MONTHYEARML18052A4912018-02-14014 February 2018 Radiological Emergency Plan Annex and Addendum Revisions ML16190A3852016-07-0808 July 2016 EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure RA-15-116, Attachment 3, Revision 11 to EP-AA-1010, Radiological Emergency Plan Annex for Oyster Creek Station, and Attachment 4, Revision 0 to EP-OC-1000, Oyster Creek Emergency Plan.2015-12-21021 December 2015 Attachment 3, Revision 11 to EP-AA-1010, Radiological Emergency Plan Annex for Oyster Creek Station, and Attachment 4, Revision 0 to EP-OC-1000, Oyster Creek Emergency Plan. RA-15-112, Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390)2015-12-15015 December 2015 Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390) RS-15-327, Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form.2015-12-15015 December 2015 Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form. RA-13-066, Standardized Radiological Emergency Plan Implementing Procedure Revisions2013-07-25025 July 2013 Standardized Radiological Emergency Plan Implementing Procedure Revisions ML14311A6432013-07-18018 July 2013 Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions. (Version ML13200A124) ML14311A5752013-07-18018 July 2013 Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions RA-10-087, Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation2010-11-11011 November 2010 Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation ML0635603802006-12-13013 December 2006 Revision to EP-OC Series Procedures, Rev. 1 to EP-OC-112-202, TSC Facility Support Group, and Rev. 4 to EP-OC-114-100, State/Local Notifications. ML0410501522004-04-0505 April 2004 Revision 5 to EMG-3200.12, Radioactivity Release Control ML0411905432004-04-0202 April 2004 Revised Emergency Operating Procedures for Oyster Creek, Includes: 2000-EMG-3200.01A, - Rev. 11, 2000-EMG-3200.01B - Rev. 13, 2000-EMG-3200.02 - Rev. 17, 2000-EMG-3200.11 - Rev. 11 ML0404202142004-02-0202 February 2004 Revision 16 to Emergency Plan Implementing Procedures OEP-ADM-1319.01 ML0334603902003-12-0505 December 2003 Revision 2 to EP-AA-110-301, Core Damage Assessment (Bwr). ML0332105392003-11-17017 November 2003 Revision to Emergency Plan Implementing Procedures ML0331802342003-11-0404 November 2003 Transmittal of Emergency Plan Implementing Procedure, OEP-ADM-1319.02 Rev.15 ML0330105182003-10-10010 October 2003 5 to OEP-ADM-1319.01, Oyster Creek Emergency Preparedness Program. ML0326000092003-09-0404 September 2003 Revision 5 to 1820-IMP-1720.01, Emergency Public Information Implementing Procedure. ML0314108642003-05-13013 May 2003 Emergency Preparedness Implementing Procedure OEP-ADM-1319.04, Revision 7 ML0312205842003-04-23023 April 2003 Emergency Plan Implementing Procedure Revision ML0309905082003-04-0101 April 2003 Emergency Plan Implementing Procedure Revisions, List of Pages Through Exhibit 4 ML0309903642003-04-0101 April 2003 Emergency Plan Implementing Procedure Revisions ML0309904682003-04-0101 April 2003 Emergency Plan Implementing Procedure Revisions, List of Pages to Exhibit 16 ML0309900202003-03-28028 March 2003 Emergency Plan Implementing Procedure Revisions ML0308401512003-03-14014 March 2003 Emergency Plan Implementing Procedure Revisions ML0307900392003-03-10010 March 2003 Implementation of Emergency Action Levels Developed from NUMARC/NESP-007 Methodology ML0305804922003-02-19019 February 2003 Emergency Plan Implementing Procedure Revisions ML0226901422002-09-17017 September 2002 Emergency Plan Implementing Procedure Revisions ML0223301362002-08-0707 August 2002 Emergency Plan Implementing Procedure Revisions ML0221205722002-07-25025 July 2002 Emergency Plan Implementing Procedure Revisions ML0220600572002-07-16016 July 2002 Emergency Plan Implementing Procedure Revisions ML0208006582002-03-0808 March 2002 Emergency Plan Implementing Procedure, Revision 13 to EPIP-OC-27, the Operations Support Center. ML0205901002002-02-14014 February 2002 Emergency Plan Implementing Procedure Revisions ML0201106382001-12-19019 December 2001 Emergency Plan Implementing Procedure Revisions ML0200202942001-11-12012 November 2001 Emergency Plan Implementing Procedure Revision ML0214004012001-10-25025 October 2001 Emergency Plan Implementing Procedures Revisions, Including Revision 25 to EPIP-OC-.06, Revision 25 to EPIP-OC-.25, and Revision 2 to EPIP-OC-.45 ML0119102262001-07-0505 July 2001 Emergency Prepardness Implementing Procedure ML0121202362001-06-25025 June 2001 EPIP Series - Emergency Plan Implementing Procedures, Personnel Accountability. ML0105700552001-02-15015 February 2001 4 to EPIP-OC-.06 Additional Assistance & Notification ML0037112722000-04-27027 April 2000 Revised Epips,Including Revision 9 to 2000-EMG-3200.01A, RPV Control - No ATWS, Revision 9 to 2000-EMG-3200-01B, RPV Control - with ATWS, Revision 15 to 2000-EMG-3200.02, Primary Containment Control, Revision 8 to 2000-EMG-3200.10, ML0037438492000-01-19019 January 2000 5 for EPIP-OC-.03, Emergency Notification for Oyster Creek ML0037438652000-01-13013 January 2000 2 to EPIP-OC-.25, Emergency Operations Facility (EOF) for Oyster Creek ML0036771252000-01-0404 January 2000 Docket No.50-219 Emergency Plan Implementing Procedure Revisions,Including Revision 9 to EPIP-OC-10,Emergency Radiological Surveys Onsite & Revision 14 to EPIP-OC-11,Emergency Radiological Surveys ML9934701391999-12-0303 December 1999 Emergency Plan Implementing Procedure Revisions ML9932404841999-11-10010 November 1999 Revised Epips, Including Revision 8 to EPIP-OC-.10, Emergency Radiological Surveys Onsite and Revision 20 to EPIP-OC-.26, the Technical Support Center. with 11/10/99 Letter 2018-02-14
[Table view] |
Text
A rnerGen An Exelon Company Telephone No. (609) 971- 4652 RM Dept.
DOCUMENT TRANSMITTAL April 5, 2004 To:
PETER S TAM-USNRC SR. PROJECT MANAGER COPY SERIAL #72 WASHINGTON DC 20555 ,
PLEASE NOTE: IT IS IMPERATIVE THAT YOU NOTIFY RM OF ADDRESS CHANGES!!
FILE INSTRUCTIONS: DESTROY OUTDATED:
2000-EMG-3200.12 REV 5 2000-EMG-3200.12 REV 4l FAILURE TO COMPLY WITH REQUIRED ACTION, WITHIN TWO (2) WORKING DAYS OF THIS REQUEST, COULD RESULT IN A CAP.
REQUIRED ACTION: 1. ADD REVISION TO YOUR CONTROLLED COPIES.
- 2. DESTROY OUTDATED MATERIAL.
- 3. RETURN TRANSMITTAL SIGNED AND DATED.
SIGN AND RETURN TO: RECORDS MANAGEMENT, OCAB-1 NAME: DATE: l YOUR SIGNATURE ON THIS FORM INDICATES THAT YOU HAVE FILED THE CURRENT REVISION. THIS SIGNED FORM CAN BE USED FOR AUDITING PURPOSES.
AG5942 (08/02)
-f' 04S
\
I-I. ArerGe OYSTER CREEK NUCLEAR GENERATING Number An Exelon Compa STATION PROCEDURE EMG-3200.12 Tit
_ e _____ __-- _ Revision No._.__
RADIOACTIVITY RELEASE CONTROL 5 Applicability/Scope Usage Level Responsible Department EMERGENCY OPERATING PROCEDURE FOR OYSTER CREEK 1 OPERATIONS Effective Date I
Prior Revision 4 incorporated the This Revision 5 incorporates the following Temporary Changes: following Temporary Changes:
N/A N/A LIST OF PAGES (all pgs. rev'd to Rev. 5) 1.0 to 2.0 E1-1 E2-1 to E2-2 OYSTER CREEK CONTROLLED DISTRIBUTION47S)
DOCUMENT SERIAL NUMBER9..... .L IR MNC Signature l_Concurring Organization Element Date Originator /s/ EOP COORDINATOR 3/16/04 Concurred By /s/ EOP COMMITTEE 3/16/04 Isl DIRECTOR ENGINEERING 3/20/04 Approved B /s/ PLANT OPERATIONS DIRECTOR 3/22/04 Approved By /s/ PLANT MANAGER 3/24/04 I (320012) 1. 0
- 1 ^ OYSTER CREEK NUCLEAR GENERATING l Number STATION PROCEDURE EMG-3200.12
-Title - - Revision-No.------
RADIOACTIVITY RELEASE CONTROL 5 Applicability/Scope Usage Level Responsible Department EMERGENCY OPERATING PROCEDURE FOR OYSTER CREEK OPERATIONS Effect e,/jate I
Prior Revision 4 incorporated the This Revision -5 incorporates the following Temporary Changes: following Temporary Changes:
LIST OF PAGES (all pgs. rev'd to Rev. 5) 1.0 to 2.0 El-1 E2-1 Signature Concurring Organization Element Date Originator EOP COORDINATOR Concurred By EOP COMMITTEE DIRECTOR ENGINEERING 3____/t
____________ PLANT OPERATIONS DIRECTOR 104...
Approved By fA PLANT MANAGER I (32002) 1.
(320012) 1.0
a ' i M eurcy~
An Exelon
- .. E..,LL
.*L.* ."_L
.1r STATION PROCEDURE
.... .. -TT.- ~u-.'..--
ENIG-3200.12 Title - Revisibn-No; ---- ~~-~
K> RADIOACTIVITY RELEASE CONTROL 5 1.0 PURPOSE The purpose of the Radioactivity Release Control Procedure is to limit the radioactivity release into areas outside the Primary and Secondary Containments.
2.0 REFERENCES
2.1_ Procedures -- - -. -<
- AD-OC-103, EOP-SAM Program Control
- 329, Turbine Bldg. Heating and Ventilation System 2.2 - 2000-GLN-3200.01, OC Plant Specific Technical Guidelines 2.3 - 2000-STD-1218.04, EOP Writer's Guide 3.0 ATTACHMENTS 3.1 Attachment A - Secondary Containment and Radioactivity Release Control EOP Flowchart K> EMG-3200.11 & EMG-3200.12 Rev. 5 3.2 Attachment B - Support Procedure 51, Turbine Building Ventilation Restart (320012) 2.0
A ---
irmervwen _
A ,A IsTA TO P RO U STATION PROCEDURE
.. . .E. ..
EMG-3200.12 An Exelon Company
-Title Reirisi5No.--
RADIOACTIVITY RELEASE CONTROL 5 ATTACHMENT A Attachment A to EMG-3200.12, Radioactivity Release Control, is the Secondary Containment and Radioactivity Release Control EOP Flowchart, EMG-3200.11 & EMG-3200.12 Rev. 5. I I
I, I
(320012/S3) E1-1
Procedure EMG-3200.12 Support Proc - 51 Rev. 5
_ _ Attachment B_
Page I of 2 SUPPORT PROCEDURE 51 TURBINE BUILDING VENTILATION RESTART 1.0 PREREQUISITES Operation of Turbine Building Ventilation has been directed by the Emergency Operating Procedures.
2.0 PREPARATION None. -- -- --- ---
3.0 PROCEDURE 3.1 Confirm TB Operating Floor Exhaust Fan EF 1-33 secured (Panel 11R).
3.2 IF Turbine Building Ventilation is shutdown, THEN complete the following:
- 1. Reset the Turbine Bldg. Ventilation System by K) momentarily depressing the system RESET pushbutton (Panel liR). l
- 2. IF Exhaust Fan EF 1-7 was previously running, THEN start Exhaust Fan EF 1-7 by placing its controlswitch to START position (Panel llR). l
- 3. IF Exhaust Fan EF 1-6 was previously running,
.THEN start Exhaust Fan EF 1-6 by placing its control switch to START position (Panel llR). l
- 4. Select and start either Supply Fan SF 1-1 or SF 1-2 by placing its control switch in the ON position (Panel 1iR).
- 5. Select and start either Supply Fan SF 1-3 or SF 1-4 by placing its control switch in the ON position (Panel llR).
OVER Procedure EMG-3200.12 (320012/S4) E2- I
I Support Proc - 51 Rev. 5 Attachment B
-Page -of -2 -- -- -.-
i
- 6. Select and start either Supply Fan SF 1-5 or SF 1-6 by placing its control switch in the ON position (Panel lIR).
- 7. Verify Exhaust Fan EF 1-4 automatically starts.
- 8. Confirm Feed and Condensate Pump Room Supply Fan SF 1-7 and Exhaust Fan EF 1-1 operating (Panel IlR).