Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18052A49114 February 2018Radiological Emergency Plan Annex and Addendum RevisionsSafe Shutdown
Health Physics Network
High winds
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Scaffolding
Power change
ML16190A3858 July 2016EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing ProcedureSafe Shutdown
Health Physics Network
Ultimate heat sink
FLEX
Severe Accident Management Guideline
Minimum staff
RA-15-116, Attachment 3, Revision 11 to EP-AA-1010, Radiological Emergency Plan Annex for Oyster Creek Station, and Attachment 4, Revision 0 to EP-OC-1000, Oyster Creek Emergency Plan.21 December 2015Attachment 3, Revision 11 to EP-AA-1010, Radiological Emergency Plan Annex for Oyster Creek Station, and Attachment 4, Revision 0 to EP-OC-1000, Oyster Creek Emergency Plan.Safe Shutdown
Fitness for Duty
Health Physics Network
High Radiation Area
Offsite Dose Calculation Manual
Nuclear Accident Reporting System
Emergency Lighting
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Fuel cladding
Minimum staff
Fire Protection Program
Grace period
Power change
Siren
RA-15-112, Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390)15 December 2015Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390)
RS-15-327, Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form.15 December 2015Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form.
RA-13-066, Standardized Radiological Emergency Plan Implementing Procedure Revisions25 July 2013Standardized Radiological Emergency Plan Implementing Procedure Revisions
ML14311A64318 July 2013Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions. (Version ML13200A124)
ML14311A57518 July 2013Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions
RA-10-087, Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation11 November 2010Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation
ML06356038013 December 2006Revision to EP-OC Series Procedures, Rev. 1 to EP-OC-112-202, TSC Facility Support Group, and Rev. 4 to EP-OC-114-100, State/Local Notifications.Offsite Dose Calculation Manual
Met Tower
Nuclear Accident Reporting System
ML0410501525 April 2004Revision 5 to EMG-3200.12, Radioactivity Release Control
ML0411905432 April 2004Revised Emergency Operating Procedures for Oyster Creek, Includes: 2000-EMG-3200.01A, - Rev. 11, 2000-EMG-3200.01B - Rev. 13, 2000-EMG-3200.02 - Rev. 17, 2000-EMG-3200.11 - Rev. 11Boric Acid
Squib
Hardened vent
ML0404202142 February 2004Revision 16 to Emergency Plan Implementing Procedures OEP-ADM-1319.01Fitness for Duty
ML0334603905 December 2003Revision 2 to EP-AA-110-301, Core Damage Assessment (Bwr).
ML03321053917 November 2003Revision to Emergency Plan Implementing ProceduresFitness for Duty
Minimum staff
ML0331802344 November 2003Transmittal of Emergency Plan Implementing Procedure, OEP-ADM-1319.02 Rev.15Met Tower
ML03301051810 October 20035 to OEP-ADM-1319.01, Oyster Creek Emergency Preparedness Program.Fitness for Duty
ML0326000094 September 2003Revision 5 to 1820-IMP-1720.01, Emergency Public Information Implementing Procedure.Reactor Vessel Water Level
Fuel cladding
ML03141086413 May 2003Emergency Preparedness Implementing Procedure OEP-ADM-1319.04, Revision 7
ML03122058423 April 2003Emergency Plan Implementing Procedure RevisionHigh Radiation Area
ML0309905081 April 2003Emergency Plan Implementing Procedure Revisions, List of Pages Through Exhibit 4Fitness for Duty
Minimum staff
ML0309903641 April 2003Emergency Plan Implementing Procedure Revisions
ML0309904681 April 2003Emergency Plan Implementing Procedure Revisions, List of Pages to Exhibit 16Fitness for Duty
Minimum staff
ML03099002028 March 2003Emergency Plan Implementing Procedure Revisions
ML03084015114 March 2003Emergency Plan Implementing Procedure RevisionsFitness for Duty
Met Tower
Fuel cladding
ML03079003910 March 2003Implementation of Emergency Action Levels Developed from NUMARC/NESP-007 MethodologySafe Shutdown
Health Physics Network
High winds
Packing leak
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Operating Basis Earthquake
Severe Accident Management Guideline
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
ML03058049219 February 2003Emergency Plan Implementing Procedure Revisions
ML02269014217 September 2002Emergency Plan Implementing Procedure RevisionsFitness for Duty
Health Physics Network
Met Tower
ML0223301367 August 2002Emergency Plan Implementing Procedure RevisionsMet Tower
ML02212057225 July 2002Emergency Plan Implementing Procedure Revisions
ML02206005716 July 2002Emergency Plan Implementing Procedure Revisions
ML0208006588 March 2002Emergency Plan Implementing Procedure, Revision 13 to EPIP-OC-27, the Operations Support Center.
ML02059010014 February 2002Emergency Plan Implementing Procedure RevisionsFitness for Duty
Met Tower
ML02011063819 December 2001Emergency Plan Implementing Procedure RevisionsSafe Shutdown
Fitness for Duty
Health Physics Network
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Earthquake
Fuel cladding
ML02002029412 November 2001Emergency Plan Implementing Procedure RevisionMet Tower
ML02140040125 October 2001Emergency Plan Implementing Procedures Revisions, Including Revision 25 to EPIP-OC-.06, Revision 25 to EPIP-OC-.25, and Revision 2 to EPIP-OC-.45Safe Shutdown
Fitness for Duty
Health Physics Network
ML0119102265 July 2001Emergency Prepardness Implementing ProcedureFitness for Duty
Met Tower
Minimum staff
ML01212023625 June 2001EPIP Series - Emergency Plan Implementing Procedures, Personnel Accountability.
ML01057005515 February 20014 to EPIP-OC-.06 Additional Assistance & NotificationHealth Physics Network
ML00371127227 April 2000Revised Epips,Including Revision 9 to 2000-EMG-3200.01A, RPV Control - No ATWS, Revision 9 to 2000-EMG-3200-01B, RPV Control - with ATWS, Revision 15 to 2000-EMG-3200.02, Primary Containment Control, Revision 8 to 2000-EMG-3200.10,Boric Acid
Squib
Hardened vent
ML00374384919 January 20005 for EPIP-OC-.03, Emergency Notification for Oyster CreekFitness for Duty
Health Physics Network
Met Tower
Minimum staff
ML00374386513 January 20002 to EPIP-OC-.25, Emergency Operations Facility (EOF) for Oyster CreekSafe Shutdown
Fitness for Duty
Met Tower
Safeguards Contingency Plan
Fuel cladding
Minimum staff
Overexposure
ML0036771254 January 2000Docket No.50-219 Emergency Plan Implementing Procedure Revisions,Including Revision 9 to EPIP-OC-10,Emergency Radiological Surveys Onsite & Revision 14 to EPIP-OC-11,Emergency Radiological SurveysMet Tower
ML9934701393 December 1999Emergency Plan Implementing Procedure RevisionsMet Tower
Fuel cladding
ML99324048410 November 1999Revised Epips, Including Revision 8 to EPIP-OC-.10, Emergency Radiological Surveys Onsite and Revision 20 to EPIP-OC-.26, the Technical Support Center. with 11/10/99 LetterSafeguards Contingency Plan
Minimum staff