ML020800658

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure, Revision 13 to EPIP-OC-27, the Operations Support Center.
ML020800658
Person / Time
Site: Oyster Creek
Issue date: 03/08/2002
From: Degregorio R
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
2130-02-20075
Download: ML020800658 (37)


Text

AmerGen AmerGen Energy Company, LLC An Exelon/British Energy Company Oyster Creek US Route 9 South PO. Box 388 Forked River, NJ o8731 0388 10 CFR 50 App. E March 8, 2002 2130-02-20075 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

Oyster Creek Generating Station Docket No. 50-219 Emergency Plan Implementing Procedure Revisions In accordance with 10 CFR 50, Appendix E, Section V, enclosed is the newly revised Index for the Oyster Creek Emergency Plan Implementing Procedures and the below listed procedures.

Procedure Number Title Revision EPIP-OC-.27 The Operations Support Center 13 If further information is required, please contact Mr. David G. Slear, Manager, Regulatory Assurance at 609-971-4112.

Very truly yours,

<--Ron J. Deý-ý Vice President Oyster Creek RJD/JJR:ew Enclosures cc: Administrator, Region I NRC Sr. Project Manager NRC Resident Inspector

EPIP SERI]ES - EMERGENCY PLAN IMPLEMENTING PROCI EDURES PROCEDURE NO. TITLE REV. NO. DATE 6630-ADM-4010.03 Emergency Dose Calculation Manual (EDCM) 11 07/23/00 EPIP-OC-.01 Classification of Emergency Conditions 12 12/14/01 EPIP-OC-.02 Direction of Emergency Response/EmergencyControl Center 30 11/19/01 EPIP-OC-.03 Emergency Notification 29 11/07/01 EPIP-OC-.06 Additional Assistance and Notification 26 12/12/01 EPIP-OC-. 10 Emergency Radiological Surveys Onsite 12 12/12/01 EPIP-OC-. 11 Emergency Radiological Surveys Offsite 17 11/07/01 EPIP-OC-. 12 Personnel Accountability 9 07/07/01 EPIP-OC-.13 Site Evacuation and Personnel Mustering at Remote Assembly 10 01/31/02 Areas EPIP-OC-.25 Emergency Operations Facility (EOF) 26 12/04/01 EPIP-OC-.26 The Technical Support Center 23 07/05/01 EPIP-OC-.27 The Operations Support Center 13 02/15/02 EPIP-OC-.31 Environmental Assessment Command Center 11 08/08/00 EPIP-OC-.33 Core Damage Estimation 5 08/08/00 EPIP-OC-.35 Radiological Controls Emergency Actions 15 12/07/01 EPIP-OC-.40 Site Security Emergency Actions 12 12/11/01 EPIP-OC-.41 Emergency Duty Roster Activation 6 11/19/01 EPIP-OC-.44 Thyroid Blocking 2 07/21/01 EPIP-OC-.45 Classified Emergency Termination/Recovery 3 12/04/01 OEP-ADM-1311.03 Emergency Preparedness Section Administration 4 08/08/01 OEP-ADM-1319.01 Oyster Creek Emergency Preparedness Program 11 01/31/02 OEP-ADM- 1319.02 Emergency Response Facilities & Equipment Maintenance 11 01/31/02 OEP-ADM-1319.04 Prompt Notification System 3 12/08/00 OEP-ADM- 1319.05 Emergency Preparedness Event Reports 2 07/02/01

Number OYSTER CREEK AmerGenm EMERGENCY PREPAREDNESS EPIP-OC-. 27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 Applicability/Scope Usage Level Responsible Department Applies to work at Oyster Creek 2 Emergency Preparedness This document is within QA plan scope X Yes No mf ect ve e Yes X-No 50.59 Reviews Required Prior Revision 12 incorporated the This Revision 13 incorporates the following Temporary Changes:

following Temporary Changes:

N/A N/A List of Pages (all pages rev'd to Rev. 13) 1.0 to 6.0 E1-I to El-6 E2-1 to E2-2 E3-1 to E3-2 E4-1 to E4-4 E5-1 E6-1 to E6-2 E7-1 to E7-2 E8-1 E9-1 El0-1 Ell-l E12-1 to E12-2 E13-1 E14-1 E15-1 E16-1 4

NON-CONTROLLED This Document Will Not Be Kept Up To Date DCC Oyster Creek Signature I Concurring Organization Element fDate Cr ntcr fr44 J-&o _L 0 EP Coordinator ot b7/rv z ByproRadiation Protection Manager (EPIP27) 1.0

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE I I Revision No.

Title 13 THE OPERATIONS SUPPORT CENTER DOCUMENT HISTORY PREPARED BY:

REVIEWED BY:

EFFECTIVE APPROVED BY:

Yr CT r,vt n 71rp DESCRIPTION OF CHANGE 4 05/94 Provide instructions on Exhibit lB for Radwaste Operator Accountability.

5 09/95 1. Clarify EX6A.

2. Clarify EX7A.
3. Modify EX8 to include UPS.
4. Modify EXIO to renumber damage equip. lockers.

6 06/97 Improved method of information flow and computer equipment upgrades.

Inclusion of communicators duties from EPIP-OC-.04 7 01/98 Added a check on OSC Activation Checklist to make sure facility doors are open. Added a check on OSC Deactivation checklist to restore doors to original configuration.

Delete ED/OPS & Plant Status lines.

They are incorporated into OPS Coordinator line.

8 10/99 Change "in accordance" to "suggested",

pg. EI-I & E7-1. Add RWP# to pg. E4-1 and add "typical arrangement" to pg.

E8-1, E9-1. Add Fax Log E 14-1. Add GPU Emergency Message form E15-1, add Communication Log E16-1. Add "contact security for TEAM status update".

9 DOS Change references from GPU to OCNGS.

10 09/00 Clarifies the activation of the OSC from the OSEO at the discretion of the ED.

11 10/00 Add statement to ensure teams are logged into REM on line. Add statement for OSC coordinator to determine team status from Ops Coordinator.

11/01 Add usage level, change 50.59 to "no", A. T. Smith 12 clarify communications link between OSC Coord., Tech. assist and OPS Coord. Remove reference to Maint.

kits.

13 01/02 Exhibit lB - Clarify NOTE regarding security coordinator tracking security teams.

Exhibit 4A - Modify section for listing team members to allow more space for member name; clarify omitted columns.

(EPIP27) 2.0

AmerGen OYSTER CREEK Number EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntlsh Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 1.0 PURPOSE 1.1 This procedure provides for the activation and functioning of the Operations Support Center (OSC) and Secondary Operations Support Center (SOSC).

1.1.1 The OSC is located in the Drywell Processing Center.

1.1.2 The SOSC is located in the rear of the Technical Support Center (TSC) on the first floor of the Site Emergency Building.

1.2 Guidance and direction are given by this procedure for Command and Control of the OSC, emergency team organization, search and rescue, and damage control operations.

2.0 APPLICABILITY/SCOPE 2.1 This procedure applies to OSC personnel and all others who support the OSC during declared or simulated emergencies.

3.0 DEFINITIONS None 4.0 RESPONSIBILITIES 4.1 The Operations Support Center (OSC) Coordinator will perform duties in accordance with Exhibit 1.

(EPIP27) 3.0

Amer em OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC-.27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE Tit~le Revision No.

THE OPER~ATIONS SUPPORT CENTER 13 4.2 The Functional Area Coordinators will complete Exhibit 2A.

4.2.1 The Emergency Maintenance Coordinator (EMC) shall direct the activities of maintenance personnel involved in emergency maintenance repair and corrective actions. He may also direct the Equipment Operators in their Emergency Duties as directed by the Operations Coordinator.

NOTE The Emergency Maintenance Coordinator shall ensure appropriate actions are taken to replace or replenish any respirator equipment used to respond to a plant emergency.

4.2.2 The Radiological Controls Coordinator (RCC) shall coordinate onsite and in-plant rad con support in accordance with EPIP-OC-.35, "Radiological Controls Emergency Actions."

4.2.3 The OSC ODerations Coordinator, if assigned, shall receive directions from the Control Room through the OSC Coordinator and direct the emergency duties of the Equipment Operators. a 4.2.4 The Medical ReDresentative shall provide triage recommendations and medical assistance as required.

(EPIP27) 4.0

AmerGen. OYSTER CREEK Number EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntish EnergyCompany IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 5.0 PROCEDURE 5.1 On Shift Emergency Organization will be directed to report to the appropriate areas by the Emergency Director (GSS).

5.1.1 OSEO may not be required to immediately activate the OSC.

Their activities will be determined by ED/SSM 5.2 Initial Response Emergency Organization (IREO) personnel will report to the OSC when they are notified of the activation of the ERO and perform the responsibilities identified in their assigned exhibits to this procedure and as requested by their emergency supervisors.

NOTE Emergency Maintenance, Chemistry, Rad Con, and First Aid equipment locker locations are identified in Exhibit 10, OSC Kits and Locker Locations.

NOTE Keys for locker padlocks are maintained in the OSC facility key locker, which will be unlocked upon activation of the center. The locker key is in the OSC Coordinator log book. The lock is the "Breakaway" type and can be twisted off by hand if necessary.

6.0 REFERENCES

6.1 2000-PLN-1300.01, OCGS Emergency Plan.

6.2 EPIP-OC-.01, Classification of Emergency Conditions.

6.3 EPIP-OC-.10, Emergency Radiological Surveys Onsite.

6.4 EPIP-OC-.12, Personnel Accountability.

6.5 EPIP-OC-.26, The Technical Support Center.

6.6 EPIP-OC-.35, Radiological Controls Emergency Actions.

6.7 Procedure 106, Conduct of Operations.

6.8 Procedure 106.6, Conduct of Chemistry Operations.

6.9 Procedure 124.2, Control of Plant Engineering Directed Replacements and Modifications.

6.10 Procedure OEP-ADM-1319.02, Emergency Response Facilities and Equipment Maintenance.

6.11 Procedure 831.10, Operation of the GE Post-Accident Sampling System.

(EPIP27) 5.0

AmerGen. OYSTER CREEK Number EAmRreNCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bitish Energy Company IMPLEMENTING PROCEDURE Title Revision NO.

THE OPERATIONS SUPPORT CENTER 13 7.0 EXHIBITS 7.1 OSC Coordinator Checklist Exhibit 1A, Activation of OSC Exhibit lB, Operation of OSC Exhibit IC, Deactivation of OSC 7.2 Functional Area Coordinator Checklist Exhibit 2A, Activation of OSC Exhibit 2B, Operation of OSC 7.3 Search and Rescue Assignment Exhibit 3A, Checklist Exhibit 3B, Guidelines 7.4 Emergency Team Briefing/Debriefing Exhibit 4A, Briefing Form Exhibit 4B, Debriefing Form Exhibit 4C, Briefing Guidelines Exhibit 4D, Debriefing Guidelines 7.5 Emergency Job Planning Guidelines Exhibit 5 7.6 Exhibit 6A, Evacuation of OSC to the SOSC OSC Coordinator Checklist Exhibit 6B, Evacuation of OSC to the SOSC Functional Area Coordinators Checklist 7.7 Exhibit 7A, Activation of SOSC, OSC Coordinator Checklist Exhibit 7B, Activation of SOSC, Functional Area Coordinators Checklist 7.8 Exhibit 8, OSC Floor Plan 7.9 Exhibit 9, SOSC Floor Plan 7.10 Exhibit 10, OSC Kits and Locker Locations 7.11 Exhibit 11, OSC Communicator - Team Status Tracking 7.12 Exhibit 12, OSC Communications Coordinator Responsibilities 7.13 Exhibit 13, OSC Emergency Shift Schedule 7.14 Exhibit 14, OSC Hy Fax Log 7.15 Exhibit 15, OSC Emergency Message 7.16 Exhibit 16, OSC Communication Log (EPIP27) 6.0

Numb er AmerGenr EenBtsE An___ CpnEMERGENCY OYSTER CREEK PREPAREDNESS EPIP-OC-.27 AnEeon/Bntish Enrgy ~ony IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT IA OSC COORDINATOR CHECKLIST ACTIVATION OF OSC CHECK 1.0 Ensure the OSC is set up as suggested in Exhibit 8.

2.0 The OSC should be declared activated when the following areas are functional:

NOTE These areas need not be 100% staffed to be considered functional.

  • Radiological Protection
  • Maintenance Support (appropriate expertise)
  • Communications links to Ops Coordinator and TSC Coordinator 3.0 Report OSC activated to the Operations Coordinator and log time.

3.1 Announce to OSC staff that center is activated.

3.2 Determine plant and teams status prior to OSC activation, and update center staff.

NOTE The following actions should be performed expeditiously but are not necessary to declare the OSC functional.

4.0 Radiological Monitoring Established 5.0 Make sure facility access/egress doors are in the proper configuration. (Facility doors, including Drywell Process Facility, may lock automatically when closed. Tape over or otherwise disable locking mechanism to allow access/egress)

(EPIP27/S3) EI-I

AmerGen. OYSTER CREEK Number EPIP-OC-.27 EMERGENCY PREPAREDNESS An Exelon/British Energy Company IMPLEENT ING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 1A (continued)

OSC COORDINATOR CHECKLIST ACTIVATION OF OSC CHECK 6.0 Areas Staffed:

6.1 Emergency Maintenance Coordinator 6.2 Rad Con Coordinator 6.3 OSC Operations Coordinator 6.4 Medical Representative 6.5 OSC Communications Coordinator 6.6 Chemistry Coordinator NOTE Notify Security of OSC positions not manned and request appropriate persons be contacted.

7.0 Communications established 7.1 OSC Coordinator Line 7.2 Communications operability check completed on all center phone/fax systems. Report deficiencies to the OSC Communications Coordinator.

OSC Coordinator Date/Time (EPIP27/S3) E1-2

AmerGen OYSTER CREEK EMERGENCY PREPAREDNESS Number EPIP-OC- .27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT lB OSC COORDINATOR CHECKLIST OPERATION OF OSC 1.0 Maintain communications with Tech. Assistant in the TSC and receive Team Dispatch Directory via Emergency Director and Operations Coordinator.

2.0 Maintain communications with Functional Area Coordinators.

3.0 Perform job planning activities using Exhibit 5, Emergency Job Planning Guidelines.

4.0 Periodically advise Functional Area Coordinators to provide updates to their respective standby personnel.

5.0 Approve the call-out of additional support personnel requested by Functional Area Coordinators as required.

6.0 Evaluate the need for an Industrial Safety Representative to provide guidance and recommendations for work involving entry to confined spaces or extreme temperature work conditions.

7.0 Periodically advise the ED of the status of all OSC teams.

8.0 Notify the Emergency Director if OSC habitability conditions exist that could require evacuation.

9.0 If evacuation of OSC becomes necessary, refer to Exhibit 6 A & B, 7 A & B, Evacuation of OSC/Activation of SOSC.

10.0 Personnel accountability is performed as directed by the ECC.

(EPIP27/S3) EI-3

Number AmerGen.

An Exelon/Bntish Energy Company OYSTER EMERGENCY IMPLEMENTING CREEK PREPAREDNESS PROCEDURE EPIP-OC-.27 Revision No.

Title 13 THE OPERATIONS SUPPORT CENTER EXHIBIT IB (continued)

OSC COORDINATOR CHECKLIST OPERATION OF OSC that all personnel 10.1 Announce Site Accountability to OSC Staff and ensure readers.

present in the OSC have key carded into accountability card NOTE level Radwaste Operators will be tracked as a team at the "ALERT" Briefings and debriefings will be done via telephone or and above.

radio.

Security 10.2 Instruct the OSC Communication Coordinator to call Main Gate ten (10) with Radwaste Operator's name and keycard number(s) within mninuts of initial declaration of accountability.

NOTE Security Coordinator will track locations and movements of Security Response Force and keep OSC advised.

Computer 11.0 If notified by the Security Shift Command/Designee of Security Failure, complete Steps 11.1 - 11.3.

11.1 Assign individual to collect accountability badges.

11.2 Direct individual to sort cards into Main Gate and North Gate groups by color/gate design.

NOTE Radwaste Operators will be tracked as a team at the "ALERT" level and above. Briefings and debriefings will be done via telephone or radio.

11.3 Direct individual to call both Main Gate and North Gate (when utilized)

Security with badge slot number within ten (10) minutes of initial declaration of accountability.

If search and rescue activity is required, utilize Exhibits 3A/3B, Search 12.0 and Rescue Assignment Checklist/Guidelines.

(EPIP27/S3) EI-4

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT IC OSC COORDINATOR CHECKLIST DEACTIVATION OF OSC CHECK 1.0 Directed by the Emergency Director or the Operations Coordinator to deactivate the center.

2.0 All teams recalled and debriefed.

3.0 All standby personnel notified of deactivation.

4.0 Emergency equipment replaced and restored to standby condition.

5.0 Center returned to standby condition.

5.1 Restore tables and chairs as required.

5.2 Wipe all status boards clean.

5.3 Refile all prints and procedures as required.

5.4 Restore access/egress doors to original configuration.

(including Drywell Process Facility Doors).

6.0 Documentation collected.

6.1 OSC Coordinator Checklist, Exhibit 1 A, B, C.

6.2 Functional Area Coordinator Checklists, Exhibit 2 A & B.

6.3 Search and Rescue Assignment Checklists, Exhibit 3 A & B.

6.4 Emergency Team Briefing/Debriefing Forms, 4 Exhibit 4 A & B.

6.5 Evacuation of OSC/Activation of SOSC, OSC Coordinator Checklist, Exhibit 6 A & B.

6.6 Evacuation of OSC/Activation of SOSC, Functional Area Coordinator Checklist, Exhibit 7 A & B.

6.7 OSC Logs.

6.9 Emergency Message Forms.

6.10 Facsimile Machine transmitted documents.

6.11 Print copy of teams from team status computer.

(EPIP27/S3) EI-5

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE 1 1Revision No.

Title 13 THE OPERATIONS SUPPORT CENTER EXHIBIT IC (continued)

OSC COORDINATOR CHECKLIST DEACTIVATION OF OSC CHECK CHECK 7.0 Ensure the following are completed and report discrepancies to the Emergency Preparedness Manager or designee.

7.1 Deliver collected documents from Section 6.0.

7.2 Report missing supplies, equipment, and documents discovered in performing Sections 4.0 and 5.0.

to the Operations Coordinator in the 8.0 Report OSC/SOSC secured Emergency Command Center.

Date/Time OSC Coordinator (EPIP27/S3) E1-6

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exe]on/Bntish Eneygy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 2A FUNCTIONAL AREA COORDINATOR CHECKLIST ACTIVATION OF OSC NOTE All the listed steps need not be completed prior to declaring an area fully functional.

CHECK 1.0 Establish work area for respective work.

2.0 Assist other Functional Area Coordinators in arranging the OSC (Exhibit 8).

3.0 Establish telephone communications on respective emergency line.

4.0 Establish radio communications utilizing appropriate radio.

5.0 Notify the OSC Coordinator that you have assumed your duties and provide him with a shift schedule for extended operations if applicable.

Functional Area Coordinator Date a (EPIP27/S4) E2-1

Numiber AmerGen. OYSTER CREEK EMERGENCY PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.27 An ExelonlBntish Energy Company Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 2B FUNCTIONAL AREA COORDINATOR CHECKLIST OPERATION OF OSC

" Maintain communications with OSC Coordinators.

NOTE OSC Communications Coordinators shall perform their duties in accordance with Exhibit 12.

" Maintain awareness of activities of response teams assigned to their respective areas.

" Ensure team briefings are provided to each Emergency Response Team utilizing In-plant Emergency Response Team Briefing. Refer to Exhibit 4C/D, Emergency Team Briefing/Debriefing Guidelines.

" Provide team debriefing to each returning Emergency Response Team utilizing In-plant Emergency Response Team Debriefing.

NOTE It may be necessary to debrief personnel dispatched prior to the activation of the OSC such as the Fire Brigade, Rad Con and Maintenance personnel to assess plant conditions.

" Coordinate Emergency Response Team activities with Rad Con Coordinator including ingress and egress routes, protective clothing and dosimetry requirements and allowable radiation exposure limits for each assignment. 6

" Ensure Emergency Response Teams in the field are advised of any changing plant conditions that could affect their routes of travel.

" Call out additional plant personnel as necessary with the OSC Coordinator's approval.

"* Establish Relief Duty Roster as required.

"* Ensure arriving personnel are directed to the standby assembly area in the Drywell Processing Center.

" Emergency Response Teams shall be formed by the Functional Area Coordinators as required, assigned a team leader, and furnished with portable two-way radio communications for contact with the OSC.

If personnel radiation exposure is anticipated above the limits of 10 CFR 20, only volunteers shall be assigned as team members.

(EPIP27/S4) E2-2

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

13 THE OPERATIONS SUPPORT CENTER EXHIBIT 3A SEARCH AND RESCUE ASSIGNMENT CHECKLIST TIME/INITIALS 1.0 Notified by Emergency Director or Operations Coordinator of:

1.1 Missing person 1.2 Disabled Person 1.3 Trapped Person 2.0 Identification of Person 2.1 Name 2.2 Work Section 3.0 Last known work assignment 3.1 Building and Elevation 3.2 RWP Number 4.0 Emergency Team Number Assignment 5.0 Functional Area Coordinator briefý 5.1 Area:

5.2 Rad Con Coordinator 6.0 Results 6.1 Located 6.2 Medical Treatment Required 6.3 Trapped Date/Time OSC Coordinator Review (EPIP27/S5) E3 -1

Number AmerGen. OYSTER EMERGENCY CREEK PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.27 An Exelon/Bntish Energy Company Title 1Revision No.

THE OPERATIONS SUPPORT CENTER j13 EXHIBIT 3B SEARCH AND RESCUE GUIDELINES NOTE This section provides guidance in Search and Rescue during emergency conditions.

Paperwork required by procedures should be completed AS TIME PERMITS.

First aid and rescue actions shall have priority over other actions.

The OSC Coordinator, upon notification of a missing or trapped individual by the Emergency Director or his designee, shall ensure a team is assigned to Search and Rescue and is dispatched in accordance with Sections 1.0 through 5.0 of Exhibit 3A, Search and Rescue Assignment.

After the individual has been located and if medical assistance is necessary, the team assigned to search and rescue shall render first aid. The OSC Coordinator shall be informed. The RCC shall be informed and assign response using 6630-ADM-4330.02 Attachment 6630-ADM-4330.02-8, Response to a contaminated injury requiring transit offsite Search and rescue operations may be terminated by the Emergency Director or his designee when all of the following conditions are met:

  • All missing persons have been accounted for.

0 All injured or disabled persons are in the care of medical personnel in accordance with applicable medical procedures or have been released by the medical representative.

0 All trapped persons have been rescued and released from their entrapment to return to their duties.

  • Search and rescue teams have returned to their duty station to stand by.

(EPIP27/S5) E3 -2

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/BTitish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

SUPPORT CENTER 13 THE OPERATIONS EXHIBIT 4A IN-PLANT EMERGENCY RESPONSE TEAM BRIEFING Team #: Destinati onl:

Priority #: t"Vy k, tf (the Emergency RWP enables the ESRD Dose Rate Function)

Purpose/job

Description:

& Resp. Qual. Status & Available Exposure: (*Team Leader)

Team Members FFNP SCBA EXP. EXP.

NAME DD Aval. RCV DD DDN _ _

E7 _ _

Verify Radio Communications Yes D7 NoD N/ AD RADIOLOGICAL DATA Estimated Exposure: a mRem Authorized Stay Time:

D--Single Double Single PCs m Rubber PCs PCs w/wet suit Boots PCs Required:

D- Partial PCs Misc.

Resp. Protection: Dosimetry Req: TLD [] 200 mr SRD [] 500 mr SRDSRD D Recommended Route:

Team authorized to exceed normal limits (Y/N) : __ to what dose mRem ED approval required for emergency exposure; Person verifying ED written approval:

Print/Sign Date/Time Special radiological requirements:

Reviewed ARM data: Li Yes [1 No Li N/A RCC/Designee:

Print/Sign Date/Time Functional Area coordinator/Designee: Date/Time Print/Sign OSC Coordinator:

P rint/Sign Date/Time Date & Time Dispatched:

(EPIP27/S6) E4-1

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

SUPPORT CENTER 13 THE OPERATIONS EXHIBIT 4B IN-PLANT EMERGENCY RESPONSE TEAM DEBRIEFING Team Number: Date:

Task Completed: (Y/N) Time Back:

Status/Work Performed Observed Abnormal Conditions: (Y/N)

Exposure Received:

Observed plant hazards (i.e., steam, water, electrical, abnormal radiological conditions)

Confirmation of Route:

Debriefing Completed/Time:

a Assessment of Damage/Comments/Materials Used:

Date Time Rad Con Coordinator/Designee Date Time Functional Area Coordinator/Designee Date Time OSC Coordinator JO#

(EPIP27/S6) E4-2

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title 13 THE OPERATIONS SUPPORT CENTER EXHIBIT 4C EMERGENCY TEAM BRIEFING/DEBRIEFING GUIDELINES F.MF.P(ZNC¥Y TEAM BRIEFING NOTE concerns The RCC shall identify conditions that do not include radiological fire outside RCA, no radiological release in progress and not (i.e.,

imminent, etc.). In these instances, direct Rad Con-coverage may be deleted with concurrence of the OSC Coordinator.

Names All departures from the OSC shall be approved by the OSC Coordinator.

shall be logged in the OSC for and team numbers of departing personnel personnel accountability.

Ensure all team members are logged into RWP. REM on line and issued appropriate dosimetry.

OSC Functional Coordinators and/or team leaders shall brief teams using the In-plant Emergency Response Team Briefing Form, Exhibit 4A.

The Radiological Controls Coordinator, or his designee, shall brief all Area departing teams in coordination with the team's respective Functional Coordinator.

Briefing Functional Area Coordinators shall ensure that job documentation and Checklists are forwarded to the OSC Coordinator for review upon completion.

(EPIP27/S6) E4-3

Ni im3/4r AmerGen.

EenBsEeyCpnEMERGENCY An___

OYSTER CREEK PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC- .27 AnExelon/Bntish EnergyConpany Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 4D EMERGENCY TEAM BRIEFING/DEBRIEFING GUIDELINES EMERGENCY TEAM DEBRIEFING OSC Functional Coordinators and/or Team Leaders shall debrief their respective teams using the In-plant Emergency Response Team Debriefing Form, Exhibit 4B.

The Radiological Controls Coordinator shall ensure the review of exposures received by Emergency Response Team members to determine whether unanticipated high dose rates were encountered.

The Radiological Controls Coordinator shall ensure the radiological exposure for each team member is entered in the appropriate records.

Functional Area Coordinators shall ensure that job documentation, team reports, and debriefing checklists are forwarded to the OSC Coordinator as soon as possible for staff notifications of results, review and record retention.

(EPIP27/S6) E4-4

Number AmerGen OYSTER CREEK EMERGENCY PREPAREDNESS EPIP-OC-.27 AnExelon/British EnergyCompany IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 5 EMERGENCY JOB PLANNING GUIDELINES NOTE This section provides guidance in job planning during declared emergencies.

Documentation required by normal Station Procedures should be completed as TIME PERMITS but may be deferred until the-emergency declaration is secured.

Repair and maintenance shall have priority over paperwork requirements.

" Job planning and implementation during emergency conditions will be controlled by EPIP-OC-.27. However, NORMAL PLANT OPERATIONS AND MAINTENANCE PROCEDURES SHOULD NOT BE DEVIATED FROM UNLESS TO PROTECT THE HEALTH AND SAFETY OF THE PUBLIC OR TO PREVENT IMMINENT DAMAGE TO PLANT EQUIPMENT. The Emergency Maintenance Supervisor should identify procedures to be implemented during the work.

" Component switching and tagging should be controlled by Procedure 108 (Equipment Control). If appropriate to deviated from 108, ensure effective constraints are employed to protect personnel safety and equipment.

" Work that is to be performed or controlled by EPIP-OC-.27 shall only be activities that are necessary to place the plant in a safe condition or will result in the ultimate termination of the emergency condition should be performed using approved procedures.

" Work performed, materials installed, testing performed, and configuration changes made, are important information. This information should be documented on the debrief form (Exhibit 4b). After the emergency conditions are secured, a Job Order should be assigned to the debrief form, and the information entered into GMS2.

" If a job assignment/task cannot be completed as directed, immediately advise the OSC and receive additional instructions. Continue on with the task utilizing this additional information.

" If personnel radiation exposures in excess of 10 CFR 20 are anticipated, only volunteers shall be assigned as team members. Emergency Director authorization for exposure shall be documented per EPIP-OC-.35, "Radiological Controls Emergency Actions", Exhibit 7, Emergency Dose Authorization.

(EPIP2 7/S7)

. o E5-1

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/British EneTgy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 6A EVACUATION OF OSC TO THE SOSC OSC COORDINATOR CHECKLIST CHECK 1.0 OSC evacuation ordered by the Emergency Director.

2.0 Advise Functional Area Coordinators to enter SOSC area from doorway identified by the TSC Coordinator.

3.0 Direct Functional Area Coordinators to use Exhibit 6B for evacuation of OSC.

4.0 Logs, communication documents, needed supplies and equipment collected for evacuation.

5.0 OSC evacuated to the SOSC, and communications re-established with the Control Room (ECC) through the TSC.

6.0 All personnel/teams dispatched by the OSC have been notified to report to and return to the SOSC.

Date OSC Coordinator (EPIP27/S8) E6 -1

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntsh Energy Company IMPLEMENTING PROCEDURE Title 1 t Revisi1on No.

13 THE OPERATIONS SUPPORT CENTER I _______________________________________

EXHIBIT 6B EVACUATION OF OSC TO THE SOSC FUNCTIONAL AREA COORDINATORS CHECKLIST CHECK 1.0 Advise the personnel in their respective areas that the OSC is being evacuated and the appropriate evacuation route as recommended by the RCC and prescribed by the OSC Coordinator.

2.0 Ensure all assigned responders are advised of the evacuation and appropriate route to SOSC.

Emergency Maintenance Coordinator to ensure personnel assigned to 3.0 the Tool Room/Cal Lab are informed of the evacuation.

4.0 Collect all documentation.

Ensure OSC equipment identified by the OSC Coordinator is 5.0 transferred to the SOSC.

Advise all telephone contacts of impending evacuation and 6.0 terminate telephone communications.

Evacuate OSC utilizing route recommended by RCC and prescribed by 7.0 the OSC Coordinator.

Date Functional Area Coordinator (EPIP27/S8) E6 -2

Number EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exlon/Britsh Energy Company IMPLEMENTING PROCEDURE Title IRevision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 7A ACTIVATION OF SOSC OSC COORDINATOR CHECKLIST CHECK 1.0 Establish work area for SOSC as suggested in Exhibit 9, SOSC Floor Plan.

2.0 Functional Areas staffed:

2.1 Emergency Maintenance Coordinator 2.2 Rad Con Coordinator 2.3 OSC Operations Coordinator 2.4 Medical Representative 2.5 OSC Communications Coordinator 2.6 Chemistry Coordinator 3.0 Communications reestablished 3.1 OSC Coordinator Line 4.0 Report SOSC activated to Operations Coordinator and Emergency Director.

4.1 Announce to SOSC staff that center is activated.

4.2 Determine plant status and update center staff.

5.0 Ensure all personnel accounted for after relocation.

OSC Coordinator Date (EPIP27/S9) E7 -1

Number OYSTER CREEK AmerGen . EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 7B ACTIVATION OF SOSC FUNCTIONAL AREA COORDINATORS CHECKLIST CHECK 1.0 Establish work area for respective work support.

2.0 Assist other Functional Area Coordinators in arranging the SOSC (Exhibit 9).

3.0 Establish telephone communications for respective emergency line.

4.0 Notify the OSC Coordinator that you have assumed your duties in the SOSC.

Functional Area Coordinator Date (EPIP27/S9) E7-2

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 8 OSC FLOOR PLAN TYPICAL ARRANGEMENT 6

A IMS-MtATO" AND InERG~kcy LDCKERS (EPIP27/SIO) E8-1

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/BintiSh Energy Company IMPLEMENTING PROCEDURE Title Revision No.

CENTER 13 THE OPERATIONS SUPPORT EXHIBIT 9 SOSC FLOOR PLAN SITE EMERGENCY BUILDING Secondary Operations Support Center Area TYPICAL ARRANGEMENT rEMERGENCY EOUIP.

LOCKERS NOTE Set up of SOSC will be accomplished by using available tables in that area.

Set up should be to accommodate the communication lines As designated in the center.

(EPIP27/Sll) E9-1

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 10 OSC KITS AND LOCKER LOCATIONS Emergency Chemistry Ecquipment Location Kit/Locker Kits #5 and #6 OSC (Hallway)

Emergency First Aid and Rescue Equipment stretcher New Radwaste Bldg. Control Room adjacent to door Reactor Building Elevation:

stretcher 23 ft. adjacent to Drywell entrance to elevator stretcher and 23 ft. adjacent extrication locker w/trauma kit (RB-EL23) stretcher 51 ft. adjacent to elevator to elevator stretcher 73 ft. adjacent to elevator stretcher 119 ft. adjacent landing extrication 119 ft. stairwell locker w/trauma kit (RB-ELl19)

Turbine Building Elevation:

adjacent to Condenser Bay entrance stretcher 0 ft. south, 0 to Condenser Bay entrance stretcher 0 ft. north, adjacent 23 ft. adjacent to elevator stretcher 46 ft. adjacent to PC change area stretcher and extrication locker w/trauma kit (TB-EL46)

Stretcher Main Office Bldg., third floor adjacent to Rad Con monitor and control point Emergency Rad Pro Eguipment OSC )Hallway) Rad Pro Instrument and Safety Lockers (EPIP27/S12) E10-1

Number AmerGen-An Exelon/British Energy Company ERGCOYSTER CREEK Y PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.27 Title fRevision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 11 OSC COMMUNICATOR - TEAM STATUS TRACKING 1.0 Turn on the power to the large NEC monitor in corner.

2.0 Turn on power strip under the inside computer cabinet. The team tracking program will load and establish communications with the TSC.

3.0 Set time using "Set Time" stamp with PPM.

4.0 Select Lotus Notes Application.

5.0 When "work space" is available, select "Emergency Preparedness on Notes Server 3".

6.0 Select "OSC Communications Coordinator".

7.0 Select "OSC Team Tracking".

7.1 Screen will list teams dispatched.

7.2 Screen should be "Refreshed" by striking F9 key occasionally.

8.0 Assign the team priority (1-3) according to the following definitions:

Priority 1 - Absolute highest priority. Must be accomplished immediately. All available resources should be focused on priority 1 items.

Priority 2 - Standard priority. Item must be accomplished as soon as possible but can wait for priority 1 items.

Priority 3 - For low priority and long term items.

9.0 Enter the team description. Make the description as complete as possible, including member's names. When finished, the team will be transferred to the team listing portion of the screen.

10.0 Periodically print copy of teams.

(EPIP27/S13) El1-1

Number AmerGen-An Exelon*Entish Energy Company OYSTER EMERGENCY CREEK PREPAREDNESS IMPLEMENTING PROCEDURE EPIP-OC-.27 Revision No.

Title CENTER 13 THE OPERATIONS SUPPORT EXHIBIT 12 OSC COMMUNICATIONS COORDINATOR RESPONSIBILITIES INITIALS 1.0 Report to the OSC Coordinator.

2.0 Direct the efforts of the OSC Communicators.

Ensure all phone ringers are set below mid-volume to minimize 3.0 noise level.

3.1 Verify phones and FAX machines are functional.

4.0 Indicate the development of a watch bill for your organization that will support the emergency on a 24 hour/day basis.

(Refer to Exhibit 13) 5.0 Ensure all communications personnel use tag board.

6.0 Report failed communications system to the TSC Communications Coordinator.

NOTE Provide specific information for each trouble report including: circuit, nature of problem, location of phone, etc.

7.0 Call out additional personnel if required.

NOTE For call out of Duty Roster positions contact Security Shift Commander. For additional staff contact Group Leader Adxmin Support. If he is not available, use normal department call-out methods.

(EPIP27/S14) E12-1

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 12 (continued)

OSC COMMUNICATIONS COORDINATOR RESPONSIBILITIES INITIALS 8.0 Instructions for use of Team Status Tracking System are found in Exhibit 11. Maintain team status board.

NOTE If the system fails, continue to track teams manually on the Team Status Sheets and forward the information to the ECC and TSC via fax about every fifteen (15) minutes.

NOTE Radwaste Operators will be tracked as a team at the "ALERT" level and above if applicable. Briefings and debriefings will be done via telephone or radio.

9.0 Plant parameters are displayed via Plant Computer System (PCS) in the TSC, OSC, and EOF.

NOTE If this system fails ensure that the TSC transmits critical plant parameters to the OSC approximately every fifteen (15) minutes or as conditions change. Manually transmitted p.1ant parameters should be displayed on an overhead projector in the OSC or posted in an area where they are available to the OSC Coordinator.

10.0 Upon termination of the emergency, ensure communications equipment, supplies and procedures are replaced or returned to a ready status.

11.0 Then forward to the OSC Coordinator, all logs and records.

SignatureR Date OSC Communication Coord.

(EPIP27/S14) E12 -2

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 13 Page of EMERGENCY SHIFT SCHEDULE TYPICAL DATE:

Functional Group:

GROUP (eg. Admin.):

TIME: SHIFT 1 SHIFT 2 SHIFT 3 BEGIN END NAME NAME NAME POSITION #

P HOME #

H O WORK #

N E BEEPER #

POSITION #

P HOME #

H 0 WORK #

N E BEEPER #

POSITION #

P HOME #

H O WORK #

N E BEEPER #

POSITION #

P HOME #

H O WORK #

N E BEEPER #

(EPIP27/S15) E13 -1

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bntish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 14 HIFAX LOG TYPICAL MESSAGE TIME SEND TSC OSC EOF ECC COMMENTS INITIAL

- 4 4 + 4 r

_______ 4- L 4 4- 4 4 4- 4 +/- F 4- 4 4 + 4 4

+/- 1 1 4 4 4

+ 4 1 - t 1 r

.I- 4 4 + 4 1

+

4-4 4

4 4

4 4

+

4 4

_______ 4- 4 4 L 4 4- 4 4- 4 4- I- 4 4 L 1 4- 4- 4 + 4 4 4 +/- 4- 1 4 I- 4 + 4 4 1 TSC OSC EOF ECC ICOMMENTS (EPIP27/S16) E14-1

Number OYSTER CREEK AmerGen. EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/Bitish Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 15 TYPICAL Number Emergency Message To: Qosc QTSC QEACC Staff Position/Other QECC [EEOF Message:

Originator:

Staff Position Initials Time Date Location: QECC QTSC [EOSC EJEOF Reply:

Reply Completed by :

Staff Position Initials Time Date (EPIP27/SI7) E15-1

Number OYSTER CREEK AmerGen EMERGENCY PREPAREDNESS EPIP-OC-.27 An Exelon/British Energy Company IMPLEMENTING PROCEDURE Title Revision No.

THE OPERATIONS SUPPORT CENTER 13 EXHIBIT 16 TYPICAL OYSTER CREEK GENERATING STATION EMERGENCY COMMUNICATIONS Conmunicator Log Location: Date:

DLV Number: ___ _____ Dial Code:

Time Remarks (EPIP27/S18) E16-1