ML17027A161
| ML17027A161 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/27/2017 |
| From: | John Hickman Reactor Decommissioning Branch |
| To: | Hobbs T Duke Energy Florida |
| John Hickman NMSS/DUWP/RDB 301-415-3017 | |
| Shared Package | |
| ML17027A159 | List: |
| References | |
| TAC L53146 | |
| Download: ML17027A161 (5) | |
Text
ENCLOSURE 1 AMENDMENT NO. 255 TO LICENSE NO. DPR-72 DUKE ENERGY FLORIDA, LLC CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302
DUKE ENERGY FLORIDA, LLC DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 255 License No. DPR-72
- 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the Crystal River Unit 3 Nuclear Generating Plant (the facility) Facility Operating License No. DPR-72 filed by Duke Energy Florida, LLC, (the licensee), dated August 31, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is hereby amended as indicated in the attachment to this license amendment, and Facility Operating License No. DPR-72 is hereby amended to read as follows.
Paragraph 1.E. of Facility Operating License No. DPR-72 is hereby amended to read:
Duke Energy Florida, LLC is technically qualified and financially qualified to engage in the activities authorized by this operating license in accordance with the rules and regulations of the Commission;
Paragraph 2.A. of Facility Operating License No. DPR-72 is hereby amended to read:
This amended license applies to the Crystal River Unit 3 Nuclear Generating Plant, a pressurized water nuclear reactor and associated equipment (the facility), owned by Duke Energy Florida, LLC. The facility is located on the Gulf of Mexico, about seven and one-half miles northwest of the town of Crystal River, Citrus County, Florida, and is described in the Final Safety Analysis Report as supplemented and amended and the Environmental Report as supplemented and amended.
Paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read:
Technical Specifications The Technical Specifications contained in Appendix A are hereby replaced with the Permanently Defueled Technical Specifications (PDTS). Duke Energy Florida, LLC shall maintain the facility in accordance with the Permanently Defueled Technical Specifications, as revised through Amendment No. 253.
Paragraph 2.C.(14) of Facility Operating License No. DPR-72 is hereby amended to read:
Deleted per Amendment No. 253 Paragraph 2.G. of Facility Operating License No. DPR-72 is hereby amended to read:
This amended license is effective as of the date of issuance. Facility Operating License No. DPR-72, as amended, shall expire at midnight, December 3, 2016.
Duke Energy Florida, LLC submitted the 10 CFR 50.82(a)(1) notification to the Nuclear Regulatory Commission on February 20, 2013. Per 10 CFR 50.51(b), the Facility Operating License No DPR-72 continues in effect until the Commission notifies the licensee that the License has been terminated.
- 3.
This license amendment is effective as of the date Duke Energy Florida, LLC submits written notifications that all spent fuel has been transferred from the spent fuel pool to the ISFSI, and shall be implemented within 60 days. Implementation of the amendment shall also include revision of the facility's Quality Assurance Program Description and Compliance Procedure CP-0500, SPECIAL ACTIONS AND REPORTING REQUIREMENTS to incorporate the commitment contained in the licensee's application dated August 31, 2016.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Bruce A. Watson, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs, Office of Nuclear Material Safety and Safeguards.
Attachment:
Changes to the Facility Operating License and Technical Specifications Date of Issuance:
ATTACHMENT TO LICENSE AMENDMENT NO.255 FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the pages of Facility Operating License DPR-72 and Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Operating License No. DPR-72 Remove Insert 1
1 2
2 3
3 4
4 Technical Specifications Remove Insert All pages i
ii 4.0-1 5.0-1 5.0-2