Category:Letter
MONTHYEARIR 05000302/20240012024-09-23023 September 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 ML24054A0612024-04-0202 April 2024 Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson ML24054A0582024-04-0202 April 2024 Achp S106 Initiation Crystal River Unit 3 - Letter 1 ML24079A2472024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Cypress, Talbert ML24079A2482024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Hill, David Hill ML24054A0812024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Osceola, Marcellus ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 ML24073A1922024-03-11011 March 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24054A6452024-02-29029 February 2024 Letter - Reply to Request for RAI Extension Related to the Crystal River License Termination Plan ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23342A0942024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commissions Analysis of ADP CR3, LLCs Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan 2024-09-23
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 ML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a ML20069A0262020-04-0101 April 2020 CR-3 License Transfer Enc 2 Att 1 FOL Amnd 258.doc ML20069A0252020-04-0101 April 2020 CR-3 License Transfer Enc 2 Amendment ML19129A1412019-05-15015 May 2019 Corrected Page for Amendment No. 257 to License No. DPR-072 for Duke Energy Florida, Inc ML19080A1872019-05-0303 May 2019 Enclosure 1 Amendment No. 257 to License No. DPR-72 Duke Energy Florida, Inc., Crystal River, Unit 3, Docket No. 50-302 ML18017A9882018-02-14014 February 2018 Amendment No. 256 to License No. DPR-72 Duke Energy Florida, LLC Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 ML17027A1612017-06-27027 June 2017 Enclosure 1, Amendment to Crystal River License No. DPR-72 ML17027A1632017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Table of Contents ML17027A1642017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Section 4.0 ML17027A1652017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254 Section 5.0 ML17027A1602017-06-27027 June 2017 Ltr to T. Hobbs re: Crystal River Unit 3 Nuclear Generating Plant - Amendment to Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pools ML17027A1622017-06-27027 June 2017 Facility Operating License Pages ML17096A2812017-06-22022 June 2017 Amendment to License No. DPR-72 Duke Energy Florida, LLC Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 ML17096A2822017-06-22022 June 2017 FOL Amnd 254 ML17048A4782017-03-22022 March 2017 Amendment to License No. DPR-72 for ISFSI Emergency Plan and EAL Bases Manual ML16244A1012016-12-0505 December 2016 Amendment Approving ISFSI Emergency Plan ML16293A2002016-11-30030 November 2016 Operating License Amendment 251 Changed Pages ML16173A0232016-08-10010 August 2016 Revised License Pages for License Transfer, Crystal River Unit 3 ML16173A0212016-08-10010 August 2016 Conforming Amendment for License Transfer, Crystal River Unit 3 ML15261A4522015-11-27027 November 2015 Nuclear Generating Plant - Issuance of Amendment No. 249 Regarding Technical Specification Change of Management Titles to General Manager Decommissioning ML15224B2862015-09-0404 September 2015 Nuclear Generating Plant - Issuance of Amendment for Operating License and Technical Specification Based on Permanently Shutdown and Defueled Status ML15121A5702015-05-29029 May 2015 Letter, Safety Evaluation for Order Approving Transfer of Licenses and Conforming Amendments ML15027A2092015-03-31031 March 2015 Issuance of Amendment Regarding Changes to the Emergency Plan and Emergency Action Levels ML14318A9292014-12-19019 December 2014 H. B. Robinson; Shearon Harris Nuclear Power Plant; and Crystal River, Unit 3 - Issuance of License Amendments Regarding Revision to Cyber Security Plan Implementation Schedule Completion Date (TAC Nos. MF3263 - MF3267) ML14097A1452014-07-11011 July 2014 Nuclear Generating Plant - Issuance of Amendment No. 244, Revise Technical Specifications to Remove Certain Requirements from Section 5, Administrative Controls ML13158A2772013-10-18018 October 2013 Issuance of Amendment Regarding the Request to Change the Licensee'S Name ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security ML12136A3922012-06-26026 June 2012 Issuance of Amendment Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments ML12081A2792012-03-19019 March 2012 License Amendment Request #312, Revision 0, Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Implementation Schedule Change Request ML11292A0412012-02-24024 February 2012 Nuclear Generating Plant - Issuance of Amendment 240 Regarding Improved Technical Specifications 3.7.19 Diesel Drive Emergency Feedwater Pump Fuel Oil, Lube Oil, and Starting Air ML11321A1652011-12-27027 December 2011 Nuclear Generating Plant - Issuance of Amendment 239 Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments ML11193A0282011-07-29029 July 2011 Issuance of Amendments Approval of Cyber Security Plan ML0911000562009-05-29029 May 2009 License Amendment, Issuance of Amendment Regarding the Revision of the Steam Generator Portion of the Technical Specifications to Replacement of the Steam Generators ML0834704912009-01-0909 January 2009 Issuance of Amendment Regarding Revisions to Improved Technical Specification Surveillance Requirement 3.7.5.2, Emergency Feedwater System ML0820200062008-07-30030 July 2008 Issuance of Amendment 230 Regarding Control Room Envelope Habitability in Accordance with TSTF-448 ML0801403722008-01-14014 January 2008 Cyrstal River Unit 3 - Administrative Correction to Amendment Steam Generator Reporting Requirements (Tac. MD7453) ML0729103172007-10-25025 October 2007 License Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool ML0725501372007-10-24024 October 2007 Issuance of Amendment Regarding Spent Fuel Pool Missile Shields ML0728508942007-10-23023 October 2007 License Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System ML0723400102007-08-23023 August 2007 Revised Pages of Facility Operating License DPR-72 B.5.b ML0715004662007-06-15015 June 2007 License Amendment, Issuance of Amendment to Adopt TSTF-372 ML0713401122007-05-16016 May 2007 Issuance of License Amendment 223 Regarding Steam Generator Tube Inspection Program ML0709401402007-03-27027 March 2007 Administrative Amendment for EA-06-037 ML0529401792005-10-31031 October 2005 License Amendment, Probabilistic Methodology for Tube End Crack Alternate Repair Criteria, TAC No. MC5813 ML0525900462005-09-15015 September 2005 License Amendment, Temporary Extension of the Nuclear Services Seawater System Train Completion Time ML0522101892005-09-0606 September 2005 License Amendment No. 220 Regarding Removal of Obsolete Footnotes from the Technical Specifications ML0517103812005-08-0404 August 2005 License Amendment, Reactor Building Spray Nozzle Surveillance Requirement ML0518903482005-07-27027 July 2005 Amendment 218, Surveillance Requirements for RCP Flywheel Inspection ML0511104972005-04-19019 April 2005 Amendment 217, TS Revision to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Reports Requirements 2021-11-24
[Table view] Category:Safety Evaluation
MONTHYEARML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a ML21159A0422021-06-28028 June 2021 VY and CR Indirect License Transfer Package ML20101G5832020-04-10010 April 2020 CR-3 License Transfer SE Corrected ML20101G5822020-04-10010 April 2020 CR-3 License Transfer SE Corrected Cover Letter ML20069A0272020-04-0101 April 2020 CR-3 License Transfer Enc 3 SE ML20009D0432020-01-10010 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Corrected Safety Evaluation for Approval of Partial Site Release for Facility Operating License No. DPR-72 ML20009D2502020-01-10010 January 2020 SER Crystal River Unit 3 Nuclear Generating Plant - Corrected Safety Evaluation for Approval of Partial Site Release for Facility ML19339G5092020-01-0202 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19080A1892019-05-0303 May 2019 Rev 1 Safety Evaluation ML17027A1672017-06-27027 June 2017 Safety Evaluation ML17096A2832017-06-22022 June 2017 Non-Sensitive Safety Evaluation by the Office of Nuclear Material Safety and Safeguards for Crystal River Unit 3 ML17048A4832017-03-22022 March 2017 Safety Evaluation for CR-3 ISFSI Emergency Plan and EAL Bases Manual ML16244A1032016-12-0505 December 2016 Safety Evaluation for Crystal River Unit 3 ISFSI Emergency Plan ML16201A1352016-08-12012 August 2016 Safety Evaluation Input for Independent Spent Fuel Storage Installation Only Emergency Plan ML16173A0222016-08-10010 August 2016 Safety Evaluation for License Transfer, Crystal River Unit 3, from Seminole Electric Corp., Inc. to Duke Energy Florida, Inc ML15261A4522015-11-27027 November 2015 Nuclear Generating Plant - Issuance of Amendment No. 249 Regarding Technical Specification Change of Management Titles to General Manager Decommissioning ML15224B2862015-09-0404 September 2015 Nuclear Generating Plant - Issuance of Amendment for Operating License and Technical Specification Based on Permanently Shutdown and Defueled Status ML15121A5702015-05-29029 May 2015 Letter, Safety Evaluation for Order Approving Transfer of Licenses and Conforming Amendments ML15110A1292015-04-22022 April 2015 Correction to the Emergency Planning Exemptions Safety Evaluation ML15027A2092015-03-31031 March 2015 Issuance of Amendment Regarding Changes to the Emergency Plan and Emergency Action Levels ML15058A9062015-03-30030 March 2015 Letter, Exemptions from Certain Emergency Planning Requirements and Related Safety Evaluation ML14344A4082014-12-19019 December 2014 Nuclear Generating Plant - Review of Spent Fuel Management Program and the Preliminary Decommissioning Cost Estimate ML14318A9292014-12-19019 December 2014 H. B. Robinson; Shearon Harris Nuclear Power Plant; and Crystal River, Unit 3 - Issuance of License Amendments Regarding Revision to Cyber Security Plan Implementation Schedule Completion Date (TAC Nos. MF3263 - MF3267) ML14097A1452014-07-11011 July 2014 Nuclear Generating Plant - Issuance of Amendment No. 244, Revise Technical Specifications to Remove Certain Requirements from Section 5, Administrative Controls ML14155A1812014-06-26026 June 2014 Review of Certified Fuel Handler Training and Retraining Program ML13158A2772013-10-18018 October 2013 Issuance of Amendment Regarding the Request to Change the Licensee'S Name ML13121A1092013-05-0909 May 2013 Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security ML12249A2362012-10-11011 October 2012 Nuclear Generating Plant - Relief Request #11-001-MX Related to Suspension of Concrete Containment Examination for the Fourth-10-Year Interval of the Inservice Inspection Program ML12136A3922012-06-26026 June 2012 Issuance of Amendment Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments ML11292A0412012-02-24024 February 2012 Nuclear Generating Plant - Issuance of Amendment 240 Regarding Improved Technical Specifications 3.7.19 Diesel Drive Emergency Feedwater Pump Fuel Oil, Lube Oil, and Starting Air ML11321A1652011-12-27027 December 2011 Nuclear Generating Plant - Issuance of Amendment 239 Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments ML11255A0552011-12-0202 December 2011 Transmittal Letter - Order Approving Indirect License Transfer ML11193A0282011-07-29029 July 2011 Issuance of Amendments Approval of Cyber Security Plan ML1006400842010-03-19019 March 2010 Relief Requests 09 001 II, 09 002 II, and 09 003 II, Third 10-year Interval Inservice Inspection Program Plan. ML0911000562009-05-29029 May 2009 License Amendment, Issuance of Amendment Regarding the Revision of the Steam Generator Portion of the Technical Specifications to Replacement of the Steam Generators ML0834704912009-01-0909 January 2009 Issuance of Amendment Regarding Revisions to Improved Technical Specification Surveillance Requirement 3.7.5.2, Emergency Feedwater System ML0822103922008-09-0909 September 2008 Request for Relief No. 07-001-SS Regarding the Fourth 10-Year Interval Inservice Inspection Visual Examination of the Reactor Vessel Support Skirt ML0817502522008-07-31031 July 2008 Relief Request No. 07-00-001- Pt Fourth Ten-Year Interval Inservice Inspection on System Pressure Test Boundary Tac MD7738) ML0820200062008-07-30030 July 2008 Issuance of Amendment 230 Regarding Control Room Envelope Habitability in Accordance with TSTF-448 ML0812604712008-05-22022 May 2008 Relief Request #08-001-RR, Revision 1, to Install a Weld Overlay on the Dissimilar Metal Weld in the Decay Heat Drop Line ML0730301322007-11-15015 November 2007 Relief Request #07-003-RR Regarding Structural Weld Overlays ML0729103172007-10-25025 October 2007 License Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool ML0725501372007-10-24024 October 2007 Issuance of Amendment Regarding Spent Fuel Pool Missile Shields ML0728508942007-10-23023 October 2007 License Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System ML0722600082007-08-23023 August 2007 Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4524) ML0715004662007-06-15015 June 2007 License Amendment, Issuance of Amendment to Adopt TSTF-372 ML0713401122007-05-16016 May 2007 Issuance of License Amendment 223 Regarding Steam Generator Tube Inspection Program ML0709505032007-04-27027 April 2007 Evaluation of 2005 Steam Generator Tube Inspections at Crystal River Unit 3 ML0622005742006-10-19019 October 2006 Authorization for Use of Delta Protection Mururoa Single-Use, Supplied-Air Suits, Models V4 F1 and V4 Mth 2 2021-06-28
[Table view] |
Text
January 29, 2002 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
CRYSTAL RIVER UNIT 3 - ISSUANCE OF AMENDMENT TO REVISE THE EMERGENCY DIESEL GENERATOR LOSS OF POWER START LIMITING CONDITION FOR OPERATION (TAC NO. MB1222)
Dear Mr. Young:
The Commission has issued the enclosed Amendment No. 202 to Facility Operating License No. DPR-72 for the Crystal River Unit 3. The amendment consists of changes to the existing Improved Technical Specification 3.3.8, Emergency Diesel Generator (EDG) Loss of Power Start (LOPS), in response to your letter dated February 21, 2001, as supplemented April 26, 2001. The amendment revises the actions to be taken in the event that one or more channels of the loss of voltage or degraded voltage EDG start functions become inoperable.
A copy of the Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
John M. Goshen, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosures:
- 1. Amendment No. 202 to DPR-72
- 2. Safety Evaluation cc w/enclosures: See next page
Florida Power Corporation CRYSTAL RIVER UNIT NO. 3 GENERATING PLANT cc:
Mr. R. Alexander Glenn Chairman Associate General Counsel (MAC-BT15A) Board of County Commissioners Florida Power Corporation Citrus County P.O. Box 14042 110 North Apopka Avenue St. Petersburg, Florida 33733-4042 Inverness, Florida 34450-4245 Mr. Daniel L. Roderick Ms. Sherry L. Bernhoft Plant General Manager Manager Regulatory Affairs Crystal River Nuclear Plant (NA2C) Crystal River Nuclear Plant (NA2H) 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Michael A. Schoppman Senior Resident Inspector Framatome ANP Crystal River Unit 3 1911 North Ft. Myer Drive, Suite 705 U.S. Nuclear Regulatory Commission Rosslyn, Virginia 22209 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. William A. Passetti, Chief Department of Health Mr. Richard L. Warden Bureau of Radiation Control Manager Nuclear Assessment 2020 Capital Circle, SE, Bin #C21 Crystal River Nuclear Plant (NA2C)
Tallahassee, Florida 32399-1741 15760 W. Power Line Street Crystal River, Florida 34428-6708 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100
January 29, 2002 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
CRYSTAL RIVER UNIT 3 - ISSUANCE OF AMENDMENT TO REVISE THE EMERGENCY DIESEL GENERATOR LOSS OF POWER START LIMITING CONDITION FOR OPERATION (TAC NO. MB1222)
Dear Mr. Young:
The Commission has issued the enclosed Amendment No. 202 to Facility Operating License No. DPR-72 for the Crystal River Unit 3. The amendment consists of changes to the existing Improved Technical Specification 3.3.8, Emergency Diesel Generator (EDG) Loss of Power Start (LOPS), in response to your letter dated February 21, 2001, as supplemented April 26, 2001. The amendment revises the actions to be taken in the event that one or more channels of the loss of voltage or degraded voltage EDG start functions become inoperable.
A copy of the Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
John M. Goshen, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosures:
- 1. Amendment No. 202 to DPR-72
- 2. Safety Evaluation cc w/enclosures: See next page DISTRIBUTION: WBeckner (e-mail)
PUBLIC CSchulten (e-mail)
PDII-2 Reading RidsRgn2MailCenter (LWert)
RidsNrrDlpmLpdii2 (RCorreia) BClayton (Hardcopy)
RidsNrrPmJGoshen RidsOgcRp RidsAcrsAcnwMailCenter GHill (2 Hard Copies)
RidsNrrDlpmLpdii (HBerkow) JLazevnick(e-mail)
ADAMS ACCESSION NO. ML020300321 OFFICE PDII-2/PM PDII-2/LA OGC PDII-2/SC NAME JGoshen BClayton DCummings RCorreia DATE 01/02/02 01/02/02 01/18/02 01/22/02 OFFICIAL RECORD COPY
FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURG CITY OF NEW SMYRNA BEACH AND UTILITIES COMMISSION, CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO SEMINOLE ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 202 License No. DPR-72
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Florida Power Corporation, et al. (the licensees) dated February 21, 2001, as supplemented April 26, 2001, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 202, are hereby incorporated in the license. Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Richard P. Correia, Chief, Section 2 Project Directorate II Division of Project Licensing Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: January 29, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 202 FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following pages of the Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
Remove Insert 3.3-20 3.3-20 3.3-21 3.3-21 B3.3-69 B3.3-69 B3.3-70 B3.3-70 B3.3-71 B3.3-71
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 202 TO FACILITY OPERATING LICENSE NO. DPR-72 FLORIDA POWER CORPORATION, ET AL.
CRYSTAL RIVER UNIT NO. 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302
1.0 INTRODUCTION
By letter dated February 21, as supplemented April 26, 2001, Florida Power Corporation (FPC) submitted License Amendment Request (LAR) Number 265, Revision 0 for the Crystal River Unit 3 (CR-3) Facility Operating License No. DPR-72. The LAR proposed changes to the CR-3 Improved Technical Specifications (ITS) 3.3.8, Emergency Diesel Generator (EDG) Loss of Power Start (LOPS). The proposed changes are intended to ensure that actions appropriate to the CR-3-specific LOPS circuits are taken in the event that one or more channels of loss of voltage or degraded voltage EDG start functions become inoperable. The additional information provided by FPC in the letter dated April 26, 2001, did not change the initial proposed no significant safety hazards consideration determination.
2.0 BACKGROUND
The CR-3 ITS 3.3.8 specifies the required actions to be taken in the event one or more channels of the loss of voltage function or the degraded voltage function of the EDG LOPS instrumentation become inoperable. At CR-3 the loss of voltage function is performed by first level undervoltage relays (FLURs). The degraded voltage function is performed by second level undervoltage relays (SLURs). The FLURs and the SLURS sense the voltage of the engineered safeguards (ES) 4160 volt buses. The intent is that the FLURs will detect a complete loss of voltage on the ES buses and the SLURs will detect a low (degraded) voltage on the ES buses.
Each channel of the loss of voltage function consists of a FLUR and an associated auxiliary relay. An ES bus loss of voltage condition detected by a FLUR will actuate its associated auxiliary relay after a 7.8-second time delay, thereby, actuating that loss of voltage channel.
There are a total of three loss of voltage channels on each ES bus combined into two-out-of-three logic that, when actuated, send a command to start the associated EDG, open the ES bus feeder and load breakers (except for running Block 1 loads), and start a 3-second timer for EDG breaker closure. In the event an engineered safeguards actuation system (ESAS) actuation occurs coincident with actuation of the loss of voltage function, the FLURs also provide an input to block the loading of the safety equipment onto the associated EDG (with the exception of Block 1 loads) until the loss of voltage condition clears (two-out-of-three FLURs reset).
ENCLOSURE
Each ES 4160 volt bus is also provided with three degraded voltage channels. Each degraded voltage channel consists of an SLUR and an associated time delay relay. A degraded voltage condition (ES bus voltage less than setpoint for 5 seconds) detected by three-out-of-three SLURs will send a start command to the associated EDG. If the degraded voltage condition persists for an additional 13 seconds, the affected bus ES bus feeder and load breakers will be opened (except for running Block 1 loads) and a 3-second timer for EDG breaker closure will start. There is no blocking of safety equipment loading on coincident ESAS and degraded voltage (SLUR) actuations comparable to that which occurs in the loss of voltage (FLUR) design.
Guidance for this Limiting Condition for Operation (LCO) is provided in NUREG 1430 (Standard Technical Specifications: Babcock and Wilcox Plants).
3.0 EVALUATION FPC states that, in implementing the guidance for the EDG LOPS instrumentation provided in NUREG-1430 (Standard Technical Specifications: Babcock and Wilcox Plants), they did not fully consider the CR-3 specific configuration of the loss of voltage and degraded voltage actuation logic, or the interaction of the FLURs with the ESAS automatic actuation logic.
If one channel of the loss of voltage function should become inoperable, CR-3 ITS 3.3.8 currently requires that the channel (the FLUR) be placed in trip. While this action satisfies the requirements of ITS 3.3.8, it renders the ESAS function of the loss of voltage instrumentation inoperable. FPC explains in its February 21, 2001, letter that placing a FLUR in a tripped condition would result in a loss of redundancy for the associated channel of ESAS actuation logic; and entry into CR-3 ITS 3.3.7, ESAS Automatic Actuation Logic, Condition A would be required. The reason for the loss of redundancy in the ESAS function is that the two-out-of-three FLURS that must reset in order to unblock the loading of safety equipment onto the EDG, revert to two-out-of-two when one FLUR is permanently tripped. FPC states in its April 26, 2001, letter that the ESAS specification requires all three of the logic channels to be operable.
Another problem with the current version of CR-3 ITS 3.3.8 is that the specification treats the loss of voltage function and the degraded voltage function identically. The loss of voltage actuation logic, however, is two-out-of-three and the degraded voltage actuation logic is three-out-of-three. It is, therefore, not correct to treat both functions in an identical fashion.
FPCs solution to this CR-3-specific dilemma is to create requirements in CR-3 ITS 3.3.8 that are different for the loss of voltage function than they are for the degraded voltage function.
Action A in the proposed specification requires that, when one channel of loss of voltage per EDG is inoperable, the channel must be restored to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This would replace the current requirement to place the loss of voltage channel in trip within one hour, necessitating entry into LCO 3.3.7. If the 72-hour Completion Time of Action A is not met, Action D in the proposed specification requires that the plant begin to shut down. The 72-hours completion time allowed by Action A is consistent with other technical specification completion times involving a loss of redundancy.
When one or two channels of the degraded voltage function per EDG are inoperable, Action B in the proposed specification requires that the channel(s) be placed in trip within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. If the 1-hour completion time is not met, Action E in the proposed specification requires that the EDG
specification immediately be entered for the EDG made inoperable by the EDG LOPS instrumentation. These actions and completion times are appropriate for this condition since inoperability of one or two channels of the three-out-of-three degraded voltage logic represents a loss of function. Tripping the affected channel(s) restores the function (logic reverts to two-out-of-two or one-out-of-one). Unlike the loss of voltage function, the degraded voltage function does not interface with the ESAS automatic actuation logic. Therefore, tripping a degraded voltage channel will not affect the operability of the ESAS logic.
Action C of the revised specification requires that, when two or more channels of the loss of voltage function or three channels of the degraded function per EDG are inoperable, the EDG specification immediately be entered for the EDG made inoperable by the EDG LOPS instrumentation. Under this condition, which represents a loss of function, tripping of the inoperable channels is not an option since doing so would result in an EDG actuation.
4.0 STATE CONSULTATION
Based upon a letter dated March 8, 1991, from Mary E. Clark of the State of Florida, Department of Health and Rehabilitative Services, to Deborah A. Miller, Licensing Assistant, U.S. Nuclear Regulatory Commission, the State of Florida does not desire notification of issuance of license amendments.
5.0 ENVIRONMENTAL CONSIDERATION
S The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (66 FR 15925), dated March 21, 2001. Accordingly, these amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of these amendments.
6.0 CONCLUSION
The staff finds that the changes proposed by FPC satisfactorily resolve the conflict between ITS 3.3.8 and ITS 3.3.7. The changes proposed by FPC also correctly tailor the requirements to the specific actuation logic for the loss of voltage function and the degraded voltage function.
The required actions and their associated completion times are generally consistent with other comparable technical specification requirements and NUREG 1470. The staff finds these changes acceptable.
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of these amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: James Lazevnick, Carl Schulten, NRR Date: January 29, 2002