Air Sampler Op Check Initials 13.0 Turn off Air Sampler and-disconnect the Air Sampler Battery Clips.

Connect two Battery Clips together.

14.0 Leave the DC air sampler in the vehicle.

15.0 If the air sampler does not pass the Op check, tag the instrument as bad and obtain a spare. If no spare is available, contact the EAC/RAC. Document instructions in the Survey Team Log. In the event that the DC air sampler is used, ensure the EAC/RAC is aware of the flow rate.

Signature (EPIPI1/S4) E2 -7

Number OYSTER CREEK AmerGen A PECO Enegy/Brtish Erw Cwopany EMERGENCY PREPAREDNESS EPIP-OC-. 11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 3 OCNGS FMT Termination Checklist Initials 1.0 Transport Field Monitoring Samples to the Offsite Sample Storage Facility, designated by the EAC. Use FRH6 key. This should be the Environmental Lab (Building No. 18) on the Forked River Site.

NOTE For Drills and Exercises return all Field Monitoring Samples to the Environmental Controls Section for disposition.

2.0 Place signed Team Logs/Inventory Forms and Data Forms with the Field Monitoring Samples.

Turn in TLD's and completed Control Point Admission Tickets to the Dosimetry Radiological Support Group, normally located at Building No. 14 Processing Center, Forked River Site.

Contact EAC/RAC to determine where to turn in dosimetry if the center has been relocated.

NOTE After a drill, dosimetry should be returned to the Monitoring Kit Instrument Locker in Building 12.

3.0 Return vehicle to Building 12, and return keys to Monitoring Kit Instrument Locker.

4.0 Return all the Emergency Monitoring Equipment to the Monitoring Kit Instrument Locker.

5.0 Return hand held radio to the charging rack inside the Monitoring Kit Instrument Locker in Building 12.

6.0 Complete and sign all logs and checklist. Return to Emergency Preparedness.

Time Completed Signature (EPIPII/S5) E3 -1

AMerGen OYSERCREKNube EMRGENCY PREPAREDNESS EPNP-oc-. 11 APECOErergyt EmW CWPNI IMPLEMENTING PROCEDURE Title Revision No.

Emergen~cy Radiological Surveys Of fsite 15 EXHIBIT 4 Conduct of a Dose rate Survey 1.0 Ensure a pre-operational check has been completed for the dose rate instrument in accordance with Exhibit 2B.

2.0 Observe Cold Weather Operations Limitation described in Exhibit 1, Step 6.0.

3.0 Switch the dose rate instrument range selector switch to the highest scale that will give the operator amid range meter reading.

4.0 Dose rate measurement should be performed approximately one meter (1m) above the ground (waist level) outside the emergency vehicle, unless directed otherwise by the RAC.

5.0 Record the survey results on Exhibit 18, Dose Rate Survey Record.

6.0 Determine if the survey location may be within the radioactive plume and advise RAC/EAC.

6.1 IF Beta Gamma (OW) measurements are less than 110 % of the Gamma (CW) measurements, THEN dose rate measurements indicate that the plume is elevated over and/or horizontally displaced from the survey location.

6.2 Identify on Exhibit 17, Dose Rate Survey Record, that the location is not in plume.

6.3 IF Beta Gamma (OW) measurements are equal to or greater than 110%

of the Gamma (CW) measurements, THEN dose rate measurements indicate that the plume may have touched.

down at the Survey locations -9 Take an air sample and contact the RAC/EAC.

(EPIPIl/S6) E4-1

nerGen AeenOYSTEREMERGENCY CREEK PREPAREDNESS Number ErIP-OC-. 11 APECO EreWg/Bntish Enrgy Company m i'wiotvDir

-r,-'rny To na~r Title Revision No.

Emergenlcy Radiological Surveys Offoite 1 EXHIBIT 5 Conduct of a Count Rate Survey 1.0 Don surgeons gloves and obtain smear discs and sample envelopes from the Emergency Monitoring Kit.

2.0 Record Date, Time and Survey Location on sample envelope.

2 to obtain a sample of 100 cm 3.0 Wipe smear disc on horizontal surfaces 4.0 Wipe the smear disc in a lazy S pattern approximately 16 inches long, or Wipe smear disc in an area of approximately 4 inches by 4 inches.

5.0 If smear samples are taken from a non-horizontal surface, provide a description of the sampled surface on the smear disc envelopes.

6.0 Determine Background Count Rate by reading count rate instrument with no sample present.

NOTE The smear sample counting area background count rate must be less than 300 counts per minute (cpm) using a count rate instrument.

NOTE A rough order of magnitude for Dose rate conversion to CPM is count rate (CPM) = 3000 x dose rate (mR/hr).

7.0 Record the Background counts per minute (Bcpm) on Exhibit 16, Count Rate Survey Record.

8.0 Obtain the smear Gross Count Rate.

"* Place detector probe within 1/2 inch of the smear disc with the sample surface toward the detector window.

"* Count the smear disc.

"* If activity is indicated within 15 seconds, allow the meter indicator to stabilize before recording.

"* Record the maximum smear sample Gross counts per minute (Gcpm) on Exhibit 15, Count Rate Survey Record.

"* Complete the appropriate data on Exhibit 15, Count Rate Survey Record.

(EPIPII/S7) E5-1

  • T .....

OYSTER CREEK Amer~en Enew/Snbsh E A PECO C EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EP3P-OC-. 11

}Revision No.

Title Emergency Radiological Surveys Offaite i s____________

EXHIBIT 6 Conduct of an Air Sample 1.0 Prerequisites

"* The Air Sampler shall be located in a manner that will minimize cross contamination.

"* All samples shall be labeled and saved for further analysis.

2.0 Set up Air Sampler if the filter and cartridge require replacement.

0 unscrew the particulate filter and Silver Zeolite Cartridge rings from the air sampler head.

0 Install a new Silver Zeolite Cartridge ensuring the arrow on the side of the cartridge points toward the air sampler.

0 Install a new particulate filter ensuring the side of the filter which has a woven appearance is nearest to the Silver Zeolite Cartridge.

  • Reassemble the air sampler head and screw into air sampler.

NOTE The air sampler is calibrated with both the Particulate Filter and Silver Zeolite Cartridge in place. Both must be in place even if an iodine sample has not been requested and the Silver Zeolite Cartridge will not be analyzed in the field.

3.0 Draw a 2 minute minimum air sample at 56 1pm (50-61 1pm) as indicated on the paper scale if possible using a watch, stopwatch, or timer to measure the time duration unless otherwise directed by the RAC/EAC.

4.0 Obtain a general area count rate with the count rate instrument and pancake probe at approx. waist level. If the background exceeds 300 CPM move to a location where the background is less than 300 CPM.

5.0 -Record air sampler run time and flow rate on the Air Sample Data Collection Envelope and Exhibit 14.

6.0 Wearing protective gloves, unscrew the filter holder section of the sampler head from the Silver Zeolite cartridge holder section such that the particulate filter is held in place in the removed section.

7.0 Remove the retainer ring from the filter holder and obtain a count rate on the particulate filter byholding the front side of the filter holder against the pancake probe. Record the count rate as Gross CPM on Air Sampler Data Collection Envelope and on Exhibit 14.

8.0 Using tweezers, remove the filter from the holder. Place the filter in an Air Sample Data Collection Envelope.

(EPIPII/S8) E6-1

AmerGen OYSERCREKNube EMERGENCY PREPAREDNESS EPrP-OC-. 1 APECO Ene*gy/Bsh Ewgy Company IMPLEMENTING PROCEDURE Title Emergency Radiological Surveys OffSite j_____________

Revision No.

EXHIBIT 6 (Continued)

Conduct of an Air Sample 9.0 Recount the filter holder without the particulate filter in place.

Enter this count rate as background CPM on the Air Sample Data Collection Envelope and on Exhibit 14.

10.0 Subtract the background cpm (Bcpm) from gross cpm (Gcpm) and record as "Net cpm" on the Air Sample Data Collection Envelopes.

11.0 Measure the contact Dose Rate and record on the Air Sample Data Collection Envelope.

12.0 Retain the sample for later analysis.

NOTE Monitor the driver and passenger area dose rates. If any area exceeds 2.0 mR/hr, notify the RAC/EAC and request guidance.

13.0 Wearing protective gloves remove the Silver Zeolite cartridge from the sampler head and place it in an Air Sample Data Collection Envelope.

14.0 Count both sides of the Silver Zeolite cartridge through the envelope.

Record the higher count rate as "Gross" on the Air Sample Data Collection Envelope and on Exhibit 14.

15.0 Subtract the background cpm (Bcpm) from the gross cpm (Gcpm) and record the result as "Net cpm" on the Air Sample Data Collection Envelope.

  • Measure the contact dose rate and record on the Air Sample Data Collection Envelope
  • Retain the sample for later analysis.

16.0 Establish contact with the EACC/RAC.

17.0 Transmit the data from the Air Sample Data from Exhibit 14.

(EPIPII/S8) E6-2

Number OYSTER CREEK AmerGen A PECO Energy/8Bt Erergy Companry EMERGENCY PREPAREDNESS EPIP-oc-. 11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offaite 15 EXHIBIT 7 Conduct of Noble Gas Sampling 1.0 Obtain a 500 ml bottle that was prefilled with clean water. When a sample is needed, stand well away from vehicles or other obstructions (10 ft or greater), remove the cap and pour the water from the container. Cap or close the container.

2.0 Label the sample container with the date/time of collection, and location. Record the same information in the first two columns of Exhibit 15. Write "Noble Gas" in the 3rd column and leave the other columns blank.

3.0 Retain all samples for later counting and analysis.

NOTE Monitor the driver and passenger area dose rates. If any area exceeds 2.0 mR/hr, notify the RAC/EAC and request guidance.

(EPIPll/S9) E7-1

ATerGen CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-. 11 APECO Energy/Brsh Energy Company IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offaite i5 EXHIBIT 8 Conduct of Soil or Snow Sampling 1.0 Soil and snow sampling shall be conducted with one team member collecting samples and the other team member providing radiation monitoring for the sample collector.

2.0 Obtain sample container and trowel from Emergency Monitoring Kit.

3.0 Label container with Time, Date, Monitoring Location, Type of Sample, and Dose rate.

Example:

Sample Label Date Time:

Sample Type Sample Location Contact Dose Rate mr/hr ____nr/hr (OW) (CW)

Background bcpm Contact count rate gcpm Initials 4.0 Choose a sample area free from leaves, grass and other vegetation.

5.0 Wearing protective gloves scrape approximately the top 1/2 inch of soil or snow with trowel and place into container until full. Cap container.

6.0 Perform a contact dose rate survey of container with a dose rate meter.

7.0 Record dose rate on label.

8.0 If contact dose rate is less than 0.2 mR/hr, perform a contact count rate measurement of sample container.

"* Measure Background Count Rate (bcpm)

"* Measure Sample Contact Count Rate (gcpm) 9.0 Complete the appropriate data on Exhibit 16.

10.0 Record the following on the sample label

"* Background Count Rate bcpm

"* Gross Count Rate gcpm 11.0 Save all samples for future analysis.

12.0 Surgeon's gloves should be changed after each sample is collected to prevent cross-contamination.

(EPIPII/SI0) E8-1

OYSTER CREEK Number AmerGen APECO Enrew/nbsh Energy Co-prany EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.1I Title Revision No.

Emergency Radiological Surveys Offsite I_15 EXHIBIT 9 Conduct of Vegetation Sampling 1.0 Vegetation sampling shall be conducted with one team member collecting samples and the other team member providing radiation monitoring for the sample collector.

2.0 Obtain clippers and medium plastic bag from Emergency Monitoring Kit.

3.0 Label sample bag with Time, Date, Monitoring Location, Type of Sample, and Dose rate.

Example:

Sample Label Date Time:

Sample Type Sample Location Contact Dose Rate mr/hr mr/hr (OW) (CW)

Background bcpm Contact count rate gcpm Initials 4.0 Wearing protective gloves, take as large a sample of green (living) vegetation as can be fit into bag.

NOTE Do NOT include soil, large branches or roots.

5.0 Place sample in bag.

6.0 Seal the bag and perform a Contact Dose Rate.

7.0 Record Dose rate on label.

(EPIPII/Sll) E9-1

  • er e*EMERGENCY PREPAREDNESS EPIP-OC-. 11 AmerGen AP E E P OYSTER CREEK IMPLEMENTING PROCEDURE Number Title Revision No.

Emergency Radiological Surveys Off site 15___________

EXHIBIT 9 (Continued)

Conduct of VeQetation Sampling 8.0 If contact dose rates are less than 0.2 mR/hr, perform a contact count rate measurement of sample container.

"* Measure Background Count Rate (bcpm)

"* Measure Sample Contact Count Rate (gcpm) 9.0 Complete the appropriate data on Exhibit 16.

10.0 Record the following on the sample label

"* Background Count Rate bcpm

"* Gross Count Rate gcpm 11.0 Save all samples for future analysis.

12.0 Surgeon's gloves should be changed after each sample is collected to prevent cross-contamination.

(EPIPII/Sll) E9-2

Number OYSTER CREEK AmerGen APECO Energy/Ethsh Energy Compny EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 10 Conduct of Water Sampling 1.0 Water sampling shall be conducted with one team member collecting samples and the other team member providing radiation monitoring for the sample collector.

CAUTION Use life vest when collecting water samples from bodies of water i.e.

lakes, bay, ocean.

2.0 Obtain empty plastic screw-top sample bottle and a plastic bag.

3.0 Label bag with Time, Date, Monitoring Location, Type of Sample, and Dose rate.

Example:

Sample Label Date Time:

Sample Type Sample Location Contact Dose Rate mr/hr mr/hr (OW) (CW)

Background bcpm Contact count rate gcpm Initials 4.0 Wearing protective gloves, remove cap, submerge bottle, rinse and discard water. Submerge bottle in water to obtain a surface sample. Take care not to disturb sediment.

5.0 Recap bottle and place in a plastic bag. Seal the bag.

6.0 Perform a Contact Dose Rate survey of the bottle through the plastic bag.

7.0 Record Dose Rate on sample label.

(EPIPII/S12) E10-1

A A

erGen erG APEC EwyBb en EMERGENCY CREEK oYSTERPREPAREDNESS Number EPRP-OC-.D11 Ere Co IMPLEM4ENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Off site 1 EXHIBIT 10 (Continued)

Conduct of Water Sampling 8.0 If contact dose rates is less than 0.2 mR/hr, perform a contact count rate measurement of sample container.

"* Measure Background Count Rate bcom

"* Measure Sample Contact Count Rate gcpm 9.0 Record the appropriate data on Exhibit 16.

10.0 Record the following on the sample label

"* Background Count Rate bcpm

"* Gross Count Rate gcpm 11.0 Save all samples for future analysis.

12.0 Surgeon's gloves should be changed after each sample is collected to prevent cross-contamination.

(EPIPII/SI2) E10-2

Number OYSTER CREEK AmerGen A PECO Energy/qnbsh ErWgy CoMrTny EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

N1 0o 0.65/ East end of old Left onto Rt. 9, left just after Crest 1045.9 Energy Spectrum intake canal, and proceed to the OC-3 parking lot old site of the Energy Spectrum N2 70 1.2/ Intersection of Left onto Rt. 9, left onto 1930.8 Taylor Lane and Taylor Lane, proceed 0.2 mile to Kennebec Rd. Kennebec Rd.

N2a N-2 20 1.8/ Playground Rt. 9 north Lakeside Drive, left Lakeside Drive at onto Lakeside Dr. 3/4 miles with to Moose Head St. playground at intersection Crest Moose Head St.

OC-II N3 --- 3520 2.5/ Along curb Left onto Rt. 9 approx. 1.5 adjacent to park miles to Lakeside Dr., left onto 4022.5 at intersection Lakeside Dr. to Deer Head Lake of Lakeside Dr. Drive and Deer Head Lake Drive N4 N-4 3540 3.2/ Lacey Township Left onto Rt. 9 to Rt. 614

-1 5148.8 Municipal Bldg. (Lacey Rd.), left onto Lacey parking lot. Road 1.7 miles to Lacey Township 110 AC available Municipal Bldg. on right N5 N-5 3540 4.21/ North commuter Left onto Rt. 9 to Rt. 614

-1 6773.9 parking lot at (Lacey Rd.), left onto Lacey Forked River Road to G.S. Pkwy., north on service area on Pkwy to Forked River service G.S. Pkwy. area 110 AC available N6 356.50 4.45/ Approx. 1/3 mile Left onto Rt. 9 to Rt. 614 west of Central (Lacey Rd.), left onto Lacey Rd.

Regional High to G.S. Pkwy. North on Pkwy.

School along for 2.2 miles at overpass of Pinewald-Keswick Pinewald-Keswick Rd. Mile Post Rd. at junction 77.2 with G.S. Pkwy.

N10 - 3 9.6/ Ocean County Left onto Rt. 9 to Rt. 614 Courthouse (EOC) (Lacey Rd.), left onto Lacey Rd.

Toms River, to G.S. Pkwy north to Exit 81, parking log. east on Water St. for 0.5 mile 110 AC available to Main St., left one block to Washington St., right on Washington t~o 2nd left to Horner St.

(EPIPII/S13) El1-1

Number OYSTER CREEK AmerGen APECO EnergyEn*th EnerY CoMra EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-. 1I Title Revision No.

Emergency Radiological Surveys Offaite EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

Ni0a 3590 8.75/ Left side of road Left onto Rt. 9, continue left before traffic at Rt. 166 junction to G.S.

14.078 light at Pkwy. Interchange approaching intersection of intersection of Rt. 530 (Dover G.S. Pkwy, Rt. 530 Rd.), left to roadside area (Dover Rd.) and before intersection.

Rt.9 N20 N-20 351.50 10.8/ Rt. 37, DOT Left onto Rt. 9 to Rt. 614 Maintenance Yard (Lacey Rd.) to G.S. Pkwy.,

17,377 West of Mule Rd. North to Exit 82W, 1.9 mile South side Rt. 37 west to DOT Maintenance Yard on left using jug handle west of Mule Road NNE1 19° 0.45/ Rt. 9 mile mrkr 80 Left onto Rt. 9 to intake canal CREST 724.0 cal O.C. intake at bridge at mile marker 80 canal OC-6 NNEla --- 230 0.7/ Intersection of Left onto Rt. 9, 0.7 mile to Biscayne Dr. and traffic light at Beach Blvd.,

1126.3 Nantucket Dr. right on Beach Blvd. to Biscayne Dr. (ist right) to Nantucket Rd.

NNE2 NNE-2 23.50 1.7/ Forked River State Left onto Rt. 9, 1.6 mile to

-i Marina SW corner Forked River State Marina of parking lot.

110 AC available NNE3 --- 24.50 2.5/ Intersection of Left onto Rt. 9, 2.6 miles to 4022.5 Rt. 9 and Sunrise Bld Sunrise Blvd.

Blvd.

NNE4 270 3.7/ Intersection of Left onto Rt. 9, 3.9 miles to Rt. 9 and Laurel Laurel Blvd.

Blvd. parking lot NNE5 26° 4.6/ Intersection of Left onto Rt. 9, 4.9 miles to 7401.4 7401.4 access Rt. road 9 and WOBM WOBM radio station access road NNE6 240 5.6/ Rt. 9, Pinewald Left onto Rt. 9, 6.2 miles on 9010.4 Substation, 0.1 right, 0.1 miles North miles North of Serpentine Dr. at large metal Serpentine Dr. utility poles NNE6a --- 32.50 6.8/ Edge of Bay, Left onto Rt. 9, 6.2 miles to east on Bay Blvd. to 10,941 Bay Blvd. end Blvd.

Bay of road (EPIP11/S13) E11-2

OYSTER CREEK Number AmerGen A PECO Energy/BYbsh Energy Company EMERGENCY PREPAREDNESS EPIP-oc-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

NNE7 NNE 23.50 6.0/ Bayville First Left onto Rt. 9, approx. 6.4 1 Aid, Rt. 9, miles to Bayville, Rt. 9 @

Bayville, 110 AC Station Blvd.

available NNE10 21.50 7.55/ Intersection of Left onto Rt. 9, 7.6 miles to Rt. 9, Veeder multi-point intersection, just Lane, Ocean Gate past MacDonald's to parking Dr. & Mill Creek area near intersection on Rd. parking lot right NNEI0a --- 22.50 8.65/ Intersection of Left onto Rt. 9, 7.6 miles, go Chelsea Ave and past MacDonald's, right on Ocean Gate Drive Ocean Gate Dr. to Chelsea Ave (near end)

NNEI0b 16.50 9.9/ Intersection of Left onto Rt. 9 to Rt. 614 Rt. 37 and Vaughn (Lacey Rd.) to G.S. Pkwy. to Ave, lot on first Rt. 37 (Exit 82) east approx.

jug-handle exit 2.9 miles to Vaughn Ave from Rt. 37 intersection right jughandle NNE20 27.50 10.5/ Bay Bridge Inn Left onto Rt. 9 to Rt. 614 parking lot near (Lacey Rd.) to G.S. Pkwy.,

16,895 Rt. 37 and west Exit 82, to Rt. 37 east to end of bridge at bridge, right into parking lot west shore of Barnegat Bay NEI 470 0.3/ Intersection of Left onto Rt. 9, 0.2 miles to 482.7 ra 9 and farm Rt. first right at farm road road NEla -42 0.9/ #732 Bermuda Dr. Left onto Rt. 9 to first near Nantucket Rd. traffic light, right onto 1448.1 Beach Blvd. to Bermuda Dr.,

right .to end of road.

Address #732. Just past Nantucket Rd.

NE2 -41 1.6/ Captain's Inn, Left onto Rt. 9 to second 2574.4 Lacey Rd. parking traffic light, right onto 2 lot at rear Lacey Rd. to Captain's Inn (near end of road)

NE3 --- 42.50 2.4/ Game Farm Ocean Left onto Rt. 9, beyond second Residential Group traffic light, right onto Game Center Farm Rd. (concrete parking lot OC-12 near buildings)

(EPIPII/S13) Eli-3

Number OYSTER CREEK AmerGen A PECO Energy./atsh Energy Co-Pazy EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-Oc-.11 Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

NE4 510 3.1/ End of Sail Dr. Left on Rt. 9, north 2.6 miles near intersection to Sunrise Blvd., turn right, 4987.9 of Sunrise Blvd. go approx. 1.4 miles to Sail Dr. (at bend in road), left on Sail Dr.

NE5 NE- 470 4.8/ Laurel Blvd. Left on Rt. 9, 3.9 miles (past Address #1063. (NJ 2nd traffic light) to Laurel 5-1 7723.2 Location #1068) Blvd., right on Laurel Blvd. at curve (at street light,)

address #1063 NE10 - 44 9.5/ Intersection of Left onto Rt. 9, left at 2nd 15,286 Central Ave. and traffic light onto Rt. 614 14th St., Seaside (Lacey Rd.) to G.S. Pkwy.,

Park north to Exit 82E, east onto Rt. 37 over bridge to Rt. 35 south (Central Ave), right onto Central Ave. to intersection of Central Ave. and 14th St.

NE20 -37 11.8/ Near intersect-ion Left on Rt. 9, left at 2nd of Rt. 37 access traffic light on Rt. 614 (Lacey road and Rt. 35 Rd.) to G.S. Pkwy., north to north (Central Exit 82 east on Rt. 37, cross Ave.) bridge to Rt. 35 north, exit.

At first traffic light, turn right, "U-Turn" onto service rd. area ENEl 700 0.25/ Yellow N.J. Left onto Rt. 9, approx. 25 Natural Gas Co. yds. south of North Gate access marker approx. 100 road on left yds. north of main entrance ENE2a 670 1.15/ Intersection of Left onto Rt. 9 to 1st traffic Tampa Rd. and light (Beach Blvd.), right onto 1850.4 Sandy Hook Dr. Beach Blvd. to Forked River

(#701 Tampa Rd.) Bridge. Just over bridge turn right onto Sandy Hook Dr. to second left (Tampa Rd.)

ENE2 ENE- 59.50 1.15/ Beach Blvd. to Left onto Rt. 9 to 1st traffic left side of road light (Beach Blvd.), right onto after crossing Beach Blvd.. to southeast end of OC-4 Forked River Forked River Bridge Bridge (EPIP11/SI3) Eli-4

Number OYSTER CREEK AmerGen Company APECO Energy/BMnsh Erne*W EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

ENE3 700 2.3/ Intersection of Left on Rt. 9 to 1st traffic light (Beach Blvd.), right onto Beach Tamiami Roadand Blvd. Beach Blvd., over Forked River Bridge to next bridge (wooden) continue over bridge to right fork (Tamiami Rd.)

ENE4 580 3.7/ Parking lot at Left on Rt. 9 to Sunrise Blvd.,

Sunrise Beach Club right on Sunrise to Capstan Dr.

on left. Capstan Dr. straight to Sunrise Beach Club ENE7 670 6.3/ Island Beach State Left onto Rt. 9 to 2nd traffic Park service area light, Rt. 614 (Lacey Rd.),

parking lot left on Lacey Rd. to G.S. Pkwy.

between north and North on Pkwy. to Exit 82E, south swimming east on Rt. 37 across bridge to area parking lots Rt. 35 south (Central Ave.) to Is. Beach State Park, 3.5 mi.

south of park entrance gate to swimming area parking lots ENE10 600 7.35/ Island Beach State Left on Rt. 9 to 2nd traffic Park, 2.5 miles light, Rt. 614 (Lacey Road),

south of park left on Lacey Rd. to G.S. Pkwy entrance at North on Pkwy. to Exit 82E, chained access east on Rt. 37 across bridge to road, on right Rt. 35 south (Central Ave.) to Island Beach State Park, 2.5 miles south of park entrance gate to intersection of chained access road on right El 820 0.3/ Opposite Main Gate Exit Main Gate onto Rt. 9 CREST 482.7 on Rt. 9 OC-7 Ela 87.50 0.85/ The Farm Area Left onto Rt. 9, right at first Northeast corner farm road to second left to of dredge spoils corner of dredge spoils basin.

basin Key for gate lock in FMT vehicle E2 870 1.6/ Intersection of Left onto Rt. 9, right at ist Albatross Ct. and traffic light to Forked River Orlando Dr. Bridge, cross bridge to Elks Club, right on Club House Dr.,

4 blocks to Orlando Dr., left on Orlando Dr. to Albatross Ct.

(second left)

(EPIPII/S13) Eli-5

Number OYSTER CREEK AmerGen A PECO EneWr/Bnbs EnWey COrmnY EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-oc-.1.

Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

E7 94.50 5.9/ Old Coast Guard Left onto Rt. 9, left at 2nd Watch Station Island traffic light onto Rt. 614 Tower, (Lacey Rd.) to G.S. Pkwy.,

Beach State Park north to Exit 82E, east on Rt.

I1OAC 37 to Rt. 35 south (Central Ave.) to Is. Beach State Park, to 7 miles south of entrance gate to station on left ESEI 1110 0.3/ Yellow marker (NJ Right onto Rt. 9, approx. 0.1 Natural Gas Co.) mile south of O.C. Main Gate 0.1 mile south of O.C. Main Gate ESEla ESE 1110 0.8/ Fork area formed Right *onto Rt. 9, 0.5 mile, 1 1287.2 at intersection left on Bay Pkwy. to Bay Pkwy. and Dock intersection with Willow and Ave. Willow also Dock Avenues intersects here ESE2 109.50 1.85/ End of Bay.Pkwy. Right onto Rt. 9, 0.5 mile, at Barnegat Bay left on Bay Pkwy. to end of CREST 2976.7 street at Barnegat Bay OC-14 ESE7 1090 6.3/ Island Beach State Left onto Rt. 9 to 2nd traffic Park southern end light, Rt. 614 (Laceyto Rd.),

G.S.

of paved park road left onto Lacey Rd.

Pkwy. North on Pkwy. to Exit 82E, east on Rt. 37 across bridge to Rt. 35 south (Central Ave) to Island Beach State Park; go 8.2 miles south of park entrance to southern end of paved road SEI 1260 0.36/ Rt. 9, south of Right onto Rt. 9, over South Access Rd., discharge canal bridge, just south of discharge past South Access Road canal bridge SEla 1400 0.5/ Southeast corner Right onto Rt. 9, left on Bay of Bay Pkwy., Parkway along Rt. 9, next to residence at 2 Bay Parkway (EPIP!l/SI3) E11-6

Number OYSTER CREEK AmerGen A PECO Er*w/Bribsh E*eYgy Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-. 11 Revision No.

Title Emergency Radiological Surveys Offsite j s EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

SE2 1300 1.7/ South end of Shore Right onto Rt. 9, approx. 0.75 Dr. and on mile, left onto Main St., 0.4 2735.3 Barnegat Bay, mile to Lighthouse Dr., left Waretown onto Lighthouse Dr. to Shore Dr., right onto Shore Dr. to end of Shore Dr.

SE7 SE- 1270 6.3/ Across the street Right onto Rt. 9 to from the Coast intersection of Rt. 72, east Guard Station on onto Rt. 72 to Long Beach Bayview Ave., Blvd., left onto Long Beach Barnegat Light Blvd., left onto 6th St. to Borough Bayview Ave., left onto Bayview Ave. and across the street from the Coast Guard Station SSE2a 1640 1.6/ Waretown Vol. Fire Right onto Rt. 9, 1.6 miles, 2574.4 Co. right onto Rt. 532, 1 block, building on left SSE2 SSE 1540 1.55/ Area east side of Right onto Rt. 9, 0.75 mile, 1 2494.0 Main St. and south left onto Main St., 0.75 mile of Skippers Blvd. to just past intersection with Skippers Blvd.

SSE3 SSE3 1660 1.7/ Township of Ocean Township of Ocean Municipal Crest 2735.3 Municipal Building Building parking lot Route 9 OC-2 Coraliss and to Rout 532. West on Route Railroad Ave. 532 to Coraliss St. Left on Coraliss to Railroad Ave.

SSE4 1640 2.65/ Lagoon (BBCA Right onto Rt. 9, 2.2 miles, 4263.9 Recreation Area) left onto Barnegat Beach Dr.,

near Bonita Blvd. 0.6 mile, right on Lagoon View Rd., 1-1/2 blocks to area on left next to lagoon SSEI0 1530 8.3/ Intersection south Right onto Rt. 9 to 13,355 Anchor St. with intersection of Rt. 72, east Harvey Cedars onto Rt. 72 to intersection of Water Stand Pipe Long Beach Blvd., left onto Long Beach Blvd. to intersection of West 80th St.

to intersection with S. Anchor St. and Harvey Cedars Water Stand Pipe (EPIP11/S13) E11-7

Number OYSTER CREEK AmerGen A PECO Energy/Brtish Energy CopanprY EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-Oc-. 1I Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate &.Rt. 9)

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

S2 1840 1.6/ 0.7 mile west of Right onto Rt. 9, right onto Rt. 9 on Rt. 532 Rt. 532, 0.7 mile just beyond CREST 2574.4 residence #172 and dirt lane OC-15 S3 S-3 1780 2.3/ Waretown Right onto Rt. 9, 2.5 miles, 10 3700.7 Substation yards in from Rt. 9, pole No. R

-1 144 Z, JC 83. Residence #13 S3a 182.50 2.6/ Along Rt. 9, Right onto Rt. 9, 2.9 miles, 4183.4 Waretown junction pole #BT 1545 and 4" x 4" timber with gas pipeline leakage tester attached S4 1760 3.2/ Pebble Beach Water Right onto Rt. 9, 3.2 miles, Tower left onto Seneca Blvd. to 5148.8 intersection of Eighth St. and Water Tower S5 S-5 1870 4.45/ Roadside area, Right onto Rt. 9, 4.8 miles, Barnegat Service left on East Bay Ave., 0.6

-I 7160.0 Pole #27 on East miles, to intersection of Lower Bay Ave. Shore Road.

S7 1830 6.3/ End of Taylor Lane Right onto Rt. 9, 6.2 miles, at gate left onto Taylor Lane (dirt 10,137 road), 1.6 miles to end of road at gate Slo 1860 9.65/ Intersection of Right onto Rt. 9 to Rt. 72, 15,527 Bay Ave. east on Rt. 72 for 2.5 miles, turn left, go 0.2 mile to intersection of Bay Ave.

S20 1690 10.65/ Surf City Stand Right onto Rt. 9 to Rt. 72, 17,136 Pipe east on Rt. 72 to end at Long Beach Blvd., left onto Long Beach Blvd., left onto N. 14th St. to Surf City Water Pipe on right SSW2 2100 1.7/ Intersection of Right onto Rt. 9 to right on Rt. 532 and Rt. 532 (Wells Mills Rd.), 1.3 2735.3 Laurelwyck Dr. miles to intersection on left SSW4 205.50 3.45/ End of Rose Hill Right onto Rt. 9, 4.4 miles to Rd. at cemetery right on Rose Hill Rd., one 5551.1 mile to cemetery.

(EPIPll/SI3) Eli-8

Number OYSTER CREEK AmerGen A PECO Energy/Bash Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.I1 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS EMERGENCY N.J. DISTANCE (From OCNGS Main Gate & Rt. 9).

SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

SSW5a --- 210.50 4.5/ Opposite G.S. Pkwy Right onto Rt. 9 to third Maintenance Area traffic light. Right on 7240.5 Rt. 554 *(Bay Ave.) to Parkway on Rt. 554, east of Garden State entrance area Parkway SSW5 193.50 4.35/ Barnegat Township Right onto Rt. 9, 4.8 miles, 6999.2 Municipal Bldg. right on Rt. 554 (Bay Ave.) 50 yards on right SSW7 1970 5.8/ Rt. 9 and Taylor Right onto Rt. 9, 6.2 miles, 9332.2 Lane left Ln onto entrance of Taylor Lane SSWI0 - 199 7.5/ Southern Reg'l Right onto Rt. 9, 8.2 miles, 12,068 High School right onto parking lot north of buildings SSWl0a 2000 9.0/ Entrance to Right onto Rt. 9, 10 miles to Atlantic City paved entrance of substation on 14,481 Electric Co. left side of road substation on Rt. 9 SSW20 2010 11.0/ Dinner Point dr. Right onto Rt. 9, 11.9 miles to

- Staffordville Staffordville, left onto Dinner 17,699 Point Dr., 25 yds. on left side of road SW2 --- 2210 1.8/ Ocean County Right onto Rt. 9 to first CREST 2896.2 Cemetery on traffic light, right onto 1.75 Rt. 532 Rt. 532 (Wells Mills Rd.),

OC-8 miles to cemetery SW3 --- 227.50 2.15/ Intersection of Right onto Rt. 9, right onto Rt. 532 and G.S. Rt. 532 (Wells Mills Rd.) to Pkwy. intersection with G.S. Pkwy.

SW4 SW- 2190 3.45/ Barnegat Toll Right onto Rt. 9, right onto booth on G.S. Rt. 532 (Wells Mills Rd.) to Pkwy. 110 AC G.S. Pkwy. south, right side of road just beyond toll booth near telephone booth.

SW5 2170 4.5/ Parking area Right onto Rt. 9 to Rt. 554 Bay 7240.5 between 1st and Ave. Right onto Rt. 554 to 2nd Sts. west of first right after G.S. Pkwy.

G.S. Pkwy. exit exit (First St.)

ramp, 110 AC (EPIPII/S13) Eli-9

Number OYSTER CREEK AmerGen A PECO Energy/Bntsh Energy Compary EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.11 Revision No.

Title Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

EMERGENCY SAMPLE STATE AZIMUTH (MILES/! LOCATION DIRECTIONS LOCATION NO. METERS)

SW7 228.50 7.2/ Intersection of Right onto Rt. 9, right onto Rd. and Rt.

Meadow Fawn Rt. 532 (Wells Mills Rd.) to 11,585 72 at Lakes G.S. Pkwy. south; south to Exit 67 onto Rt. 554 west to 72 east to Meadow Rd. at Fawn Lakes SWI0 2290 8.9/ Intersection of Right onto Rt. 9, south to 14,320 Hay Rd. and Rt. 72, west onto Rt. 72.

Micaja's Rd. Approx. 100 yds. past G.S.

NOTE- unimproved Pkwy. intersection to Recovery Nt umroved Rd. on south side of Rt. 72, right onto Hay Rd. Approx. 3 miles to Micaja's Rd.

SW20 214.50 13.2/ Intersection of Right onto Rt. 9, right onto Rt. 539 and G.S. Rt. 532 to G.S. Pkwy. Take Pkwy. Pkwy. south to Exit 58 (Tuckerton) and make right onto Rt. 539. Park along right side of road WSWl 2490 0.3/ Southwest corner Right onto Rt. 9, over of O.C. discharge canal bridge, right CREST 482.7 substation, 110 AC on South Access Road to OC-9 substation WSW2 --- 247.50 1.55/ G.S. Pkwy. picnic Left onto Rt. 9, left on Rt. 614 (Lacey Rd.) to G.S.

2494.0 area Pkwy. Take pkwy. north to Forked River service area on left. Make U-turn and go south into picnic area on left at mile marker 71.5 WSW3 2400 2.5/ Ocean County Voc. South on Rt. 9, right on 4022.5 School Rt. 532 0.6 mi. beyond G.S.

CREST Pkwy. on left OC-I WSW4 WSW- 251.50 3.75/ Intersection of South on Rt. 9, right onto Rt. 532 and Bryant Rt. 532, continue 4.4 miles Rd.) to Rd. dirt road on right (Bryant just before steel guard rail WSW5 2550 4.35/ Intersection of Right on Rt. 9, right onto Rt. 532 and dirt Rt. 532, continue 4.85 miles to road dirt road Zn right (EPIPII/S13) Ell-10

Number OYSTER CREEK AmerGen A PECO Energy/BhJsh Enrg Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.11 Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

EMERGENCY SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

WSW6 2540 5.3/ Junction Rt. 532 Right on Rt. 9, right onto and Rt. 611 6 miles to junction Rt. 532, (Brookville of 8527.7 (Brookville Rd) Rt. 611 Rd.) on opposite Southern left opposite Landfill entrance Ocean Landfill entrance WSW0 - 2520 7.5/ Intersection of Right onto Rt. 9, right onto Rt. 532 and Rt. 72 to intersection of Rt. 532 (Barnegat 12,068 Rt. 72 Rd.)

WSW20 2430 11.45/ End of Rt. 608 Right onto Rt. 9, right onto 18,423 (Simm Place Rd.) Rt. 532. At intersection of 1 at gate Rt. 532 and Rt. 72 and Rt. 610 go straight on Rt. 610 to intersection of Rt. 539, turn left, 1 mile to Rt. 608, stop at end of road.

W2 2700 1.25/ G.S. Pkwy. right Left on Rt. 9 to 2nd traffic side grass area at light, left on Rt. 614 (Lacey mile marker 72.2 Rd.) to G.S. Pkwy. north to service area, turn south on Pkwy. to mile marker 72.2 W2a W-2-1 2690 1.3/ G.S. Pkwy. picnic Left onto Rt. 9 to 2nd traffic 614 (Lacey Rt. north marker mile area at 72.1 Rd.) G.S. on light,to left Pkwy. to service area, turn south on Pkwy. to mile marker 72.1 W7 2590 6.7/ 0.6 mile north of Right on Rt. 9 to 1st traffic Rt. 532 on light (Rt. 532), right on with Rt.

Jones Rd. 532 through intersection Rt. 611 (Brookville Rd.) 1.2 miles to dirt access road on right (Jones Rd.), continue 0.6 mile to fork WI0 2600 9.15/ Intersection of Right on Rt. 9 to Rt. 532, Rt. 72 (Barnegat right on Rt. 532 Northto Rt. on72 14,722 Rd.) and Rt. 539 (Barnegat Rd.).

(Warren Grove - Rt. 72 to intersection with Whiting Rd.) Rt. 539 (Warren Grove - Whiting Rd.)

(EPIPlI/SI3) Ell-11

Number OYSTER CREEK AmerGen APECO Ener*yW/fsh ErW Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EpIp-oc-.11 Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

EMERGENCY SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

W20 2760 14.0/ Intersection of Right on Rt. 9 to Rt. 532, turn Rt. 72 (Barnegat right onto Rt. 532 to Rt. 72 22,526 Rd.) and Rt. 532 north. Approx. 7.3 miles to left fork junction with Rt. 532 WNWI 2840 0.6/ Forked River Met Left on Rt. 9, first left after 965.4 Tower intake canal, travel west past CREST the old site of the Energy OC-16 Spectrum until 230V highline.

Turn right onto dirt road.

Unlock gate at south branch of Forked River, (key with Met Tower keys) continue across bridge and follow curve to the right.- Turn right at second road (directly west of Met Tower) and continue to tower sight.

WNW2 2910 1.35/ G.S. Pkwy., right Left on Rt. 9 to 2nd traffic side at mile light, left on Rt. 614 (Lacey marker 72.4 Rd.) to G.S. Pkwy. north to service area, turn south on Pkwy. to mile marker 72.4 WNW10 2850 9.7/ Rt. 539 (Warren Right on Rt. 9 to 1st traffic Grove - Whiting light, right on Rt. 532 to Rd.) where it Rt. 72, right on Rts. 71/532 to crosses over Rt. 539 (Warren Grove - Whiting Chamberlain Brook Rd.), north on Rt. 539, approx. 3.3 miles to Chamberlain Brook NW2 322.50 1.7/ G.S. Pkwy. mile Left on Rt. 9 to 2nd traffic marker 73.0 light, left on Rt. 614 2735.3 (Lacey Rd.) to G.S. Pkwy. north to service area, turn south on Pkwy. to mile marker 73.0 NW6 3220 5.95/ Rt. 614 (Lacey Left on Rt. 9 to 2nd traffic Rd.) 0.1 mile down light, left on Rt. 614 9573.6 dirt road (west of (Lacey Rd.) to mile marker 7 Cranberry Bog) (3.2 mi. west of G.S. Pkwy.),

dirt access road on left after mile marker 7 (EPIPII/S13) Ell-12

Number OYSTER CREEK AmerGen APECO Ener tshErng Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.11 Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 11 (continued)

OFFSITE MONITORING POINTS N.J. DISTANCE (From OCNGS Main Gate & Rt. 9)

EMERGENCY SAMPLE STATE AZIMUTH (MILES/ LOCATION DIRECTIONS LOCATION NO. METERS)

NWl0 3140 8.7/ Intersection of Left on Rt. 9 to 2nd traffic light, left on Rt. 614 13,998 Rt. 614 (Lacey Rd.) and Good Luck (Lacey Rd.) to mile marker 5 Rd. (5.3 mi. west of G.S. Pkwy.) at Good Luck Rd. intersection NW20 3170 13.3/ Town of Whiting, Left on Rt. 9 to 2nd traffic light, left on Rt. 614 21,400 junction at RR tracks and Whiting (Lacey Rd.), past Bamber Lake

- Lacey Rd. to Town of Whiting (RR tracks)

NNW3 - 340 2.77/ G.S. Pkwy. mile Left on Rt. 9 to 2nd traffic marker 74.4 light, left on Rt. 614 (Lacey Rd.) to G.S. Pkwy.,

north to service area (1/2 mile) on left, enter service area, turn south on Pkwy. to mile marker 74.4 NNW4 3480 3.5/ Intersection of Left onto Rt. 9, left at 2nd Rt. 614 (Lacey traffic lightto on Rt. 614 5631.5 Rd.) and G.S. (Lacey Rd.) intersection of Pkwy. G.S. Pkwy.

NNW5 3310 4.65/ Roadside at Pole Left onto Rt. 9, left at 2nd

  1. BT4112 at Rt. 614 traffic light onto Rt. 614 7481.9 (Lacey Rd.) at (Lacey Rd.), 1.7 miles west of Deep Hollow Creek G.S. Pkwy.

(intermittent stream)

NNW10 3390 7.9/ Just before Left onto Rt. 9, left at intersection of Rt. 618 (Central Pkwy. opposite 12,711 Pinewald - Keswick Butler Blvd.) to Rt. 530 Rd. and Rt. 530 (Dover Rd.)

(Dover Rd.) on rt.

NNW20 3420 12.55/ Intersection of Left onto Rt. 9, left at 2nd 20,193 Rt. 37 and traffic light onto Rt. 614 Northampton Rd. (Lacey Rd.) to G.S. Pkwy.,

north to Exit 82, west on Rt. 37, 3.75 miles from Pkwy.

exit, turn right to offstreet parking (EPIPII/S13) Ell-13

OYSTER CREEK Number AmerGen APECOEnergys EnergCoPa, I EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPNbP-OC-. 1 Title Revision No.

Emergency Radiological Surveys Of fsite i5 EXHIBIT 12 PLUME SEARCH ROUTES

1. If the wind is from the north/northeast, proceed south from the plant on Route 9 to Route 72. West on Route 72 to Route 539 follow Route 539 north to Lacey Road, follow Lacey road to Route 9, then return to the plant on Route 9.
2. If the wind is from the south/southeast, proceed north from the plant on Route 9 to Route 530 (South Toms River), follow Route 530 to Route 539, follow Route 539 south to Route 72, follow Route 72 east to Route 554, continue east on Route 554 to Route 9 in Barnegat, follow Route 9 north to the plant.
3. If the wind is from the southwest, proceed north on Route 9 to Ocean Gate; however, DO NOT proceed to Seaside Heights/Island beach State Park until communications have been established with the EAC. Proceed to Seaside Heights and Island Beach State Park ONLY when directed to do so by EAC.
4. If the wind is from the northwest, proceed south from the plant on Route 9 to Route 72 at Manahawkin, east on Route 72 to Long Beach Boulevard on Long Beach Island, proceed north on Long Beach Boulevard to Barnegat Lighthouse State Park.

NOTE Plume searches should be conducted while driving at no more than 30 mph.

The location of the plume edges and centerline, along with the magnitude of the open and closed window readings at the plume centerline should be recorded and transmitted to the RAC/EAC. Unless otherwise directed, the plume search should be conducted with the dose rate instrument detector held outside the vehicle window.

(EPIPII/SI4) E12-1

Number OYSTER CREEK AmerGen A PECO nergyw/bsh Energy CompanY EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.11 Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 13 OFFSITE RADIOLOGICAL/ENVIRONMENTAL SURVEY TEAM LOG Date: CHRONOLOGY OF EVENTS Team Members:

Team:

TIME EVENT Called the RAC/EAC (see 3.0 for numbers) and Plant Status and MET conditions are as follows:

An (UE/A/SAE/GE) was declared at on (Date)

(Circle One) (Time-24 Hr Clock)

There is (No) (A Controlled) (An Uncontrolled)

(Circle One)

(RADIOLOGICAL)

I (NON-RADIOLOGICAL) Release in Progress.

(Circle One - If Appropriate)

Wind Direction from: 0/Wind Speed: MPH (Compass Point)

PAGE OF PAGES (EPIPII/SI5) E13-1

OYSTER CREEK Number AmerGen APECO Energyfsh EneWgCompany EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.11 Revision No.

Title Emergency Radiological Surveys Offsit* 1 EXHIBIT 13 (Continued)

OFFSITE RADIOLOGICAL/ENVIRONMENTAL SURVEY TEAM LOG CHRONOLOGY OF EVENTS TIME EVENT PAGE OF PAGES (EPIP11/S15) E13-2

OYSTER CREEK Number A

A PEC erg Enry s Enrg Copn EMrG ERGENCY PREPAREDNESS IMPLEMIENTING PROCEDURE EPIP-OC-. 11 Revision No.

Title Emergency Radiological Surveys Offoite i5 EXHIBIT 13 (Continued)

OFFSITE RADIOLOGICAL/ENVIRONMENTAL SURVEY TEAM LOG CHRONOLOGY OF EVENTS TIME EVENT Signed:

Team Member PAGE OF PAGES (EPIP11/S15) E13-3

K (

Procedure EPIP-OC-.11 Rev. 15 EXHIBIT 14 Sample Record TEAM: Date:

  • T1D*7wV ATR AMPT.F.
  1. Time Logation Window Closed Window Open Background Particulate Silver Zeolite Flow Rate Run Time mR/hr mR/hr cpm Gross cpm Gross cpm 1pm Min 2

3 H

4 5

6 7

8 9

1i0 Signed:

I Team Member (EPIPII/S16)

Number OYSTER CREEK EPIP-OC-.11 AmerGen A PECO Energy/BeIish ErEe COfn~arY EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE Revision No.

Title 15 Emergency Radiological Surveys Offsite EXHIBIT 15 COUNT RATE SURVEY RECORD Date:

Team:

COUNT RATES SAMPLE LOCATION GROSS BKGD TIME 24 HR CLOCK DESCRIPTION [ (gcpm) (bcpm)

I I t

_________ I I t SIGNED:

Team Member (EPIPlI/S17) E15-1

Number OYSTER CREEK AmerGen A PECO Energy/Brash Energy Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-oc-.1.

Title Revision No.

Emrgency Radiological Surveys Offsite 15 EXHIBIT 16 ENVIRONMENTAL SAMPLE Date:

DOSE RATES-MR/HR COUNT RATE cpm SAMPLE OPEN WINDOW CLOSED WINDOW GROSS TIME LOCATION (OW) (CW) (bcpm) (gcpm) 24 HR CLOCK DESCRIPTION BETA - GAMMA GAMMA BACKGROUND COUNT RATE SIGNED:

Team Member (EPIP11/S18) E16-1

Number OYSTER CREEK AmerGen A PECO Er*W/B'esh Enery Comrwary EMERGENCY PREPAREDNESS EPIP-OC-.11 IMPLEMENTING PROCEDURE Title Revision No.

Emergency Radiological Surveys Offsite 15 EXHIBIT 17 DOSE RATE SURVEY RECORD Date: Team Members: Instrument Cal Due Date:

Team: Instrument Beta Correction Factor:

DOSE RATES--mR/hr IS (ow)

SAMPLE READING

>110% OF (cw)

TIME LOCATION INSTRUMENT OPEN WINDOW CLOSED WINDOW READING?

(24 HR CLOCK) DESCRIPTION MODEL/SERIAL # (ow) (cw) YES NO BETA-GAMMA GAMMA

__ _I _ _ 1 I1__ _ _ _ _ _ 1 _ _ _ _ 1 _

.1. 4 4 4 .4-

+ 4 4 4 4 .4-4 4 4 4 .4.

£ £ A 4 NOTE:

IF (YES),

THEN SURVEY LOCATION MAY BE WITHIN PLUME TAKE AN AIR SAMPLE CONTACT RAC/EAC.

SIGNED: Reviewed /

Team Leader Rad Con Coordinator (EPIP1l/S19) E17-1

Number OYSTER CREEK AmerGen A PECO Energy/MbSh EnegyMC anY EMERGENCY PREPAREDNESS EPIP-OC-.12 IMPLEMENTING PROCEDURE Title Revision No.

PERSONNEL ACCOUNTABILITY 8 Applicability/Scope Responsible Office Applies to work at Oyster Creek Division & Support Divisions Emergency Prep

-... *.- "7' *-.1 o Y Ve No Effective Date X.Yes No Date of Sale Safety Reviews Required Prior Revision 7 incorporated the This Revision 8 incorporates the following Temporary Changes: following Temporary Changes:

N/A N/A List of Pages (all pages rev'd to Rev. 8) 1.0 to 5.0 El-I to El-3 E2-1 to E2-3 E3-1 to E3-2 E4-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek Crseer oncurring Organization Element Date originator-Emergency Planner Cbncurred By Site Security ManaQer / -l1 -2_oo Site Securitv Manaaer

\1 I

Director Oos & Mtce.

Approved By Manaaer. Ernercencv Preparedness Manae Emrec /eaen

/ /

(EPIPI2) 1.0

OYSTER CREEK Number AmerGen A PECO Enefgy/BrIsh Energy Company EMERGENCY PREPAREDNESS TMPI.RRNT'NC PROCEDURE EPIP-OC-.12 Title Revision No.

PERSONNEL ACCOUNTABILITY 8 DOCUMENT HISTORY PREPARED BY:

EFFECTIVE REVIEWED BY:

REVISION DATE DESCRIPTION OF CHANGE APPROVED BY:

2 04/94 Provide notes in Exhibit 2 to clarify Radwaste Operator accountability.

3 07/94 Move Rad Con locker into.Warehouse at Security Control Point for accessibility.

4 03/95 Provide EAAC Interim Coverage on Backshifts.

5 04/97 Add OCAB Cafeteria as EAA T. Blount 6 10/97 Add OCAB Cafeteria Phone Numbers A. Smith 7 12/98 Clarify OCAB phone numbers as A. Smith primary and back-up. Numbers stayed same.

8 DOS Delete Home Base # from cover page A. Smith (EPIPI2) 2.0

Number OYSTER CREEK AmerGen APECO Energy/ish Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.12 IMPLEMENTING PROCEDURE Title Revision No.

PERSONNEL ACCOUNTABILITY 8 1.0 PURPOSE 1.1 This procedure provides the method of conducting an accounting of personnel in the protected area during a declared or simulated emergency.

1.2 This procedure shall be initiated by the Emergency Director and implemented by the Security Coordinator.

1.2.1 For clarity, the Security Coordinator will be referred to as the Security Shift Commander in this procedure.

1.3 This procedure provides guidance and direction for activation and operation of the Emergency Assembly Area (Materials Management Warehouse or OCAB Cafeteria).

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to Oyster Creek Site Security and Emergency Response Organization members for use in a declared or simulated emergency.

3.0 DEFINITIONS 3.1 Emergency Assembly Area - The Emergency Assembly Area is the designated location non-essential personnel will muster at to ensure:

(1) They are protected from an impending hazard on-site (2) Pre-positioned to expeditiously evacuate the Site if and when required.

3.2 Two locations within the Owner Controlled Area will be available for use - OCAB Cafeteria(Primary) and/or Material Services Warehouse (Secondary). Other Locations may be used as necessary.

(EPIPI2) 3.0

AmerGen OYSTER CREEK EMERGENCY T.VMFN1T*NGPREPAREDNESS PROCEDURE Number EPIP-OC-.12 ErwI EnergCp APEC0 TM Title Revision No.

PERSONNEL ACCOUNTABILITY 8 4.0 RESPONSIBILITIES 4.1 The EmerQency Director shall notify, via accountability page announcement, the Security Shift Commander that personnel accountability has been ordered and to implement this procedure. The OCAB Cafeteria shall be used as the primary location unless it is unavailable or inaccessible, then the Warehouse or other Locations will be used.

4.1.1 In the event the North Gate Processing Center is in use, all Badge North Gate personnel will exit the Main Gate enroute to the OCAB Cafeteria unless otherwise directed by the ED.

4.2 The Security Shift Commander shall:

4.2.1 Direct and oversee the personnel accountability process.

4.2.2 Report the current status of personnel accountability to the Emergency Director or Emergency Director Assistant 30 minutes after initiated.

4.2.3 Provide a list of personnel missing during accountability to Emergency Preparedness manager upon termination of emergency drill.

4.2.4 Ensure command and control at the Emergency Assembly Area.

4.3 The GSS and OSC, TSC and EAA Facility Coordinators shall direct accountability in their respective facilities and ensure accountability status is reported to Security within 10 minutes of accountability being initiated.

4.4 Emergency Assembly Area Coordinator - is responsible to direct and oversee the personnel accountability process at the EAA in accordance with Exhibit 4.

(EPIPI2) 4.0

AmerGen CopaDUR Enerngy APECO EnePgyOCbEsh OYSTER EMERGENCY CREEK PREPAREDNESS Number EPIP-OC-.12 Title Revision No.

8 PERSONNEL ACCOUNTABILITY 5.0 PROCEDURE 5.1 The Emergency Director will notify the Security Shift Commander, directly or via accountability page announcement, that personnel accountability has been ordered and provide him any additional instructions deemed necessary.

5.2 The Security Shift Commander will implement Exhibit 1.

5.3 The Emergency Assembly Area Coordinator will implement Exhibit 4.

6.0 REFERENCES

None 7.0 EXHIBITS 7.1 Exhibit 1 - Personnel Accountability Form.

7.2 Exhibit 2 - Accountability Methods (Instructions).

7.3 Exhibit 3 - Emergency Assembly Area (Warehouse) Floor plan.

Exhibit 3A- Emergency Assembly Area (OCAB) Floor plan.

7.4 Exhibit 4 - Emergency Assembly Area Coordinators Checklist.

(EPIPI2) 5.0

Number OYSTER CREEK AmerGen Compan APECO ErneWAsh EnemW EMERGENCY PREPAREDNESS EPIP-OC-.12 TVAD0T-WWM~?'Tf7 V'ReW-(~Rfl1 Title Revision No.

PERSONNEL ACCOUNTABILITY 8 EXHIBIT 1 PERSONNEL ACCOUNTABILITY FORM Time/Initials

/ 1.0 Notified by Emergency Director that personnel accountability has been ordered.

I 2.0 Secure securitycomputer.,access,.points 1-13"-througII .............

(Accountability Key Card Readers).

/ 3.0 If security computer access points 113 through 116 cannot be secured, notify the following locations that the alternate accountability process will have to be used:

[[ ]] Control Room

] Technical Support Center

[ Operations Support Center

[ ] Monitor and Control Area

[ ] EAA

/ 4.0 Security Officer dispatched to the receiving area to process warehouse personnel back into the protected area, if using warehouse.

/ 5.0 Establish communication with Emergency Assembly Area Coordinator.

OCAB Ext. Primary 5277, Back-up 5276 or if warehouse is used dial 87 on EP Line.

5.1 After normal work hours (5 PM to 8 AM, Mon-Fri & Sat, Sun) dispatch Security Officer to EAA. (Ref 7.2.2, 7.2.3 and 7.2.4 Exhibit 1)

/ 6.0 Gate 3 opened.*

/ 6.1 Ensure Rad Techs have been dispatched from the OSC to provide personnel monitoring while this gate is open. Should plant conditions warrant, the gate may be opened without Rad Con Personnel immediately available. However, personnel monitoring devices should be accessible.

7.0 Primary/Alternate accountability process started.

7.1 Primary - Security computer generated listing obtained.

List zones #1 through #14 in the security computer.

Individuals that are listed in any zones other than 2, 8, 9, 10, and/or 15 must be contacted and their status determined. (Refer to Exhibit 2 for detailed instructions.)

7.2 Alternate - Security badge storage drawers inventoried for open slots. (Refer to Exhibit 2 for instructions.)

7.2.1 Security Officer dispatched to the Monitor and Control Area to muster RWP workers. Muster list should be submitted to Shift Commander within 10 minutes of Accountability announcement.

  • simulated during drills.

(EPIPI2/S3) EI-I

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIP-OC-.12

....... IMPLEM*ENTING PROCEDURE Revision No.

Title 8

PERSONNEL ACCOUNTABILITY EXHIBIT I (continued)

PERSONNEL ACCOUNTABILITY FORM Time/Initials 7.2.2 If using Warehouse, Security Officer dispatched to open south side personnel door (131-D) of the Emergency Assembly Area to o...cllect. .accountability..-cards, and-ensure proper use of security key cards and accountability key card readers.

[ 7.2.3 Security Officer to ensure Rad-Techs have been dispatched from the OSC to provide personnel monitoring.

NOTE Once the Rad Techs have arrived they will assist in the duties of the EAAC (Exhibit 4) until the EAAC arrives, in addition to Personnel Monitoring.

[ 7.2.4 Accounting reports received from the following locations:

[ ] Control Room Technical Support Center

[ ] Operations Support Center

[ ] Monitor and Control Area

[ ] EAA 7.2.5 Accountability reports compared with security badge storage drawer inventory sheets (or computer generated listing) and the following determined:

A. All personnel accounted for - No action required.

B. Missing person(s) - Action required (per Step 11.0).

[ C. Reporting/Inventory Error - Determine source of error and follow action outlined in Part A or B above.

8.0 Report current accountability status to Emergency Director or ED Assistant within 30 minutes of accountability initiation.

(EPIPI2/S3) EI-2

OYSTER CREEK Number AmerGen A PECO Erwgy/ibsh Energy Company EMERGENCY PREPAREDNESS TMD T.S*1'lPl~*T h*Tt PROc!RDTLRE EPIP-OC-.12 Title Revision No.

PERSONNEL ACCOUNTABILITY 8 EXHIBIT 1 (continued)

PERSONNEL ACCOUNTABILITY FORM 9.0 Accountability completed, final status reported to Emergency

.. Director or.ED.Assistant.... (CompLete.within.2,0.-1minutes..if possible).

10.0 Page missing person(s). If no response within 2 minutes, attempt to contact the supervisor(s) of the missing person(s). Further action may include attempts to contact the person(s) at home or at EAA (Security Line, dial code 87 for Warehouse or OCAB Cafeteria Ext. 5276/5277).

11.0 Provide a list of missing persons to Emergency Preparedness Manager upon termination of emergency/drill.

Signature: Date:

Security Shift Commander (EPIPI2/S3) EI-3

Number OYSTER CREEK AmerGen APECO Energy/ffish EnergY C-VpriY EMERGENCY PREPAREDNESS EPIP-OC-.12 IMPLEMENTING PROCEDURE Title Revision No.

PERSONNEL ACCOUNTABILITY 8 EXHIBIT 2 ACCOUNTABILITY METHODS 1.0 Primary Accountability Method 1.1 The security computer system will be used as the primary method of Site Accountability. A listing of all unaccounted for personnel within the Protected Area can be obtained from the security computer system by listing zones #1 through #14.

NOTE Radwaste Operators are tracked as a team at the "ALERT" level and above, but are not logged in on the OSC Card Reader. The OSC will provide their names and key card numbers to the Main Security Gate when Site Accountability is ordered.

1.2 The security computer listing will result in one of the conditions listed below:

1.2.1 First Condition: All security key card numbers identified on the security computer generated listing are listed in Zones 2, 8, 9, and/or 10.

Required Action: The Security Shift Commander shall notify the Emergency Director or ED Assistant that all personnel in the Protected Area have been accounted for.

1.2.2 Second Condition: Security key card numbers that are identified on the security computer generated listing are listed in Zones 1, 3, 4, 5, 6, 7, 11, 12, and 14.

Required Action: The Security Shift Commander shall attempt to locate the missing person(s) by paging the individual(s) on the plant page system, or by any other means available. The Security Shift Commander must report the current status of Site Accountability to the Emergency.Director or ED Assistant within 30 minutes of accountability initiation. Once Site Accountability has been completed, the Security Shift Commander shall notify the Emergency Director or ED Assistant, and provide the names and slot numbers of the missing persons, if any. A copy of the missing persons list will also be sent to the Emergency Preparedness Manager at the completion of the emergency/drill.

1.3 In the event of a security computer failure, the alternate accountability process will have to be used. Personnel accountability cards will have to be collected from the Control Room, Technical Support Center, Operations Support Center, Monitor and Control Area, Security Department, and the Emergency Assembly Area(if the Warehouse is used). (Refer to Section 2.0 for instructions.)

(EPIP12/S4) E2-1

  • V .....

AmerGen A *com*TMIPT*!MENING

  • co*e*

OYSTER CREEK PROCEDURE EMERGENCY PREPAREDNESS mudber EPIP-OC-. 12 Title Revision No.

PERSONNEL ACCOUNTABILITY 8 EXHIBIT 2 (Continued)

ACCOUNTABILITY METHODS 2.0 Alternate Accountability Method 2.1 Upon receiving notification that accountability has been ordered, the Security Shift Commander will direct Security Officers to inventory all security badge storage drawers for. open.slots...Usinng*the security badge storage drawer inventory sheets provided in the accountability packet, the Security Officers will identify all slot numbers that are empty (no Accountability Card or I.D. Badge present). When the Accountability Cards are returned from other mustering points, these slot numbers will be crossed off the security badge storage drawer inventory sheets.

NOTE Radwaste Operators are tracked as a team at the "ALERT" level and above, but are not logged in on the OSC Card Reader. The OSC will provide their names and key card numbers to the Main Security Gate when Site Accountability is ordered.

2.2 The Security Shift Commander will ensure that accountability reports are received from the Control Room, Technical Support Center, Operations Support Center, Monitor and Control Area, and the Security Department.

These slot numbers shall be crossed off the security badge storage drawer inventory sheets.

2.3 Results of the above comparison may result in one or more of the conditions listed below:

2.3.1 First Condition: All security badge slot numbers that were identified on the security badge storage drawer inventory sheets (or computer generated listing) correspond with the security badge slot numbers received during the accountability process.

Required Action: The Security Shift Commander will notify the Emergency Director or ED Assistant that all personnel in the protected area have been accounted for.

2.3.2 Second Condition: Security badge slot numbers that were identified appear on the security badge storage drawer inventory sheets (or computer generated listing) but were not received during the accountability process.

Required Action: The Security Shift Commander will notify the Emergency Director or ED Assistant that accountability has been completed, and provide the names and slot numbers of missing persons, if any. A copy of the list of missing persons will be sent to Emergency Preparedness Manager at termination of emergency/drill.

(EPIPI2/S4) E2-2

AmerGen A PECOEnergy/8ntsh Enec Comrpary OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.12 TMPLEMENTING PROCEDURE Title Revision No.

PERSONNEL ACCOUNTABILITY 8 EXHIBIT 2 (Continued)

ACCOUNTABILITY METHODS 2.3.3 Third Condition: Security badge slot numbers received during the accountability process-do not,.-appear.as.identified on the security badge storage drawer inventory sheet (or computer generated listing).

Required Action: Determine the source of the error, i.e.,

security badge filed in the wrong slot, incorrect security badge slot number recorded on the security badge storage drawer inventory sheet. Upon resolution of the discrepancies, the Security Shift Commander will notify the Emergency Director or ED Assistant that all persons have been accounted for or provide the names and slot numbers of missing persons, if any. A copy of this list of missing persons will be sent to Emergency Preparedness Manager at termination of emergency/drill.

2.4 Page missing persons using the Plant Page System. Attempts should be made to contact the supervisors of the missing persons not responding within two minutes. Other actions may include attempts to telephone persons at home or at the Emergency Assembly Area (Primary OCAB Ext.

5276/5277) or (Secondary warehouse if used Security dial code 87).

2.5 The Security Shift Commander will ensure that a list of missing personnel has been forwarded to Emergency Preparedness Manager upon termination of emergency/drill.

(EPIPI2/S4) E2-3

Number OYSTER CREEK AmerGen A PECO Energy/Bntisi Energy Company EMERGENCY PREPAREDNESS EPIP-OC- .12 IMPLEMENTING PROCEDURE Title Revision No.

PERSONNEL ACCOUNTABILITY 8 EXHIBIT 3 COTROL POINT

. ..- jj:= I 41 RU= m20-h AXnz ABEULY I

  • C M-CAL SnORA= inn RECKlZVING ROOM STA2GImW L EMERGENCY ABSMDLY ALEA WAREHOUSE

,,RAD CON LCM

-czzZ:>-N R&D CaM CCUTRfL POINT (EPIPl2/S5) E3- 1

Number OYSTER CREEK AmerGen A PECO Erwgy/B'nsh ErWgy Company EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.12 Revision No.

Title PERSONNEL ACCOUNTABILITY 8 EXHIBIT 3A EMERGENCY ASSEMBLY AREA OCAB (EPIP12/S5) E3-2

Number OYSTER CREEK AmerGen A PECO Energy/Bnbsh EnergYC*-nVi EMERGENCY PREPAREDNESS EPIP-OC-.12 IMPLEMENTING PROCEDURE Title Revision No.

PERSONNEL ACCOUNTABILITY 8 EXHIBIT 4 EMERGENCY ASSEMBLY AREA COORDINATOR CHECKLIST Time/Initials 1.0 Ensure control at the Emergency Assembly Area by direct and overseeing thepersonnel accountabil*ty.process at appropriate EAA.

NOTE When using the Warehouse, ensure entry granted light registers for each individual keycard insertion.

Malfunctions (i.e. Entry Denied) contact Security Shift Commander.

2.0 Ensure Rad-Techs have been dispatched from the OSC to provide personnel monitoring.

3.0 When using the Warehouse, if security computer accountability system fails collect/sort accountability cards and forward to appropriate gates ASAP. (i.e.; Blue Main Gate, Orange - North Gate.)

4.0 Take attendance by routing an attendance sheet/sign-in sheet around , ensuring everyone is signed in. This is to allow the organization to know who & what expertise is available. (For Drills - Safety training or other pertinent information will be provided to personnel in the EAA. Arrangements will be made prior to Drill Conduct.)

5.0 If a Site Evacuation is declared, contact Security Shift Commander for further instructions utilizing the Station Security Line 80 or extension 4954.

Emergency Assembly Area Coordinator Date (EPIPI2/S6) E4-1

Number AmerGen A PECO Energy/Brtsh EnewgyCornPay OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.13 IMPLEMENTING PROCEDURE Title Revision No.

SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEM33LY AREAS Applicability/Scope Responsible Office Applies to work at Oyster Creek Emergency Preparedness This document is within QA plan scope "XYes No Effective Date "XYes No Date of Sale Safety Reviews Required Prior Revision 6 incorporated the This Revision 7 incorporates the following Temporary Changes: *following-Temper-ary Changes:

N/A N/A List of Pages (all pages rev'd to Rev. 7) 1.0 to 4.0 El-l to El-3 E2-1 to E2-2 E3-1 E4-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek

____ JConcurring Organization Element Date Originator _ _ _ Planner

_ _ _ __ncy Concurred By Director Plant Operations 1-_7--00

________________ Security Manager I -iOO Approved By Emergency Preparedness Mgr.- OC I V (EPIPI3) 1.0

OYSTER CREEK Number AmerGen A PECO Energy/'Bish Energy Corpany EMERGENCY PREPAREDNESS TMPL.*MEN'PT1TNQ PROCEDUTRE EPIP-OC-.13 Title Revision No.

SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEMBLY AREAS PROCEDURE HISTORY REV DATE ORIGINATOR

SUMMARY

OF CHANGE 3 06/95 A. Smith Add additional evacuation areas outside the Protected Area. Replace Trl. 250 with OCAB. New layout for Forked River Assembly Area.

4 05/96 D. VanNortwick Add additional facilities to be evacuated on site evaluation checklist.

5 05/97 A. Smith AEOF removed from E-Plan 1000-PLN-1300.01 in Rev. 11.

6 10/97 A. Smith Update local telphone Area Codes 7 DOS A. Smith Required for sale of OCNGS. Changes references of GPU or GPUN to OCNGS.

________ I. ________ I ___________________ __________________________________________________________

(EPIPI3) 2.0

AmerGen A PECO EnEMe A PCO--e.-S C-PanY Copan OYSTERGE

=XIERGENCY PREPAREDN'ESS Number PEP-OC-.13 Title Revision No.

SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEMBLY AREAS 1.0 PURPOSE 1.1 This procedure provides for the orderly mustering and evacuation of all non-essential personnel from the protected area and other owner controlled areas at Oyster Creek to the Forked River Assembly Area and/or the Berkeley Remote Assembly Area.

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to Oyster Creek Site Security 3.0 DEFINITIONS None.

4.0 RESPONSIBILITIES 4.1 The Emergency Director shall notify the Security Shift Commander that a site evacuation has been ordered and provide the evacuation route, areas other than the protected area to be evacuated and any other pertinent instructions. The Emergency Director will specify either the Forked River Assembly Area or the Berkeley Remote Assembly Area as a destination.

4.2 The Security Shift Supervisor shall coordinator the site evacuation, the accompanying muster, and the activation of the designated assembly area.

4.3 The Security Officer dispatched to either assembly area shall assume command and control duties at the facility.

5.0 PROCEDURE 5.1 The Emergency Director shall perform his duties in accordance with EPIP-OC-.02, Exhibit 1, "General Emergency", Section 3.2.1.

5.2 The Security Shift Commander shall perform his duties in accordance with Exhibit 1.

5.3 The Security-Officer dispatched to the assembly area shall perform his duties in accordance with Exhibit l.

(EPIPI3) 3.0

AmerGen Arnerwe APECO Energy/8~s1 Energy Company OYTRCREEK EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE Number EPzP-OC-. 13 Title Revision No.

SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEMBLY AREAS

6.0 REFERENCES

6.1 2000-PLN-1300.01 "OCNGS Emergency Plan".

6.2 Procedure EPIP-OC-.12, "Personnel Accountability".

6.3 Procedure OSEC-CON-1530.58, "Security Force Evacuation".

7.0 EXHIBITS 7.1 Exhibit 1, Site Evacuation Checklist 7.2 Exhibit 2, Departure Instruction Sheet and Evacuation Route Map 7.3 Exhibit 3, Layout of the Berkeley Remote Assembly Area 7.4 Exhibit 4, Layout of the Forked River Assembly Area (EPIPI3) 4.0

ArnerG en EMERGENCY PREPAREDNESS PROCEDURE ZPIP-OC-. 13 IMPLEMENTING Title Revision No.

SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEMBLY AREAS EXHIBIT 1 SITE EVACUATION CHECKLIST TIME/INITIALS

/_ 1.0 Notified by Emergency Director that site evacuation has been ordered. Evacuation destination to be used:

[ Forked River Assembly Area Berkeley Remote Assembly Area Evacuation- Route:

[ North [ ] South*

2.0 Evacuation to include the following areas outside the Protected Area.

] Building 24 I Area outside the protected area between the canal and Route 9 including the switchyard

[ Oyster Creek Administration Building

[ Trailer #300 complex

[ Forked River Site Buildings 1, 2, 5, 12, and 14

[ Security Firing Range I Fire Brigade Training Area

[ GPU Energy Southern Area Stores GPU Energy Combustion Turbine Site Independent Spent Fuel Storage Facility I Fire Pond Pump House 3.0 Notify areas identified via Forked River Page and/or bullhorns.

3.1 Perform sweep of O.C. Admin. Building, Trailer 300, and Forked River Buildings when manpower levels permit.

4.0 If not previously accomplished, ensure site Security personnel are accounted for utilizing a security badge slot number listing.

5.0 If necessary: evacuate Security force personnel in accordance with OSEC-CON-1530.58.

6.0 Security officer assigned to each exit area (EAA, MGPC, and NGPC) to collect security badges and dosimetry and to issue evacuation instructions and route maps. (Exhibits 2 and 3)

  • South route may be simulated during drills.

(EPIPI3/S3) EI-I

OYSTER CREEK Number AmerGen APECO EnWgy/Bsi ErnW C-PanY EMERGENCY PREPAREDNESS EPIP-OC-.13 Title Revision No.

SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEMBLY AREAS EXHIBIT 1 (Cont'd)

/_ _ 7.0 Appropriate gates and/or doors opened to accommodate evacuation.

Gate 3**

The following should be opened only if personnel accountability was previously ordered and the EAA activated.

Door 130-D opened by Secondary Alarm Station*

[ ] Door 139-B open 8.0 security officer(s) assigned to be dispatched with Rad Con Tech(s) to the specified assembly area.

[ Forked River [ I Berkeley

[ Rad Con Coordinator notified to coordinate assembly of Rad Con Tech(s) and equipment with security officer(s).

[ Security officer(s) issued assembly area packet and instructed to obtain names and slot numbers of evacuees arriving at the RAA.

[ Security officer(s) and Rad Con Tech(s) dispatched to the assembly area.

Security officers directed to provide verbal instruction to proceed, for further processing, directly and expeditiously to the designated assembly area by the appropriate route in vehicles containing no less than four persons. (South evacuation route may be simulated during drills).

/_ 9.0 If Berkeley Remote Assembly Area is specified:

GPU Energy System Dispatcher or, during working hours, the Supervisor-Line Berkeley District shall be notified and instructed not to allow Oyster Creek evacuees into the RAA until the arrival of the security officer(s) and Rad Con Tech(s).

GPU Energy System Pineland Area Load Supervisor (973) 455-8462 or 8274 or 8493 Berkeley Operations Headquarters (732) 244-4728

/_ 10.0 Rad Con Coordinator contacted to remove collected dosimetry.

  • Emergency only
    • Normally simulated during drills (EPIPI3/S3) EI-2

Number OYSTER CREEK AmerGen ComPwY APECO En yai8sh EnergY EMERGENCY PREPAREDNESS EPIP-OC-.13 IMPLEMENTING PROCEDURE Title Revision No.

SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEMBLY AREAS EXHIBIT 1 (Cont'd) 11.0 Site evacuation complete.

12.0 Communication established with security officers assigned to

.the assembly area. ...

13.0 Security officers and Radiation Control Technicians establish access control point at assembly area north entrance.

Security officers will assume command and control duties.

[ ] Security officer maintains access control log.

[ ] Security officer will call in Muster List within 30 minutes of establishing access control point to the Security Shift Commander if possible. Security officer will call in additional persons arriving at assembly area periodically as they arrive.

14.0 Upon arrival of traffic control point (local police officer) provide evacuation route (north/south)..

15.0 Perform actions to verify areas outside the Protected Area are evacuated.

Signature: Date:

Security Shift Commander (EPIP13/S3) EI-3

(

(

H t;

'~ ' LACEY 904 Oyster Creek N Station Evacuation Route W

H NORTH S

DEPARTURE INSTRUCTIONS NORTH ROUTE A. Personnel are required to report to the Remote Assembly Area at GPU From OCNGS go NORTH on RoUte 9 Energy Berkeley Operations to the second stop light. Turn Headquarters. LEFT on Lacey Rd. At Rt. 618 B. Automobiles driven to the Remote (Dover Road) turn RIGHT. Turn Assembly Area will have at least LEFT on Route 530 to the!

4 occupants. Berkeley Operations HQ C. Windows and air vents must remain (on the left).

closed.

D. Park as directed at the Remote Assembly Area.

E. Muster with the Site Protection Officer.

( C t;

Hr H

8

-- W-Oyster Creek Station Evacuation Route N

U OQ0 H

SOUTH 0

-B LI '1 RoUTE 532 back at cross-ovnz) oI DEPARTURE INSTRUCTIONS A. Personnel are required to report to SOUTH ROUTE Ii From OCNGS go SOUTH on Route 9 to the the Remote Assembly Area at GPU first stop light. Turn RIGHT on Rt. 532 Energy Berkeley Operations to the Parkway. Double back to the NORTH Headquarters. at first crossover. Go NORTH on Pa-rw-a- 0 B. Automobiles driven to the Remote to Exit 74, take Lacey Rd. WEST to Rt. 618 -13 Assembly Area will have at least (Dover Rd.) . At Rt. 618 (Dover Rd.) turn 4 occupants. RIGHT. Turn LEFT on Route 530 to the 0 Berkeley Operations HQ (on the left). H C. Windows and air vents must remain W closed.

D. Park as directed at the Remote Assembly Area.

E. Muster with the Site Protection Officer.

Number OYSTER CREEK AmerGen A PECO Energy/Bbsh Energy Co*pay EMERGENCY PREPAREDNESS TMPLRMENTTNQ PROCEDURE EPIP-OC-.13 Title Revision No.

SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEMBLY AREAS EXHIBIT 3 BERKELEY REMOTE ASSEMBLY AREA LAYOUT

- Radiological Equipment and Supplies

-.. Vehicle IKey-..Storage.

- Station Security Line

]TO AuEXON" - Alternate Communication Lines I

  • 1 1 I

I Z'

Z 0'

Iz1

[.)

WI P UI->l F4 I E--1 L)O1 RAA Entrance (EPIPI3/S5) E3-1

Number AmerGen A PECO Eneer.W/Bitsh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS PR*C* DUTRE EPIP-OC-. 13 TT.-WTRFT'r(

Revision No.

Title SITE EVACUATION AND PERSONNEL MUSTERING AT REMOTE 7 ASSEMBLY AREAS EXHIBIT 4

~FlTWEf RIVER AgSSEMBLY AREA LAYOQUIT C

0 t.

ACCESS CENTER MEDICAL TLD FORKED RIVER BUILDING 14 (EPIP13/S6) E4-1

Number OYSTER CREEK AmerGen Energy Company A PECOErergy/WSSsh EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 Applicability/Scope Responsible Office Applies to work at Oyster Creek Emergency Preparedness Thi document is within OA nlan scone X Yes No Effective Date Safety Reviews Required X Yes-No Date of Sale Prior Revision 21 incorporated the This Revision 22 incorporates the following Temporary Changes: following Temporary Changes:

N/A N/A List of Pages (all pages rev'd to Rev. 22) 1.0 to 5.0 El-I to El-16 E2-1 to E2-2 E3-1 to E3-2 E4-1 to E4-9 E5-1 to E5-2 E6-1 to E6-3 E7-1 to E7-2 E8-1 to E8-2 E9-1 to E9-3 El0-1 to El0-5 Ell-1 E12-1 E13-1 E14-1 E15-1 El6-1 E17-1 El8-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek

_______ Concurring Organization Element Date Originator j c r i n Concurred BY Director Ops & Maintenance Approved By I Emergency Preparedness Mgr. OC ________

ff I (EPIP25) 1.0

Number OYSTER CREEK AmerGen A PECO Energy/Brelsh Erergy Company EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 DOCUMENT HISTORY REVISION DATE ORIGINATOR DESCRIPTION OF CHANGE 10 06/94 A. Smith Insert step to make sure breaker on generator is open for testing purposes only.

11 09/94 A. Smith Revise NRC Exhibit lB to include NUREG 1471 requirements. Clarify exhibit 4, 4B, 4C for better flow. Exhibit 6 generator operation include manufactures updates for output. Add Exhibit 13 Media Access.

12 02/95 A. Smith 50-54.x requirements added as an exhibit 14 as is in Procedures EPIP-OC-.02 and EPIP-OC-.26.

Provide Media Access during Security Driven Events. Assign GPU rep. to assist BNE with Tech. Info. for PAR.

13 07/95 A. Smith Delete "Bullets" from Communications Req.

Correct EPIP-OC-.29 to read EPIP-COM-.45.

Update EOF Layout Diagram. Add note clarifying North Gate usage. Update Berkeley RAA Title.

14 12/95 A. Smith Clarify Authorization Form for request from deviation from requirements.

15 04/96 A. Smith Remove IDT Terminal Instructions and PCS Data Trent instructions. Remove operating procedure for EOF Back Up Power.

Remove EOF Layout Relocate Frisker Adjust exhibit numbers to reflect changes 16 10/96 T. Blount Change PAR guide & logic diagram to make Evacuation Preferred recommendation, provided direction to perform following notification for Off-site Protective Actions. Deleted reference to AEOF. Remove Ex 13-Procedure deviations, clarified EP Rep's duties.

17 06/97 A. Smith Reflect recent improvements in technology and incorporate communications activities from EPIP-OC-04 Comm. & Recordkeeping for better procedure flow. Add notes for PAR beyond 10 mile EPZ.

18 10/97 A. Smith Update Area Codes.

19 05/98 A. Smith Clarify offsite notifications, clarify frisking at EOF.

20 02/99 A. Smith EPIP-COM-.44 and EPIP-COM-.45 have been changed to Oyster Creek site specific procedures and the new numbers are EPIP-OC-.44 and EPIP-OC-.45 (reference EP changes98-021 &

98-022) 21 05/99 A. Smith Incorporate the new public information process and update Pinelands area load super. phone number.

22 DOS A. Smith Change references from GPU or GPUN to OCNGS.

(EPIP25) 2.0

Number A rneri Amer~enOYSTER CREEK EEMERGENCY PREPAREDNESS EPIP-OC-. 25 IMPLEMENTING PROCEDURE Title Re vision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 1.0 PURPOSE This procedure describes the staffing, activation, and operation of the Emergency Operations Facility (EOF).

2.0 APPLICABILITY/SCOPE 2.1 This procedure shall apply to all AmerGen personnel assigned to the EOF during a Site Area Emergency, General Emergency, or when EOF activation is required by the Emergency Director.

3.0 DEFINITIONS 3.1 None 4.0 RESPONSIBILITIES 4.1 The Emergency Support Director (ESD) will perform or delegate the completion of the ESD's checklist (Exhibit 1).

4.2 The Emergency Support Director Assistant will assist the ESD in completing Exhibit 1 and complete the ESD assistant checklist (Exhibit 2).

4.3 The Group Leader - Radiological and Environmental Controls will complete the Group Leader R&EC checklist (Exhibit 3).

4.4 The Group Leader - Administrative Support will complete the Group Leader Administrative Support checklist (Exhibit 4) and implement the EOF Access Control Checklist (Exhibit 4B).

4.5 The Technical Support Representative will complete the Technical Support Representative checklist (Exhibit 5).

4.6 The Materials Management Coordinator will complete the Materials Management Coordinator checklist (Exhibit 6).

(EPIP25) 3.0

Number OYSTER CREEK AmerGen A PECO EnergyBsitsih Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 4.7 The EmerQency Preparedness Representative will assist the ESD in completing Exhibit 1 and complete the Emergency Preparedness Representative checklist (Exhibit 10).

4.8 The Communications Coordinator will monitor and support/direct Communicator activities in support of the emergency.

5.0 PROCEDURE 5.1 Emergency Support Organization (ESO) personnel will report to the EOF when they are notified of the activation of the ESO and perform the responsibilities identified in their assigned exhibits to this procedure and as requested by their emergency supervisors.

6.0 REFERENCES

6.1 2000-PLN-1300.01, "OCNGS Emergency Plan".

6.2 Oyster Creek Emergency Plan Implementing Procedures.

6.3 EPIP-OC-.26, The Technical Support Center.

6.4 EPIP-OC-.27, The Operations Support Center.

6.5 2000-ABN-3200.30, Control Room Evacuation.

6.6 18 20-IMP-1720.01, Emergency Public Information Implementing Procedure.

7.0 EXHIBITS 7.1 Exhibit 1, Emergency Support Director's Checklist 7.2 Exhibit 1A, Emergency Support Director Turnover Checklist.

7.3 Exhibit 1B, NRC Emergency Response Interface Criteria.

7.4 Exhibit 1C, Protective Action Recommendation Logic Diagram for Oyster Creek.

7.5 Exhibit 2, ESD Assistant Checklist.

(EPIP25) 4.0

a Number Ameruen Enr*Wcorpaiy A ECO nErwgyBnbst OYSTER CREEK EMERGENCY PREPAREDNESS Nme EPIP-OC-. 25 I CIMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (Ebr) 122 7.6 Exhibit 3, Group Leader - Radiological and Environmental Controls Checklist.

7.7 Exhibit 4, Group Leader - Administrative Support Checklist.

7.8 Exhibit 4A, Emergency Aviation Support Instruction Form.

7.9 Exhibit 4B, EOF Access Control Checklist.

7.10 Exhibit 4C, Instructions for Source Check of Frisker at EOF.

7.11 Exhibit 5, Technical Support Representative Checklist.

7.12 Exhibit 6, Materials Management Coordinator Checklist.

7 .13 Exhibit 6A, Lakewood Microwave Room Emergency Electric Procedure.

7.14 Exhibit 7, EOF Communications Coordinator Checklist.

7.15 Exhibit 8, EOF Communicator General Duties.

7.16 Exhibit 9, Press Release Approval Guidance.

7.17 Exhibit 10, Emergency Preparedness Representative Checklist.

7.18 Exhibit 10A, Emergency Response Facility Fitness For Duty Determination Instructions.

7.19 Exhibit 10B, ALCO Sensor III Operational Checklist.

7.20 Exhibit 11, Route to EOF.

7.21 Exhibit 12, Emergency Shift Schedule (Sample).

7.22 Exhibit 13, Alternate Emergency Response Facilities.

7.23 Exhibit 14, Site Access Policy for Media During Emergencies.

7.24 Exhibit 15, OC Emergency Communications Log (Sample).

7.25 Exhibit 16, Emergency Message Form (Sample).

7.26 Exhibit 17, HIFAX Log (Sample).

7.27 Exhibit 18, Media Access Briefing Form.

(EPIP25) 5.0

AmerGen OYSTER CREEKNumber EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC- .25 Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 1 EmerQency Support Director's Checklist Initials 1.0 Activate the EOF by performing these steps:

1.1 Complete Exhibit 1A of this procedure by obtaining a turnover from the ED. Contact the ED in the TSC or Control Room as appropriate.

Confirm that the following functions are available at the EOF (Areas 1.2 need not be fully staffed to be considered functional):

Environmental Assessment Technical Support Communications with TSC Offsite Notifications 1.3 Ensure that Access Control is maintained to only allow authorized personnel in the EOF.

1.4 Once the above steps have been completed, inform the ED that you are ready to assume your position as ESD and will take over responsibility for:

Approving and directing official notifications to offsite agencies.

(EPIP25/S3) EI-I

AmerGen ONumber EMERGENCY PREPAREDNESS EPIP-OC-.25 Enerh EnyI PE*CO IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 1 (continued)

Emergency Support Director's Checklist Initials

  • Approving and directing information releases to the media.

NOTE ED/ESD approval is not needed for information releases involving boiler plate information only, (e.g., emergency declarations and media center opening).

  • Briefing the NRC Site Team Leader and serve as the official point of contact for receiving NRC directives. This includes interfacing with the NRC regarding deviations from license conditions or technical specifications (10 CFR 50.54).

NOTE Ensure ED advises the ESD when such deviations are planned and the technical experts are consulted to the fullest extent practicable.

NOTE The ESD may overrule the ED if the ESD believes a higher emergency declaration is warranted.

1.5 Announce to the EOF staff that the EOF is activated, and ensure that you or your designee has notified the President of the Corporation.

(EPIP25/S3) EI-2

AmerGen AP OYSTER CREEKNumber EMERGENCY PREPAREDNESS EPIP-OC-. 25 IMPLEMENTING PROCEDURE Title Revision No.

EMERG;ENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 1 (continued)

EmerQency Support Director's Checklist Initials 1.6 Brief the EOF staff including NRC and State representatives (if available) of plant conditions using the EOF public address system.

ESD should notify the State Office of Emergency Management of the Plant Status.

1.7 Review, as appropriate, Exhibit 1B, NRC Emergency Response Interface.

1.8 Ensure that someone is assigned to maintain the ESD's log and track ESD assigned action items.

1.9 Review all press releases related to the emergency that have been approved for release by the ED.

2.0 ESD Conferences 2.1 ESD conferences should be held for information exchange periodically (approximately one every hour) with representatives from the State and NRC and the Group Leader R&EC, Technical Support Representative, Public Information Representative, EP Representative, and other staff as necessary.

2.2 While the ESD is in conference, a staff member should be assigned as "in charge" of EOF activities and instructed to interrupt the conference in the event of a major plant change.

2.3 Action items resulting from ESD conferences should be logged and tracked, and their disposition should be discussed at future conferences.

3.0 EOF Staff Briefings 3.1 When major changes in plant status have occurred, the EOF staff should be briefed and status updated.

(EPIP25/S3) EI-3

Number Amer~enOYSTER CREEK EMERGENCY PREPAREDNESSPROCEDURE EPIP-OC-.25 AP)ECOEnergy/l~ithsh Energy CorrpaflY TMDT.w ?,MTTNTh Title Revision No.

22 EMERGENCY OPERATIONS FACILITY (ZOF)

EXHIBIT 1 (continued)

Emergency Support Director's Checklist 4.0 Press Releases/Media Site Access that a 4.1 Press Releases should be issued within approximately one hour from the time major plant event has occurred. "Draft" press releases shall have a timely review.

Refer to Exhibit 7A for additional guidance.

NOTE Press releases such as media advisories, emergency reclassifications which merely provide boiler plate information need not have the ED/ESD approval.

Once the Governor has declared a state of emergency, ensure all OCNGS press releases are provided to the state representative at the JIC for review.

4.2 If media access to the site is requested, refer to Exhibit 14, "Site Access Policy for Media during Emergencies".

5.0 Onsite Protective Actions 5.1 Determine the status of site accountability (if applicable) from the Group Leader Administrative Support or the ED. Ensure this is logged in ESD's Log.

5.2 Determine if a site evacuation has been ordered and ensure provisions are made for providing site employees with instructions on reporting to work for the next business day. Site evacuation should be logged in ESD's Log.

5.3 Determine if any of the offsite OCNGS Facilities are downwind of a radioactive release and provide for their monitoring and protection (e.g., Trailers 300, Oyster Creek Admin. Bldg. and Forked River).

5.4 If non emergency OCNGS facilities are within sectors that were ordered to evacuate by the State, then they should be evacuated also.

5.4.1 If OCNGS Emergency Facilities e.g. Remote Assembly Area are within sectors ordered to evacuate, direct the Group Leader R&EC to ensure appropriate assessment and protective actions for there locations. They need not be evacuated unless local conditions make it necessary.

(EPIP25/S3) EI-4

Number OYSTER CREEK AmerGen A PECO ErwW/Bntsh Emny Company EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 1 (continued)

Emeroencv SUppOrt Director's Checklist 5.5 A description of evacuation preplanning for Alternate Emergency Response Facilities is provided in Exhibit 11.

6.0 Changes to Emergency Classifications emergency 6.1 Immediately notify the EOF Communications Coordinator of any changes in classifications and approve the offsite notification form.

NOTE These offsite notifications must be made within 15 minutes of an emergency declaration.

7.0 Offsite Protective Action Recommendations (PAR) 7.1 At the Site Area Emergency, convene an ESD conference and review the PAR Logic Diagram (Exhibit 1C) in preparation for a General Emergency declaration.

7.2 At the General Emergency, convene an ESD conference and immediately discuss the PAR Logic Diagram (Exhibit 1C). Develop a PAR for appropriate notifications within approximately 15 minutes from the GE declaration and approve the offsite notification form for transmitting the PAR to the State.

7.2.lProviding the written and signed copy of the PAR notification to the OEM Liaison (if he is present in the EOF) is considered to meet state notification time requirements.

7.2.1.1 However, notification of the PAR to the State by OC Communicators must also proceed directly.

7.2.1.2 ESD personal conveyance of the PAR to the OEM should, if possible, also proceed directly.

7.3 To the maximum extent practicable, attempt to obtain agreement from the State and NRC on the PAR. However, whether agreement is or is not reached, the Corporation shall communicate its PAR to the State OEM within approximately 15 minutes from the time the GE was declared.

(EPIP25/S3) EI-5

AmerGen OYSTER CREEKNumber EMERGENCY PREPAREDNESS EPIP-OC-.25 Enes Eny C ECO IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (ZOF) j22 EXHIBIT 1 (continued)

Emerqency Support Director's Checklist 7.4 ESD should discuss (time permitting) or inform the ED of the PAR decision. This should not hold up the notification of offsite agencies.

7.5 The PAR should not be included in press releases.

7.6 The ESD should ascertain from the NJ OEM what "Protective Action" has been implemented off-site. This should be provided to the NRC via the ENS line as required by 10 CFR 50.72 - follow-up notifications.

8.0 NRC Interface 8.1 Brief the NRC upon arrival and determine if the Senior NRC person is the Site Team Leader or Director, Site Operations (see Exhibit IB). This briefing should include the status of the event and information on the structure of the OCNGS emergency organization. Request the NRC keep OCNGS informed of all substantive information exchanges between the NRC and the state. The OCNGS emergency organization is not standard in the industry. Specifically discuss that the ED oversees site related activities, maintains a general cognizance of reactor operations (not detailed), and that while the ESD oversees the whole emergency effort, he concentrates on offsite issues.

8.2 Assign an individual to introduce OCNGS personnel to their NRC counterparts in the EOF.

8.3 NRC directives can only be received by the ESD (or in the ESD's absence, the ED)

NRC should be requested to provide all directives in writing.

9.0 Long-term Recovery 9.1 Refer to Procedure EPIP-OC-.45 for Long-Term Recovery and discuss its implementation at an ESD conference and with the ED.

9.2 If a General Emergency is in effect, OCNGS will not de-escalate to a lower level of emergency. The only option is to go into Long-term Recovery and this transition shall not occur until all offsite protective actions have been completed and the State has been informed.

Name Date Time (EPIP25/S3) EI-6

Number OYSTER CREEK AmerGen A PECO Energ'y/Atsh EnemgyCoapary EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 1 22 EXHIBIT 1A Page 1 of 3 EMERGENCY SUPPORT DIRECTOR TURNOVER CHECKLIST NOTE This form may be completed by ESD Assistant/Emergency Preparedness representative and may be used to brief State and NRC Representatives upon their arrival.

EMERGENCY CLASSIFICATION DATE/TIME OF DECLARATION UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY

  • Reactor Power at time of event  % BRIEF DESCRIPTION OF THE EMERGENCY CURRENT PAR STATUS * (Recnuired for General EmerQency)

STATUS OF ACCOUNTABILITY/ONSITE PROTECTIVE ACTIONS PRESENT STATUS OF PLANT AT POWER ( %_)

Hot Standby Hot Shutdown Cooling down (describe cooldown mode)

(EPIP25/S3) EI-7

Number OYSTER CREEK AmerGen A PrCO Enertsbh EnemgCompany EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT lA (continued)

Page 2 of 3 EMERGENCY SUPPORT DIRECTOR TURNOVER CHECKLIST Estimated time to 'STABLE' plant conditions hours Did reactor trip? YES - NO Did ECCS activate? YES - NO Is offsite power available? YES - NO Are both Diesel Generators operable? YES - NO Are Diesels Running? #1 YES - NO #2 YES -NO Are the Station Blackout CT's Available? YES - NO Is fuel integrity maintained? YES - NO Is containment integrity maintained? YES - NO If no, specify Do you suspect there is a release (monitored or unmonitored) in progress? = NO DYES = N/A If yes, specify pathway:

Is release WIRBORNE RELEASE EID RELEASE D]OWN Plume dispersion F ELEVATED -- GROUND = N/A Details:

Are there any abnormally high inplant radiation levels? YES - NO Specify location YES - NO Are there any personnel injuries?

Provide status YES - NO Were there any news releases issued?

Specify EXHIBIT IA (Continued)

Page 3 of 3 EMERGENCY SUPPORT DIRECTOR TURNOVER CHECKLIST YES - NO Are there any open technical issues?

Specify News releases issued ATTACHED NOTES:

(EPIP25/S3) EI-8

Number OYSTER CREEK AmerGen A PECO EnergyWBeWsl g Company EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Revision No.

Title 22 EMERGENCY OPERATIONS FACILITY (EOF)

When finished sign below:

Time Date Emergency Support Director (EPIP25/S3) EI-9

CREEKNumber AmerGenOYSTER EMERGENCY PREPAREDNESS PROCEDURE EPIP-OC-.25 I IMPLEMENTING Title }Re vision No.

EmERGENCY OPERATIONS FACILITY (EOF) 1 22 EXHIBIT lB NRC EMERGENCY RESPONSE INTERFACE CRITERIA This is a synopsis of the NRC emergency response process as it applies to OCNGS.

In essence, directives from the NRC must come from the NRC Director (typically, the NRC Chairman) or from the NRC Director of Site Operations (typically, the NRC Regional Administrator). Such advice or directive can only be communicated to the Emergency Director (the Emergency Support Director once the EOF is activated). If a directive order is issued by the NRC Director or Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive.

While NRC advice may be challenged by the ED or ESD, directives must be complied with.

With respect to Protective Action Recommendations for the public, the NRC may either endorse the OCNGS recommendation or opt to recommend a different one. The ED/ESD is encouraged to include the NRC and State representatives in the Protective Action Recommendation discussions in order to arrive at a mutually agreeable recommendation.

In the event that the NRC opts to recommend a different recommendation, they will attempt to resolve their differences with the utility prior to recommendations to the state. Their recommendation, like the utility recommendation, will be considered by the State in the development of a Governor directive.

(EPIP25/S3) El-10

AmerGen OYSTER CREEKNumber EMERGENCY PREPAREDNESS I o IMPLEMENTING PROCEDURE EPIP-OC-.25 Title 1 evision No.

EMERGENCY OPERATIONS FACILITY (BOF) J22 EXHIBIT lB (Continued)

NRC EMERGENCY RESPONSE INTERFACE CRITERIA Upon arrival of the NRC, the ED/ESD should:

- Verify who is the senior NRC person in charge.

- Ask the Senior NRC Person to inform the ED/ESD when the position of Director Site assumed and whether the responsibility to issue DIRECTIVES is included.

Operations is

- Request that the NRC keep OCNGS informed of all substantive information exchanges between the NRC and the State.

- Request the NRC provide all DIRECTIVES in writing.

SYNOPSIS - NRC EMERGENCY RESPONSE NOTE Review the following as time permits and/or if the NRC is expected to respond.

Revision 2 to NUREG 0728, supplemented by NUREG 0845 and NUREG-1471, describes the manner in which the NRC will respond to an incident and provides criteria for making preplanned response decisions. They provide procedural guidance, describe the functions related to "NRC emergency response, and define procedures for responding to the following NRC modes of operation.

Each mode defines the scope of NRC activities related to a particular level of emergency response in ascending order of degree of involvement to deactivation. The various modes are characterized as follows:

1. Normal mode - Normal activities designed to maintain readiness.
2. Standby mode - Regional office activates the Incident Response Center (IRC with an appropriate staff and NRC Headquarters Operations Center staffed by a standby team.

EXHIBIT lB (Continued)

NRC EMERGENCY RESPONSE INTERFACE CRITERIA

3. Initial activation - NRC Operations Center is staffed by a response team, the Regional IRC is fully activated and a site team is dispatched under the leadership of the Reqional Administrator, normally desiqnated as Director of Site Operations (DSO).
4. Expanded activation - Focus on NRC response operations is shifted to the site.

DSO is designated primary spokesman for the NRC and may be empowered with directive authority by the Chairman of the Nuclear Regulatory Commission.

5. Deactivation - Follow-up activities (e.g., reviews, investigation, and recovery operations).

(EPIP25/S3) EI-11

Affl 0r&eft Nuimber Amenven A

W W o,~ReE OYSTER CRE EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.25 Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 The particular mode assumed by the NRC will be dependent upon licensee event classification and "independent NRC perception of relative severity of uncertainty of accident conditions."

NRC ADVICE The NRC may offer advice or assistance to the Licensee during an emergency, or may respond to Licensee requests for advice or assistance. This may involve diagnosis of critical problems, development of proposed remedial courses of action, and proposals to implement additional precautionary measurers. The NRC is also prepared to direct that certain actions be taken if, after thorough discussion with the Emergency Director (the Emergency Support Director once the EOF is activated) it is decided that such direction is required.

In the event that such action is taken by the NRC Director or the NRC Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive. Directives will be communicated directly to the ED/ESD from the NRC Director (NRC Chairman) or from the NRC Director of Site Operations (DSO), typically the Regional Administrator, once appointed and empowered to do so.

(EPIP25/S3) El-12

Number AmerGen OYSTER EMERGENCY CREEK PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.25 Title 1Revision No.

EMERGENCY OPERATIONS FACILITY (ZOP) J22 EXHIBIT lB (Continued)

NRC EMERGENCY RESPONSE INTERFACE CRITERIA Several important concepts govern the NRC in providing advice, assistance, or direction.

They are:

a. The Licensee is at all times responsible for mitigating the consequences of the incident.
b. Although the NRC could issue formal orders to the Licensee to take certain measures and to monitor implementation, ". . . licensee continues to make other key operational decisions and to operate and manage the facility .
c. The NRC must have a single voice when advising or directing the Licensee.
d. The ED/ESD has the option to accept or challenge NRC advice.

At no time will advice or direction come from both the Director and DSO and the Licensee will always be kept apprised of who is empowered to exercise authority as the NRC Spokesman. All other NRC personnel in contact with Licensee personnel are responsible to make clear that discussions should not be construed as advice or direction but rather as a sharing or gathering of information.

NRC INPUT TO RECOMMEND PROTECTIVE ACTIONS The NRC responsibility during an emergency, as during normal operations, is to ensure that protection of public health and safety is adequate. One aspect of exercise of this "responsibility is to provide Protective Action Recommendations or advice to offsite authorities. This may take the form of an NRC endorsement of a Licensee Protective Action Recommendation or the NRC may opt to recommend additional protective actions. The NRC is not involved in recommending protective actions. However they may get involved if a major problem is identified with the protective actions recommended by the Licensee or protective actions undertaken by the state or local government. Additionally NRC involvement may be requested by state or local officials.

NRC ORGANIZATION The attachment to the synopsis is provided for your information. This attachment depicts the site team organization and is an extract of NUREG 1471. It defines the number of NRC personnel expected to operate in each facility and shows the lines of communications the NRC expects to use.

(EPIP25/S3) El-13

Procedure EPIP-25 Rev. 22 Exhibit lB (continuted)

NRC Site Organization - Initial Site Team I Dashed bordered boxes indicate F Critical Director of (DSO)_

Site Sadpositions Critical Positions. I -Operations-constitute the minimum staff I EOF S i 7OF n0r-C-odie.e I,

X.eg"`eY Ro*pno**

(ERC) nrEOF

- -FI - .,17 - - i ..

Govermoent Li...n Coordinator (GLC) ii Public Affairs Coordinator (PAC) i

- n-Protective Measures Coordinator (PeC)

E0F l'""' I-Rea tor safety Coordinator EOF (RSC) 1 Status Sumary Coordinator (STSC)

EOF

-,r.

0

-nnr Coordinator EOF (SSC)

I -- ---- - .l A -I

. .1 - U U INN INUOUWj re.otrSafety I I ~~~~~nn State EO PublicAffair, F~i ---- Saet operations Coordinator Status Summary Safeguards/Security

  • Coord inator Aaat. Coordinator Coordina tor (MRhC) (RSOC) Commu.nioator Aesiatant Coordinator

. .. _ (See Note 3) S..

State EOF JIC

_n i

EOF/TSC tNje . IE. 10. NOUI.

EOF/TSC EOF EOF/TSC I.

Location of all positions is driven by the HP Specialist I- State/Licensee's Emergency Response Organization. The facilities listed with TSC/.OSC these positions represent the probable locations.

'......caorI Note 1: Either the PMCL Communicator will be a critical position, not both. Ie EoF!

Note 2: Either the ENS Communicator or the RSCL r

nvsm. 1imo SeN Note 1 RPMn io 3os Communicator will be a critical position, not both.

Assessment Coordinator Note 3: Safeguards/Security Assistant I

Coordinator is part of the Initial Site l - o d Team only in safeguards/security type events.

(EPIP25/S4)

Number OYSTER CREEK AmerGen Cowmpay A PECO Ener*-Wbsh EnerWY EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title 1Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 PAR LOGIC DIAGRAM CHANGE Exhibit 1C SITE AREA EMERGENCY IS DECLARED I S REVIEW PAR LOGIC DIAGRAM IN PREPARATION FOR A POTENTIAL GENERAL I EMERGENCY DECLARATION AND PROTECTIVE ACTION.RECOMMENDATIONS I

GENERAL NO EMERGENCY ME

< DECLAREDC YYES EVACUATE A 2 MILE RADIUS AND 5 MILES DOWNWIND UNLESS it is KNOWN THAT SHELTERING will offer Greater Protection See Exhibit ic Section 1.1.1 thru 1.1.3 SHELTER ANY AREAS OF THE 10 MILE EPZ NOT EVACUATED NOTE If PAGs are exceeded, or are expected to be exceeded, beyond the 10 mile EPZ, assess the impact on an AD HOC Basis (i.e. Field Monitoring Team Data or Hand Written Contingency Calculations), and provide recommendations as appropriate.

CONTINUE ASSESSMENT BASED ON ALL AVAILABLE PLANT AND FIELD MONITORING INFORMATION EXPAND EVACUATION RECOMMENDATION TO COVER AREAS WHERE DOSES ARE EXPECTED TO EXCEED1 REM TEDE OR 5 REM ADULT THYROID (EPIP25/S5) El-15

?,Timh"r AmerGen A PECO Erergtsh Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-. 25 I IMPLEMENTING PROCEDURE Title 1 evision No.

EMERGENCY OPERATIONS FACILITY (KOF) J22 EXHIBIT Ic (continued)

OFFSIDE PROTECTIVE ACTION RECOMMENDATIONS GUIDE 1.0 Offsite 1.1 At the General Emergency, review the Protective Action Logic Diagram and provide PAR's to the State within approximately 15 minutes of declaring the General Emergency.

1.1.1 The guidance provided by the NRC for a Protective Action Recommendation at a General Emergency is Evacuation 2 miles in 360 degrees and 5 miles downwind. Shelter all other non-affected areas of the 10 mile EPZ.

NOTE If PAGs are exceeded, or are expected to be exceeded, beyond the 10 mile EPZ, assess the impact on an AD HOC basis (i.e., Field Monitoring Team Data or hand written contingency calculations), and prbvide recommendations as appropriate.

1.1.2 Under certain circumstances it is permissible to recommend Sheltering if it is known that Sheltering WILL PROVIDE GREATER PROTECTION.

1.1.2.1 This would most likely occur only for short (puff) release periods that are less than 1.5 Hrs. (which is substantially shorter than the evacuation time).

1.1.2.2 There must be strong assurance that there is definite control of the release and termination of the release by the positive actions of the emergency responders actions during the release process (such as Containment Venting).

1.1.3 Sheltering may be the protective action of choice, if rapid evacuation is impeded by:

a) severe environmental conditions - e.g. severe weather or floods; b) physical constraints to evacuation - e.g. inadequate roads NOTE The information in 1.1.3 a) and b) MAY ONLY BE AVAILABLE from previous discussions with New Jersey Office of Emergency Management or New Jersey Bureau of Nuclear Engineering Personnel.

1.2 During a Site Area Emergency, Protection Action Recommendations should not be immediately necessary, however, the PAR Logic Diagram should be reviewed.

1.3 Offsite Protective actions should not be required during an Unusual Event or Alert.

(EPIP25/S5) El-16

AmerGen OYSTER CNumber EMERGENCY PREPAREDNESS EPIP-OC-.25 ApECO EnIEy IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 2 ESD ASSISTANT CHECKLIST Initials 1.0 Upon arrival at the EOF, ensure that steps are being taken to expeditiously activate the EOF and assist the ESD in filling out his checklist.

2.0 Ensure that missing positions are provided to the Group Leader Admin.

Support so that personnel can be contacted to fill the positions.

3.0 Ensure that personnel properly use the EOF name board and have tags displayed to identify the position they are filling.

4.0 Provide a briefing to the NRC and State personnel once they arrive.

5.0 Review, as appropriate, Exhibit IB, NRC Emergency Response Interface.

6.0 Review and initial press releases as requested by the ESD or Press Release Writer. The review of press releases should be performed for technical accuracy as quickly as possible. Utilize the guidance in Exhibit 9 for areas of content. Do not "editorialize" information.

7.0 Request the Group Leader Admin Support or the Communications coordinator to call out additional personnel to provide interface with the NRC if necessary. Other ESD Assistants, Licensing personnel, or Corporate Licensing may be useful in providing information to the NRC.

(EPIP25/S6) E2 -1

Number OYSTER CREEK AmerGen APECO Energy/8tsit Energy Co-PanY EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 2 (Continued)

ESD ASSISTANT CHECKLIST Initials 8.0 If the ESD leaves the EOF for any reason (e.g., leaves the immediate area of the second floor of the Lakewood facility) assume the Person-In-Charge role until he returns.

9.0 Assume the point of contact role for any inquiries from Nuclear Energy Institute (NEI) Technical and Regulatory Division or EPRI.

10.0 Refer to EPIP-OC-.01, "Classification of Emergency Conditions" whenever major plant changes have occurred to determine if an emergency upgrade is warranted.

(EPIP25/S6) E2-2

Number AmerGen A PECOEnrgy/h Ene Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) J22 EXHIBIT 3 GROUP LEADER - RADIOLOGICAL AND ENVIRONMENTAL CONTROLS CHECKLIST 1.0 Evaluate the need for personnel frisking at the EOF and notify the Group Leader Adm. Support.

2.0 Start a Group Leader R&EC log.

3.0 Confirm that the EACC is staffed and operational.

4.0 Establish communications with the RAC.

5.0 Review, as appropriate, Exhibit IB, NRC Emergency Response Interface.

6.0 Request the Group Leader Admin Support or the Communication Coordinator to call out additional personnel to provide interface with the NRC if necessary. Other Group Leader R&EC's, Licensing personnel, or Corporate Licensing may be helpful in providing information to the NRC.

7.0 Ensure that all Radiological Control personnel use the tag board.

8.0 Initiate the development of a watchbill for your organization that will support the emergency on a 24 hour/day basis using Exhibit 12 and forward to the Group Leader Admin Support.

9.0 Direct the EAC to supply you with dose projections and field monitoring team results as applicable.

10.0 Be prepared to brief the ESD on all radiological conditions and review the PAR Logic Diagram (Exhibit 1C) in preparation for PAR discussions.

NOTE Should it be necessary to evacuate the areas containing the RAA (NNW 5 10 miles) consider appropriate protection for personnel at the facility.

This may consist of increased habitability.

(EPIP25/S7) E3-1

Number Amer~efl Energy/Bobsh' Energy Compry APECO OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 3 (continued)

GROUP LEADER - RADIOLOGICAL AND ENVIRONMENTAL CONTROLS CHECKLIST Surveys, use of protective equipment, sheltering or evacuation.

The Administrative exposure limit criteria as modified by EPIP-35, "RAC Guide", should be used unless the workers are considered critical in which case emergency workers overexposure authorization must be obtained.

11.0 Assume responsibility for all Radiological and Environmental Control Activities.

12.0 Forward this completed form to the EOF Communications Coordinator.

Group Leader R&EC should participate in BNE PAR process following the ESD PAR Development. This is to ensure OCNGS & BNE are basing PAR's on identical plant information. OCNGS should try to understand the basis for the BNE's PAR. If the PAR is different from OCNGS the group leader R&EC shall notify the ESD.

Review and initial press releases as requested by the ESD or P.I. Rep.

Signature Date Time Group Leader R&EC (EPIP25/S7) E3-2

AmerGen *IMPLEMENTING AECO OYSTER EMERGENCY PREPAREDNESSPROCEDURE Number EPIP-OC-.25 Title Revision No.

EMERGENCY OPERATIONS FACILITY (KOF) 22 EXHIBIT 4 GROUP LEADER - ADMINISTRATIVE SUPPORT CHECKLIST Initials 1.0 Maintain awareness of security events and Materials Management Coordinator Activities (i.e., procurement of transportation, equipment).

2.0 Assign an individual to implement exhibit 4B, EOF Access Control Checklist.

NOTE If problems are encountered with emergency telephones, contact the EOF Communications Coordinator.

3.0 Ensure all Admin Support personnel use the tag board.

4.0 Assist EOF Coordinators and Group Leaders in:

0 Filling personnel vacancies (via Security).

  • Developing shift schedules.

0 Coordinating with offsite support.

  • Obtaining needed reference material (i.e., INPO Resource Manual, Plant Prints, Technical Specifications, etc.).

(EPIP25/S8) E4-1

AmerGen OYSTER CREEKNumber EMERGENCY PREPAREDNESS EPIP-OC-. 25 IMPLEMENTING PROCEDURE Title Revision No.

EMRGENCY OPERATIONS FACILITY (KOF) 122 EXHIBIT 4 (Continued)

GROUP LEADER - ADMINISTRATIVE SUPPORT CHECKLIST Initials 5.1 Assist NRC in implementation of their work area at EOF by providing the following items (as needed):

NOTE THIS APPLIES DURING EMERGENCIES. DO NOT PERFORM THIS FUNCTION DURING DRILLS/EXERCISES UNLESS INSTRUCTED BY THE DRILL CONTROLLER.

  • Use of facsimile and Xerox machines.
  • Additional office space in building where available.
  • Office supplies.

6.0 Direct the efforts of the Administrative Support staff in the administrative and logistic support of the Emergency Response Organization.

Including, but not limited to:

6.1 General administration.

6.2 Personnel administration and accommodations.

6.3 Outside plant support.

NOTE If diesel fuel is needed for the site due to emergency conditions (e.g. hurricane) and can not be obtained through normal commercial suppliers, contact the OEM Rep.

at the EOF or the NJ Office of Emergency Management (OEM).

See EPIP-OC-.06 for the number.

6.4 Commissary/Food Logistics.

6.5 Human.Resources/Paychecks.

6.6 Aviation Support (Exhibit 4A).

(EPIP25/S8) E4-2

AmerGen i OYSTER CREEK Number EMERGENCY PREPAREDNESS EPIP-OC-.25 ay APECOnEr~gy/Bntisi IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 4 (continued)

GROUP LEADER - ADMINISTRATIVE SUPPORT CHECKLIST Initials 7.0 Develop a shift schedule for your organization. (Exhibit 12) 8.0 Notify the ESD Assistant when the facility is functionally staffed with groups as outlined below. Collect, coordinate and maintain shift staffing schedules (Exhibit 12) prepared by the following group leaders:

8.1 EOF Communications Coordinator.

8.2 Technical Support Representative.

8.3 Group Leader Radiological and Environmental Controls.

8.4 Environmental Assessment Coordinator.

8.5 Material Management Coordinator.

8.6 PI Tech Rep/EOF.

8.7 Emergency Preparedness Representative.

9.0 If necessary, provide support to the Communications Coordinator.

10.0 Function as point of contact for ANI/INPO.

11.0 Function as Person-In-Charge if asked and both the ESD and ESD Assistant must leave the (2nd floor of the Lakewood facility) EOF.

12-.0 If site access is required by personnel not currently badged at OCNGS:

12.1 Using the Site Confidential Phone List, contact the Technical Training Manager or designee for O.C. Inform individual of the circumstances and request provisions be made to accommodate emergency training.

13.0 Ascertain from the Security Shift Commander and inform the ESD on the status of accountability and/or site evacuation, if and when declared.

0 Establish telephone and radio communications with Site Security.

14.0 If any personnel are injured onsite, keep the ESD informed. All official notifications are done by tHe Medical Department.

(EPIP25/S8) E4-3

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.25 Title Revision No.

EMERGENCY OPERATIONS FACILITY (ZOF) 22 EXHIBIT 4 (continued)

GROUP LEADER - ADMINISTRATIVE SUPPORT CHECKLIST Initials 15.0 Documentation collected from center coordinators.

"* Communicator Log Sheets.

"* Emergency Message Forms.

"* Facsimile Machine Transmitted Documents.

16.0 Emergency Center restored.

0 Procedures returned.

& Prints returned.

0 Office supplies returned.

0 Computers, lights and other equipment turned off.

17.0 Center returned to an orderly Condition.

  • Clean off status boards.

18.0 Report the EOF secured to the Emergency Support Director.

Signature Date Time Group Leader Administrative Support (EPIP25/S8) E4-4

AmerGen AEC Enegyn EnIMPLEMENTING OYSTER EMERGENCY PREPAREDNESS EEKNumber PROCEDURE EPIP-OC-.25 Title Revision No.

EMERGENCY OPERTIONS FACILITY CEOF) 22 EXHIBIT 4A EMERGENCY AVIATION SUPPORT INSTRUCTION FORM Initials 1.1 Request for Aviation Support Authorized by:

Title:

Name: Signature:

1.2 Contact Horsham Valley Airways, Inc.

(215) 674-2100 working hours (215) 674-2101 after hours (215) 578-6466 pager Identify yourself by title and name. Record the data and time and name of the person contacted:

Name:

Time and Date: /

1.3 -Describe the extent of the emergency aviation support needed.

1.4 Provide the Aviation Support Contractor with the location of the pick up and destination.

1.4.1 Record the location and personnel/cargo to be picked up, as well as the estimated time of arrival at the pick up site.

(Location)

(Personnel/Cargo)

(Estimated Time of Arrival)

(EPIP25/S8) E4-5

Number OYSTER CREEK AmerGen A PECO Energy/EftsJh Energ Company EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 4A (Continued)

EMERGENCY AVIATION SUPPORT INSTRUCTION FORM Initials 1.4.2 Record the destination of the cargo from Step 1.4.1 and estimated time of arrival.

(Cargo)

(Estimated Time of Arrival) 1.5 Arrangements have been made to deliver the cargo to the pickup site by the estimated arrival time.

by 1.6 Arrangements have been made to pick up the cargo at the destination the estimated arrival time.

1.7 For additional emergency aviation support, repeat Steps 1.2 through 1.6 recording conversation using the Telephone and Communications Logsheet.

1.8 Upon completion of emergency aviation requirements, notify the e

aviation services contractor to terminate services. Record the name of the individual and the time of the notification.

Oyster Creek Aviation Facility Information Form

1. Airports
a. Miller Air Park located west of Toms River on Pinewald-Keswick Road.
b. Lakewood Airport located on Rt. 528 Southeast of Lakewood.
2. Heliports
a. Onsite heliport is designated as FAA Site Number H-205 and is equipped with a wind sock but no lights.

(EPIP25/S8) E4-6

Number OYSTER CREEK AmerGen A PECO Enefgy/wEsh Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 4B EOF ACCESS CONTROL CHECKLIST Initials 1.0 Establish an Access Control area at the main entrance of the EOF/JIC.

2.0 Ensure all entrances other than the main entrance to the EOF/JIC are locked. Post the locked doors of the JIC with the signs available in the main hallway closet, when time and resources permit.

3.0 Activate and reset the alarm system. The power switch is inside the closet in the hallway by the entrance to the Auditorium (JIC Briefing area).

4.0 Establish an access log. Allow only authorized personnel to enter the EOF or JIC.

NOTE Authorized personnel are: Employees with Employee Identification Card, Federal and State Emergency Response personnel with proper identification. The duty roster may be used for guidance. If personnel other than those on the roster request entry, you must get authorization from the Group Leader Admin. Support or the Emergency Preparedness Representative.

NOTE If unauthorized personnel attempt to gain access to the EOF, the individual assigned access control should contact the OEM Representative at the EOF or the Lakewood Police Dept. at (732) 363-0200 and request assistance.

5.0 Source check the frisker stored in the EOF using the instructions in Exhibit 4C. After source checking the frisker, place it at the entrance of the EOF with the range switch set for 500 CPM full scale. Hand and foot frisks should be required until the Group Leader R&EC arrives, and confirms or discontinues the need for frisking. Otherwise, when communications are established call the RAC at 609-971-4156 and ask if frisking is required.

(EPIP25/S8) E4-7

Number OYSTER CREEK AmerGen A PECO ErWgy/*,bsh Enery Corpany EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 4B (Continued)

EOF ACCESS CONTROL CHECKLIST Initials 6.0 If you are notified by an individual that they have consumed an alcoholic beverage within the past five (5) hours or believe an individual should be tested for Fitness for Duty, notify the Emergency Preparedness Representative.

7.0 Forward this completed form to the Group Leader Administrative Support.

Signature Date Time (EPIP25/S8) E4-8

AmerGen AP EMERGENCY PREPAREDNESS Number EPIP-OC-.25 I pIMPLEMENTING PROCEDURE Title Revision No EMERGENCY OPERATIONS FACILITY (EOF) j22 EXHIBIT 4C INSTRUCTIONS FOR SOURCE CHECKS OF FRISKER AT EOF The frisker is located in the EOF next to Public Information Desk. The check source is located in a lock box above the frisker.

Initials 1.0 Verify with the Gr Ldr R & EC that frisking is required at the EOF if the Gr Ldr is available, otherwise setup the frisking station.

2.0 Check calibration sticker and ensure that the current date is before the "Calibration Due Date".

3.0 Ensure the frisker is plugged into 11OV AC outlet.

NOTE The frisker will operate on battery power if no 110V AC is available.

4.0 Check the frisker cable connections secure.

5.0 Turn selector knob to "BATT" (battery) position and check that meter reads in BATT OK range. Assure AC light is on.

6.0 Unplug the AC Power, Take Frisker to Supply Closet.

7.0 Turn selector knob to "X500" position, place probe directly over the source and wait 30 to 60 seconds for meter to respond. If it does not, contact Group Leader R&EC for direction.

8.0 Turn selector knob to Xl position.

9.0 Relocate the frisker to the EOF entrance to be used for personnel monitoring, as appropriate, with existing conditions.

10.0 When the frisker is no longer needed, or the EOF is deactivated, return-the frisker to EOF, turn selector knob to "OFF" and plug the frisker into 110V AV electrical outlet to maintain a charge on the batteries.

(EPIP25/S8) E4-9

AmerGen OYSTER CREEKNumber EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.25 Title jRevision No.

EMERGENCY OPERATIONS FACILITY (BOF) 22 EXHIBIT 5 TECHNICAL SUPPORT REPRESENTATIVE CHECKLIST Initials 1.0 Start a Technical Support Representative log.

2.0 Ensure all Tech Support personnel use the tag board.

3.0 If additional personnel are needed for technical reasons or NRC interface, request the Group Leader Admin Support to call out personnel. Tech Support staff from other teams, Licensing personnel, or Corporate Licensing may be helpful in providing information to the NRC.

4.0 Monitor the (01) Conference Line ED/OPS Headset to keep abreast of Plant conditions. This line is not to be used for communicating Engineering questions, concerns or discussions. Engineering tasks should be communicated over other EP lines or alternate lines as appropriate.

5.0 Initialize the Plant Computer System Terminal and Display Data on center screen. Operating aids for the projector are at the projector.

6.0 Ensure the computer is on next to the projector stand in center. This computer is also connected to the projector and can display other information as desired, such as logs, action items, etc.

7.0 Ensure the PPM Computer is on and displaying appropriate tables as requested.

8.0 Review, as appropriate, Exhibit 1B, NRC Emergency Response Interface.

9.0 If problems are encountered with emergency telephones, contact the EOF Communications Coordinator.

10.0 Verify that prints, technical manuals, reference materials, etc., are availabl-e in the Technical Support area.

11.0 Initiate the development of a watchbill for your organization that will support the emergency on a 24 hour/day basis using Exhibit 11 and provide to the Group Leader Admin. Support.

(EPIP25/S9) E5-1

AmerGen ONumber EMERGENCY PREPAREDNESS EPIP-OC-.25 Energ,/8,bs* EneyCompay

  • CO IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY CEOF) 122 EXHIBIT 5 (continued)

TECHNICAL SUPPORT REPRESENTATIVE CHECKLIST Initials 12.0 When the BNE arrives, establish an information exchange pathway with them. Provide known current plant status. Ensure communications are clear and precise. It is important to answer all BNE questions concerning plant status, release pathway etc. in a timely fashion.

The ESD should be made aware of any request that can not be met in a timely fashion so that the appropriate contacts can be made to answer the question.

13.0 Be prepared to advise the ESD on any plant or technical information which may be needed and review the PAR Logic Diagram (Exhibit IC) and obtain data necessary to answer PAR questions in advance of PAR

.discussion.

14.0 Obtain additional technical support (as requested) for the Emergency Response Organization through contact with the Corporate Engineering dept. personnel. Call-out additional assistance through use of the Engineering dept. call-out list.

15.0 Review the appropriate press releases for technical accuracy, as quickly as possible, when requested by the PI rep. or ESD. Utilize the guidance in Exhibit 9A as a reference.

16.0 Forward this completed form to the EOF Communications Coordinator.

Signature Date Time (EPIP25/S9) E5-2

Number OYSTER CREEK AmerGen A PECO Energy/Bebsh Ereg COmpanrY EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 6 MATERIALS MANAGEMENT COORDINATOR CHECKLIST Initials 1.0 Access the Automated Materials Management System (AMMS).

2.0 Initiate the development of a watchbill for your organization that will support the emergency on a 24 hour/day basis using Exhibit 12 and provide to the Group Leader Admin. Support.

3.0 Be prepared to place the EOF microwave system backup generator in service using Exhibit 6A when directed by the ESD.

Date Time Signature (EPIP25/SI0) .E6-1

Number Amer~enOYSTER CREEK EMERGENCY PREPAREDNESS PROCEDURE EPIP-OC-.25 A PECO Enermsh EropnIMPLEMENTING Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 122 EXHIBIT 6A LAKEWOOD MICROWAVE ROOM EMERGENCY ELECTRIC PROCEDURE 1.0 PURPOSE The purpose of this procedure is to provide the necessary steps to provide an emergency electric power supply for the microwave radio equipment and base station radio equipment located at the Lakewood facility.

NOTE The microwave communications system will function for up to eight hours after a loss of power on its batteries. Before connecting the portable generator, attempt to contact tele-communications technicians from the Larrabee Shop, phone number (732) 370-7242. During off hours contact the Pinelands Area Load Supervisor at (973) 455-8274 and request that technicians be called out to connect the generator. The tele-communications supervisor may also be paged at (973) 203-8164.

2.0 PROCEDURE 2.1 Move the portable emergency generator from the boiler room to the rear of the building; the generator should remain outside the building and be within close proximity of the microwave room. The key for the boiler room must be gotten from the key cabinet in the EOF. The key for the lock on the generator security chain is located on the "Emergency Backup Generator Supplies" board located in the microwave room.

2.2 Fill the generator with gas. Gas containers and gas can be found in the "Flammable Fuels" cabinet located in the Line Department's fenced-in storage enclosure. Note that gas is also available at the outside gas pumps which are also powered by a backup generator.

2.3 On the generator, set the Voltage Selector to the "120V/240V" position.

2.4 On the generator, set the AC Circuit Breaker to the "OFF" position.

2.5 On the two battery charger/eliminators, set the Power Switcbes to the "OFF" position.

(EPIP25/Sl0) E6-2

AmerGen APECO CoEMERGENCY OYSTER CREEKNumber PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 6A (Cont'd)

LAKEWOOD MICROWAVE ROOM EMERGENCY ELECTRIC PROCEDURE 2.6 Disconnect the base station radios power cords.

2.7 Disconnect the two power cords for the battery charger/eliminators.

2.8 Select one of the battery charger/eliminators for use. Only one is required to supply the necessary power for the microwave equipment.

2.9 On the selected battery charger/eliminator open the front panel by loosening the two top screws. Set the battery charger/eliminator input source switch to operate at "240 Volts".

2.10 Connect the two extension cords to the generator and the appropriate equipment.

The extension cords are located on the "Emergency Backup Generator Supplies" board located in the microwave room. The "120 Volt" extension cord is for the base station radios; the "240 Volt" extension cord is for the one selected battery charger/eliminator which will power the microwave equipment.

2.11 Start the generator by turning the ON/OFF switch to the "ON" position and pulling the starter rope. A choke is also available and may have to be used.

See the generator operator manual for additional operating instructions.

2.12 On the generator, turn the AC Circuit Breaker to the "ON" position.

2.13 On the selected battery charger/eliminator, set the POWER switch to the "ON" position.

2.14 The microwave equipment and the base station radios are now back in operation powered the emergency backup generator.

2.15 To ensure adequate cooling for the microwave room, keep the door open and apply forced ventilation via electric fan. The fan may be plugged into the extension cord used by the radios.

(EPIP25/Sl0) E6-3

Number OYSTER CREEK AmerGen A PECO Ererrgy/Bish Energy Corny EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 7 EOF COMMUNICATIONS COORDINATOR CHECKLIST INITIALS 1.0 Report to the ESD Assistant, monitor and support/direct communicator activities in support of the emergency.

2.0 Ensure that sufficient communications capability exists to function satisfactorily. Report phone problems to the TSC Communications Coordinator who will initiate repairs.

3.0 Verify all computers are running and displaying the appropriate information.

4.0 Set the EOF clock to agree with the time displayed by the PCS.

(During drills ask the controller). Maintain a communications log, recording significant communications related events. Utilize the PC if available, or other means of recording information.

5.0 Ensure all communications personnel use tag board.

6.0 Call out additional personnel if required.

NOTE For call out of Duty Roster positions contact Security Shift Commander. For additional staff contact Group Leader Admin Support. If he is not available, use normal department call out methods.

7.0 Assign responsibilities to Communicators for:

  • Notifications to offsite agencies (EPIP-OC-.03) as appropriate.

"* Maintaining ESD log and ESD Action Items using a PC or other means as appropriate or available.

"* Status boards if needed or appropriate.

(EPIP25/Sll) E7-1

Number OYSTER CREEK AmerGen A PECO Energy/Brnsh Energy ComparY EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 7 (continued)

EOF COMMUNICATIONS COORDINATOR CHECKLIST INITIALS 8.0 When the ESD activates the EOF, contact the ECC Communications Coordinator and assume Off-site notification responsibilities unless directed not to do so. Request all completed off-site notifications checklists and station status checklists be faxed, so that there is a clear understanding of which notifications have been made from the ECC.

Time of Transfer:

ECC Communications Coordinator:

Name 9.0 Initiate the development of a watch bill for your organization that will support the emergency on a 24 hour/day basis.

Refer to Exhibit 12.

10.0 Upon termination of the emergency ensure that communications equipment and supplies are replaced and returned to a ready status upon deactivation of the EOF.

11.0 Upon termination of the emergency, ensure those agencies previously notified in EPIP-OC-.03 have been advised of the termination.

12.0 Forward all completed logs and records to the Emergency preparedness Department.

Signature: Date:

EOF Communication Coordinator (EPIP25/Sll) E7-2

AmerGen ONumber EMERGENCY PREPAREDNESS EPIP-OC-.25 I PIMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 8 EOF COMMUNICATOR GENERAL DUTIES 1.0 Report to EOF Communications Coordinator.

2.0 Receive and direct incoming calls to requested positions.

3.0 Complete outgoing calls as directed by.Emergency Management.

4.0 Direct outgoing messages to appropriate facilities.

5.0 Maintain telephone log and/or message log current.

5.1 Communications logs are stored at the communicator's duty station via the PC or book. Alternately, Exhibit 15 may be used.

5.2 The following items should be recorded:

  • All significant telephone conversations (e.g.: 08:40-ESD called re Status of OSC Team #8) 0 Date and time of emergency declarations 0 Notifications of offsite agencies a Incoming fax transmissions
  • Plant status prior to and at the time of emergency declarations
  • Logging and routing of incoming message forms 0 Major actions requested and major actions performed (by whom) 0 Significant information (e.g., Protective Action Recommendations, requests for assistance, etc.)

0 Communications with offsite agencies 6.0 Collect all paper records (Ensure records have been completed as appropriate) and turn over to EOF Communications Coordinator for review.

7.0 Report telecommunications problems to EOF Communications Coordinator.

(EPIP25/S12) E8-1

AmerGen AmereCn APECO Egy/h Eergy Company OYSE CREEK EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-. 25 Title Revision No.

EMERGENCY OPERATIONS FACILITY (ZOF) 22 EXHIBIT 8 (continued)

EOF COMMUNICATOR GENERAL DUTIES 8.0 Perform offsite notifications in accordance with EPIP-OC-.03 as directed by EOF communications Coordinator.

9.0 Relay requests.

9.1 Verbal requests for engineering information (TSC) should be logged.

Request may be followed up with written communications over the fax.

9.2 When transmitting a written request:

"* transcribe it (as necessary) onto the Emergency Message Form (Exhibit 16)

"* complete all spaces on the form

"* message number (Communicators may assign message numbers to correspond with individual Communicator's log but must reserve the Message Number Line for the number assigned by Plant Status Update Line Communicator).

"* to whom directed

"* to center directed

"* "from" person

"* "from" center

"* Completed form should be faxed to the appropriate center. The reply may be stapled to, or transcribed onto the same message form.

"* Number and log each fax ransmission using Exhibit 17.

NOTE Number outgoing transmissions sequentially regardless of the type of transmission. Use location designator as part of sequential number, i.e. EOF-001, EOF-002, etc.

(EPIP25/S12) E8-2

CREEKNumber AmerGenOYSTER AmeCrw e EMERGENCY PREPAREDNESS EPIP-OC-.25 A oIMPLEMENTING PROCEDURE TitleRevision No.

E~GNY OPERATIONS FACILITY (KOF) 2 EXHIBIT 9 PRESS RELEASE APPROVAL GUIDANCE 1.0 Press releases should be issued within approximately one hour from the time that a major plant event has occurred. Press releases shall include the time that the information is current and be written in accordance with the following guidelines.

2.0 The following categories of information should be included in press releases.

a. Level of Emergency This is simply identifying which one of the four emergency levels was declared.
b. Basis for Emergency Declaration This should be a simplified description of the plant condition which produced the emergency action level (e.g., a leak of radioactive water within the plant building).
c. Operational Status of Plant A simple description of plant status at the time of the emergency declaration (e.g., OCNGS was operating at 100% power when the leak was discovered, however, the plant is currently reducing power).
d. Company/Government Interface This is intended to inform the public that OCNGS has notified and is working closely with government officials so that public confidence and company credibility can be increased.

(EPIP25/SI3) E9 -1

AmerGen YoSTER Number Company EMERGENCY PREPAREDNESS EPIP-OC-.25 Energyabsh Ew APECO IC IMPLEMENTING PROCEDURE Title Revision No.

EmERGENCY OPERATIONS FACILITY (EOF) J22 EXHIBIT 9 (Continued)

PRESS RELEASE APPROVAL GUIDANCE

e. Corrective Actions This should be a non-technical description of what plant personnel are doing to correct the problem. It may include such language as "attempts are being made to stop the leak" or "plant personnel are investigating the cause of the leak."
f. Offsite Impact A statement which simply assesses what impact this event may have on the environment. This is intended to provide factual information on offsite radiological conditions (e.g., a radioactive release is in progress, however, environmental monitoring teams have not detected any radiation levels offsite in excess of normal background).

The initial press release should include all or part of the above information since time is of the essence. However, at the very least it should contain items a-e above. (pre-approved boiler plate news releases are contained in Procedure 1820-IMP-1720.01, Attachment 1) 3.0 In addition to the above, the following guidance will be used in issuing press releases:

  • Speculation, dose projections and Protective Action Recommendations should not be included in press releases.

(EPIP25/S13) E9-2

AmerGen AP OYSTER CREENumber EMERGENCY PREPAREDNESS EPIP-OC-. 25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (NOF) 22 EXHIBIT 9 (Continued)

PRESS RELEASE APPROVAL GUIDANCE 0 All press releases must be approved by the ESD, except the press release announcing the opening and location of the Joint Information Center when it is activated. Operational and radiological review and concurrence by the ESD Assistant and Group Leader R&EC may be appropriate if the press release has radiological or operation details.

NOTE For security related events, Press releases containing potential Safeguards information are to be reviewed by the Security Coordinator.

Original initialed copies are to be retained for records. Exceptions to this are limited to press releases with boiler plate information only (e.g., pre-approved boiler plate news releases are contained in Procedure 1820-IMP-1720.01, Attachment

1) which may be issued without prior review and approval. Once the Governor has declared a "State of Emergency" all OCNGS Press Releases shall be provided to the State Police representative in the Joint Information Center for review prior to final issuance. Changes made as a result of this review should be communicated to the ESD.

"* Press releases will be reviewed expeditiously in order to support timely issuance.

"* Press releases should avoid technical terms (e.g., plant names) and jargon (e.g.,

trip) and should be written as simple as possible. For example, Iso Condenser could be referred to as a heat removal process from the reactor.

(EPIP25/S13) E9-3

Amer~enNumber Amer~en A O t E OYSTER CREEK EMERGENCY PREPAREDNESS Nme EPIP-OC-.25 IMPLEMENTING PROCEDURE Title {Re vision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 10 EMERGENCY PREPAREDNESS REPRESENTATIVE CHECKLIST Initials 1.0 Ensure that EOF communications links and information displays are properly set up and functioning.

2.0 If requested, assist the ESD in completing Exhibit 1.

3.0 Ensure that proper information channels have been set up with BNE and NRC representatives if necessary.

4.0 Initiate a watchbill for your position that will support the emergency on a 24 hour/day basis using Exhibit 12 and forward to the Group Leader Admin. Support.

5.0 Ensure that all EOF personnel have used the tag board.

6.0 Support the ESD by providing information on:

1. The Emergency Plan implementation.
2. On Site, Off Site and State Emergency Response facilities. Refer to the NJ State RBRP and applicable procedures (SOP's)Provide interpretation/conversion of PAR Keyhole sectors and related NJ-OEM used Emergency Response Areas (ERPA's) - (SOP-305).
3. Communications abilities, means and methods. Initiate ESDs on the PC in Conf. area next to "Large Screen" TV.
4. Personnel and resources availabilities.
5. Procedure/Plan requirements.

7.0 When requested by the ESD, ensure Fitness for Duty requirements are met in accordance with Exhibit 10A. Breathalizers are kept in the EOF supply cabinet.

8.0 Approve access for those who are not badged or on the approved access list.

9.0 Ensure the Communications Coordinator collects completed checklists from all EOF personnel when time permits and forwards them to you.

Signature _ Date Time (EPIP25/S14) E10-1

Number OYSTER CREEK AmerGen A PECO Energy/f&fit hnergy CoPaiY EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 10A EMERGENCY RESPONSE FACILITY FITNESS FOR DUTY DETERMINATION INSTRUCTIONS NOTE The Fitness for Duty rule applies to all Company employees (including contractors and vendors) granted unescorted-access to the protected area or who are required by position or name to report to the EOF. These instructions address their evaluation for utilization in an emergency only. All "for cause" evaluations must be conducted by the Medical or Security Department.

Scope:

In accordance with 1000-ADM-2002.06, Fitness for Duty, individuals responding to an emergency who have consumed alcohol within the previous five hours but believe that they are fit for duty shall inform the Emergency Support Director and receive an evaluation.

Contractor/vendor personnel shall be asked if they have consumed alcohol within the previous 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. If the answer is yes, an evaluation shall be conducted.

Instructions:

The Emergency Support Director shall direct the Emergency Preparedness Representative to administer the breath alcohol evaluation in accordance with Exhibit 10B.

NOTE Extra copies of Exhibit 10B are kept with the instrument.

Based on the results of the test, perform the following:

1) BAC 0.01% or less Allow the individual to work in the facility.

(EPIP25/S14) E10-2

Number AmerGen APECO ErewBnejsh Engy Comfpany OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY CEOF) 22 EXHIBIT 10A (Continued)

EMERGENCY RESPONSE FACILITY FITNESS FOR DUTY DETERMINATION INSTRUCTIONS

2) BAC greater than 0.01% but less than 0.04%

Allow the individual to work in the facility. Re-test the individual approximately every thirty minutes to determine the maximum BAC. If the maximum BAC is equal to or greater than 0.04%, refer to Step 3. If less than 0.04%, no further action is required.

3) BAC equal to or greater than 0.04%

If determined that the individuals unique knowledge or skills are required, that Individual shall only be permitted to work with permission of the Site Director, (or in his/her absence, his/her designee), Emergency Support Director, Emergency Director, or Office of the President only after satisfactory assurance, that the individual is capable of performing his/her duties. Remind the Emergency Support Director that if this individual is needed to work, he/she must be escorted at all times. Arrangements should be made as soon as practicable for (For Cause) testing in accordance with 1000-ADM-2002.06.

NOTE Individuals not "ON CALL" who report to their Emergency Response Facility and test equal to or greater than 0.04 percent BAC are not subject to disciplinary action.

4) Ensure the individual who tested equal to or greater than 0.04 percent, if not needed, is not permitted to drive home. Provide a place for the individual to rest or contact Group Leader - Admin Support to arrange for transportation.
5) Be alert for any individual that exhibits aberrant behavior or smell of alcohol.

Test these individuals in accordance with this exhibit. If aberrant behavior cannot be attributed to a positive BAC reading, ask the Group Leader - Admini Support to contact the Security Department for further action.

(EPIP25/S14) E10-3

Number OYSTER CREEK AmerGen A PECO Er*gys/Brib En*egy Compa'y EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 SAMPLE EXHIBIT 10B ALCO SENSOR III OPERATIONAL CHECKLIST TEST SUBJECT NAME: DATE:

SOCIAL SECURITY #: SERIAL #:

TEST 1 TEST 2 TIME OF TEST:

0.  % TEST 2 0.  %

TEST RESULT (BAC): TEST 1 SIGNATURE:

OPERATOR NAME:

INSTRUCTIONS - check each box after completion of step.

NOTE The fifteen minute observation period of the subject may be waived as long as a positive test result is not received. Should a positive test result be indicated, it shall be disregarded and the alcohol breath test started anew after at least a 15 minute observation period.

A weak battery is indicated by an "8.888" in the display window. Replace battery.

1. Z--I Check temperature window on back of unit (should read 20° to 36°C)
2. I Have the individual mount mouth piece on unit.

- Press "READ" button and hold for (10) seconds. Check to see if .000

3. is constant. If not, press "Set" button and recheck in one minute.

If the display reads greater than .000, use another unit or send individual to another location. Remove the instrument from service and forward to the Medical Department for repair and use another instrument for testing.

4. Press "SET" button.

Instruct subject to take a deep breath and blow steadily through the

5. tube until told to stop (minimum of 4 seconds). (NO smoking within

[15] minutes of test.)

Push "READ" button during third second that the subject is blowing.

6. (Subject MUST continue to blow for a minimum of one [1] second after the "READ button is depressed.)

(EPIP25/S14) E10-4

Number OYSTER CREEK AmerGen A PECO Energy/BrTtsh Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 10B (Continued)

ALCO SENSOR III OPERATIONAL CHECKLIST

7. Keep "READ" button depressed until reading stops climbing.

Record and time of TEST 1/TEST 2. (Note: The two readings must

8. [j agree within + 10%, of the averages of the two measurements, if not, use another instrument)
9. Press "SET" button to accelerate elimination of reading and
  • elecrically clean the cell surface.
10. Wait a minimum of two minutes and a maximum of 10 minutes and repeat Steps 3hjough 9.

(EPIP25/SI4) E10-5

Number OYSTER CREEK AmerGen P EMERGENCY IMPLEMENTING PREPAREDNESS PROCEDURE EPIP-OC-. 25 Title Revision No.

EMERGENCY OPERATIONS FACILITY (ZOF) 22 EXHIBIT 11 ROUTE TO EOF (PINELAND DIVISION OFFICE)

1. Take Route 9 north to Lacey Road.
2. Make left on to Lacey Road and travel west to the Parkway North entrance which will be on your right.
3. Take Garden State Parkway North. to exit 83 (Lakewood).
4. Follow jug handle to Route 9 North. (An AT&T microwave tower is located in the center of the jug handle.)
5. Take Route 9 North.
6. The EOF (Pineland Division Office) is on the right about 500 ft. past the light at the intersection of Routes 9 and 528.

by S

4ct (EPIP25/S!5) El1-1

Number OYSTER CREEK AmerGen A PECO ErwIne Bsh Energy Company EMERGENCY PREPAREDNESS EPIP-OC-. 25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 12 Page of SAMPLE DATE:

EMERGENCY SHIFT SCHEDULE GROUP (eg. Admin.):

TIME: SHIFT 1 SHIFT 2 SHIFT 3 BEGIN ENDl NAME NAME NAME POSITION #

P H HOME #

0 N WORK #

E BEEPER #

POSITION #

P H HOME #

0 N WORK #

E BEEPER #

POSITION #

P H HOME #

N WORK #

E BEEPER #

POSITION #

P H HOME #

0 N WORK #

E BEEPER #

(EPIP25/Sl6) E12-1

AmerGen A C B OYSTER CREEKNumber EMERGENCY PREPAREDNESS EPIP-OC-.25 I 0IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 13 ALTERNATE EMERGENCY RESPONSE FACILITIES This exhibit provides for a description of evacuation preplanning for Alternate Emergency Response Facilities as follows:

1. Control Room/ECC - Evacuation of Control Room - the Operators control the plant from remote shutdown panels and the GSS directs plant operations from the TSC. All other ECC IREO members are integrated into the TSC organization. (Refer to 2000-ABN 3200.30 for specific direction).
2. OSC - Evacuation of OSC - all OSC personnel are evacuated to the SOSC which is located in the rear of the TSC. (Refer to EPIP-OC-.27 for specific direction.)
3. TSC - Evacuation of TSC - the ED support staff which includes the ED, ED Assistant, RAC, RASE, and PI Rep. evacuate to the Control Room (ECC). The Tech Support staff which includes the TSC Coordinator, TSC Engineers, Communication Coordinator, Communicators and the Tech Assistant evacuate to the OSC. The Core Engineer would initially report to the Control Room, but if his services are not needed, he will be sent to the OSC. (Refer to EPIP-OC-.26 for specific direction).
4. Remote Assembly Area - Evacuation of RAA's - if the Forked River Bldg. 14 RAA is not available then relocate to the Berkeley Customer Operations Center and vise versa.
5. Emergency Assembly Area - The EAA may be redirected to the Forked River Assembly Area or to the Remote Assembly Area at Berkeley Line as directed by management. In this case Site Accountability is conducted as personnel exit the site.
6. EOF - There are no backup facilities for the EOF because it is remote from the site and it is unlikely that a nuclear related incident would affect both the plant and this center.

(EPIP25/SI7) E13 -1

AmerGen Ji imh Ar*nber A e n

I OYSTE CREE EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-. 25 Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) j22 Exhibit 14 SITE ACCESS POLICY FOR MEDIA DURING EMERGENCIES Providing reasonable site access to the media during a plant emergency is in the best interest of OCNGS and the public.

Responsibility for approving site access rests with the Emergency Support Director, or if the EOF is not activated, with the Emergency Director.

For purposes of media access to the site during an emergency, the same industrial safety and security standards and requirements that apply to non-essential employees will be applied to the media.

Communication Dept. Responsibilities Requests for media access will be made to the ESD or ED by the Public Information Duty Representative or the Media Center Lead.

Communications will provide the ED/ESD with the number of media to gain site access, areas to be accessed and length of time the media will be there. (Communications will decide the number of media gaining access based on conditions at the time of the emergency. An attempt will be made to gain access for, at a minimum, one representative each from radio, television, and print media.)

Communications will provide media transportation on and off site.

Communications will have each member of the media sign a Media Access Briefing Form, Exhibit 18, indicating they were briefed about the risks as they were known at the time by the Corporation.

1. If media access does not involve entry into a posted radiologically controlled area:
a. At Oyster Creek, Security will retain responsibility for sign in and badging.
b. Communications will supervise and escort the media while on site.
c. Communications will conduct a briefing explaining the radiological and industrial conditions and risks on site.
2. If media access involves entry into a posted radiologically controlled area:
a. Media will be processed as appropriate, receiving dosimetry, training, bioassay, waivers and briefings based on established procedural requirements.
b. Communications will notify the Security Coordinator prior to site access.
c. Communications in conjunction with Radiological Controls will supervise and escort the media while in posted radiologically controlled areas.

ED/ESD Responsibilities

1. The ED/ESD will consult with the RAC/Group Leader R&EC, and media will be granted access if the projected dose will not exceed the 500 millirem annual limit including external and internal exposure.

NOTE For Security Driven Events, media access to the site must also be approved by the local Law Enforcement Agency and Security.

2. Approve media access to the site if requirements are met.

(EPIP25/S18) E14-1

Number AmerRen APECOErGy/Bnbsh Er*W Confany OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (NOF) 22 EXHIBIT 15 SAMPLE OYSTER CREEK NUCLEAR GENERATING STATION EMERGENCY COMMUNICATIONS Communicator Log Location: ________ ____Date: ___

DLV Number: ______ _____Dial Code: ___

Name:.____________

Time: Remarks:

(EPIP25/SI9) E15-1

Number OYSTER CREEK AmerGen A PECO Energy/fBish Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 16 SAMPLE Number Emergency Message To: 0SC TSC EACC ECC EOF Staff Position/Other Message:

Originator:

Staff Position Initials Time Date Location: ECC TSC OSC EACC EOF Reply:

Reply Completed by:

Staff Position/Other Initials Time Date A0001731 10-84 (EPIP25/S20) E16-1

Number OYSTER CREEK AmerGen A PECO Energy./8tsh Enery Compary EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

ERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 17 HIFAX LOG SAMPLE SEND MESSAGE TIME INITIAL TSC OSC EOF ECC COMMENTS

__ 1. 1

__ __ 1 __ 1 __ .1 .1. .1

+ 4 I - -t t

.J. 1 4 & 4 + 4 4 4 4 4 4 .4. 4

+ 4 4 4 4 4 4 J. A I & 4 .4. 4 4 4 4 4 4 +

+ 4

  • 4 4 4 4

+ 4 4 t 4 4 4 J. 1 I & 4 4 4

.4. 4 4 4 4 4 .4.

+ 4 4 4 4 4 4 TSC OSC EOF ECC COMMENTS (EPIP25/S21) E17-1

Number AmerGen APECO Erewg/Whtsh Er*W C-noriwaY OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.25 IMPLEMENTING PROCEDURE Title Revision No.

EMERGENCY OPERATIONS FACILITY (EOF) 22 EXHIBIT 18 MEDIA ACCESS BRIEFING FORM I have been briefed about the risks, both industrial and radiological, to which I may be exposed while at this nuclear facility. I understand there may be some risk and willingly accept it for the purpose of visiting the plant site.

Signature Date News Organization Communications Rep.

(EPIP02/S22) E18-1

Number OYSTER CREEK AmerGen A PECO Energ/aitish Energy ComPanY EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Revision No.

Title THE TECHNICAL SUPPORT CENTER 21 Applicability/Scope Responsible Office Applies to work at Oyster Creek Division & Support Divisions Emergency Preparedness

_..'- -.. '

  • V v T No Effective Date Safety Reviews Required XYes No Date of Sale Prior Revision 20 incorporated the This Revision 21 incorporates the following Temporary Changes:

following Temporary Changes:

N/A N/A List of Pages (all pages rev'd to Rev. 21) 1.0 - 5.0 El-I to El-20 E2-1 E3-1 to E3-4 E4-1 to E4-2 E5-1 to E5-2 E6-1 E7-1 E8-1 to E8-2 E9-1 to E9-2 El0-1 to E10-6 Ell-1 to Eli-3 E12-1 El3-1 to E13-5 E14-1 E15-1 to E15-2 El6-1 E17-1 E18-1 E19-1 E20-1 NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek Concurring Organization Element Date Originator /F--e rqency Planner Concurredr By Director, Ops/Mtce.

Approved Emeraencv Preoaredness Mgr, O.C. ///( /c?

_________Emergenc ---- - Prprens Mgr, O.C."L (EPIP26) 1.0

OYSTER CREEK Number AmerGen A PECO Energy/Bnsh Energy Company EMERGENCY PREPAREDNESS TMPLETMENTING PROCEDURE EPIP-OC-.26 Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 DOCUMENT HISTORY REVISION DATE ORIGINATOR DESCRIPTION OF CHANGE 10 A. Smith Improve guidance for authorizing deviations from procedures, operating limits, Tech, Spec's, license and license conditions. Added Exhibit 13.

Also changed reference to EPIP-OC-.23 to EPIP COM-.44.

Provide guidance in Exhibit 10 Computer Eng.

Checklist for modem reset if ERDS has problems.

Add note concerning Main Gate Evacuation new Exhibit 14, Core Engineers Responsibilities.

11 12/94 A. Smith Update GPUN/NRC response interface criteria per NUREG-1471. Add Exhibit 15 for media access during emergencies.

12 02/95 A. Smith Provide guidance for Media access during Security driven events and add current time of events statement to Exhibit IF.

13 06/95 A. Smith Update facility titles and changes to facility locations due to elimination of trailer complexes. Delete Energy Spectrum as an alternate location for AEOF. Also renumber pages to eliminate blank page.

14 11/95 T. Blount Corrects typols, upgrade and modify ED Deviation Authorization Form based on feedback.

15 10/96 T. Blount Change PAR guide and Logic diagram to make Evacuation Preferred recommendation. Deleted reference to AEOF based on Rev. 11, E Plan change. Deleted TSC Layout diagram since it is normally set up.

16 06/97 A. Smith Reflect recent improvements in Technology and incorporate communicator activities from EPIP OC-.04.

17 08/98 A. Smith Improve & clarify ED Assistants first step on checklist. Reword press release reviews for ED Assistant to be consistent with EPIP-OC-.25.

Which is less ambiguous. Make Tech. Assistants checklists responsibilities instead of check offs.

18 02/99 A. Smith EPIP-COM-.44 and EPIP-COM-.45 have been changed to Oyster Creek site specific procedures and the new numbers are EPIP-OC-.44 and EPIP-OC-.45 (reference EP changes98-021 & 98-022) 19 05/99 A. Smith Revise the public information-process. Change reporting of Tech Assistant to the ED instead of Comm. Coord.

20 10/99 A. Smith Clarify Core Eng. reporting to EOC then TSC.

21 DOS A. Smith Change references from GPU to OCNGS.

(EPIP26) 2.0

AmerGen CREEK Number EMERGENCY PREPAREDNESS EPIP-OC-.26 Enegyh Eerw A PECO C IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 1.0 PURPOSE 1.1 This procedure provides for the activation, operation, deactivation, and evacuation of the Technical Support Center (TSC).

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to TSC personnel.

3.0 RESPONSIBILITIES 3.1 The Initial Response Organization Emergency Director is responsible for completing Exhibit 1.

3.2 The ED Assistant is responsible for assisting in completing Exhibit 1.

3.3 The Tech Support Center Coordinator is responsible for completing Exhibit 3 and implementing Exhibit 9 as appropriate.

3.4 The Tech Support Engineers are responsible for completing Exhibit 4 and 5.

3.5 The Chemistry Coordinator is responsible for completing Exhibit 6.

3.6 The Radiological Assessment Coordinator is responsible for completing Exhibit 7.

3.7 The Radiological Assessment Support Engineer is responsible for completing Exhibit 8.

3.8 The Core Engineer is responsible for implementing Exhibit 14.

(EPIP26) 3.0

OYSTER CREEK Number AmerGen A PECO Energy/Bsh Energy Compary EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Revision No.

Title 21 THE TECHNICAL SUPPORT CENTER 4.0 PROCEDURE 4.1 Initial Response Emergency Organization (IRO) personnel assigned to the Technical Support Center (TSC) will report to the TSC when they are notified of activation of the IRO and perform the responsibilities identified in their assigned exhibits to this procedure and as requested by their emergency organization supervisors.

5.0 REFERENCES

5.1 2000-PLN-1300.01 OCNGS Emergency Plan.

5.2 OEP-ADM-1319.02, "Emergency Response Facilities and Equipment Maintenance" 5.3 EPIP-OC-.01, "Classification of Emergency Conditions" 5.4 EPIP-OC-.27, "The Operations Support Center" 5.5 2000-ABN-3200.30, "Control Room Evacuation" 5.6 1820-IMP-1720.01, "Emergency Communications Implementing Procedure" 6.0 EXHIBITS 6.1 Exhibit 1, Emergency Director Checklist.

6.2 Exhibit 1A, Emergency Director Turnover Checklist.

6.3 Exhibit 1B, Protective Action Recommendation Guide.

6.4 Exhibit IC, Oyster Creek PAR Logic Diagram.

6.5 Exhibit 1D, Emergency Director Responsibilities.

6.6 Exhibit 1E, NRC Emergency Response Interface Criteria.

6.7 Exhibit 2, Control Room Evacuation.

6.8 Exhibit 3, TSC Coordinators Checklist.

6.9 Exhibit 4, TSC Coordinator Checklist.

(EPIP26) 4.0

AmerGen EMERGENCY CREEK PREPAREDNESS Number EPIP-OC-.26 A PECO Ernefg Energy CarnpanY IMPLEMENTING PROCEDURE Title Revision No.

THE TECENICAL SUPPORT CENTER 21 6.11 Exhibit 5, TSC Checklist.

6.12 Exhibit 5A, TSC Technical Assistant Responsibilities.

6.13 Exhibit 6, TSC Chemistry Coordinators Checklist.

6.14 Exhibit 7, TSC Radiological Assessment Coordinators Checklist.

6.15 Exhibit 8, TSC Radiological Assessment Support Engineer Checklist.

6.16 Exhibit 9, Press Release Approval Guidance.

6.17 Exhibit 9A, Public Information Representative Checklist.

6.18 Exhibit 10, Plan for Storage and transfer of Contaminated Water.

6.19 Exhibit 11, Relocation of the TSC.

6.20 Exhibit 12, Alternate Emergency Response Facilities.

6.21 Exhibit 13, Emergency Director Authorization Form for Deviations from Requirements.

6.22 Exhibit 14, Core Engineers Responsibilities.

6.23 Exhibit 15, Site Access Policy for Media During Emergencies.

6.24 Exhibit 16, Emergency Shift Schedule.

6.25 Exhibit 17, HiFax Log.

6.26 Exhibit 18, Communications Log.

6.27. Exhibit 19, Emergency Communicator Log.

(EPIP26) 5.0

AmerGen OYS CREEK Number EPIP-OC-. 26 EMERGENCY PREPAREDNESS A PEC E IMPLEMENTING PROCEDURE Title Revision No.

THE TECEWCAL SUPPORT CENTER 21 EXHIBIT 1 Emergency Director's Checklist NOTE The Emergency Director may initially report to the ECC to assess plant status. He may assume ED duties in the ECC but should activate the TSC and relocate to it in a timely manner. The ED Assistant will assist with the completion of this checklist but may not assume ED responsibility as delineated in Exhibit 1D.

Initials 1.0 Activate the TSC by performing these steps:

1.1 ED Assistant has confirmed that the following areas are functional (Areas need not be 100% activated to be considered "functional"). Once the following areas are functional inform the ED that the center is ready to be activated and receive him if not already in TSC.

Technical Support Radiological Assessment Communications link to Control Room and OSC NOTE Areas need not be 100% staffed to be considered functional 1.2 The ED will complete Exhibit 1A of this procedure by obtaining a turnover from the Shift ED (GSS/SSM). This may be done in the Emergency Control Center, face to face, or may be done from the TSC by phone.

1.3 Brief the TSC staff including NRC (if available).

1.4 Once the above steps have been completed, inform the Shift ED that you are ready to assume your position as ED and will take over ED responsibilities (Exhibit ID contains these for reference).

1.5 Announce to the TSC staff that you are the ED, the TSC is activated and will assume Site Command and Control and off site notifications if appropriate. Notify site protection security supervisor that the TSC is activated.

1.6 Review all press releases related to the emergency that have been approved for release by the Shift ED. Only thi ED can approve.

1.7 Log TSC Activation time in ED Log.

(EPIP26/S3) EI-I

OYSTER CREEK Number AmerGen APECO Energyi sh Ernery 0Corn Y EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECNNICAL SUPPORT CENTER 21 EXHIBIT 1 Emergency Director's Checklist (cont'd)

Initials 2.0 TSC Operations 2.1 TSC information exchanges should take place periodically (approximately one every hour) with NRC (if available), RAC, Technical Support Coordinator, Technical Assistant, ED Assistant, EAA Coordinator and other staff as necessary. Log briefing time and synopsis of briefing in ED Log for each occurrence.

2.2 EDA or designee to maintain the ED's log and track assigned action items.

2.2.1 Action items resulting from ED assignments shall be logged and tracked, and their disposition should be discussed periodically. The rolling white board or the PC may be used to display Action Items.

2.3 If the ED leaves the TSC for any reason, as the ED assistant, assume the person-in-charge until the ED returns.

NOTE 1 This does not include assuming ED responsibilities (see exhibit 1D for reference).

NOTE 2 Interrupt the ED Conferences or phone calls to inform him of major plant changes or as other conditions warrant.

2.4 EDA to brief NRC and provide liaison.

2.5 When the EOF is activated the ESD will seek an initial briefing.

There after the ED should periodically brief the ESD approximately hourly or as conditions change. The ESD may take this briefing with his staff (and NRC/BNE) via a speaker phone.

NOTE These briefings shall be general in nature. Technical discussions should be conducted between the TSC and EOF engineering staff to ensure accuracy.

2.6 EDA is point of contact for NEI or EPRI or INPO.

(EPIP26/S3) EI-2

OYSTER CREEK Number AmerGen A PECO Energy/Brnbs En,*g Co0rpary EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 1 Emergency Director's Checklist (cont'd)

Initials 2.7 EDA directs efforts as appropriate for the following groups:

Communicates through the ECC and TSC communications coordinators.

"* Security through the Security Shift Commander.

" Emergency Assembly Area through Security or the EAA coordinator.

2.8 Ensure that any TSC or Security teams are tracked by the OSC.

2.9 Review, as appropriate, Exhibit 1E, NRC Emergency Response Interface.

3.0 Site ED Page 3.1 Periodic briefings (hourly or when major changes in plant status have occurred) should take place using the ED page system. This system goes to all on-site Emergency Response Facilities (OSC, ECC, Main Gate, North Gate, TSC).

4.0 Press Releases (If not yet assumed by ESD) 4.1 Press releases should be issued within approximately one hour from the time that a major plant event has occurred. "Draft" press releases shall have a timely review. Refer to Exhibit 9 for additional guidance.

NOTE Pre-approved boiler plate press releases are contained in Procedure 1820-IMP-1720.01, Attachment 1. Boiler plate information need not have the ED/ESD approval.

4.2 Once the Governor has declared a "state of emergency", ensure all OCNGS press releases are provided to the state police representative at the Media Center for review and agreement.

(EPIP26/S3) EI-3

AmerGen EMERGENCY PREPAREDNESSCREEK Number EPIP-OC-.26 A IMPLEMENTING PROCEDURE Revision No.

Title THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 1 Emergency Director's Checklist (cont'd)

Initials 5.0 On-site Protective Actions 5.1 If any of the off-site GPUN Emergency Response Facilities are downwind of a radioactive release, provide for their monitoring and protection (e.g., RAA at Forked River). Exhibit lB provides guidance.

5.1.1 If these GPUN facilities are within sectors that were ordered to evacuate by the State, then they should be relocated to an alternate facility.

5.2 If site accountability has been ordered, ensure it is logged on PAR status board, in the ED's log, and communicated to the ESD.

Direct the C.R. to make the appropriate page announcement for accountability. If needed, provide the route to the EAA(OCAB/Warehouse).

5.3 If a site evacuation has been ordered, ensure provisions are made for providing site employees with instructions on reporting to work for the next business day. Site evacuation should be logged on PAR status board, ED's log, and communicated to ESD.

6.0 Changes to Emergency Classifications NOTE If the Communications have not been turned over to the EOF, off-site notifications must be made within 15 minutes of an emergency declaration.

6.1 Immediately notify the TSC Communications Coordinator of any changes in emergency classifications and direct the notifications be completed.

6.1.1 All notifications for on-site and off-site should be conducted from the Control Room if available, until the off-site notifications are assumed by the EOF. Upon changes in classes direct the Control Room (ECC Comm Coord, Ops Coord or GSS) to complete the appropriate notifications. This directions satisfies the approval of such notifications.

6.1.2 If off-site notifications have been tarned over to EOF, immediately confer with ESD on the need to reclassify the emergency. Remind him to ensure appropriate off-site notifications are made within 15 minutes.

6.2 Log any changes in classification in the ED Log.

(EPIP26/S3) EI-4

OYSTER CREEK Number AmerGen A PECO ErWWlntsh EnWey COTPany EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 1 Emergency Director's Checklist (cont'd)

Initials 7.0 Off-site Protective Action Recommendations (PAR)

NOTE These actions shall be performed if off-site PAR responsibility is not turned over the ESD. They may be done in parallel if responsibility has been turned over.

7.1 At the Site Area Emergency, review the PAR Logic Diagram (Exhibit IC) in preparation for a General Emergency declaration.

7.2 At the General Emergency, immediately review the PAR Logic Diagram (Exhibit 1C) with appropriate staff members. Develop a PAR within approximately 15 minutes from the GE declaration and approve the off-site notification form for transmitting the PAR to the State.

7.3 OCNGS should attempt to obtain agreement from the NJBNE and NRC on the PAR. However, whether agreement is or is not reached, OCNGS shall communicate its PAR to the State OEM within approximately 15 minutes from the time the GE was declared.

7.4 The PAR should not be included in press releases.

7.5 The ED should ascertain from the NJOEM what protective action has been implemented off-site (= 45 min. after providing PAR).

This should be provided to NRC via the ENS Line as required by 10-CFR 50.72 - follow-up Notifications - (if not done by ESD).

Off-site protective action and time implemented should be logged in ED's Log.

8.0 All deviations from procedures, equipment operating limits, Technical Specifications, License, and License Conditions will be authorized and documented using the guidance in Exhibit 13.

(EPIP26/S3) EI-5

AmerGen CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.26 APEco Enys' EnyCompy IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 1 Emergency Director's Checklist (cont'd)

Initials 9.0 NRC Interface 9.1 The Security Plan allows that "when ever site conditions are, or may soon become, a danger to the public health and safety, certain safe guards measures may be suspended in accordance with the following requirements. The action taken is approved by the Manager of Plant Operations, Operations Group Shift Supervisor or Emergency Director. If the ED is not a licensed SRO, he/she must consult with a licensed SRO prior to authorizing the Suspension of any safeguards measures".

9.1.1 Security is able to process the NRC site response team rapidly if the ED (GSS/SSM) authorizes their immediate access under the above Security Plan provision. Any such authorization should be logged.

9.1.2 If this provision is not used it will likely take 2-3 hours to train, badge and allow access to the whole NRC team. This delay will detract from the functioning of the NRC Team but is clearly at the judgment/discretion of the ED.

NOTE An alternative to waiving access requirements is to arrange for escort.

9.1.3 NRC immediate access under this Security Plan provision is meant to provide access to emergency centers Only, not site wide access, RWP access or approve respiratory protective equipment use.

9.2 Brief the NRC upon arrival and determine if the Senior NRC person is the Site Team Leader or Director, Site Operations (see Exhibit 1E for reference).

9.3 NRC directives can only be received by the ESD (or in the ESD's absence, the ED). NRC should be requested to provide all directives in writing.

(EPIP26/S3) EI-6

AmerGen OYSTER CREEK EMERGENCY PREPAREDNESS Nuber EPIP-OC- .26 A PECOEmnbsh Erww CWoarry TMPT,2M.ITING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 1 Emergency Director's Checklist (cont'd)

Initials 9.4 As time permits, discuss with the senior NRC person in the TSC the OCNGS emergency organization. Discuss that the ED oversees site related activities, maintaining general (not detailed) cognizance of reactor operations and that while the ESD oversees the whole emergency effort, he concentrates on off site interfaces and issues.

9.5 If media access to the site is requested, refer to Exhibit 15, "Site Access Policy for Media During Emergencies".

10.0 Long-term Recovery 10.1 Refer to Procedure EPIP-OC-.45 for Long-term Recovery and discuss its implementation with the ESD.

10.2 If a General Emergency is in effect, OCNGS will not de-escalate to a lower level of emergency. The only option is to go into Long-term Recovery and this transition shall not occur until all off-site protective actions have been completed and the State has been informed.

10.3 Establish long term staffing requirements and prepare appropriate watch bill.

11.0 Control Room Evacuation 11.1 Review Exhibit 2A for guidance.

12.0 TSC Relocation 12.1 Should the TSC be or become unavailable (e.g. due to Fire, Security Event, etc.) refer to Exhibit 11 which provides guidance for the establishment of TSC functions in alternate locations.

12.2 A description of evacuation preplanning for other Alternative Response Facilities is provided in Exhibit 12.

Name Date Time (EPIP26/S3) EI-7

OYSTER CREEK Number AmerGen A PECO Energy!/lBt Energy Confa-y EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 (Page 1 of 3)

EXHIBIT 1A EMERGENCY DIRECTOR TURNOVER CHECKLIST NOTE This form may be completed by ED in the Control Room or via phone. It may be used to brief NRC representatives upon their arrival.

EMERGENCY CLASSIFICATION DATE/TIME OF DECLARATION UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY

  • Reactor Power at time of event  % BRIEF DESCRIPTION OF THE EMERGENCY CURRENT PAR STATUS * (Required for General Emergency)

STATUS OF ACCOUNTABILITY/ON-SITE PROTECTIVE ACTIONS PRESENT STATUS OF PLANT/TIME OF DATA: DATE:

AT-POWER (  %)

Hot Standby Hot Shutdown Cooling down (describe cooldown mode)

(EPIP26/S3) E1-8

OYSTER CREEK Number AmerGen A PEC-oEmMV /Bnts EnewgC-VnaIY EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.26 t Revision No.

Title Revision No.

21 TUE TECHNICAL SUPPORT CENTER

.1.

EXHIBIT 1A (Continued) (Page 2 of 3)

EMERGENCY DIRECTOR TURNOVER CHECKLIST hours Estimated time to 'STABLE' plant conditions YES - NO Did reactor trip?

YES - NO Did ECCS activate?

YES - NO Is off-site power available?

YES - NO Are both Diesel Generators operable?

  1. 1 YES - NO #2 YES - NO Are Diesels Running?

YES - NO Are the Station Blackout CT's Available?

YES - NO Is fuel integrity maintained?

YES - NO Is containment integrity maintained?

If no, specify Do you suspect there is a release (monitored or unmonitored) in progress? NO YES N/A If yes, specify pathway:

Is release AIRBORNE RELEASE L IQUID RELEASE UNKNOWN ELEVATED GROUND N/A Plume dispersion Details:

Are there any abnormally high implant radiation levels? YES - NO Specify location Are there any personnel injuries? YES - NO Provide status Were there any news releases issued? YES - NO Specify (EPIP26/S3) EI-9

OYSTER CREEK Number AmerGen A PECO En*rgy/sBnbs EWn COMPany EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 (Page 3 of 3)

EXHIBIT 1A (continued)

EMERGENCY DIRECTOR TURNOVER CHECKLIST YES - NO Are there any open technical issues?

Specify News releases issued ATTACHED NOTES:

When finished sign below:

Emergency Director Time Date (EPIP26/S3) El-10

AmerGen OYS CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.26 A PEC E/ IMPLEMENTING PROCEDURE Title Revision No.

THE TECEIICRL SUPPORT CENTER 21 EXHIBIT lB PROTECTIVE ACTION RECOMMENDATION GUIDE 1.0 On-site 1.1 Inform the OSC Coordinator of personnel who were dispatched in support of emergency before the OSC was activated.

1.2 Relocate site personnel from areas of hazard or where the dose is projected to exceed 1000 mRem Total Effective Dose Equivalent (TEDE). Consult RAC.

1.3 Evacuation of any area, site accountability, and site evacuation may be ordered at the discretion of the Emergency Director.

Accountability is required at the declaration of a Site Area Emergency, or at the discretion of the ED in accordance with the E-Plan.

Site Evacuation is required at the declaration of a General Emergency, or at the discretion of the ED in accordance with the E-Plan.

NOTE During Drills do not initiate Site Accountability or Site Evacuation without Drill Controller agreement.

During Real Events accountability and evacuation shall be conducted in accordance with the E-Plan. If the Main Gate is evacuated, accountability can not be conducted.

1.4 Consider protective actions such as: securing ventilation, access control, Safety Department support.

1.5 Consider protective actions such as: leaving the site, sheltering, or evacuation to an assembly area for OCAB, Forked River Site, Combustion Turbine Site, Southern Area Stores Warehouse and Trailer 300. If action is necessary, personnel may be informed by the following mechanisms:

1.5.1 Contact Security Shift Supervisor to make a page announcement on the Forked River Site and Trailer 300.

AND 1.5.2 Direct Security Shift Supervisor to dispatch a patrol to the affected areas to direct personnel to take the prescribed protective actions. Consider Security manpower requirements when taking this action.

OR 1.5.3 Direct available personnel (e.g., from OSC) to go to the affected areas to direct personnel to take the prescribed protective actions.

(EPIP26/S3) El-11

OYSTER CREEK Number AmerGen Enemy Company A PECO EnergywWMttish EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT lB (cont'd)

PROTECTIVE ACTION RECOMMENDATION GUIDE 1.6.1 Consider use of KI if personnel have been exposed to significant radioactive Iodine. Consult RAC and Medical representative. EPIP-OC-.44 provides guidance.

1.7.1 Consider the need for security to control access to hazardous areas outside the RCA or outside the Protected Area.

1.8 Emergency Exposure Guidelines A. Voluntary Life Saving Actions No Pre-established limit B. Corrective Actions Administrative Guidelines

1. Total Whole body dose (TEDE) 10 Rem
2. Lens of the eye 30 Rem
3. Total organ dose 100 Rem 2.0 Off-site 2.1 At the General Emergency, review the Protective Action Logic Diagram and provide PAR's to the State within approximately 15 minutes of declaring the General Emergency.

2.1.1 The guidance provided by the NRC for a Protective Action Recommendation at a General Emergency is Evacuation 2 miles in 360 degrees and 5 miles downwind. Shelter all other non affected areas of the 10 mile EPZ.

NOTE If PAGs are exceeded, or are expected to be exceeded, beyond the 10' mile EPZ, assess the impact on an Ad Hoc Basis (i.e. Field Monitoring Team Data or Hand Written Contingency Calculations), and provide recommendations as appropriate.

2.1.2 Under certain circumstances it is permissible to recommend Sheltering if it is known that Sheltering WILL PROVIDE GREATER PROTECTION.

2.1.2.1 This would most likely occur only for short (puff) release periods that are less than 1.5 Hrs. (which is substantially shorter than the evacuation time).

2.1.2.2 There must be strong assurance that there is definite control of the release and termination of the release by the positive actions of the emergency responders actions during the release process (such as Containment Venting).

(EPIP26/S3) El-12

OYSTER CREEK Number AmerGen A PECO Enrgy/nbSh Energy Cor ny EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 1B (cont'd)

PROTECTIVE ACTION RECOMMENDATION GUIDE 2.1.3 Sheltering may be the protective action of choice, if rapid evacuation is impeded by:

a) severe environmental conditions-e.g. severe weather or floods; b) physical constraints to evacuation-e.g. inadequate roads NOTE The information in 2.1.3 a & b MAY ONLY BE AVAILABLE from previous discussions with New Jersey Office of Emergency Management or New Jersey Bureau of Nuclear Engineering Personnel.

2.2 During a Site Area Emergency, Protection Action Recommendations should not be immediately necessary, however, the PAR Logic Diagram should be reviewed.

2.3 Off-site protective actions should not be required during an Unusual Event or Alert.

(EPIP26/S3) El-13

OYSTER CREEK Number AmerGen APECO Energy.etsh Erneg Corpany EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 1C OYSTER CREEK PAR LOGIC DIAGRAM SITE AREA EMERGENCY IS DECLARED REVIEW PAR LOGIC DIAGRAM IN PREPARATION FOR A POTENTIAL GENERAL EMERGENCY DECLARATION AND .4 AL PROTECTIVE ACTION RECOMMENDATIONS GENERAL NO EMERGENCY p

DECLARED YES EVACUATE A 2 MILE RADIUS AND 5 MILES DOWNWIND UNLESS it is KNOWN THAT SHELTERING will offer Greater Protection See Exhibit lb Section 2.1.1 through 2.1.3 SHELTER ANY AREAS OF THE 10 NILE EPZ NOT EVACUATED NOTE If PAGs are exceeded, or are expected to be exceeded, beyond the 10 mile EPZ, assess the impact on an AD HOC Basis (i.e.

Field Monitoring Team Data or Hand Written Contingency Calculations, and provide recommendations as appropriate.)

CONTINUE ASSESSMENT BASED ON ALL AVAILABLE PLANT AND FIELD MONITORING INFORMATION EXPAND EVACUATION RECOMMENDATION TO COVER AREAS WHERE DOSES ARE EXPECTED TO EXCEED 1 REM TEDE OR 5 REM ADULT THYROID (EPIP26/S3) El-14

OYSTER CREEK Number AmerGen A PECO Energy/Bi'bsh Energy Pary EMERGENCY PREPAREDNESS EPIP-OC-. 26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT ID EMERGENCY DIRECTOR RESPONSIBILITIES The ED is vested with certain authority and responsibilities that may not be delegated to a subordinate. Included are:

A. Approving and directing official notifications to off-site agencies.

B. Approving and directing information releases to the media. ED/ESD approval is not required for public announcement of formal emergency declaration and changes of emergency classifications, or other pre-approved boiler plate news releases as contained in Procedure 1820-IMP-1720.01, Attachment 1.

C. Approving and, if possible, personally conveying appropriate Protective Action Recommendations to the New Jersey Office of Emergency Management.

D. Serve as principle "point of contact" for receiving NRC directives.

E. Classification of an emergency event.

F. Directing on-site evacuation at the Alert or lower level emergency classification based on potential hazard to nonassigned personnel.

G. Authorizing emergency workers to exceed 10 CFR 20 Radiation Exposure Limits in accordance with Exhibit lb.

H. Approving and directing deviation from established operating procedures, normal equipment operating limits, or technical specifications during attempts to control the plant emergency/or during a declared National Security Emergency.

NOTE: For National Security Emergencies, the following conditions must be met.

1. When this action is immediately needed to implement national security objectives as designated by the National Command Authority through the NRC.

and

2. No action consistent with license conditions and technical specifications that can meet national security objectives is immediately apparent.

(EPIP26/S3) El-15

OYSTER CREEK Number Amer~en A PEO eErI EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.26 Title Revision No.

THE TECHNICAL SUPPORT CENTER 21.

EXHIBIT ID (continued)

EMERGENCY DIRECTOR RESPONSIBILITIES NOTE: In essence, no one below a licensed SRO individual can make the decision to depart from the license. However, if a more senior manager is present (i.e., Emergency Director) even though he may not posses an SRO license, the decision authority would be passed to him as a higher authority in the chain of command. The licensed SRO shall provide his best judgment to the ED for his consideration. Beyond that, the SRO shall follow the orders of his supervisor. It is imperative that the Emergency Director consult the SRO, and the Technical Support Center to the fullest extent practicable in arriving at a decision to deviate from prescribed procedures. However, Emergency Operating Procedures should generally not be deviated from. If the decision is made to depart from licensee conditions or technical specifications, notify the NRC before taking such actions, if time permits or if time does not permit then within one hour.

When the Emergency Support Director (ESD) arrives at the EOF and declares himself to be ready to assume that role, he will assume overall responsibility for management of the response to the accident and recovery operations. With the activation of the Emergency Support Direction function, the ESD specifically will assume decision authority for Items A, B, C, and D. However, decision authority for Items E, F, G, and H will be retained by the ED. Decisions on all of the listed actions normally will result from close and continuous consultation between the ED and the ESD, and it shall be the responsibility of the ED to ensure the ESD is provided with the necessary information to arrive at timely and appropriate decisions. In the special case of event classification, the ESD shall retain the prerogative to overrule the ED if, in the judgment of the ESD, uncertainty or other considerations exist to the extent Warranting classification of higher level of emergency than that classified by the ED.

(EPIP26/S3) El-16

OYSTER CREEK Number Amer~en A PECOEr*W/BshEne* CanlPy EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.26 Title Revision No.

THE TECENICAL SUPPORT CENTER 21 EXHIBIT 1E NRC EMERGENCY RESPONSE INTERFACE CRITERIA This is a synopsis of the NRC emergency response process as it applies to OCNGS.

In essence, directives from the NRC must come from the NRC Director (typically, the NRC Chairman) or from the NRC Director of Site Operations (typically, the NRC Regional Administrator). Such advice or directive can only be communicated to the Emergency Director (the Emergency Support Director once the EOF is activated). If a directive order is issued by the NRC Director or Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive.

While NRC advice may be challenged by the ED or ESD, directives must be complied with.

With respect to Protective Action Recommendations for the public, the NRC may either endorse the OCNGS recommendation or opt to recommend a different one. The ED/ESD is encouraged to include the NRC and State representatives in the Protective Action Recommendation discussions in order to arrive at a mutually agreeable recommendation. In the event that the NRC opts to recommend a different recommendation, they will communicate directly with the State. Their recommendation, like the utility recommendation, will be considered by the State in the development of a Governor directive.

Upon arrival of the NRC, the ED/ESD should:

- Verify who is the senior NRC person in charge

- Ask the senior NRC person to inform the ED/ESD when the position of Director Site Operations is assumed and whether the responsibility to issue directives is included.

- Request that the NRC keep OCNGS informed of all substantive information exchanges between the NRC and the slate.

- Request the NRC provide all directives in writing.

SYNOPSIS - NRC EMERGENCY RESPONSE NOTE Review the following as time permits and/or if the NRC is expected to respond.

Revision 2 to NUREG-0728, supplemented by NUREG-0845 and NUREG-1471, describes the manner in which the NRC will respond to an incident and provides criteria for making preplanned response decisions. They provide procedural guidance, describe the functions related to NRC emergency response, and define procedures for responding to the following NRC modes of operation.

(EPIP26/S3) El-17

AmerGen OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-. 26 APco E/n TMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT lE NRC EMERGENCY RESPONSE INTERFACE CRITERIA Each mode defines the scope of NRC activities related to a particular level of emergency are response in ascending order of degree of involvement to deactivation. The various modes characterized as follows:

1. Normal mode - Normal activities designed to maintain readiness.
2. Standby mode - Regional office activates the Incident Response Center (IRC with an appropriate staff and NRC Headquarters Operations Center staffed by a standby team.
3. Initial activation - NRC Operations Center is staffed by a response team, the Regional IRC is fully activated and a site team is dispatched under the leadership of the Regional Administrator, normally designated as Director of Site Operations (DSO).
4. Expanded activation - Focus on NRC response operations is shifted to the site. DSO is designated primary spokesman for the NRC and may be empowered with directive authority by the Chairman of the Nuclear Regulatory Commission.
5. Deactivation - Follow-up activities (e.g., reviews, investigation, and recovery operations).

The particular mode assumed by the NRC will be dependent upon licensee event classification and "independent NRC perception of relative severity of uncertainty of accident conditions."

NRC ADVICE The NRC may offer advice or assistance to the Licensee during an emergency, or may respond to Licensee requests for advice or assistance. This may involve diagnosis of critical problems, development of proposed remedial courses of action, and proposals to implement additional precautionary measurers. The NRC is also prepared to direct that certain actions be taken if, after thorough discussion with the Emergency'Director (the Emergency Support Director once the EOF is activated) it is decided that such direction is required. In the event that such action is taken by the NRC Director or the NRC Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive.

Directives will be communicated directly to the ED/ESD from the NRC Director (NRC Chairman) or from the NRC Director of Site Operations (DSO), typically the Regional Administrator, once appointed and empowered to do so.

Several important concepts govern the NRC in providing advice, assistance, or direction.

They are:

a. The Licensee is at all times responsible for mitigating the consequences of the incident.
b. Although the NRC could issue formal orders to the Licensee to take certain measures and to monitor implementation, ". . . licensee continues to make other key operational decisions and to operate and manage the facility.
c. The NRC must have a single voice when advising or directing the Licensee.
d. The ED/ESD has the option to accept or challenge NRC advice.

(EPIP26/S3) El-18

OYSTER CREEK Number Amer~en A P E E m EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.26 Title fRevision 21.

No.

THE TECHNICAL SUPPORT CENTER EXHIBIT lE (continued)

NRC EMERGENCY RESPONSE INTERFACE CRITERIA At no time will advice or direction come from both the Director and DSO and the Licensee will always be kept apprised of who is empowered to exercise authority-as the NRC Spokesman. All other NRC personnel in contact with Licensee personnel are responsible to make clear that discussions should not be construed as advice or direction but rather as a sharing or gathering of information.

NRC INPUT TO RECOMMEND PROTECTIVE ACTIONS The NRC responsibility during an emergency, as during normal operations, is to ensure that protection of public health and safety is adequate. One aspect of exercise of this responsibility is to provide Protective Action Recommendations or advice to off-site authorities. This may take the form of an NRC endorsement of a Licensee Protective Action Recommendation or the NRC may opt to recommend additional protective actions. The NRC is not involved in the process of recommending Protective Actions, the NRC may get involved if a major problem is identified with the protective actions recommended by the licensee or protective actions undertaken by the state or local government. Additionally NRC involvement may be requested by state or local officials.

NRC ORGANIZATION The attachment to the synopsis is provided for your information. This attachment depicts the site team organization and is an extract of the Region I supplement.

It defines the number of NRC personnel expected to operate in each facility and shows the lines of communications the NRC expects to use.

(EPIP26/S3) El-19

I EPIP-OC-.26, REV. 21 NRC SITE ORGANIZATION - INITIAL SITE TEAM' 7m -Y. -, 07ii 7i i-t Di~rector e-m0n

-fSt

-l - Dashed bordered boxes indicate of Sit I I Critical Positions. Critical positions Operations (DSO)

I I constitute the minimum staff necessary I EOF I I to perform the critical NRC response L-... . ..

- -iii- - -- functions preparatory to designation of a Director of Site Operations (DSO).

I i

--Respoe Rspos- r A overnmentI -mmenc ul- m -fairs Af i- I Measures r-Protective ....-

- - - ..- - . ,I r-"-- - -- r saf-guard/ sec.urity i Coordinator C (ERC) I Liaison Coordinator I Coordinator I Coordinator (PMC) I Reactor Safety Status s summary ll Coordinator (SSC)

I_______IIIII ~I (GLC) II II I Coordinator (RSC)

CI I

  • I Coordinator (STSC)

I I II I

I R II I I EOF tOF I I' EOF III I I! EOF/TSC I I II I

- -L - - -

I - - - - - - -

I - - - - - - - - - -

Public Affairs re-c, State EOC Asst. Coordinator R a f I operatioi Coordinator JIC r "E I....

State EOC I Radiation Safety I I SCoordinator (RASC)

I EOF/TSC I l I Location of all positions is driven by the State/Licensee's Emergency Response Organization. The facilities listed with these position Specialist represent the probable locations.

TSC/S S PMLC Communicator Commsunicator I

Note 1: Either the PMCL Communicator or the HPN Communicator will be a critical position, not both. I (See Note 1)

Note 2: Either the ENS Communicator or the RSCL Communicator will be a critical position, pot both.

Note 3: Safeguards/Security Assistant Coordinator is part of the Initial r .........- "%

Site Team only in safeguards/security type events.

  • Environmental Dose l lAssessment Coordinator iI EOF Ii I I

AmerGen A PECOEnerbsh EnergyCV OER PREPAREDNESS MGCY IMPLEMENTING PROCEDURE EPIP-OC- .26 Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 2 CONTROL ROOM EVACUATION CR evacuation is guided by Operations Procedures. Should it be necessary Operations personnel will establish plant control via the remote shut down panels. If the CR evacuation is the initiating event, CR staff will implement their procedures and declare an Alert, activating the Emergency Response Organization. Operations Management will locate in the TSC. If the ERO is already activated, several ECC personnel will report to the TSC.

In either case guidance for integrating these resources into the TSC staff follows:

- OPs Coordinator with Technical Assistant

- GSS/SSM, STA will require table space in back of TSC to guide operators by radio.

- ECC Communicators - to Communications Coordinator for deployment in TSC, other centers, Remote Assembly Area or home.

- ECC Communications Coordinator is licensed and may be of use to OPs Coord, GSS/SSM, TSC Coord, EOF or as NRC liaison. Discuss these arrangements with the OPs Coordinator and deploy personnel accordingly.

(EPIP26/S5) E2 -1

Number AmerGen A PECO Ererg bS nerwgC-nanY OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Revision No.

Title 21 THE TECHNICAL SUPPORT CENTER EXHIBIT 3 TSC Coordinators Checklist Initials 1.0 TSC Activation 1.1 The TSC should be declared ready for the ED when the following areas are functional:

NOTE These areas need not be 100% staffed to be considered functional.

oRadiological Assessment oTechnical Support (appropriate engineering expertise) oCommunications links to Control Room and OSC NOTE The following actions should be performed expeditiously but are not necessary to declare the TSC functional.

1.2 When possible perform, or have a Technical staff member perform, a briefing of the TSC staff prior to the ED's arrival. This should provide the staff with the current emergency conditions 1.3 Ensure all required TSC personnel use the position tag board and display position tags.

1.4 Ensure the RASE has set up one entry point with a frisking station is established. Based on actual or expected emergency conditions, Rad Con will evaluate whether or not a whole body frisk is required for entry into the TSC. If a whole body frisk is required, Rad Con will post the area accordingly. Proper frisking techniques will be followed by all personnel prior to entering the TSC once the area is posted as requiring a whole body frisk.

(EPIP26/S6) E3-1

Number OYSTER CREEK EMERGENCY AmerGen APECO Erhy/WbSh EneWgCo-irY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE I ff Revision No.

Title 21 THE TECHNICAL SUPPORT CENTER EXHIBIT 3 (continued)

TSC Coordinators Checklist 1.5 Ensure the RASE has performed continuos air monitor preoperational checks and the system is operating.

1.6 Ensure the RASE has performed area radiation monitor preoperational checks and the system is operating.

1.7 Check duty board in back of TSC to determine positions not manned. Notify Security of unfilled positions and ask them to call out personnel. The following engineering disciplines should be adequately represented:

1.7.1 Mechanical Engineering 1.7.2 Electrical Engineering 1.7.3 Radiological Engineering 1.7.4 Instrument and Controls Engineering NOTE Report to the TSC Coordinator, unless needed in the ECC. If Core Engineer reports to ECC first, then the TSC Coordinator should be informed.

1.7.5 Core Engineering 1.8 Callout any additional personnel as needed. Complete staffing of this area is not necessary for TSC activation. Security through the ED Assistant can help with duty roster callouts.

1.9 Ensure one set of Emergency Plan Implementing Procedures are available at the ED's desk, the TSC Coordinator's desk, and the RAC/Chemistry Coordinator's desk.

1.10 Ensure both PCS terminals in the TSC are functioning.

1.11 Check on PCS availability at the OSC and EOF. Attempt to help the other centers bring on-line if necessary.

1.12 Check the status of the ERDs link. If necessary, work to establish the line to the NRC.

[

NOTE If there is an ERDS problem it may be because the modem (located in the Computer Room) is locked up: The problem may be resolved by resetting the modem or turning it off and on.

1.13 Call Computer APPS. for additional assistance as needed.

(EPIP26/S6) E3-2

A erGen A PECO Er*/nbsh E OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-0C-.26 IMPLEMENTING PROCEDURE Title Revision No.

TEE TECHNICAL SUPPORT CENTER 21.

EXHIBIT 3 (continued)

TSC Coordinators Checklist 1.14 Set TSC clock to match the time on the Plant Computer System display (during drills this time may be obtained from the controller).

2.0 TSC Operations 2.1 Accept assignments from the ED. Disposition them to TSC staff and log in the TSC Coordinator's log using Lotus Notes or paper.

2.2 If at any time it becomes necessary to operate the TSC Ventilation System review the following guidance.

2.2.1 There is a continuous indicating air monitor in the TSC which will provide indication if the need for use of the TSC ventilation charcoal filters. Rad Con is also located in the TSC and can provide guidance on use of the filters.

2.2.2 TSC Ventilation System normally operates with charcoal filters bypassed.

2.2.3 The filters are controlled by a two position covered switch on the rear column in the TSC. It is labeled Emergency/Normal. The Emergency position places the charcoal filters in service. The Normal position removes the filter from service.

2.2.4 When the charcoal filters are engaged the gauge above the Control switch should be at + 0.125 inches water or greater to assure no leakage into the room.

If it is otherwise notify Radiological Controls to assess habitability and specify compensatory measures as necessary.

2.2.5 Log time charcoal filter enters and is taken out of service. This may be entered in the ED's Log.

2.2.6 Advise RAC to conduct surveys in accordance with Exhibit 8 Step 6.

2.3 -Establish contact with Corporate Engineering Support and assess their status and resources. Engineering requests suited for Corporate Engineering should be sent to them, in writing if practical. Corporate Engineering will contact the TSC as soon as they are available.

2.4 Develop a shift schedule for the TSC organization Exh.

(16). The current duty roster may be used to develop this schedule. Attempt to allow adequate rest time for all shifts off duty.

(EPIP26/S6) E3-3

Ame~enOYSTER Enfyth APECO

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 3 (continued)

TSC Coordinators Checklist 2.5 TSC support of site accountability.

2.5.1 Announce Site accountability to the TSC Staff and ensure that all personnel present in the TSC have key carded into the Accountability Key Card Reader.

2.6 If notified by the Security Shift Commander/designee of security computer failure, complete Steps 2.6.1 through 2.6.4.

2.6.1 Assign an individual to collect accountability cards in facility.

2.6.2 Direct individual to sort the cards into separate groups for North Gate and Main Gate.

2.6.3 Direct individual to call both Main Gate and North Gate Security with badge slot numbers within 10 minutes of initial declaration of accountability.

2.6.4 Accountability notifications completed for facility.

2.7 Should long term accident management require it, Exhibit 10 provides guidance on storage/transfer of contaminated water.

3.0 Facility deactivated by order of Emergency Director.

3.1 Documents, records, and reports delivered to Emergency Preparedness Department.

3.2 Record any equipment failures.

3.3 Refile prints and procedures as required.

3.4 Report discrepancies to the Emergency Preparedness Dept.

3.5 TSC returned to standby condition.

4.0 TSC Evacuation 4.1 Should the TSC be or become unavailable (e.g.; due to Fire, Security Event, etc.) refer to Exhibit 11 which provides guidance for the establishment of the TSC Functions in alternate locations.

NAME:

Technical Supnort Center Coordinator Time Date (EPIP26/S6) E3 -4

Amer enOYSTER Amer~enEPIP-OC-.26 CREEK EMERGENCY Number EnrWW/ntsh ErlW CoIPar*Y APECO PREPAREDNESS IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 4 TSC COMMUNICATIONS COORDINATOR CHECKLIST INITIALS 1.0 Report to the ED Assistant and support information transmittals to ECC, OSC, EOF, 'BNE and NRC-using-Exhibit 19 or Lotus notes as appropriate.

2.0 Set the TSC clock to agree with the time displayed by the PCS. (During drills, ask the Controller).

3.0 Log appropriate activities or tasks via lotus notes or exhibit 18.

4.0 Dim the lighting in the front of the TSC to enhance data display.

5.0 Activate fax and set time in accordance with PCS Clock.

Send test transmissions to the activated Centers.

6.0 Number and log each fax transmission using Exhibit 17.

NOTE Number outgoing transmissions sequentially regardless of the type of transmission. Use location designator as part of sequential number, i.e. TSC-001, TSC-002, etc.

7.0 When the ED Assumes command and Control in the TSC, Relay Appropriate directives to the ECC Communications Coordinator Such as:

1. Perform Off-site Notifications
2. Perform On-site Notifications
3. Transfer Notification Responsibilities.

8.0 Ensure that communications to the NRC via NRC/ENS line are made by an individual knowledgeable of plant systems. This may require callout of additional personnel. Only one Emergency Center should provide this function at one time.

9.0 Report failed communications systems to information services for resolutions when needed have security or the group leader admin. callout information services telecommunications personnel. These individuals will work under the TSC Communications Coordinator's direction to repair phone problems in emergency centers. If they must leave the SEB to effect repairs, coordinate their movements with the OSC as a repair team. A briefing via telephone is permissible if briefing items are logged. Alternately the briefing forms could be telefaxed from OSC to TSC and back.

Report ENS or ERDS phone line problems (FTS72000) to the NRC at (301) 816-5100.

(EPIP26/$7) E4-1

Number OYSTER CREEK EMERGENCY AmerGen A PECO Er* y/Bntis Ener*y Con y PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE I I Title Revision No.

21 THE TECHNICAL SUPPORT CENTER EXHIBIT 4 (continued)

TSC COMMUNICATIONS COORDINATOR CHECKLIST INITIALS 10.0 If the Plant Computer System fails, ensure that the ECC transmits critical plant parameters to the TSC every 15 minutes or as conditions change. The TSC should retransmit plant parameters to the EOF and OSC in as timely a manner as possible.

11.0 Upon termination of the emergency, if notification were made from the TSC ensure those agencies previously notified in EPIP-OC-.03 have been advised of the termination.

11.1 If Off-site notifications responsibility has been transferred, this responsibility should be transferred also, verify completion with appropriate Communication Coordinator.

12.0 Ensure communications equipment, supplies and procedures are replaced or returned to a ready status.

13.0 Forward all completed logs and records to the Emergency Preparedness Dept.

Signature Date TSC Communication Coord.

(EPIP26/S7) E4-2

Number AmerGen Ener* Compray A PECO ErWgyW/BbSh OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

21 THE TECHI*fCAL SUPPORT CENTER EXHIBIT 5 TSC Engineers Responsibilities 1.0 Report to the TSC Coordinator.

2.0 As requested assist the TSC Coordinator in activation, operation, and recovery of the TSC. Refer to his checklist (Exhibit 3) for guidance.

3.0 Perform and document engineering tasks as directed by the TSC Coordinator as needed provide appropriate information to the EOF or other activated centers.

4.0 Present all documentation generated during the performance of their duties to the TSC Coordinator.

5.0 As directed, assist TSC Coordinator in deactivation of TSC.

6.0 Should the TSC be or become unavailable (e.g.; due to which Fire, Security Event etc.) refer to Exhibit 11 TSC provides guidance for the establishment of the functions in alternate locations.

(EPIP26/S8) E5-1

Number AmerGen A PECO Energy*nBnsh Energy Compeary OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

21 THE TECHNICAL SUPPORT CENTER EXHIBIT 5A TSC TECHNICAL ASSISTANT RESPONSIBILITIES 1.0 Report to the TSC Emergency Director.

2.0 Maintain Operations Conference Line in response to calls from Operations Coordinator .

3.0 Coordinate with the ED, ED Assistant and Engineering Staff in the TSC to provide technical support to the ECC pertaining to various items such as:

"* Equipment Failure

"* EOP's Support 4.0 NOTE If operational data is not being provided as needed, actively solicit this data.

5.0 Monitor the Equipment Status Display System (ESDS) if available. Provide technical update on equipment status as necessary, validate and correct as needed.

6.0 Convey ED directives to the ECC through the Ops Coordinator as necessary. Maintain ED (TSC Staff) apprised of the operational status and activities taken by the ECC, Review EAL matrix periodically for applicability of classifications and changes to plant conditions.

(EPIP26/S8) E5-2

Number AmerGen A PECO Enewr/Bsh Energy CoTpa&

OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 6 TSC Chemistry Coordinator Responsibilities NOTE Chemistry Department will staff the OSC Chemistry Coordinator position first and send a Chemistry supervisor to the TSC when available.

1.0 Advise the ED and RAC on conditions related to reactor coolant chemistry including, but not limited to:

1.1 Normal chemistry sampling.

1.2 Post Accident Sampling (PASS and RAGEMS) 2.0 Coordinate with the RAC to develop source term information.

3.0 Prestage a chemistry team to obtain and analyze an effluent sample should it become necessary. This should be given the highest priority if a release begins.

4.0 Prestage a PASS team to obtain and analyze samples should it become necessary. Ensure all necessary equipment and arrangements are in place should transport of the PASS sample off-site become necessary.

5.0 Consider actions necessary to quantify all components of radiological releases. Plan a course of action which will support post accident investigation of source term released to the environment.

6.0 Should the TSC be or become unavailable (e.g.; due to Fire, Security Event, etc.) refer to Exhibit 11 for guidance.

(EPIP26/S9) E6-1

A erGenOYSTER Amer~enEPIP-OC-. CREEK PREPAREDNESS MGENCY Number 26 APECO EneW/Bft ErShCwlefg IMPLEMENTING PROCEDURE Title Revision No.

THE TECNICAL SUPPORT CENTER 21 EXHIBIT 7 TSC Radiological Assessment Coordinators Checklist Initials 1.0 Periodically brief the ED on radiological conditions.

In-plant radiation and contamination levels and associated protective actions.

On-site (and near site) radiological conditions and associated protective actions.

Off-site radiological conditions including dose projections and Protective Action Recommendations until relieved of this responsibility by the Environmental Assessment Coordinator (EAC).

2.0 Routinely ensure the EAC is informed of all source term information which is available.

3.0 Coordinate with the Chemistry Coordinator to develop source term information.

4.0 Maintain the meteorological and PAR status boards.

5.0 Periodically review Radiological EAL's in EPIP-OC-.01 "Classification of Emergency Conditions". Ensure that the ED is immediately notified of any situation which meets these EALs.

6.0 At the Site Area Emergency assist the ED with review of the PAR Logic Diagram (Exhibit IC). Provide route for Site Accountability to the ED that avoids/minimizes radiological hazards.

7.0 At the General Emergency assist the ED with development of a PAR (Exhibit 1C). Provide route for Site Evacuation to the ED that avoids/minimizes radiological hazards.

8.0 Should the TSC be or become unavailable, (e.g.; due to

-Fire, Security Event, etc.) refer to Exhibit 11 for guidance.

(EPIP26/SI0) E7 -1

AmerGen AP E Aner~enOYSTER E C oPI-s CREEK EMERGENCY PREPAREDNESS Number .2

.2 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 8 TSC Radiological Assessment Support Engineer Checklist Initials 1.0 Report to the Radiological Assessment Coordinator (RAC) and provide support.

2.0 Establish one entry point with a frisking station as directed by the TSC Coordinator/Radiological Assessment Coordinator.

3.0 Place a sign on the south door, "This TSC Entrance Closed. Use other Door".

4.0 Perform an operational check on the continuous air monitor to ensure the system is operating. Report Status to the TSC Coordinator when complete.

5.0 Perform an operational check on the area radiation monitor to ensure the system is operating. Report Status to the TSC coordinator when complete.

6.0 Provide radiological evaluation on the air and ambient radiation levels of the TSC.

CAUTION Turn on HEPA filter when continuous air monitor trends upward after initial stabilization during startup.

6.1 If HEPA filter turned on, have filters monitored periodically (approx. every 15-30 minutes) 6.2 Post area in accordance with RadCon procedures.

6.3 Advise TSC Coordinator of survey results.

7.0 Distribute self reading dosimetry to all TSC personnel.

8.0 Perform radiological hazard/ALARA analysis for investigative, corrective, and recovery actions as directed.

9.0 On an ongoing basis determine source terms for ground and elevated releases and provide to EAC.

10.0 Perform internal and external personnel exposure evaluations as necessary.

11.0 Provide on going technical support and analysis for the radiological aspects in support of radiological control activities.

(EPIP26/SII) E8-1

A erGen EreWMgy/8 Eney Company OYSTER CREEK EMERGENCY PREPAREDNESS Number EPI P-oc-.26 APECO IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21.

EXHIBIT 8 (continued)

TSC Radiological Assessment Support Engineer Checklist 12.0 Establish Radiological Communications as the other emergency centers become activated. Maintain a Communications Log.

13.0 Activate the Dose Assessment Computer and ensure operability. Perform off-site dose calculations as requested by the RAC using actual or projected source terms.

14.0 Inform the RAC, or the TSC Coordinator in the absence of the RAC, that the TSC Radiological Work Area is ready for activation.

15.0 In the event of a radiological release, recommend on-site and near site protective actions as appropriate (see Exhibit lB for guidance).

16.0 Maintain the Emergency Classification/PAR and Meteorology Status Board.

17.0 Present all documentation generated during the performance of their duties to the TSC Coordinator.

(EPIP26/Sll) E8-2

AmerGenOS Amer~F. CREEK EMERGENCY PREPAREDNESS EPP-OC-.

Number 26 APECOEnergy/& EnsEryCwpny IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 9 PRESS RELEASE APPROVAL GUIDANCE 1.0 Press releases should be issued within approximately one hour from the time that a major plant event has occurred. Press releases shall include the time that the information is current and be written in accordance with the following guidelines:

1.1 The following categories of information should be included in press releases.

a. Level of Emergency This is simply identifying which one of the four emergency levels was declared.
b. Basis for Emergency Declaration This should be a simplified description of the plant condition which produced the emergency action level (e.g., a leak of radioactive water within the plant building).
c. Operational Status of Plant A simple description of plant status at the time of the emergency declaration (e.g., OCNGS was operating at 100% power when the leak was discovered, however, the plant is currently reducing power).
d. Company/Government Interface This is intended to inform the public that OCNGS has notified and is working closely with government officials so that public confidence and company credibility can be increased.
e. Corrective Actions This should be a nontechnical description of what plant personnel are doing to correct the problem. It may include such language as "attempts are being made to stop the leak" or "plant personnel are investigating the cause of the leak."
f. Off-site Impact A statement which simply assesses what impact this event may have on the environment. This is intended to provide factual information on off-site radiological conditions (e.g., a radioactive release is in progress, however, environmental monitoring teams have not detected any radiation levels off-site in excess of normal background). The initial press release should include all or part of the above information since time is of the essence. However, at the very least, it should contain items a-e above.

2.0 In addition to the above, the following guidance should be used in issuing press releases:

  • Speculation, dose projections and Protective Action Recommendations should not be included in press releases.

(EPIP26/S12) E9-1

Number AmerGen A PECO Energy/Slrtsh Energy Corrpany OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

21 THE TECHNICAL SUPPORT CENTER I

EXHIBIT 9 (continued)

PRESS RELEASE APPROVAL GUIDANCE

  • Press releases may have operational and radiological review but shall have concurrence by the ED. Original initialed copies are to be retained for records. Exceptions to this-are limited to press releases with boiler plate information only (e.g., Pre-approved boiler plate news releases are contained in Procedure 1820-IMP-1720.01, Attachment 1) which may be issued without prior review and approval. Once the Governor has declared a "State of Emergency", all OCNGS press releases shall be provided to the State Police representative in the Media Center for review prior to final issuance. Changes made as a result of this review should be communicated to the ESD (ED if ESD is not activated).

NOTE For security related events, press releases containing potential safeguards information are to be reviewed by the Security Coordinator.

"* Press releases will be reviewed expeditiously in order to support timely issuance.

"* Press releases should avoid technical terms (e.g., plant names) and jargon (e.g., trip) and should be written as simple as possible. For example, ISO Condenser could be referred to as a heat removal process from the reactor.

(EPIP26/S12) E9-2

AmerGen APEflEflbshEref pany CREEK EMERGENCY OYST PREPAREDNESS Number IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 10 PLAN FOR STORAGE AND TRANSFER OF CONTAMINATED WATER Prior to implementing a recovery program for handling large volumes of contaminated water, the conditions unique to the accident should be known and evaluated. Methods for dealing with large amounts of contaminated water and dependent on its volume, activity, and location, and require that technical evaluations be performed and'special procedures be developed prior to implementation. Unless required by Emergency Operating Procedures or directed by the ED, it is OCNGS policy not to transfer radioactive material out of primary or secondary containment to any other storage location. For any such transfers (except as permitted by EOP's), a detailed safety evaluation must be performed and approved by the Emergency Director. This report, therefore, provides only general guidelines for the post accident handling of large volumes of contaminated water released as a result of pipe breaks that occur either in or out of primary containment.

I. PIPE BREAK IN PRIMARY CONTAINMENT A pipe break in primary containment will cause contaminated liquid to be discharged initially to the Drywell basement floor. Depending upon the severity of the break, and if the 1-8 sump capacity is exceeded, contaminated water could eventually flood the basement and spill into 3

the Torus. The Torus can accommodate an additional 126,000 ft of liquid before reaching its flooded volume capacity of 213,000 ft. 3 .

A. Drains and Sump Operation in Primary Containment The Drywell Floor Drain Sump 1-8 is part of the Equipment and Floor Drainage System and normally collects water from spills received through the Drywell floor drains. The sump is located in the Drywell at elevation 6'0" and has an available capacity of 81.6 gallons. The sump discharge is isolated (full valve closure of containment isolation valves V-22-28, 28) on high Drywell pressure or low, low reactor water level. These valves can also be manually controlled from panel 11F in Control Room by making necessary electrical changes per OCNGS Procedure 312.1, "Drywell Isolation Signal Bypass" (Emergencies). The sump pumps are interlocked to shutdown on closure of the discharge isolation valves. This allows for the isolation of contaminated liquid within primary containment. In addition, the sump can be manually isolated by closing sump pump discharge valves V-22-184, 186.

To discharge the contents of the sump for processing, pumps 1-8A and 1-8B can be manually operated intermittently using their respective power supplies IA21 and 1B21. This operation assumes that the containment isolation valves have reopened or are in the open position. Also, the sump isolation valves V-22-184, 186 should be considered for manually controlling the sump discharge flow.

(EPIP26/S13) E10-1

AmerGen Am r e A PEC Energy/Bntb'h Energ Com~nyPRPAEDES OYSTER CREEK EMERGENCY PRPRDNS Number PIP-OC- .26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 10 (continued)

PLAN FOR STORAGE AND TRANSFER OF CONTAMINATED WATER II. PIPE BREAK OUTSIDE PRIMARY CONTAINMENT The most likely areas for contaminated water to collect following a pipe break in the Reactor Building or Turbine Building basement are Reactor Building sump 1-6 and 1-7 and Turbine Building sump 1-3. The amount of contaminated water expected to be released during a break outside primary containment will be relieved through the floor drain system located in each building to the respective sump.

A. Drains and Sump Operation Outside Primary Containment Reactor Building Contaminated water relieved through the floor drains in the Reactor Building will collect in sumps 1-6 and 1-7 (SE Corner). The sumps are located at Elevation -1916" and have a combined capacity of approximately 1,500 gallons. The sumps are interconnected and provided with sump inlet isolation valves (V-24-35, 36, 37, 38) which automatically close on high, high sump level. Sump 1-7 discharge lines are equipped with isolation valves (V-22-167, 169) that are manually (local) controlled to allow for sump isolation, and can be used to control sump outlet flow for intermittent liquid processing. In addition to valve manipulations, the sump pumps can be tripped off manually from the 480 switchgear room (supplies 1A21, IB21) to allow for local sump flooding and contaminated liquid isolation.

Turbine Building The Condenser Bay Area of the Turbine Building basement is most likely to accumulate contaminated water resulting from a pipe break in the basement and steam tunnel. In the extreme case, a pipe line break (LOCA) in the Main Steam System outside primary containment would cause high pressure steam to be discharged from'both sides of the break. However, the flow limiters in the main steam line would control the blowdown to 200% of rated flow. The line break would be sensed by either increased pressure drop across venturis due to high steam flow rate, or increased temperature in pipe tunnel, and main steam isolation valve closure would be activated within 0.5 seconds after break and full valve closure at 10.5 seconds. The limited amount of contaminated water deposited as the steam condense would be drained through the Equipment Floor Drain System.

The basement floor is equipped with a segregated floor drain system for controlled drainage to the Turbine Building sumps. Sump 1-3 collects the contaminated water generated in a Condenser Bay Area and would collect the water generated from a major pipe break. The sump is located at Turbine Building (NW corner of Condensate Pump Pit) at elevation 010" and has a capacity of 1,500 gallons.

(EPIP26/S13) E10-2

AOerGenAmeren APECD Enegysh ErW CE oYSTER REPREDESSEPIP-OC-.

EMERGENCY PREPAREDNESS Number 26 IMPLEMENTING PROCEDURE Title Revision No.

TEE TECHNICAL SUPPORT CENTER 21 EXHIBIT 10 (continued)

PLAN FOR STORAGE AND TRANSFER OF CONTAMINATED WATER The sump pump discharge valves (V-22-172, 174) are manually (local) isolated from the Turbine Building and the sump pump power supplies (IA12, lBl2) secured from Turbine Building Mezzanine North Control location. Manual isolation of sump 1-3, which is similar to the manual isolation of Reactor Building sump 1-7, will allow local flooding to occur. Intermittent pump operation or valve throttling will allow for controlled liquid processing at a desired capacity.

III. SAMPLING CONTAMINATED WATER Samples of the contaminated water should be obtained to determine the liquid's radioisotopic content and conductivity. The sampling results will influence the subsequent processing path chosen.

Possible sample points that should be investigated for use are:

TO SAMPLE USE LOCATION Torus V-21-57 "C" Containment Spray Pump - Reactor Building Drywell Sump (1-8) Drywell Sample Valve Reactor Building 23' Elev.

Reactor Building Sump (1-7) DS HV-133 ORW Pipe Tunnel Turbine Building Sump (1-6) DS HV-134 ORW Pipe Tunnel Since operation of the respective sump pumps will be required for sampling, pump run time should be minimized to limit the amount of contaminated water transported to Chem. Waste/Floor Drain System. An attempt should be made, therefore, to sample the contaminated water at a point nearest to the break location using a Geyser Pump and ALARA practices when transporting the liquid.

IV. PROCESSING SCHEMES Prior to transferring highly contaminated water from its spill area, several issues need to be addressed in a technical evaluation. These include:

1. Does the flooded area need to be recovered radiologically to allow workers entry?
2. Does retaining the water pose a greater radiological concern than transferring to Radwaste?
3. Does Radwaste have available capacity?
4. Are there processing options such as a temporary demineralizer?

(EPIP26/SI3) E10-3

AmerGenOYSTER APeCE e n APEC EneW1rfd* Ene* Cor~aW CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECENICAL SUPPORT CENTER 21 EXHIBIT 10 (continued)

PLAN FOR STORAGE AND TRANSFER OF CONTAMINATED WATER These types of concerns should be addressed on an individual basis prior to implementing a processing plan.

A. NORMAL Contaminated water generated within the plant during normal operation which collects in the Drywell, Turbine Building, or Reactor Building sumps is transferred to the Chem. Waste/Floor Drain System for processing. This system, in addition to the High Purity Liquid Waste System, comprises the new Radwaste Liquid Radwaste System. The Chem.

Waste/Floor Drain System receives the sump water in a series of collector tanks; WC-T-IA, lB, 1C. The total combined capacity of these tanks is 42,000 gallons. In the event that this primary collector capacity is unavailable for use, 10,000 gallons of secondary collector capacity is available by diverting flow to the ORW Floor Drain Collector Tank NV-49. Flow from the Turbine Building sumps to NV-49 can be accomplished by manually opening DS-HV-111 and closing DS-HV-106 from their location in the ORW pipe tunnel. Flow from Reactor Building Sump 1-7 to NV-49 can be accomplished by closing DS-HV-109 and opening DS-HV-114. Additional tanks available for receiving water are:

Waste Neutralizer Tanks NV-05A/B - 10,000 gallons each.

High Purity Waste Collector Tank HP-T-IB - 30,000 gallons.

Water can be transferred from NV-49 to the Waste Neutralizer Tank using Section 11 of OCNGS Station Procedure 313.2.

The Chem. Waste/Floor Drain System is capable of processing water at 60 GPM with both process trains in use.

B. According to Sample Results Water with Excessively High Radioisotopic Activity Contaminated water of excessively high radioisotopic activity which precludes safe handling and disposition will be retained at its location and processed in small enough portions such that exposures to operating personnel are not significantly impacted. The method for handling this water will depend on its location and rad levels. If necessary, steps should be taken to dilute the Contaminated water with low activity water to reduce the concentrations. Subsequent to authorization allowing the processing to occur, contaminated water located in the sumps can be directed to the Chem. Waste/Floor Drain System tanks and diluted as required. Water located in the Torus can be drained through the Containment Spray Pumps 1-3 and 1-4 manual drain valves V-21-57, 58. Manual drainage in this manner will allow water to subsequently be processed in either the High Purity System or Chem.

Waste/Floor Drain System depending on water quality. (Water sent to High Purity System should have conductivity less than 50 UMHOs/CM refer to SP-1302-28-001 Water Quality, OCNGS or the permission of the Manager of Chemistry).

(EPIP26/S13) E10-4

AOYSTER erGEny APEC Erwfnsh Ee CREEK EMERGENCY PREPAREDNES PREPAREDNESS Number EPIP-OC- .26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 10 (continued)

PLAN FOR STORAGE AND TRANSFER OF CONTAMINATED WATER Outdoor Storage Limit Not Exceeded If the radioisotopic concentration of the contaminated water in the Torus is such that the outdoor storage Technical Specification (3.6..C) of 10 curies (see note below) would be exceeded, and processing cannot be initiated, outdoor storage options should be investigated. The following tanks can be used to store water:

Condensate Storage Tank - 535,000 gallons Torus Water Storage Tank - 763,000 gallons A temporary connection from the blind 14" flange off the common discharge header of containment Spray Pumps 1-3 and 1-4 will allow water to be transferred from the Torus to the above tanks.

NOTE: The new Radiological Effluents Technical Specifications Spec.

3.6.C allows storage of up to 10.0 Ci in the Condensate storage Tank. OCNGS would have to apply to the NRC for authorization to include Torus Water Storage Tank in the outdoor storage plan.

C. Radiation Levels not a Limiting Constraint Processing through High Purity Waste System Contaminated water of low mineral content is normally processed through the High Purity System. Torus water can be routed through Containment Spray Pumps 1-3, 1-4 drain valves V-21-57, 58 and allowed to collect in the R.B.E.D.T. The contents of the tank can then be pumped directly to the High Purity Waste Collector Tanks using existing connections. Contaminated sump water can be processed through the Chem. Waste/Floor Drain System bypassing the evaporators. Processing without the evaporators will allow rates approaching 60 GPM per train.

Processing through Chem. Waste/Floor Drain System Contaminated water of high mineral content is normally processed through the Chem. Waste/Floor Drain System. Since sump water is normally processed through this system, temporary connections are not required. Contaminated Torus water can be processed through this system if the Reactor Building Equipment Drain Tank (R.B.E.D.T.) is allowed to overflow into Reactor Building sump 1-7(B). This can be accomplished by directing Torus water through Containment Spray Pumps 1-3, 4 drain valves (V-21-57, 58), so that drainage to the R.B.E.D.T. through the floor drain system will occur (see Appendix 1). The normal effluent path of.R.B.E.D.T. can be manually isolated to allow for overflow by controlling pump isolation valves V-22-150, 152 from the Reactor Building or by manually controlling pump power (local controls - supply MCC 1B21).

(EPIP26/S13) E10-5

AmerGen APECOEnergy/Bntsh EneigyConvry OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC- .26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 10 (continued)

PLAN FOR STORAGE AND TRANSFER OF CONTAMINATED WATER V. STORAGE OF PROCESSED WATER The Chem. Waste/Floor Drain System has the capability of providing 20,000 gallons of primary storage space. Two Chem.

Waste Distillate Storage Tanks (WC-T-3A, 3B) normally provide space for water processed through the Chem. Waste System during normal operation. Two storage tanks, HP-T-2A, 2B, provide 60,000 gallons of High Purity Storage for water processed through the High Purity System. In addition, water processed in these two systems may be discharged to the condensate system directly if they are of condensate quality.

Secondary Storage Capacity is provided through use of the following vessels:

Condensate Storage Tank - 535,000 gallons Hotwells - 84,550 gallons Torus Water Storage Tank - 763,600 gallons The secondary storage capacity will find use if the Torus contents have been processed and additional storage capacity is required.

(EPIP26/S13) E10-6

Number AmerGen A PECO Energy/fbsh Enrgy Coarry OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

21 THE TECHNICAL SUPPORT CENTER EXHIBIT 11 Relocation of the TSC 1.0 This Exhibit provides guidance for establishing TSC functions in alternate locations when directed by the ED.

2.0 TSC functions should be divided between the ECC and OSC as follows (ED may direct other arrangements as needed):

2.1 The following should relocate to the ECC, take direction from the ED, and follow EPIP-26 or EPIP-35 as appropriate.

NOTE The ECC has limited space and facilities so the number relocated here should be minimized.

2.1.1 ED

  • ED briefings should be made on the Plant Page System or by telephone 2.1.2 ED Assistant 2.1.3 RAC/RASE 2.1.4 Core Engineer (if required in ECC) 2.1.5 Corrimunications duties should be handled by the existing ECC communicators and the EOF for off site notifications once activated.

2.2 The following should relocate to the Drywell Command Center (Conference Room) of the OSC and take direction from the TSC Coordinator:

(EPIP26/S14) E11-1

Number AmerGen A PECO Energy/Bnbst Energy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-. 26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 11 (continued)

Relocation of the TSC 2.2.1 TSC Coordinator

  • Continue to take direction from the ED while coordinating with the OSC Coordinator to minimize interference.

2.2.2 TSC Engineers 2.2.3 TSC Communications Coordinator 2.2.4 TSC Communicators 2.2.5 TSC Tech Assistant 2.2.6 Core Engineer (if not required in the ECC)

NOTE The OSC has limited space and may be controlling several Damage Control Teams. To minimize interference only the TSC Coordinator should interface with the OSC Coordinator initially.

2.3 The following guidance is provided for integrating the TSC engineering function into the OSC.

2.3.1 TSC Engineer should establish a work space in the Drywell Command Center and survey the available procedures and drawings. If additional references are needed, they may be obtained from the Maintenance building.

2.3.2 The Plant Computer System terminal is located in the OSC in a very busy area. If it is needed, coordinate with OSC staff to minimize interference.

(EPIP26/S14) E11-2

AmerGe APECO EyBt E C OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 11 (continued)

Relocation of the TSC 2.3.3 TSC Communicators may not be needed by the OSC.

However, at least one should be used to support ED/TSC Coordinator Communications. This may be via a normal telephone to ECC. This should be coordinated with the ECC Communications Coordinator.

Communicators who are not required for OSC operations may be useful at the EOF, especially if NRC is sending a response team. This should be coordinated with the EOF Communications Coordinator.

2.3.4 The Tech Assistant may be useful to assist the OSC with operational related teams. He may replace or supplement the GOS assigned to the OSC.

2.3.5 Personnel who are not required may be sent to the Emergency Assembly Area or Remote Assembly Area as appropriate. If neither Assembly Areas are activated, they may be sent home with reporting instructions for the next day (e.g.; report to site, EOF, OSC, etc.).

(EPIP26/SI4) E11-3

AmerGe APED Enryb nerG~ EMC-PEPREDES OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-. 26 Number IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 12 ALTERNATE EMERGENCY RESPONSE FACILITIES This exhibit provides a description of evacuation preplanning for Alternate Emergency Response Facilities as follows:

1. Control Room/ECC - Evacuation of Control Room - the Operators control the plant from remote shutdown panels and the GSS directs plant operations from the TSC. All other ECC IREO members are integrated into the TSC organization. (Refer to 2000-ABN-3200.30 for specific direction).
2. OSC - Evacuation of OSC - all OSC personnel are evacuated to the SOSC which is located in the rear of the TSC. (Refer to EPIP-OC-27 for specific direction.)
3. TSC - Evacuation of TSC - the ED support staff which includes the ED, ED Assistant, RAC, and RASE evacuate to the Control Room (ECC). The Tech Support staff which includes the TSC Coordinator, TSC Engineers, Communication Coordinator, Communicators and the Tech Assistant evacuate to the OSC. The Core Engineer would initially report to the Control Room, but if his services are not needed, he will be sent to the OSC.
4. Remote Assembly Area - Evacuation of RAA's - if the Forked River Bldg. 14 RAA is not available then relocate to the Berkeley Customer Operations Center and vise versa.
5. Emergency Assembly Area - The EAA may be redirected to the Forked River Assembly Area or to the Remote Assembly Area at Berkeley Line as directed by management. In this case Site Accountability is conducted as personnel exit the site.
6. EOF - There are no backup facilities for the EOF because it is remote from the site and it is unlikely that a nuclear related incident would affect both the plant and this center.

(EPIP26/S15) E12-1

Number AmerGen APECO EnerW/Bnsh Enemy Company OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC- .26 IMPLEMENTING PROCEDURE I i Revision No.

Title 21 THE TECHNICAL SUPPORT CENTER EXHIBIT 13 EMERGENCY DIRECTOR AUTHORIZATION FORM FOR DEVIATIONS FROM REQUIREMENTS TYPE OF DEVIATION I. Deviations authorized under the Emergency Plan.

Deviations from operating procedures, emergency procedures, emergency plan implementing procedures, or normal equipment operating limits that do not result in a deviation from Technical Specifications, Operating License, License Conditions or other NRC Rules, Regulations, or Orders.

II. Deviations authorized by 10 CFR 50.54 (x) and (y) for the protection of public health and safety.

A. Departure from a Technical Specification requirement.

B. Departure from the Operating License.

[ C. Departure from a License Condition.

(Refer to page E13-3 & 4 for assistance in defining "License Conditions")

[ D. Departure from NRC Rules, Regulations, or Orders.

Deviations are only permissible if all of the following are met:

1. An Emergency condition exists which can impact the public health and Safety.
2. The deviation is allowed if there are no actions which are inconsistent with license conditions or technical specifications.
3. The action must be taken immediately in order to be effective in protecting the public health and safety.

(EPIP26/S16) E13 -1

Number OYSTER CREEK EMERGENCY AmerGen APECO Enefg/BnbSh Enefg ComParry PREPAREDNESS EPxP-OC-.26 IMPLEMENTING PROCEDURE t

Revision No.

Title 21 THE TECHNICAL SUPPORT CENTER EXHIBIT 13 (continued)

EMERGENCY DIRECTOR AUTHORIZATION FORM FOR DEVIATIONS FROM REQUIREMENTS DEVIATION JUSTIFICATION TYPE TYPE TYPE I II I II I II (circle)

Deviation From Deviation From Deviation From Procedure Procedure Procedure Tech Spec Tech Spec Tech Spec Operating License Operating License Operating License (includes EOP's) (includes EOP's)

(includes EOP's)

License Condition License Condition License Condition (See E13-3&4) (See E13-3&4)

(See E13-3&4)

NRC Rules, Reg or NRC Rules, Reg or NRC Rules, Reg or _

Orders Orders Orders Other Other Other Deviation Justification Deviation Justification Deviation Justification Alternatives Considered Alternatives Considered Alternatives Considered SRO Concurrence SRO Concurrence SRO Concurrence TSC Engr TSC Engr TSC Engr Concurrence Concurrence Concurrence ED Approval ED Approval ED Approval Date Time Date Time Date Time Notification of NRC Notification of NRC Notification of NRC by by by Date Time Date Time Date Time NRC Person Notified NRC Person Notified NRC Person Notified (EPIP26/S16) E13 -2

Procedure EPIP-uC-.26 Rev. 21 EXHIBIT 13 (continued)

EMERGENCY DIRECTOR AUTHORIZATION FORM FOR DEVIATIONS FROM REQUIREMENTS LICENSED CONDITIONS REGULATION REQUIREMENT DESCRIPTION DEVIATION 10 CFR 50.54(A) OQA Plan Plan to insure quality in all phases of A 50.54(x) deviation consists of not 10 CFR 50 APP. B Nuclear Plant operation and to enhance implementing the OQA Plan of a Safety section of the Plan to protect public safety and health. See NOTE 1 below.

10 CFR 50.54(p) Safeguards and Requirement for Physical Security and A 50.54(x) deviation is not 10 CFR 73.55 Security Plan control of information pertaining to the implementing a major portion of the method employed. Security Plan to protect public health and safety. See Note 2 below.

10 CFR 50.54(q) Emergency Plan Plan to insure the appropriate All of these sub-parts of the 10 CFR 50.47(b) facilities, personnel, procedures and Emergency Plan are implemented via 10 CFR 50 APP. E equipment are available to adequately implementing procedures.

respond to emergencies. Examples of 50.54(x) DEVIATIONS, The sub-parts of this item are: while protecting public health and I

"* Standard Classification System safety follow:

"* Notification of Local, State and Deciding intentionally to NOT L.J Federal Organizations

  • Control exposures of all workers

"* Methods, Systems & Equipment for per EPA-400 limits assessing & monitoring actual or

  • Activate the Emergency Response potential radiological consequences organization

"* Use of Protective Action

  • Use/Activate Emergency Facilities Recommendations
  • Controlling radiological exposure The other items of this part do not

"* Activation/use of Emergency Response meet the criteria for a 50.54(x)

Facilities DEVIATION that would still protect

"* Use of ERDS (Emergency Response Data the public health and safety. Any System) instance of not complying with these parts is a violation, but not a valid DEVIATION.

10 CFR 50.54(z) NRC Operations Requires notify and maintain A 50.54(x) deviation is when the NRC Center communications with the NRC Operations is Intentionally Not notified or Center of events specified in 10 CFR when communications with NRC is 50.72 being suspended without NRC concurrence to protect public health and safety.

Procedure EPIP-uC-.26 Rev. 21 EXHIBIT 13 (continued)

EMERGENCY DIRECTOR AUTHORIZATION FORM FOR DEVIATIONS FROM REQUIREMENTS LICENSED CONDITIONS (CONTINUED)

NOTE 1 - The OQA Plan describes the formal plan to implement the requirements of 10 CFR 50 Appendix B. The Plan contains the controls and bases for procedures that implement the Plan. If an entire process described in the Plan is not followed, this must be considered under 10 CFR 50.54(x). It is unlikely thaL such a deviation could be considered to protect the health and safety of the public thus could not be authorized under 10 CFR 50.54(x).

Specific and individual deviations from the plan's implementing procedures are not considered a deviation form the Plan, and as such would still require the approval of the Emergency Director and documentation on Exhibit 6 but would not require notification of the NRC per 10 CFR 50.72(a) (2) (i)

(C).

NOTE 2 - The Security Plan implements the requirements of 10 CFR 73.55. In essence, deviations from the Security Plan are deviations from 10 CFR 73.55 and in accordance with 10 CFR 73.55(a) are reported in accordance with 10 CFR 50.54(x). In addition to the Security Plan, 10 CFR 73.55 required a Safeguards Contingency Plan which gives guidance to accomplish specific defined objectives for different events. The Safeguards Contingency Plan is considered similar to an implementing document and therefore specific deviations from it are not 10 CFR 50.54(x) deviations. However, if whole parts of the Safeguards Contingency Plan are not followed, these should be considered under 10 CFR 50.54(x).

Example: The Security Plan, as required by 10 CFR 73.55, contains requirements on access controls.

If access controls are suspended this should be considered a deviation of the Security Plan and be reported in accordance with 10 CFR 50.54(x). However, if access Controls will be maintained but differently than described in the procedures, this is not a 10 CFR 50.54(x) deviation but would still require the appropriate approval and documentation using this exhibit page E13-1 and E13-2.

OYSTER CREEK Number AmerGen APECO Energy/Bnbsh EnereComparY EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE I 1*

Revision No.

Title 21 THE TECHNICAL SUPPORT CENTER EXHIBIT 13 (continued)

EMERGENCY DIRECTOR AUTHORIZATION FORM FOR DEVIATIONS FROM REQUIREMENTS ADDITIONAL INFORMATION AND REGULATORY EXCERPTS 50.54(x) - A licensee may take reasonable action that departs from a license condition or technical specification (contained in a license issued under this part) in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent.

F.

NOTE The NRC has interpreted 50.54(x) to apply to NRC rules, regulations and orders in addition to Technical Specifications, Licenses, and License Conditions.

50.54(y) Licensee action permitted by paragraph (x) of this section shall be approved, as a minimum, by a licensed senior operator prior to taking the action.

73.55(a) In accordance with section 50.54(x) and (y) of Part 50, the licensee may suspend any safeguards measure pursuant to Section 73.55 in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with the license conditions and technical specifications that can be provide adequate or equivalent protection is immediately apparent. This suspension of safeguards measures must be reported in accordance with the provisions of 73.71. Reports made under Section 50.72 need not be duplicated under 73.71.

NOTE In essence, no one below a licensed SRO individual can make the decision to depart from the License. However, if a more senior manager is present (i.e., Emergency Director) even though he does not possess an SRO license, the decision authority would be passed to him as a higher authority in the chain of command. The licensed SRO shall provide his best judgment to the ED for his consideration.

Beyond that the SRO shall follow the orders of his supervisor.

It is suggested that the Emergency Director consult to the extend practicable with the Technical experts at the TSC in arriving at a decision to deviate from prescribed procedures. However, Emergency Operating Procedures should not be deviated from.

50.72(b) Any deviation from the plant's technical specifications authorized pursuant 50.54(x) of this part.

NOTE Notify the NRC before taking action if time permits, but at least within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the deviation.

The NRC interprets the reporting requirement to cover any departure under 50.54(x) and (y), and is not limited to Technical Specification deviations.

(EPIP26/S18) E13-5

OYSTER CREEK Number AmerGen A PIMPLEMENTING EMERGENCY PREPAREDNESS PROCEDURE EPIP-OC-.26 Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 14 CORE ENGINEERS RESPONSIBILITIES 1.0 Report to the TSC Coordinator, unless needed in the ECC. If Core Engineer reports to ECC first, then the TSC coordinator should be informed.

2.0 As requested assist the TSC Coordinator in activation operation, and recovery of the TSC as applicable. Refer to Coordinators Checklist (Exhibit 3) for guidance.

3.0 Perform and document Core Damage Estimation Reports in accordance with EPIP-OC.33 and other engineering tasks as directed by the TSC Coordinator.

4.0 Assist with the PCS and SPDS Programs as requested.

5.0 Present all documentation generated during the performance of their duties to the TSC Coordinator.

6.0 As directed, assist TSC Coordinator in deactivation of TSC.

7.0 Should the TSC be or become unavailable (e.g., due to fire, security event, etc.) refer to EXHIBIT 11 which provides guidance for the establishment of the TSC functions in alternate locations.

(EPIP26/S19) E14-1

AmerGenOYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.26 A PECO EwwergBnishEny C-V IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 15 SITE ACCESS POLICY FOR MEDIA DURING EMERGENCIES Providing reasonable site access to the media during a plant emergency is in the best interest of OCNGS and the public.

Responsibility for approving site access rests with the Emergency Support Director, or, if the EOF is not activated, with the Emergency Director.

For purposes of media access to the site during an emergency, the same industrial safety and security standards and requirements that apply to non-essential employees will be applied to the media.

Communication Dept. Responsibilities Request for media access will be made to the ESD or ED by the Public Information Duty Representative or the Media Center Lead.

Communications will provide the ED/ESD with the number of media to gain site access, areas to be accessed and length of time the media will be there.

(Communications will decide the number of media gaining access based on conditions at the time of the emergency. An attempt will be made to gain access for, at a minimum, one representative each from radio, television and print media.)

Communications will provide media transportation on and off site.

Communications will have each member of the media sign a Media Access Briefing Form, Exhibit 20, indicating they were briefed about the risks as they were known at the time by the corporation.

1. If media access does not involve entry into a posted radiologically controlled area:
a. At Oyster Creek, Security will retain responsibility for sign in and badging.
b. Communications will supervise and escort the media while on site.
c. Communications will conduct a briefing explaining the radiological and industrial conditions and risks on site.
2. If media access involves entry into a posted radiologically controlled area:
a. Media will be processed as appropriate, receiving dosimetry, training, bioassay, waivers and briefings based on established procedural requirements.
b. Communications will notify the Security Coordinator prior to site access.

(EPIP26/S20) E15-1

OYSTER CREEK Number AmerGen A PECO EneWAy/'rbSh Energy Company EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE I I Title Revision No.

21 THE TECHNICAL SUPPORT CENTER EXHIBIT 15 SITE ACCESS POLICY FOR MEDIA DURING EMERGENCIES (continued)

c. Communications in conjunction with Radiological Controls will supervise and escort the media while in posted radiologically controlled areas.

ED/ESD Responsibilities

1. The ED/ESD will consult with the RAC/Group Leader R&EC, and media may be granted access if the projected dose will not exceed the 500 millirem annual limit including external and internal exposure.

NOTE For security driven events, Media access to the site must also be approved by the local Law Enforcement Agency and Security.

2. Approve media access to the site if requirements are met.

(EPIP26/S20) E15-2

OYSTER CREEK Number AmerGen ErnwW/frsh1Enwgy CoMY A PECO EMERGENCY PREPAREDNESS EPIP-OC-. 26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECHNICAL SUPPORT CENTER 21 EXHIBIT 16 Page of EMERGENCY SHIFT SCHEDULE EXAMPLE DATE:

GROUP (eg. Admin.):

TIME: SHIFT 1 SHIFT 2 SHIFT 3 BEGIN END NAME NAME NAME POSITION #

P HOME #

H O WORK #

N E BEEPER #

POSITION #

P HOME #

H O WORK #

N E BEEPER #

POSITION #

P HOME #

H o WORK #

N E BEEPER #

POSITION #

P HOME,#

H o WORK #

N E BEEPER #

(EPIP26/S21) E16-1

OYSTER CREEK Number AmerGen A PECOEnew /Britsh Er gyCo any EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE 1*

Title Revision No.

21 THE TECHNICAL SUPPORT CENTER EXHIBIT 17 HIFAX LOG EXAMPLE SEND MESSAGE TIME INITIAL TSC OSC EOF ECC COMMENTS TSC OSC EOF ECC COMMENTS (EPIP26/S22) E17-1

OYSTER CREEK Number AmerGen A PECO Energy/Bntzsh Erey COnWiy EMERGENCY PREPAREDNESS EPIP-OC-.26 IMPLEMENTING PROCEDURE I i*

Revision No.

Title 21 THE TECHNICAL SUPPORT CENTER EXHIBIT 18 EXAMPLE OYSTER CREEK NUCLEAR GENERATING STATION EMERGENCY COMMUNICATIONS Comnunicator Log Location: Date:

ERF Circuit:

Name:

Time: Remarks:

(EPIP26/S23) E18-1

OYSTER CREEK Number AmerGen A PECO Ene/Bsh Energy Co-panY EMERGENCY PREPAREDNESS

  • PIP-OC-.26 IMPLEMENTING PROCEDURE
  • 1*

Revision No.

Title Revision No.

21 THE TECHNICAL SUPPORT CENTER I

EXHIBIT 19 EXAMPLE Number OCNGS Emergency Message To: 0SC TSC EACC Staff Position Other ECC EOF Message:

Originator:

Staff Position Initials Time Date Location: ECC TSC OSC EACC ZOF Reply:

Reply Completed by:

Staff Position/Other Initials Time Date A0001731 10-84 (EPIP26/S24) E19-1

Number AmerGen APECO Energy.Snsh Enefgy COmiraY OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-. 26 IMPLEMENTING PROCEDURE Title Revision No.

THE TECENICAL SUPPORT CENTER 21 EXHIBIT 20 MEDIA ACCESS BRIEFING FORM I have been briefed about the risks, both industrial and radiological, to which I may be exposed while at this nuclear facility. I understand there may be some risk and willingly accept it for the purpose of visiting the plant site.

Signature Date News Organization Communications Rep.

(EPIP02/S25) E20-1