ML072340010

From kanterella
Jump to navigation Jump to search

Revised Pages of Facility Operating License DPR-72 B.5.b
ML072340010
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/23/2007
From: Stewart Bailey
NRC/NRR/ADRO/DORL/LPLII-2
To:
Bailey, S N, NRR/ADRO/DORL/LPL II-2
Shared Package
ML072260007 List:
References
TAC MD4524
Download: ML072340010 (2)


Text

ENCLOSURE 1 REVISED PAGE OF FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT Replace the following page of the Facility Operating License. The revised page is identified by the date of the letter issuing the page and contains a marginal line indicating the area of change.

REMOVE INSERT Page 5c Page 5c

- 5c -

2.C.(14) Mitigation Strategy License Condition The licensee shall develop and maintain strategies for addressing large fires and explosions and that include the following key areas:

(1) Fire fighting response strategy with the following elements:

a. Pre-defined coordinated fire response strategy and guidance
b. Assessment of mutual aid fire fighting assets
c. Designated staging areas for equipment and materials
d. Command and control
e. Training of response personnel (2) Operations to mitigate fuel damage considering the following:
a. Protection and use of personnel assets
b. Communications
c. Minimizing fire spread
d. Procedures for implementing integrated fire response strategy
e. Identification of readily-available pre-staged equipment
f. Training on integrated fire response strategy
g. Spent fuel pool mitigation measures (3) Actions to minimize release to include consideration of:
a. Water spray scrubbing
b. Dose to onsite responders 2.D Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Physical Security Plan, Revision 5," and "Safeguards Contingency Plan, Revision 4," submitted by letter dated May 16, 2006, and "Guard Training and Qualification Plan, Revision 0," submitted by letter dated September 30, 2004, as supplemented by letter dated October 20, 2004, and September 29, 2005.

Amendment No. 164, 212 Revised by letter dated March 27, 2007 Revised by letter dated August 23, 2007